Full Opinion

Case: 25-1715 Document: 46 Page: 1 Filed: 11/25/2026 NOTE: This disposition is nonprecedential. United States Court of Appeals for the Federal Circuit ______________________ CENTRIPETAL NETWORKS, LLC, Appellant v. KEYSIGHT TECHNOLOGIES, INC., Appellee ______________________ 2025-1715 ______________________ Appeal from the United States Patent and Trademark Office, Patent Trial and Appeal Board in No. IPR2022- 01421. ______________________ Decided: November 25, 2026 ______________________ MATTHEW JAMES DOWD, Dowd Scheffel PLLC, Wash- ington, DC, argued for appellant. Also represented by ROBERT JAMES SCHEFFEL. JONATHAN IAIN MAX DETRIXHE, Reed Smith LLP, San Francisco, CA, argued for appellee. Also represented by GERARD M. DONOVAN, Washington, DC; JAMES CHRISTOPHER MARTIN, Pittsburgh, PA; JONAH D. MITCHELL, Kilpatrick Townsend & Stockton LLP, San Francisco, CA. Case: 25-1715 Document: 46 Page: 2 Filed: 11/25/2026 2 CENTRIPETAL NETWORKS, LLC v. KEYSIGHT TECHNOLOGIES, INC. ______________________ Before STOLL, LINN, and STARK, Circuit Judges. LINN, Circuit Judge. Centripetal Networks, LLC appeals from a final writ- ten decision by the Patent Trial and Appeal Board (“Board”) in an inter partes review (“IPR”) proceeding, hold- ing claims 1–30 of its U.S. Patent No. 10,681,009 (“’009 Pa- tent”) unpatentable as obvious. Keysight Techs., Inc. v. Centripetal Nets., LLC, IPR 2022-01421, 2024 WL 4648646 (P.T.A.B. Nov. 1, 2024) (“FWD”). We have jurisdiction to review the Board’s FWD under 28 U.S.C. § 1295(a)(4)(A). We affirm. BACKGROUND Because we write for the parties, we assume familiarity with the record and include only the background necessary for understanding. At a high level, the ’009 Patent claims a method for what Centripetal calls “fast rule swapping,” by which network protection devices like firewalls swap rule sets. We treat claim 1 as representative of all but de- pendent claims 2, 15, and 19, addressed separately below. As relevant on appeal, the method of claim 1 “prepro- cess[es]” both the first and second rule sets before they are “implemented” on a network protection device. ’009 Pa- tent, Cl. 1. Then, “responsive to” a signal to swap rule sets, the method “ceas[es] processing of one or more packets,” “cach[es] the one or more packets,” “reconfigur[es] the net- work protection device to process packets in accordance with the preprocessed second rule set,” “signal[s] comple- tion of the reconfiguration,” and in response to that signal, processes the cached packets in accordance with the pre- processed second rule set. Id. Dependent claims 2, 15, and 19 add a timing limitation whereby the second rule set must be received after implementation of the first rule set. Preprocessing requires, in the context of this patent, at least one of merging two or more rules, separating one or Case: 25-1715 Document: 46 Page: 3 Filed: 11/25/2026 CENTRIPETAL NETWORKS, LLC v. 3 KEYSIGHT TECHNOLOGIES, INC. more rules into two or more rules, or reordering rules within a rule set. Id. at col. 4, ll. 50–54. In its FWD, the Board explained that implementing “means that the rule set has been put into effect as part of the policy being en- forced on the network protection device [and] that this cor- responds to step 206 of Figure 2 of the ’009 patent,” and both parties agree that implementing is the same as con- figuring. FWD, 2024 WL 4648646 at *5; see ’009 Patent, Fig. 2 (below); Appellant’s Opening Br. at 7; Appellee’s Br. at 6. As relevant here, prior art U.S. Patent No. 7,320,022 (“Hayter”) teaches devices processing packets of data that may each include a header and a payload, and caching the Case: 25-1715 Document: 46 Page: 4 Filed: 11/25/2026 4 CENTRIPETAL NETWORKS, LLC v. KEYSIGHT TECHNOLOGIES, INC. portion of those packets being processed to increase pro- cessing speed. Hayter at col. 6, ll. 3–23; id. at col. 10, ll. 59–62. In its dependent claim 9, Hayter claims storing in the cache “the entirety of the header and at least one byte of data payload of the data packet.” Id. at Cl. 9. Hayter also discusses avoiding “cache pollution” by not caching parts of data that are not being accessed. Id. at col. 12, ll. 29–32. As relevant here, prior art U.S. Patent Publication No. 2006/0048142 (“Roese”) teaches a firewall system that allows rapidly switching between different sets of rules, us- ing rapid response identifiers in response to certain trig- gering events—such as a particular network condition or a threat—to select different rule sets. Roese explains that several rule sets may be pre-installed. Roese at Abstract; id. ¶ 36. When a trigger activates, the system selects which rule set to apply and “initiates enforcement” of the rule set by signaling the processor with the “identifiers of one or more policy and/or [policy enforcement rule sets (“PER sets”)] to be implemented.” Id. ¶ 53. The rule sets may be “pre-installed, updated, re-installed, revised, or otherwise changed when and as desired,” id. ¶ 17, and may be “updated or adjusted . . . at any time,” id. ¶ 23. Keysight filed the instant IPR, challenging the patent- ability of all claims of the ’009 patent as obvious over a com- bination of Roese, Golnabi, Huima, Hayter, and other references. The Board initially denied institution, but, af- ter the Director’s intervention, instituted the IPR and held all claims obvious in its FWD. A prior IPR of U.S. Patent No. 9,674,148, a great-grandparent of the ’009 patent at is- sue here, held all claims unpatentable as obvious over Roese, Golnabi, Huima, Hayter, and other prior art. Cisco Sys., Inc. v. Centripetal Nets., Inc., IPR 2018-01454, 2020 WL 1080533 (P.T.A.B. Mar. 5, 2020). Case: 25-1715 Document: 46 Page: 5 Filed: 11/25/2026 CENTRIPETAL NETWORKS, LLC v. 5 KEYSIGHT TECHNOLOGIES, INC. DISCUSSION Patent Owner Centripetal makes several arguments challenging the Board’s constructions, findings with re- spect to the disclosures in the prior art, and procedural de- terminations. I Centripetal first argues that the Board erred in failing to limit the construction of “caching” to exclusively occur “while the rules are being swapped.” Appellant’s Opening Br. at 30–37 (citing FWD, 2024 WL 4648646 at *6). Cen- tripetal says that the claims compel such a limitation “as a matter of logic or grammar,” see Mformation Techs., Inc. v. Rsch. in Motion Ltd., 764 F.3d 1392, 1398 (Fed. Cir. 2014), and points to Figure 4 of the ’009 Patent as an example of caching during swapping. Keysight responds that there is no basis to impose such a negative claim limitation beyond the sequencing already contained in the claims and argues that Figure 4 of the ’009 Patent shows caching (step 406) after signaling (step 402) but before reconfiguration, i.e., swapping (step 408). We agree with Keysight and the Board. The claims al- ready require caching to occur in response to the signaling and after “ceasing processing of one or more packets by the network protection device.” ’009 Patent, Cl. 1. And, as the Board correctly explained, nothing about the plain and or- dinary meaning of “caching” requires incorporating a tim- ing limitation into the construction beyond that already contained in the claims. Nothing in the ’009 Patent prohib- its also caching at other times if the sequencing limitation is otherwise met. Centripetal’s reliance on Figure 4 as showing caching during swapping does not compel a differ- ent construction. Rather, Figure 4 confirms our analysis by illustrating the claimed sequence—signaling, ceasing processing packets, caching, reconfiguring to process pack- ets in accordance with the second rule set, then processing packets in accordance with the second rule set—without Case: 25-1715 Document: 46 Page: 6 Filed: 11/25/2026 6 CENTRIPETAL NETWORKS, LLC v. KEYSIGHT TECHNOLOGIES, INC. any additional temporal limitation tied to the step of cach- ing. We therefore affirm the Board’s construction of cach- ing. II Centripetal next argues that the Board lacked substan- tial evidence to find that Hayter teaches caching entire data packets (as required by the Board’s claim construc- tion, which in this respect is not contested on appeal) be- cause Hayter is fundamentally limited to caching “a portion of a received packet,” Hayter at Abstract, and no- where discusses storing an entire packet in the cache. See id. at 10:59–62 (“[T]he processor 12A or 12B may operate on a portion of the header, the entire header, or even the entire header and a portion of the data payload.”); Cl. 1. Centripetal also argues that Hayter teaches away from caching entire packets because it seeks to prevent “cache pollution” by caching only the portions of a packet that are actively being worked on. See Hayter at 12:29–32; J.App’x 1483 ¶ 35 (Centripetal Expert Report). Keysight responds that Hayter expressly teaches cach- ing “the entirety of the header and at least one byte of data payload of the data packet” in claim 9 which includes up to the entire data payload. Appellee’s Br. at 43–44 (citing Hayter at Cl. 9). Keysight also argues that Hayter ex- pressly contemplates data packets “that consist entirely of a header and include no payload data,” such as TCP ACK packets, and that Hayter’s repeated disclosures of caching the entire header thereby teach caching of those entire data packets. Appellee’s Br. at 45–48; see also J.App’x 1724; FWD, 2024 WL 4648646 at *14. Substantial evidence supports the Board’s finding that Hayter teaches caching entire data packets. The disclosure in Hayter’s claim 9 to cache “the entirety of the header and at least one byte of data payload” plainly includes caching Case: 25-1715 Document: 46 Page: 7 Filed: 11/25/2026 CENTRIPETAL NETWORKS, LLC v. 7 KEYSIGHT TECHNOLOGIES, INC. the entire header and entire payload. Nothing in Hayter limits this teaching to “at least one byte of [but not the en- tirety of] the payload.” At best, Hayter implies a distinc- tion between “a portion of the header” and “the entire header,” e.g., Hayter at col. 10, ll. 59–62, but those two terms are never indicated to be necessarily mutually exclu- sive, this distinction regarding headers need not apply to payloads, and the distinction does not limit the amount of payload data that may be cached under claim 9. Even if Centripetal’s reading of Hayter is reasonable, Centripetal fails to explain why the Board’s contrary reading is not rea- sonable and thus unsupported by substantial evidence. We also agree with Keysight’s alternative argument, that Hayter’s repeated teachings of caching entire headers, Hayter at Cl. 9; col. 11, ll. 14–16; col. 6, ll. 5–7, coupled with its teaching that some packets may be comprised of a header without a payload, id. at col. 11, ll. 1–5, J.App’x 1762–63 (¶ 53, Reply Decl. of Keysight Expert Jacobson), reasonably teaches caching the entirety of such packets. FWD, 2024 WL 4648646 at *14. The Board reasonably re- jected Centripetal’s expert’s opinion that Hayter would necessarily have divided the header and cached only a por- tion of it when caching a payload-less packet, J.App’x 1512 (¶ 89); J.App’x 1773–74, because Hayter does not indicate that such payload-less packets would be treated any differ- ently with respect to its disclosure of caching the entire header. FWD, 2024 WL 4648646 at *14; J.App’x 1762–64 (¶¶ 53–55, Reply Decl. of Keysight Expert Jacobson). We need not and do not consider Keysight’s alternative argument based on the combination of Hayter with Roese with respect to caching entire packets, because substantial evidence supports the Board’s finding that Hayter on its own teaches this limitation. Case: 25-1715 Document: 46 Page: 8 Filed: 11/25/2026 8 CENTRIPETAL NETWORKS, LLC v. KEYSIGHT TECHNOLOGIES, INC. III A Centripetal next argues that the Board lacked substan- tial evidence to find that prior art Roese teaches prepro- cessing rule sets prior to implementation. First, Centripetal argues that the Board changed its construction of “being implemented” in the final written decision, FWD 2024 WL 4648646 at *6 (the device “setup to utilize that rule set to evaluate network traffic”), from its construction in the institution decision, id. at *5 (“the rule set has been put into effect as part of the policy being enforced on the network protection device”), without providing Centripetal notice and an opportunity to address the change in viola- tion of the Administrative Procedures Act (“APA”). See 5 U.S.C. § 554(b)(3) and (c); Axonics, Inc. v. Medtronic, Inc., 75 F.4th 1374, 1383 (Fed. Cir. 2023) (requiring “adequate notice and an opportunity to respond under the new con- struction”). Centripetal appears to argue that this change was material because it conflated rule implementation and rule application/enforcement, which are distinct steps in the ’009 Patent claims. See Appellant’s Opening Br. at 51. The Board rejected this argument in rehearing, catego- rizing the change as simply a “paraphrase” that did not change the meaning of the construction. J.App’x 44. We agree with the Board that there was no APA violation here because the Board’s construction did not substantively change. We can discern no substantive difference between “setup to utilize that rule set to evaluate network traffic” and “the rule set has been put into effect as part of the pol- icy being enforced on the network protection device.” Con- trary to Centripetal’s argument, both constructions (and the Board) recognize that implementation “is separate from the actual process of having [the device] evaluate packets,” FWD, 2024 WL 4648646 at *6. Centripetal does not explain any other way that the language in the FWD changed the substantive scope of the claims. The Board’s Case: 25-1715 Document: 46 Page: 9 Filed: 11/25/2026 CENTRIPETAL NETWORKS, LLC v. 9 KEYSIGHT TECHNOLOGIES, INC. use of an immaterially different paraphrase of the agreed- upon construction does not constitute reversible error here. B Centripetal argues that the Board lacked substantial evidence for its finding that Roese teaches preprocessing a rule set prior to implementation of that rule set, as re- quired by all claims. 1 Roese teaches a device that includes “one or more policy and/or PER sets each associated with a unique rapid response identifier, pre-installed.” Roese ¶ 36 (emphasis added). Centripetal argues that “pre-installed” is used as a synonym for “implemented,” and, because Roese does not teach any processing prior to the pre-instal- lation, Roese does not teach preprocessing prior to imple- mentation. Keysight responds that the Board reasonably distin- guished pre-installation in Roese—what Keysight de- scribes as associating rule sets with unique rapid response identifiers, Appellee’s Br. at 57—from implementation, which occurs at Roese’s appropriately named “implementa- tion function 204.” See Roese ¶ 41 (“[T]he implementation function 204 . . . instructs the [policy enforcement function] 1 Centripetal further argues that the Board erred in “construing” “installation” as “receiving.” Appellant’s Opening Br. at 53–54. As the Board correctly explained, because “installation” is part of Roese’s disclosure and is not used in the challenged claims, the proper analysis con- cerns the factual disclosure of Roese and not claim con- struction. See FWD, 2024 WL 4648646 at *6 (“[A]ny discussion of ‘installation’ is made with respect to [] what the cited references teach or suggest and is not affected by any construction of any claim term.”). Thus, we review whether substantial evidence supports the Board’s reading of Roese’s disclosure. Virtek Vision Int’l ULC v. Assembly Guidance Sys., Inc., 97 F.4th 882, 886 (Fed. Cir. 2024). Case: 25-1715 Document: 46 Page: 10 Filed: 11/25/2026 10 CENTRIPETAL NETWORKS, LLC v. KEYSIGHT TECHNOLOGIES, INC. 250 . . . to implement the policy and/or PER set by signal- ing the processor 253 to initiate enforcement of the selected policy and/or PER set(s).”). Substantial evidence supports the Board’s finding that “pre-install[ation]” in Roese is not equivalent to implemen- tation. First, nothing in Roese suggests that devices with rule sets pre-installed, without further steps, are “setup to utilize that rule set to evaluate network traffic” or have “been put into effect as part of the policy being enforced,” as required by the construction of implementation. To the contrary, Roese discusses multiple additional steps before the policy is ready to be utilized or put into effect. As Keysight’s expert opined, Roese expressly teaches an im- plementation function after pre-installation, which aligns with the construction of implementation. J.App’x 1739–40 (¶¶ 13–14, Reply Decl. of Keysight Expert Jacobson). This is well-supported by the express disclosure in Roese, which describes an analysis function that determines which of the policy sets to “select[] for implementation (step 307),” and the policy manager thereafter “instruct[s] the processor 253 to initiate the process of configuring the forwarding en- gine 252 with the one or more policies and/or PERs” se- lected for implementation, and by “signaling the processor 253 to initiate the enforcement of the selected policy and/or PER set(s).” Roese ¶¶ 47, 41. Centripetal argues that the only way that pre-install can be distinct from implemented is to equate install with receipt, as it contends Keysight and the Board erroneously did. See Appellant’s Opening Br. at 53–57; but see id. at 53 (arguing that “being implemented” should be correctly un- derstood as “being received”). Neither the Board nor Keysight’s expert equated installation with receipt. The Board merely said that it did not see how a device could preprocess a rule set that has “not been installed, i.e., act on sets that they have not received, nor how rule sets could be manipulated in absentia.” FWD, 2024 WL 4648646 at *11. This statement was made in the context of rejecting Case: 25-1715 Document: 46 Page: 11 Filed: 11/25/2026 CENTRIPETAL NETWORKS, LLC v. 11 KEYSIGHT TECHNOLOGIES, INC. Centripetal’s argument for a broader reading of “imple- mentation” as used in the ’009 Patent. Id. Because the claims require preprocessing before implementation, the Board explained that a device cannot preprocess rules prior to them being “installed, i.e., act on sets that they have not received,” and thus rejected the equivalence of implemen- tation and installation. The off-hand use of “received” in this explanation did not equate pre-installation and receipt in Roese. Keysight also does not equate installation with receipt. Dr. Jacobson, Keysight’s expert, only opined that “installing [the rule sets] is putting them on that device,” but this is at least ambiguous as to whether this is “re- ceipt,” or a downstream function. J.App’x at 1832 (5:2–14). Dr. Jacobson repeatedly explained that installation is not implementation, including in the immediately succeeding colloquy, see id. at 1832 (6:8–22), and Dr. Jacobson’s state- ment does not inform the key objection Centripetal raises with respect to Roese: whether “pre-installed” in Roese means implemented. Having rejected Centripetal’s attempted remapping of implementation and receipt onto pre-installation, substan- tial evidence supports the Board’s finding that Roese teaches preprocessing prior to implementation. Keysight’s expert opined that the rule set may be preprocessed “at any time” and “at any period,” including prior to implementa- tion. J.App’x 1740 (¶ 15, Reply Decl. of Keysight Expert Jacobson); J.App’x 243–44 (¶ 126). This is also well-sup- ported by Roese’s express disclosure. Roese ¶ 23 (“[T]he policy manager function selects the relevant policy and/or PER set(s) deemed responsive to the trigger(s), selects the particular PEF(s) to be used to implement the selected pol- icy and/or PER set(s) previously installed on those PEFs, and communicates the rapid response identifier(s) for those selected policy and/or PER set(s) to be implemented. It is to be understood that the . . . policy sets, PER sets, and rapid response identifiers may be updated or adjusted by the policy manager function at any time.”); Roese ¶ 17 Case: 25-1715 Document: 46 Page: 12 Filed: 11/25/2026 12 CENTRIPETAL NETWORKS, LLC v. KEYSIGHT TECHNOLOGIES, INC. (“The policy and/or PER sets may be pre-installed, up- dated, re-installed, revised, or otherwise changed when and as desired.”). The Board reasonably read Roese’s dis- closure that updating or adjusting the policy sets and PER sets (i.e., preprocessing) can occur at any time as teaching that such preprocessing can occur prior to implementation. Centripetal argues that the “any time” modification in Roese is limited to “already-implemented, pre-installed rule sets,” Appellant’s Opening Br. at 62, but this relies on the argument we rejected above, i.e., that Roese’s disclo- sure of “pre-installed” means implemented. Substantial evidence therefore supports the Board’s rejection of this ar- gument. We affirm the Board’s conclusion of obviousness of claim 1. IV Dependent claims 2, 15, and 19 additionally require re- ceipt of the second rule set after implementation of the first rule set, whereas representative independent claim 1 does not indicate any timing requirement for the receipt of the rule sets. 2 Centripetal briefly argues that the Board lacked sub- stantial evidence to hold that these dependent claims were obvious because the Board’s finding that Roese taught the preprocessing limitation depended on having both sets of rules “pre-installed” (and thus received) prior to being pre- processed and the first rule set being implemented, which 2 In its reply brief, Centripetal concedes that its ar- guments on appeal regarding the ’009 patent’s dependent claims are limited to challenging the Board’s determina- tion of obviousness of claims 2, 15, and 19. Appellant’s Re- ply Br. at 28 n.2. Case: 25-1715 Document: 46 Page: 13 Filed: 11/25/2026 CENTRIPETAL NETWORKS, LLC v. 13 KEYSIGHT TECHNOLOGIES, INC. cannot possibly meet the dependent claim’s timing limita- tion. Keysight responds that its theory of obviousness based on Roese is not limited to having both rule sets “pre-in- stalled” at the same time. Rather, Roese teaches that rule sets “may be distributed to a [Policy Enforcement Point] before the start of any network session, when a network session is started, or during a network session,” Roese ¶ 9 (emphasis added), and that these rule sets “may be pre-in- stalled, updated, re-installed, revised, or otherwise changed when and as desired,” Roese ¶ 17. Keysight ar- gues that Roese does not require simultaneous pre-instal- lation of both rule sets or otherwise limit its expansive teaching of available timing for the receipt, preprocessing, and implementation of the rule sets. See J.App’x 1749 (¶ 32, Reply Decl. of Keysight Expert Jacobson). The Board’s decision is supported by substantial evi- dence. As Keysight correctly points out and as confirmed in Centripetal’s reply brief, Centripetal’s position depends on its incorrect characterization that Keysight’s obvious- ness theory equates pre-installation and receipt, see Appel- lant’s Reply Br. at 28, a characterization we rejected above. Moreover, Centripetal is incorrect that Keysight’s position with respect to claim 1 depends on simultaneous pre-in- stallation of the first and second rule sets; Centripetal fails to contend with Roese’s disclosure in Paragraph 17 that the “policy and/or PER sets may be pre-installed, updated, re- installed, revised, or otherwise changed when and as de- sired.” We see no inconsistency between Keysight’s obvi- ousness contentions with respect to claim 1 (which does not include any timing requirement for receipt) and with re- spect to claims 2, 15, and 19, given this expansive teaching in Roese. Case: 25-1715 Document: 46 Page: 14 Filed: 11/25/2026 14 CENTRIPETAL NETWORKS, LLC v. KEYSIGHT TECHNOLOGIES, INC. CONCLUSION For the foregoing reasons, we affirm the Board’s deter- mination that all claims of the ’009 Patent are unpatenta- ble as obvious. Because we so hold, we need not and do not reach Keysight’s alternative ground for affirmance based on collateral estoppel. AFFIRMED