Centripetal Networks, LLC v. Keysight Technologies, Inc.
CourtCourt of Appeals for the Federal Circuit
Date FiledNovember 25, 2026
Docket25-1715
StatusUnpublished
📰 News Coverage: Read the LAWS.com news report on this case
Full Opinion
Case: 25-1715 Document: 46 Page: 1 Filed: 11/25/2026
NOTE: This disposition is nonprecedential.
United States Court of Appeals
for the Federal Circuit
______________________
CENTRIPETAL NETWORKS, LLC,
Appellant
v.
KEYSIGHT TECHNOLOGIES, INC.,
Appellee
______________________
2025-1715
______________________
Appeal from the United States Patent and Trademark
Office, Patent Trial and Appeal Board in No. IPR2022-
01421.
______________________
Decided: November 25, 2026
______________________
MATTHEW JAMES DOWD, Dowd Scheffel PLLC, Wash-
ington, DC, argued for appellant. Also represented by
ROBERT JAMES SCHEFFEL.
JONATHAN IAIN MAX DETRIXHE, Reed Smith LLP, San
Francisco, CA, argued for appellee. Also represented by
GERARD M. DONOVAN, Washington, DC; JAMES
CHRISTOPHER MARTIN, Pittsburgh, PA; JONAH D.
MITCHELL, Kilpatrick Townsend & Stockton LLP, San
Francisco, CA.
Case: 25-1715 Document: 46 Page: 2 Filed: 11/25/2026
2 CENTRIPETAL NETWORKS, LLC v.
KEYSIGHT TECHNOLOGIES, INC.
______________________
Before STOLL, LINN, and STARK, Circuit Judges.
LINN, Circuit Judge.
Centripetal Networks, LLC appeals from a final writ-
ten decision by the Patent Trial and Appeal Board
(“Board”) in an inter partes review (“IPR”) proceeding, hold-
ing claims 1–30 of its U.S. Patent No. 10,681,009 (“’009 Pa-
tent”) unpatentable as obvious. Keysight Techs., Inc. v.
Centripetal Nets., LLC, IPR 2022-01421, 2024 WL 4648646
(P.T.A.B. Nov. 1, 2024) (“FWD”). We have jurisdiction to
review the Board’s FWD under 28 U.S.C. § 1295(a)(4)(A).
We affirm.
BACKGROUND
Because we write for the parties, we assume familiarity
with the record and include only the background necessary
for understanding. At a high level, the ’009 Patent claims
a method for what Centripetal calls “fast rule swapping,”
by which network protection devices like firewalls swap
rule sets. We treat claim 1 as representative of all but de-
pendent claims 2, 15, and 19, addressed separately below.
As relevant on appeal, the method of claim 1 “prepro-
cess[es]” both the first and second rule sets before they are
“implemented” on a network protection device. ’009 Pa-
tent, Cl. 1. Then, “responsive to” a signal to swap rule sets,
the method “ceas[es] processing of one or more packets,”
“cach[es] the one or more packets,” “reconfigur[es] the net-
work protection device to process packets in accordance
with the preprocessed second rule set,” “signal[s] comple-
tion of the reconfiguration,” and in response to that signal,
processes the cached packets in accordance with the pre-
processed second rule set. Id. Dependent claims 2, 15, and
19 add a timing limitation whereby the second rule set
must be received after implementation of the first rule set.
Preprocessing requires, in the context of this patent, at
least one of merging two or more rules, separating one or
Case: 25-1715 Document: 46 Page: 3 Filed: 11/25/2026
CENTRIPETAL NETWORKS, LLC v. 3
KEYSIGHT TECHNOLOGIES, INC.
more rules into two or more rules, or reordering rules
within a rule set. Id. at col. 4, ll. 50–54. In its FWD, the
Board explained that implementing “means that the rule
set has been put into effect as part of the policy being en-
forced on the network protection device [and] that this cor-
responds to step 206 of Figure 2 of the ’009 patent,” and
both parties agree that implementing is the same as con-
figuring. FWD, 2024 WL 4648646 at *5; see ’009 Patent,
Fig. 2 (below); Appellant’s Opening Br. at 7; Appellee’s Br.
at 6.
As relevant here, prior art U.S. Patent No. 7,320,022
(“Hayter”) teaches devices processing packets of data that
may each include a header and a payload, and caching the
Case: 25-1715 Document: 46 Page: 4 Filed: 11/25/2026
4 CENTRIPETAL NETWORKS, LLC v.
KEYSIGHT TECHNOLOGIES, INC.
portion of those packets being processed to increase pro-
cessing speed. Hayter at col. 6, ll. 3–23; id. at col. 10, ll.
59–62. In its dependent claim 9, Hayter claims storing in
the cache “the entirety of the header and at least one byte
of data payload of the data packet.” Id. at Cl. 9. Hayter
also discusses avoiding “cache pollution” by not caching
parts of data that are not being accessed. Id. at col. 12,
ll. 29–32.
As relevant here, prior art U.S. Patent Publication
No. 2006/0048142 (“Roese”) teaches a firewall system that
allows rapidly switching between different sets of rules, us-
ing rapid response identifiers in response to certain trig-
gering events—such as a particular network condition or a
threat—to select different rule sets. Roese explains that
several rule sets may be pre-installed. Roese at Abstract;
id. ¶ 36. When a trigger activates, the system selects
which rule set to apply and “initiates enforcement” of the
rule set by signaling the processor with the “identifiers of
one or more policy and/or [policy enforcement rule sets
(“PER sets”)] to be implemented.” Id. ¶ 53. The rule sets
may be “pre-installed, updated, re-installed, revised, or
otherwise changed when and as desired,” id. ¶ 17, and may
be “updated or adjusted . . . at any time,” id. ¶ 23.
Keysight filed the instant IPR, challenging the patent-
ability of all claims of the ’009 patent as obvious over a com-
bination of Roese, Golnabi, Huima, Hayter, and other
references. The Board initially denied institution, but, af-
ter the Director’s intervention, instituted the IPR and held
all claims obvious in its FWD. A prior IPR of U.S. Patent
No. 9,674,148, a great-grandparent of the ’009 patent at is-
sue here, held all claims unpatentable as obvious over
Roese, Golnabi, Huima, Hayter, and other prior art. Cisco
Sys., Inc. v. Centripetal Nets., Inc., IPR 2018-01454,
2020 WL 1080533 (P.T.A.B. Mar. 5, 2020).
Case: 25-1715 Document: 46 Page: 5 Filed: 11/25/2026
CENTRIPETAL NETWORKS, LLC v. 5
KEYSIGHT TECHNOLOGIES, INC.
DISCUSSION
Patent Owner Centripetal makes several arguments
challenging the Board’s constructions, findings with re-
spect to the disclosures in the prior art, and procedural de-
terminations.
I
Centripetal first argues that the Board erred in failing
to limit the construction of “caching” to exclusively occur
“while the rules are being swapped.” Appellant’s Opening
Br. at 30–37 (citing FWD, 2024 WL 4648646 at *6). Cen-
tripetal says that the claims compel such a limitation “as a
matter of logic or grammar,” see Mformation Techs., Inc. v.
Rsch. in Motion Ltd., 764 F.3d 1392, 1398 (Fed. Cir. 2014),
and points to Figure 4 of the ’009 Patent as an example of
caching during swapping. Keysight responds that there is
no basis to impose such a negative claim limitation beyond
the sequencing already contained in the claims and argues
that Figure 4 of the ’009 Patent shows caching (step 406)
after signaling (step 402) but before reconfiguration, i.e.,
swapping (step 408).
We agree with Keysight and the Board. The claims al-
ready require caching to occur in response to the signaling
and after “ceasing processing of one or more packets by the
network protection device.” ’009 Patent, Cl. 1. And, as the
Board correctly explained, nothing about the plain and or-
dinary meaning of “caching” requires incorporating a tim-
ing limitation into the construction beyond that already
contained in the claims. Nothing in the ’009 Patent prohib-
its also caching at other times if the sequencing limitation
is otherwise met. Centripetal’s reliance on Figure 4 as
showing caching during swapping does not compel a differ-
ent construction. Rather, Figure 4 confirms our analysis
by illustrating the claimed sequence—signaling, ceasing
processing packets, caching, reconfiguring to process pack-
ets in accordance with the second rule set, then processing
packets in accordance with the second rule set—without
Case: 25-1715 Document: 46 Page: 6 Filed: 11/25/2026
6 CENTRIPETAL NETWORKS, LLC v.
KEYSIGHT TECHNOLOGIES, INC.
any additional temporal limitation tied to the step of cach-
ing.
We therefore affirm the Board’s construction of cach-
ing.
II
Centripetal next argues that the Board lacked substan-
tial evidence to find that Hayter teaches caching entire
data packets (as required by the Board’s claim construc-
tion, which in this respect is not contested on appeal) be-
cause Hayter is fundamentally limited to caching “a
portion of a received packet,” Hayter at Abstract, and no-
where discusses storing an entire packet in the cache. See
id. at 10:59–62 (“[T]he processor 12A or 12B may operate
on a portion of the header, the entire header, or even the
entire header and a portion of the data payload.”); Cl. 1.
Centripetal also argues that Hayter teaches away from
caching entire packets because it seeks to prevent “cache
pollution” by caching only the portions of a packet that are
actively being worked on. See Hayter at 12:29–32; J.App’x
1483 ¶ 35 (Centripetal Expert Report).
Keysight responds that Hayter expressly teaches cach-
ing “the entirety of the header and at least one byte of data
payload of the data packet” in claim 9 which includes up to
the entire data payload. Appellee’s Br. at 43–44 (citing
Hayter at Cl. 9). Keysight also argues that Hayter ex-
pressly contemplates data packets “that consist entirely of
a header and include no payload data,” such as TCP ACK
packets, and that Hayter’s repeated disclosures of caching
the entire header thereby teach caching of those entire
data packets. Appellee’s Br. at 45–48; see also J.App’x
1724; FWD, 2024 WL 4648646 at *14.
Substantial evidence supports the Board’s finding that
Hayter teaches caching entire data packets. The disclosure
in Hayter’s claim 9 to cache “the entirety of the header and
at least one byte of data payload” plainly includes caching
Case: 25-1715 Document: 46 Page: 7 Filed: 11/25/2026
CENTRIPETAL NETWORKS, LLC v. 7
KEYSIGHT TECHNOLOGIES, INC.
the entire header and entire payload. Nothing in Hayter
limits this teaching to “at least one byte of [but not the en-
tirety of] the payload.” At best, Hayter implies a distinc-
tion between “a portion of the header” and “the entire
header,” e.g., Hayter at col. 10, ll. 59–62, but those two
terms are never indicated to be necessarily mutually exclu-
sive, this distinction regarding headers need not apply to
payloads, and the distinction does not limit the amount of
payload data that may be cached under claim 9. Even if
Centripetal’s reading of Hayter is reasonable, Centripetal
fails to explain why the Board’s contrary reading is not rea-
sonable and thus unsupported by substantial evidence.
We also agree with Keysight’s alternative argument,
that Hayter’s repeated teachings of caching entire headers,
Hayter at Cl. 9; col. 11, ll. 14–16; col. 6, ll. 5–7, coupled with
its teaching that some packets may be comprised of a
header without a payload, id. at col. 11, ll. 1–5, J.App’x
1762–63 (¶ 53, Reply Decl. of Keysight Expert Jacobson),
reasonably teaches caching the entirety of such packets.
FWD, 2024 WL 4648646 at *14. The Board reasonably re-
jected Centripetal’s expert’s opinion that Hayter would
necessarily have divided the header and cached only a por-
tion of it when caching a payload-less packet, J.App’x 1512
(¶ 89); J.App’x 1773–74, because Hayter does not indicate
that such payload-less packets would be treated any differ-
ently with respect to its disclosure of caching the entire
header. FWD, 2024 WL 4648646 at *14; J.App’x 1762–64
(¶¶ 53–55, Reply Decl. of Keysight Expert Jacobson).
We need not and do not consider Keysight’s alternative
argument based on the combination of Hayter with Roese
with respect to caching entire packets, because substantial
evidence supports the Board’s finding that Hayter on its
own teaches this limitation.
Case: 25-1715 Document: 46 Page: 8 Filed: 11/25/2026
8 CENTRIPETAL NETWORKS, LLC v.
KEYSIGHT TECHNOLOGIES, INC.
III
A
Centripetal next argues that the Board lacked substan-
tial evidence to find that prior art Roese teaches prepro-
cessing rule sets prior to implementation. First,
Centripetal argues that the Board changed its construction
of “being implemented” in the final written decision, FWD
2024 WL 4648646 at *6 (the device “setup to utilize that
rule set to evaluate network traffic”), from its construction
in the institution decision, id. at *5 (“the rule set has been
put into effect as part of the policy being enforced on the
network protection device”), without providing Centripetal
notice and an opportunity to address the change in viola-
tion of the Administrative Procedures Act (“APA”). See 5
U.S.C. § 554(b)(3) and (c); Axonics, Inc. v. Medtronic, Inc.,
75 F.4th 1374, 1383 (Fed. Cir. 2023) (requiring “adequate
notice and an opportunity to respond under the new con-
struction”). Centripetal appears to argue that this change
was material because it conflated rule implementation and
rule application/enforcement, which are distinct steps in
the ’009 Patent claims. See Appellant’s Opening Br. at 51.
The Board rejected this argument in rehearing, catego-
rizing the change as simply a “paraphrase” that did not
change the meaning of the construction. J.App’x 44. We
agree with the Board that there was no APA violation here
because the Board’s construction did not substantively
change. We can discern no substantive difference between
“setup to utilize that rule set to evaluate network traffic”
and “the rule set has been put into effect as part of the pol-
icy being enforced on the network protection device.” Con-
trary to Centripetal’s argument, both constructions (and
the Board) recognize that implementation “is separate
from the actual process of having [the device] evaluate
packets,” FWD, 2024 WL 4648646 at *6. Centripetal does
not explain any other way that the language in the FWD
changed the substantive scope of the claims. The Board’s
Case: 25-1715 Document: 46 Page: 9 Filed: 11/25/2026
CENTRIPETAL NETWORKS, LLC v. 9
KEYSIGHT TECHNOLOGIES, INC.
use of an immaterially different paraphrase of the agreed-
upon construction does not constitute reversible error here.
B
Centripetal argues that the Board lacked substantial
evidence for its finding that Roese teaches preprocessing a
rule set prior to implementation of that rule set, as re-
quired by all claims. 1 Roese teaches a device that includes
“one or more policy and/or PER sets each associated with a
unique rapid response identifier, pre-installed.” Roese ¶ 36
(emphasis added). Centripetal argues that “pre-installed”
is used as a synonym for “implemented,” and, because
Roese does not teach any processing prior to the pre-instal-
lation, Roese does not teach preprocessing prior to imple-
mentation.
Keysight responds that the Board reasonably distin-
guished pre-installation in Roese—what Keysight de-
scribes as associating rule sets with unique rapid response
identifiers, Appellee’s Br. at 57—from implementation,
which occurs at Roese’s appropriately named “implementa-
tion function 204.” See Roese ¶ 41 (“[T]he implementation
function 204 . . . instructs the [policy enforcement function]
1 Centripetal further argues that the Board erred in
“construing” “installation” as “receiving.” Appellant’s
Opening Br. at 53–54. As the Board correctly explained,
because “installation” is part of Roese’s disclosure and is
not used in the challenged claims, the proper analysis con-
cerns the factual disclosure of Roese and not claim con-
struction. See FWD, 2024 WL 4648646 at *6 (“[A]ny
discussion of ‘installation’ is made with respect to [] what
the cited references teach or suggest and is not affected by
any construction of any claim term.”). Thus, we review
whether substantial evidence supports the Board’s reading
of Roese’s disclosure. Virtek Vision Int’l ULC v. Assembly
Guidance Sys., Inc., 97 F.4th 882, 886 (Fed. Cir. 2024).
Case: 25-1715 Document: 46 Page: 10 Filed: 11/25/2026
10 CENTRIPETAL NETWORKS, LLC v.
KEYSIGHT TECHNOLOGIES, INC.
250 . . . to implement the policy and/or PER set by signal-
ing the processor 253 to initiate enforcement of the selected
policy and/or PER set(s).”).
Substantial evidence supports the Board’s finding that
“pre-install[ation]” in Roese is not equivalent to implemen-
tation. First, nothing in Roese suggests that devices with
rule sets pre-installed, without further steps, are “setup to
utilize that rule set to evaluate network traffic” or have
“been put into effect as part of the policy being enforced,”
as required by the construction of implementation. To the
contrary, Roese discusses multiple additional steps before
the policy is ready to be utilized or put into effect. As
Keysight’s expert opined, Roese expressly teaches an im-
plementation function after pre-installation, which aligns
with the construction of implementation. J.App’x 1739–40
(¶¶ 13–14, Reply Decl. of Keysight Expert Jacobson). This
is well-supported by the express disclosure in Roese, which
describes an analysis function that determines which of the
policy sets to “select[] for implementation (step 307),” and
the policy manager thereafter “instruct[s] the processor
253 to initiate the process of configuring the forwarding en-
gine 252 with the one or more policies and/or PERs” se-
lected for implementation, and by “signaling the processor
253 to initiate the enforcement of the selected policy and/or
PER set(s).” Roese ¶¶ 47, 41.
Centripetal argues that the only way that pre-install
can be distinct from implemented is to equate install with
receipt, as it contends Keysight and the Board erroneously
did. See Appellant’s Opening Br. at 53–57; but see id. at 53
(arguing that “being implemented” should be correctly un-
derstood as “being received”). Neither the Board nor
Keysight’s expert equated installation with receipt. The
Board merely said that it did not see how a device could
preprocess a rule set that has “not been installed, i.e., act
on sets that they have not received, nor how rule sets could
be manipulated in absentia.” FWD, 2024 WL 4648646 at
*11. This statement was made in the context of rejecting
Case: 25-1715 Document: 46 Page: 11 Filed: 11/25/2026
CENTRIPETAL NETWORKS, LLC v. 11
KEYSIGHT TECHNOLOGIES, INC.
Centripetal’s argument for a broader reading of “imple-
mentation” as used in the ’009 Patent. Id. Because the
claims require preprocessing before implementation, the
Board explained that a device cannot preprocess rules prior
to them being “installed, i.e., act on sets that they have not
received,” and thus rejected the equivalence of implemen-
tation and installation. The off-hand use of “received” in
this explanation did not equate pre-installation and receipt
in Roese. Keysight also does not equate installation with
receipt. Dr. Jacobson, Keysight’s expert, only opined that
“installing [the rule sets] is putting them on that device,”
but this is at least ambiguous as to whether this is “re-
ceipt,” or a downstream function. J.App’x at 1832 (5:2–14).
Dr. Jacobson repeatedly explained that installation is not
implementation, including in the immediately succeeding
colloquy, see id. at 1832 (6:8–22), and Dr. Jacobson’s state-
ment does not inform the key objection Centripetal raises
with respect to Roese: whether “pre-installed” in Roese
means implemented.
Having rejected Centripetal’s attempted remapping of
implementation and receipt onto pre-installation, substan-
tial evidence supports the Board’s finding that Roese
teaches preprocessing prior to implementation. Keysight’s
expert opined that the rule set may be preprocessed “at any
time” and “at any period,” including prior to implementa-
tion. J.App’x 1740 (¶ 15, Reply Decl. of Keysight Expert
Jacobson); J.App’x 243–44 (¶ 126). This is also well-sup-
ported by Roese’s express disclosure. Roese ¶ 23 (“[T]he
policy manager function selects the relevant policy and/or
PER set(s) deemed responsive to the trigger(s), selects the
particular PEF(s) to be used to implement the selected pol-
icy and/or PER set(s) previously installed on those PEFs,
and communicates the rapid response identifier(s) for those
selected policy and/or PER set(s) to be implemented. It is
to be understood that the . . . policy sets, PER sets, and
rapid response identifiers may be updated or adjusted by
the policy manager function at any time.”); Roese ¶ 17
Case: 25-1715 Document: 46 Page: 12 Filed: 11/25/2026
12 CENTRIPETAL NETWORKS, LLC v.
KEYSIGHT TECHNOLOGIES, INC.
(“The policy and/or PER sets may be pre-installed, up-
dated, re-installed, revised, or otherwise changed when
and as desired.”). The Board reasonably read Roese’s dis-
closure that updating or adjusting the policy sets and PER
sets (i.e., preprocessing) can occur at any time as teaching
that such preprocessing can occur prior to implementation.
Centripetal argues that the “any time” modification in
Roese is limited to “already-implemented, pre-installed
rule sets,” Appellant’s Opening Br. at 62, but this relies on
the argument we rejected above, i.e., that Roese’s disclo-
sure of “pre-installed” means implemented. Substantial
evidence therefore supports the Board’s rejection of this ar-
gument.
We affirm the Board’s conclusion of obviousness of
claim 1.
IV
Dependent claims 2, 15, and 19 additionally require re-
ceipt of the second rule set after implementation of the first
rule set, whereas representative independent claim 1 does
not indicate any timing requirement for the receipt of the
rule sets. 2
Centripetal briefly argues that the Board lacked sub-
stantial evidence to hold that these dependent claims were
obvious because the Board’s finding that Roese taught the
preprocessing limitation depended on having both sets of
rules “pre-installed” (and thus received) prior to being pre-
processed and the first rule set being implemented, which
2 In its reply brief, Centripetal concedes that its ar-
guments on appeal regarding the ’009 patent’s dependent
claims are limited to challenging the Board’s determina-
tion of obviousness of claims 2, 15, and 19. Appellant’s Re-
ply Br. at 28 n.2.
Case: 25-1715 Document: 46 Page: 13 Filed: 11/25/2026
CENTRIPETAL NETWORKS, LLC v. 13
KEYSIGHT TECHNOLOGIES, INC.
cannot possibly meet the dependent claim’s timing limita-
tion.
Keysight responds that its theory of obviousness based
on Roese is not limited to having both rule sets “pre-in-
stalled” at the same time. Rather, Roese teaches that rule
sets “may be distributed to a [Policy Enforcement Point]
before the start of any network session, when a network
session is started, or during a network session,” Roese ¶ 9
(emphasis added), and that these rule sets “may be pre-in-
stalled, updated, re-installed, revised, or otherwise
changed when and as desired,” Roese ¶ 17. Keysight ar-
gues that Roese does not require simultaneous pre-instal-
lation of both rule sets or otherwise limit its expansive
teaching of available timing for the receipt, preprocessing,
and implementation of the rule sets. See J.App’x 1749
(¶ 32, Reply Decl. of Keysight Expert Jacobson).
The Board’s decision is supported by substantial evi-
dence. As Keysight correctly points out and as confirmed
in Centripetal’s reply brief, Centripetal’s position depends
on its incorrect characterization that Keysight’s obvious-
ness theory equates pre-installation and receipt, see Appel-
lant’s Reply Br. at 28, a characterization we rejected above.
Moreover, Centripetal is incorrect that Keysight’s position
with respect to claim 1 depends on simultaneous pre-in-
stallation of the first and second rule sets; Centripetal fails
to contend with Roese’s disclosure in Paragraph 17 that the
“policy and/or PER sets may be pre-installed, updated, re-
installed, revised, or otherwise changed when and as de-
sired.” We see no inconsistency between Keysight’s obvi-
ousness contentions with respect to claim 1 (which does not
include any timing requirement for receipt) and with re-
spect to claims 2, 15, and 19, given this expansive teaching
in Roese.
Case: 25-1715 Document: 46 Page: 14 Filed: 11/25/2026
14 CENTRIPETAL NETWORKS, LLC v.
KEYSIGHT TECHNOLOGIES, INC.
CONCLUSION
For the foregoing reasons, we affirm the Board’s deter-
mination that all claims of the ’009 Patent are unpatenta-
ble as obvious. Because we so hold, we need not and do not
reach Keysight’s alternative ground for affirmance based
on collateral estoppel.
AFFIRMED