in Re: McBride Operating, LLC
Date Filed2022-12-09
Docket12-22-00279-CV
Cited0 times
StatusPublished
Full Opinion (html_with_citations)
NO. 12-22-00279-CV
IN THE COURT OF APPEALS
TWELFTH COURT OF APPEALS DISTRICT
TYLER, TEXAS
IN RE: §
MCBRIDE OPERATING, LLC, § ORIGINAL PROCEEDING
RELATOR §
MEMORANDUM OPINION
McBride Operating, LLC filed this original proceeding to challenge Respondentâs denial
of its Rule 91a motion to dismiss.1 We conditionally grant the writ.
BACKGROUND
In September 2021, Real Parties in Interest Terry Allen, Jan Allen, and Cypress Creek
Farms, LLC (collectively RPIs) sued McBride, Ronald Samford, Sammy Samford, and Vicky
Rankin, alleging that the Samfords and Rankin sold property to McBride when they had
promised to sell the property to the RPIs. 2 They further alleged that McBride filed an application
to operate a commercial waste disposal facility and associated pits with the Texas Railroad
Commission (the Commission or RRC), which administratively denied the application. They
asserted causes of action for breach of contract, fraud, promissory estoppel, and partial/specific
performance against Rankin and the Samfords, and sought a temporary restraining order,
temporary injunction, and permanent injunction against McBride. On October 8, 2021,
Respondent signed a temporary injunction, which enjoined McBride from:
A. Performing any operations in furtherance of the requested permit filed with the Railroad
Commission of Texas by the McBride Defendant and enjoining the McBride Defendant, along
1
Respondent is the Honorable James A. Payne, Jr., Judge of the 273rd District Court in Shelby County,
Texas.
2
The Samfords and Rankin are not parties to this original proceeding.
with any of their officers, agents, servants, employees, and attorneys, and upon those persons in
active concert or participation with them who receive actual notice of the order by personal service
or otherwise on the property identified as the 92.9085 acre tract of land sold from the Samford
Defendants to the McBride Defendant including any operations that would be allowed if the
permit filed with the Texas Railroad Commission is issued.
B. Actively changing the original contours of the land on the property identified as the 92.9085
acre tract of land in order to prepare the location for any planned oil and gas disposal activities
until further order of the Court.
C. From removing any top soil from the original contours of the land on the property identified as
the 92.9085 acre tract of land in order to prepare the location for any planned oil and gas disposal
activities until further order of the Court.
D. From transferring, selling or converting the property identified as the 92.9085 acre tract to any
third party by the McBride Defendant.
On June 17, 2022, the RPIs filed a first amended petition, in which they sought a
temporary and permanent injunction and asserted a violation of the Texas Natural Resources
Code against McBride. The amended petition no longer alleged causes of action against the
Samfords or Rankin. McBride filed its Rule 91a motion to dismiss and to dissolve the temporary
injunction on July 19. After a hearing, Respondent denied the motion on August 18.
Respondentâs order does not identify the reason or reasons for denying the motion. This
proceeding followed. 3
PREREQUISITES TO MANDAMUS
Mandamus is an extraordinary remedy. In re Sw. Bell Tel. Co., L.P., 235 S.W.3d 619,
623(Tex. 2007) (orig. proceeding). A writ of mandamus will issue only when the relator has no adequate remedy by appeal and the trial court committed a clear abuse of discretion. In re Cerberus Capital Mgmt., L.P.,164 S.W.3d 379, 382
(Tex. 2005) (orig. proceeding). The relator has the burden of establishing both prerequisites. In re Fitzgerald,429 S.W.3d 886, 891
(Tex. App.âTyler 2014, orig. proceeding.). âMandamus relief is appropriate when the trial court abuses its discretion in denying a Rule 91a motion to dismiss.â In re Farmers Tex. Cty. Mut. Ins. Co.,621 S.W.3d 261
, 266 (Tex. 2021) (orig. proceeding).
3
McBride also has an appeal pending before this Court in cause number 12-22-00248-CV, which
challenges the August 18 denial of its Rule 91a motion to dismiss and motion to dissolve the temporary injunction.
2
ABUSE OF DISCRETION
McBride contends that Respondent abused his discretion when denying its Rule 91a
motion to dismiss because (1) Respondent lacks subject matter jurisdiction, as the only alleged
claim is not ripe as a matter of law and there is no legal injury; (2) the natural resources code
claim fails because McBride violated no statutes or rules; and (3) dismissal of the RPIsâ only
claim also necessitates dismissal of the injunctive relief claims.
Applicable Law
With certain exceptions inapplicable to this case, a âparty may move to dismiss a cause of
action on the grounds that it has no basis in law or fact.â TEX. R. CIV. P. 91a.1. âA cause of
action has no basis in law if the allegations, taken as true, together with inferences reasonably
drawn from them, do not entitle the claimant to the relief sought.â Id.âA cause of action has no basis in fact if no reasonable person could believe the facts pleaded.âId.
A Rule 91a motion
must be based solely on the pleading of the cause of action, together with any pleading exhibits
permitted by Rule 59. 4 TEX. R. CIV. P. 91a.6.
âWe review the merits of a Rule 91a ruling de novo; whether a defendant is entitled to
dismissal under the facts alleged is a legal question.â Farmers, 621 S.W.3d at 266. âWe
construe the pleadings liberally in favor of the plaintiff, look to the pleaderâs intent, and accept as
true the factual allegations in the pleadings to determine if the cause of action has a basis in law
or fact.â Malik v. Geico Advantage Ins. Co., Inc., No. 01-19-00489-CV, 2021 WL 1414275, at *4 (Tex. App.âHouston [1st Dist.] Apr. 15, 2021, pet. denied) (mem. op.). We apply the fair- notice pleading standard to determine whether a petitionâs allegations are sufficient to allege a cause of action. Koenig v. Blaylock,497 S.W.3d 595, 599
(Tex. App.âAustin 2016, pet.
denied).
Compliance with Rule 91a.3(a)
The RPIs contend that McBride filed an untimely motion to dismiss. Under Rule 91a, a
motion to dismiss must be âfiled within 60 days after the first pleading containing the challenged
cause of action is served on the movant[.]â TEX. R. CIV. P. 91a.3(a). â[A]lthough the procedural
4
See TEX. R. CIV. P. 59 (âNotes, accounts, bonds, mortgages, records, and all other written instruments,
constituting, in whole or in part, the claim sued on, or the matter set up in defense, may be made a part of the
pleadings by copies thereof, or the originals, being attached or filed and referred to as such, or by copying the same
in the body of the pleading in aid and explanation of the allegations in the petition or answer made in reference to
said instruments and shall be deemed a part thereof for all purposes. Such pleadings shall not be deemed defective
because of the lack of any allegations which can be supplied from said exhibit. No other instrument of writing shall
be made an exhibit in the pleading.).â
3
deadlines in Rule 91a.3 are phrased in terms of âmust,â these provisions are directory and not
mandatory.â Malik, 2021 WL 1414275, at *4; see Walker v. Owens,492 S.W.3d 787
, 790â91 (Tex. App.âHouston [1st Dist.] 2016, no pet.); see also Koenig,497 S.W.3d at 599
. Thus, âany noncompliance with the timing of the motion will not result in reversal if such error is harmless.â Malik,2021 WL 1414275
, at *4.
McBrideâs motion was not untimely. The RPIs filed their original petition on September
2, 2021, alleging breach of contract, fraud, promissory estoppel, and partial/specific performance
against Rankin and the Samfords and seeking injunctive relief against McBride. They filed their
amended petition on June 17, 2022, in which McBride was the only defendant. The amended
petition again sought injunctive relief but added a new claim under the Natural Resources Code,
including a request for injunctive relief and damages under the Code. See TEX. NAT. RES. CODE
ANN. § 85.321 (West 2011) (suit for damages); see also Exxon Corp. v. Emerald Oil & Gas Co.,
L.C., 331 S.W.3d 419, 422 (Tex. 2010) (Section 85.321 creates a private cause of action for
statutory violations). Thus, the amended petition was the first pleading containing this statutory
cause of action. The certificate of service reflects that all counsel of record were served on June
17.
McBride filed its motion to dismiss on July 19, within sixty days after the amended
petition was served on McBrideâs counsel. See TEX. R. CIV. P. 91a.3(a). The motion expressly
references the amended petition, stating in pertinent part that ââŚPlaintiffs filed their First
Amended Original Petition, wherein Plaintiffs dismissed all of the claims, causes of actions
against the SAMFORDS, withdrawing their allegation of an oral contract and right to the
property in question. Plaintiffs remaining âcauses of actionâ are for a temporary and permanent
injunction for some future event that may or may not happen.â Even the RPIsâ response to the
motion acknowledges that McBride challenged the causes of action asserted in the amended
petition, stating âDefendant chose the wrong procedural vehicle to challenge the allegations in
Plaintiffâs Amended Petition.â
We do note that McBrideâs motion does not specifically mention the natural resources
code. The RPIs identified this omission in their response to McBrideâs motion and at the
hearing, but the parties addressed the substance of the issue at the hearing. 5 âA motion to
dismiss must state that it is made pursuant to this rule, must identify each cause of action to
5
The RPIs do not raise a complaint under Rule 91a.2 in their response to the petition for writ of mandamus.
4
which it is addressed, and must state specifically the reasons the cause of action has no basis in
law, no basis in fact, or both.â TEX. R. CIV. P. 91a.2 (emphasis added). Magic words are not
required; â[a]t issue is whether the grounds for dismissal are clear from the motion.â Cooper v.
Trent, 551 S.W.3d 325, 331(Tex. App.âHouston [14th Dist.] 2018, pet. denied). In Cooper, a fair reading of the motion to dismiss established that movant challenged all of the plaintiffâs causes of action, as the motion stated, âPursuant to Texas Rule of Civil Procedure 91a, Michael Trent moves to dismiss all of Cooperâs claims against him[.]âId. at 331
. The movant was ânot required to list separately each cause of action in the Rule 91a motion because he challenged their collective viability[.]âId.
Although McBrideâs motion does not expressly mention the
natural resources code, the motion did seek dismissal of the entire case and challenged the RPIsâ
âremaining âcauses of action.ââ Thus, the motion challenges the collective viability of the RPIsâ
claims for injunctive relief and damages under the natural resources code and was timely filed.
Ripeness
We first address McBrideâs contention that the lawsuit must be dismissed for want of
subject matter jurisdiction because the RPIsâ only claim is not ripe as a matter of law and the
RPIs suffered no legal injury. According to McBride, the RPIsâ claim depends on the resolution
of hypothetical facts and events that have yet to occur. Specifically, McBride identifies the
following âhypotheticalâ events that may or may not come to fruition: (1) the âCommission may
or may not issue the permit that would allow McBride to commence construction on the
facility;â and (2) McBride has not commenced constructing the facility, or begun operating it.
McBride further asserts that the RPIs have suffered no legal injury, in that McBride âhas done
nothing to injure [the RPIsâ] land; it does not even have regulatory approval that would allow it
to begin construction.â McBride maintains that a claim is not ripe if based on assumptions about
actions that a governmental entity, such as the Commission, may or may not take. They further
assert that the RPIs essentially invite a prediction regarding what a permit may look like and
speculation that McBride will violate that permit or other environmental regulations if allowed to
construct and operate the facility. McBride maintains that, at this juncture, it cannot be
determined whether the Commission will issue a permit, what activity the permit will authorize,
and whether the permit will be upheld or modified.
5
The RPIsâ Amended Petition
In the factual background section of their amended petition, the RPIs stated that they own
several acres of land and McBride is the adjoining landowner. According to the RPIs, McBride
filed with the Commission an application for a permit to operate a commercial waste disposal
facility and associated pits on McBrideâs land. The RPIs maintained that they use their land for a
commercial cattle operation and have water wells and ponds on their land, all of which would be
negatively impacted by a dumpsite. The RPIs alleged that (1) âDefendantâs desire to use the
McBride tract for an environmental dumpsite is reckless and dangerous to Plaintiffs and the
surrounding community, and court protection is required to prevent irreparable harm to land,
cattle and fresh water sources;â and (2) âDefendant by filing this permit expresses an intent to
use its land in such a way that will cause environmental harm to Plaintiffsâ land as well as to
other surrounding landowners, including harm to the fresh water strata used by numerous people
in the community.â The petition states, âBecause the likelihood of long term harm to Plaintiffsâ
land is irreparable, Plaintiffs seek the courtâs protection in preventing this environmental damage
prior to the actual damage occurring.â According to the petition, the RPIs will be substantially
and irreparably harmed due to McBrideâs requested use of its land, particularly given the request
to dispose of oil and gas waste. The petition alleges:
The contents of the materials being disposed will cause significant damage to the groundwater,
private water wells, and local water supply company that furnishes the water supply for the
community of Paxton. McBride has a long history of RRC violations and unless prevented by the
court, Defendant will create environmental damage to the McBride tract and Plaintiffâs tract.
The RPIsâ petition acknowledges that the Commission denied McBrideâs permit on December
20, 2019, but that McBride appealed and the Commission has yet to rule on the appeal.
In the cause of action section of their petition, the RPIs allege the following pertinent to
their request for a temporary and permanent injunction:
This application for Temporary and Permanent Injunction against McBride Operating LLC seeks
to prevent any damage to the McBride tract, and also the surrounding lands that will be harmed,
including the Plaintiffsâ tract. If Defendant is allowed to operate this dumpsite, Plaintiffs anticipate
a substantial amount of dust, debris, and other contaminates blowing onto their lands, crops and
grasses which are used in livestock production and cattle operation for meat.
âŚ
Plaintiffs seek to enjoin McBride from starting construction of the facility, defined in McBrideâs
permit filed on November 7, 2019 and any such amendments to said permit filed with RRC. If the
permit is granted by the RRC, the commencement of construction and operations of the facility by
McBride will result in irreparable injury and harm.
6
They sought to enjoin McBride from:
Performing any operations in furtherance of the requested permit filed with the RRC by McBride,
and enjoining McBride along with any of their officers, agents, servants, employees, and
attorneys, and those persons in active concert or participation with them who receive actual notice
of the order by personal service or otherwise, on the property identified as the 92.9085 acre
McBride tract, including but not limited to construction and operation of an environmental
dumpsite and including any operations that would be allowed if the permit filed with the RRC is
issued.
Actively changing the original contours of the land on the McBride tract in order to prepare the
location for any planned oil and gas disposal activities until further order of the Court.
Removing any top soil from the original contours of the land on the McBride tract in order to
prepare the location for any planned environmental dumpsite and/or oil and gas disposal activities
until further order of the Court.
Transferring, selling or converting the property identified as the 92.9085 acre McBride tract to any
third party.
The RPIs further assert a violation of the Natural Resources Code. This portion of their
petition states, in pertinent part, as follows:
Plaintiffs seek equitable and statutory relief regarding anticipated violations by Defendant
of the Tex. Natural Resources Code § 85.001 (Vernon Supp 2019), et seq., and Texas Statewide
Rule 8, i. e. 16 Tex. Admin. Code § 3.8 (2018).
...
Clearly Defendantsâ planned operation of an environmental dumpsite falls within the
statutorily prohibited activities which will cause pollution on Plaintiffsâ land. Plaintiffs, pursuant
to §85.321 of the Texas Natural Resources Code, seeks the courtâs protection from Defendantâs
planned unlawful activities and asks the court to issue a temporary and permanent injunction from
the following acts, omissions and events on the McBride tract:
1) creating and operating an environmental dumpsite on the McBride tract as described in
McBrideâs Application to the RRC;
2) Bringing oil and gas and hydrocarbon waste into the McBride tract;
3) Storing oil and gas waste on the McBride tract;
4) Violating Statewide Rule 8 by causing âpollutionâ as defined in Statewide Rule
8(a)(28);
5) Violating Texas Natural Resources Code §85.046(a) by permitting surface and
subsurface waste as defined therein.
âŚ
In addition to seeking an injunction, Plaintiffs seek recovery of damages that will occur
should Defendant be allowed to create and operate an environmental dumpsite on land adjacent to
Plaintiffsâ cattle operations. Pursuant to §85.321 of the Texas Natural Resources Code, property
owners are able to seek recovery of damages for violations of the Texas Natural Resources Code.
As such, Plaintiffs seek recovery of any and all damages caused by Defendantsâ proposed
operations in creating and operating an environmental dumpsite.
Plaintiffsâ damages are the difference between the value of Plaintiffsâ land and cattle
operations prior to Defendantâs activities in operating an environmental dumpsite and the value of
7
Plaintiffsâ land and cattle operations subsequent to Defendantâs activities. Plaintiffs seek any and
all recoverable damages caused to their property by Defendantâs activities on the McBride tract.
The RPIs attached exhibits to their petition, including deeds, the administrative denial of
McBrideâs permit, Terry Allenâs affidavit, and photographs. The Commissionâs denial contains
various statements in support of its decision, including that the (1) âlocation of the proposed
facility is in an area unsuitable for the processing and permanent interment of oil and gas waste,â
(2) facilityâs design and layout is not âprotective of surface water features or groundwater in the
area,â (3) âsurface relief includes slopes in excess of 5%, which may contribute to potential
pollution of surface or subsurface waters through the off-site migration of waste into sensitive
areas in the event of a waste containment failure,â (4) âproposed liner systems are not protective
of groundwater due to the presence of shallow groundwater and the permeability characteristics
of the subsurface soils,â and (5) âfacility does not provide for mechanical, chemical or thermal
separation of the incoming wastes, and there are waste streams that cannot be stored or processed
on-site by the design submitted in the application.â The denial further states:
Evaluating factors such as the topographical relief, the regional drainage patterns, the proximity to
water features and wetlands, the shallow groundwater, and the soil composition, indicates the
proposed facility location is not a viable option for the processing and permanent interment of oil
and gas waste. Technical Permitting has determined that permit issuance may cause or allow
pollution to surface or subsurface waters of the state.
The denial allowed for McBride to pursue a hearing but set forth a detailed list of items to
administratively complete the application. Those items include amending or submitting facility
designs, various diagrams, plan views, buffer zones, incoming waste streams, soil boring logs,
groundwater monitoring plans, design of truck wash bays, et cetera. Terry Allenâs lengthy
affidavit details his concerns and the impact on his property, bodies of water, and his cattle
operation should the facility be approved.
Analysis
Ripeness, a threshold issue that implicates subject matter jurisdiction, requires a plaintiff
to have a concrete injury before bringing a claim. Eagle Oil & Gas Co. v. TRO-X, LP, 619
S.W.3d 699, 706 (Tex. 2021). âUnder the ripeness doctrine, we consider whether, at the time a lawsuit is filed, the facts are sufficiently developed so that an injury has occurred or is likely to occur, rather than being contingent or remote.âId.
(quoting Waco Indep. Sch. Dist. v. Gibson,22 S.W.3d 849
, 851â52 (Tex. 2000)). Thus, ripeness focuses on whether the case involves
8
uncertain or contingent future events that may not occur as anticipated or that may never occur.
Gibson, 22 S.W.3d at 852. By focusing on whether the plaintiff has a concrete injury, the ripeness doctrine allows courts to avoid premature adjudication, and serves the constitutional interests in prohibiting advisory opinions.Id.
A case is not ripe when determining whether the plaintiff has a concrete injury depends on contingent or hypothetical facts, or upon events that have not yet come to pass.Id.
The RPIs rely on Ring Energy v. Trey Resources, Inc., 546 S.W3d 199 (Tex. App.âEl
Paso 2017, no pet.) to support their position that the case is ripe. In that case, Trey obtained
permits from the Commission to develop an injection well and before it began its injection
program, Ring sued for injunctive relief on grounds that the water injection would cause
irreparable waste damage. Ring Energy, 546 S.W3d at 202. The issue before the El Paso Court
was âwhether a trial court outside of Travis County has the jurisdiction to enjoin a party with a
valid permit from developing and using an injection well based on the claim that the injection
well will cause imminent and irreparable injury to the complaining party.â Id.The Court answered this question in the affirmative.Id.
In doing so, the Court characterized the partiesâ
arguments as follows:
Trey acknowledges that once its injection operations commence, and if it indeed damages Ring,
that a claim for damages in the courts might be cognizable under Section 85.321. Trey also
acknowledges that some form of equitable relief might also be available before the injection well
is put to use, but only in an action filed in Travis County challenging the order authorizing the
permit. But it contends that the Andrews County district court lacks subject matter jurisdiction to
prohibit the injection operation, and thus effectively invalidate the Commission's permits. Ring
counters that the plain language of Section 85.321 grants the courts of this state jurisdiction to hear
not only suits for damages, but also claims for equitable relief, which includes claims for
injunctive relief.
âŚ
The parties do not argue that Section 85.321 does not include injunctive relief. Their arguments
focus on when and where it might be available.
Id. at 207-08. The Court held that:
âŚSection 85.321 creates a cause of action for damages and injunctive relief, and Section
85.322 allows such suit against any party who violates a law, rule, or order of the
Commission. Section 85.322 contains no venue provision, indicating to us that a Section
85.322 suit is governed by the venue restrictions applicable to any suit. The general venue
provisions permit a suit to be filed where all or a substantial part of the events giving rise to the
claim occurred, which would often be outside of Travis County.
9
Id. at 211. The Court later concluded that âthe Legislature intended to allow pre-injury injunctive
relief in the county where the injury is threatened.â 6 Id. at 215.
Although Ring appears to acknowledge that a party can file for pre-injury injunctive
relief, a significant difference between Ring and the present case is that Trey had already
received its permit, while McBride has not. City of Anson v. Harper, 216 S.W.3d 384(Tex. App.âEastland 2006, no pet.) is instructive. There, several plaintiffs sued the City of Anson seeking damages and equitable relief because the City planned to build a municipal solid waste landfill on land where the plaintiffs owned minerals. Harper,216 S.W.3d at 387-88
. The City filed a plea to the jurisdiction, which the trial court denied.Id.
On appeal, the City argued that the plaintiffsâ claim for inverse condemnation was not yet ripe because their application for a landfill permit was still pending before the Texas Commission on Environmental Quality.Id. at 389-90
. The Eastland Court recognized Fifth Circuit cases in which neighboring landowners sought to enjoin further development of proposed landfills, but because permit applications were still pending before state agencies, the construction and operation of a landfill was a mere possibility and the plaintiffs had not yet suffered actual damages; thus, the controversies over the proposed landfills were not ripe.Id. at 390
. (citing Monk v. Huston,340 F.3d 279, 282
(5th Cir. 2003); Smith v. City of Brenham, Tex.,865 F.2d 662
(5th Cir.1989)). With respect to the City
of Anson, the Eastland Court sustained the ripeness issue in part, explaining as follows:
âŚThe City has filed a permit application with the TCEQ. This application may or may
not be granted. Unless and until the City receives a permit, it cannot construct or operate a landfill.
âŚ
This case is, however, distinguishable from Monk and Brenham because actual
construction had taken place on the property. The City had done some preliminary roadwork and
had cleared the propertyâs entrance. Davis testified that this work had destroyed some of their
geodes. The trial court entered findings of fact and conclusions of law following the jurisdictional
hearing. Those findings are unchallenged by the City. The trial court found that the Cityâs dirt
work had damaged a portion of the copper deposit and had restricted plaintiffsâ right to use the
surface. What might happen if the Cityâs permit application is approved does not present a ripe
controversy, and the trial court does not have jurisdiction to hear a claim based upon future events.
6
Nor do we find the RPIsâ other cases instructive. See Gregg v. Delhi-Taylor Oil Corp., 344 S.W.2d 411,
412(Tex. 1961) (Gregg was drilling or had drilled a well and planned to increase productivity by fracturing the gas producing formation; courts have power to grant injunctive relief to preserve status quo upon allegations and proof that neighbor is about to fracture oil or gas producing horizon beyond property lines for purpose of increasing productivity of neighborâs well); see also Hastings Oil Co. v. Texas Co.,234 S.W.2d 389, 398
(Tex. 1950) (well
had not been completed, but probable cause existed to show that it would be completed, thus, petitioners were
committing a continuing trespass on the respondentsâ land; injunctive relief was not beyond trial courtâs discretion).
10
But, the trial court does have potential jurisdictionâsubject to the Cityâs governmental immunity
defenseâto resolve any claim based strictly upon events which have already taken place.
Id. at 390-91. After conducting an immunity analysis, the Eastland Court concluded that the trial court had jurisdiction over the plaintiffsâ inverse condemnation claim to the extent the claim was based upon actions that caused actual interference with plaintiffsâ property rights and over plaintiffsâ Private Real Property Rights Preservation Act claim.Id. at 396
. But the trial court did not have jurisdiction over the inverse condemnation claim to the extent based upon future actions or actions which had not yet caused actual interference.Id.
Here, McBride filed a permit and that permit was denied. McBride pursued an appeal,
which remains pending to this Courtâs knowledge. But it is undisputed that McBride has yet to
receive a permit. A fair reading of the RPIsâ amended petition demonstrates that they seek
injunctive relief and damages to protect their property from harm that may result if McBride
succeeds in obtaining a permit to operate a commercial waste disposal facility. For instance,
their petition refers to McBrideâs planned operation of the dumpsite and damages caused by
McBrideâs proposed operations, states that irreparable injury and harm will occur if the permit is
granted, seeks to prevent environmental damage âprior to the actual damage occurring,â seeks
recovery of damages should McBride be allowed to create and operate the dumpsite, and seeks
equitable and statutory relief regarding anticipated violations of the Natural Resources Code and
Statewide Rule 8. 7 At this juncture, McBrideâs appeal may or may not be successful and the
RPIs may or may not be harmed. As in Harper, unless and until McBride receives a permit, it
cannot construct or operate the proposed dumpsite. Thus, until a permit is issued, the dispute
remains abstract and hypothetical, rendering it unripe for judicial review. See Monk, 340 F.3d at
283.
But the RPIs assert that their claim is not dependent on hypothetical facts or future events
because it is not solely based on whether the permit is approved. They explain that McBride has
âshown preliminary work on its land can and will proceed,â which does not fall within the
Commissionâs jurisdiction and is not covered by the permit; thus, they are not âprotected from
[McBrideâs] preparatory activitiesâ while the Commission considers the permit. They argue:
7
Statewide Rule 8 addresses water protection. See 16 TEX. ADMIN. CODE § 3.8 (2018).
11
By conducting preliminary work such as placing pits, dams, paved roads, etc. on Defendantâs
tract, it will create runoff onto Cypress Creek located on Defendantâs land but which also services
Plaintiffsâ landâŚ. there are enormous risks and dangers that Defendantâs massive preparations
will negatively impact the freshwater streams which Plaintiffs utilize for their commercial cattle
operation.⌠Such damages to this freshwater stream are irreparable.⌠An injunction is just the
type of remedy used for prevention of this kind of irreparable harm. Because Plaintiffs require
protection from Defendantâs preparatory activities while Defendantâs permit application is being
considered, their injury is imminent and not protected by the pending permit.
According to the RPIs, dissolution of the injunction would allow McBride to begin preparatory
activities that would irreparably harm the RPIsâ land and freshwater supply.
However, our review is limited to the pleading of the cause of action and permissible
pleading exhibits. See TEX. R. CIV. P. 91a.6; see also Zawislak v. Moskow, No. 03-18-00280-
CV, 2019 WL 2202209, at *4 (Tex. App.âAustin May 22, 2019, no pet.) (declining to consider
discovery exhibits and other documents in Rule 91a review but looking to live pleading and
pleading exhibits). Even construing the RPIsâ amended petition and exhibits in their favor, they
do not allege preparatory activity as a basis for their claims. Rather, the RPIsâ claims are clearly
based on the harm they will suffer should the permit be issued, and McBride constructs and
operates the dumpsite facility. From the amended petition, one could not even reasonably
conclude that an injury is likely to occur, given that the challenged activities are contingent on
the Commissionâs grant of a permit, which it has already once administratively denied. See
Eagle Oil, 619 S.W.3d at 706.
As pleaded, the RPIsâ lawsuit against McBride involves uncertain or contingent future
events that may not occur as anticipated or that may never occur. See Gibson, 22 S.W.3d at 852. Accordingly, we conclude that the RPIsâ claims are not ripe for judicial review and, consequently, they are not entitled to the relief sought. See Harper,216 S.W.3d at 390, 396
; see also Monk,340 F.3d at 283
; TEX. R. CIV. P. 91a.1 (cause of action has no basis in law if allegations, taken as true, together with inferences reasonably drawn therefrom, do not entitle claimant to relief sought); see also Gibson,22 S.W.3d at 851
(ripeness focuses on when an
action may be brought and emphasizes the need for a concrete injury to present a justiciable
claim). As a result, Respondent lacks jurisdiction over the RPIsâ claims based upon future
actions or actions which have not yet caused actual interference. Respondent thereby abused his
discretion by denying McBrideâs Rule 91a motion to dismiss and motion to dissolve the
12
temporary injunction. Because we so conclude, we need not address McBrideâs remaining
contentions. See TEX. R. APP. P. 47.1.
DISPOSITION
Having determined that Respondent abused his discretion by denying McBrideâs Rule
91a motion to dismiss, we conditionally grant McBrideâs petition for writ of mandamus. We
direct Respondent to vacate his August 18, 2022 order denying the motion to dismiss, and in its
stead, to issue an order granting the motion to dismiss, dissolving the temporary injunction, and
dismissing the case. We trust Respondent will promptly comply with this opinion and order. The
writ will issue only if the trial court fails to do so within ten days of the date of the opinion and
order. The trial court shall furnish this Court, within the time of compliance with this Courtâs
opinion and order, a certified copy of the order evidencing such compliance.
GREG NEELEY
Justice
Opinion delivered December 7, 2022.
Panel consisted of Worthen, C.J., Hoyle, J., and Neeley, J.
13
COURT OF APPEALS
TWELFTH COURT OF APPEALS DISTRICT OF TEXAS
ORDER
DECEMBER 7, 2022
NO. 12-22-00279-CV
MCBRIDE OPERATING, LLC,
Relator
V.
HON. JAMES A. PAYNE, JR.,
Respondent
ORIGINAL PROCEEDING
ON THIS DAY came to be heard the petition for writ of mandamus filed by
McBride Operating, LLC; who is the relator in appellate cause number 12-22-00279-CV and the
defendant in trial court cause number 21CV35791, pending on the docket of the 273rd Judicial
District Court of Shelby County, Texas. Said petition for writ of mandamus having been filed
herein on October 19, 2022, and the same having been duly considered, because it is the opinion
of this Court that the petition for writ of mandamus be, and the same is, conditionally granted.
And because it is further the opinion of this Court that the trial judge will act
promptly and vacate his order denying the Rule 91a motion to dismiss and, in its stead, issue an
order granting the motion, dissolving the temporary injunction, and dismissing the case; the writ
will not issue unless the HONORABLE JAMES A. PAYNE, JR. fails to comply with this
Courtâs order within ten (10) days from the date of this order.
14
Greg Neeley, Justice.
Panel consisted of Worthen, C.J., Hoyle, J. and Neeley, J.