Timberline Four Seasons Utilities, Inc. and Canaan Valley Public Service District v. Kapitus Servicing, Inc.
CourtWest Virginia Supreme Court
Date FiledNovember 12, 2026
Docket23-728
StatusPublished
📰 News Coverage: Read the LAWS.com news report on this case
Full Opinion
FILED
November 12, 2026
released at 3:00 p.m.
C. CASEY FORBES, CLERK
SUPREME COURT OF APPEALS
OF WEST VIRGINIA
IN THE SUPREME COURT OF APPEALS OF WEST VIRGINIA
September 2026 Term
_____________
No. 23-728
_____________
TIMBERLINE FOUR SEASONS UTILITIES, INC., AND
CANAAN VALLEY PUBLIC SERVICE DISTRICT,
Respondents Below, Petitioners,
V.
KAPITUS SERVICING, INC.,
Petitioner Below, Respondent.
Appeal from the Intermediate Court of Appeals
No. 23-ICA-22
(Circuit Court of Tucker County, Civil Action No. CC-47-2022-C-4)
REVERSED AND REMANDED
Submitted: September 11, 2026
Filed: November 12, 2026
Martin P. Sheehan, Esq. Ancil G. Ramey, Esq.
Sheehan & Associates, PLLC Sarah C. Ellis, Esq.
Wheeling, West Virginia Benjamin McFarland, Esq.
Attorney for Petitioner Timberline Four Colton C. Parsons, Esq.
Seasons Utilities, Inc. Steptoe & Johnson PLLC
Charleston, West Virginia
John W. Cooper, Esq. Attorneys for the Respondent
Cooper & Preston, PLLC
Davis, West Virginia Ann Starcher, Esq.
Attorney for Petitioner Canaan Valley Spencer D. Elliott, Esq.
Public Service District Webster J. Arceneaux, III, Esq.
Lewis Gianola PLLC
Jeffrey S. Zurbuch, Esq. Attorneys for Amicus Curiae, the
Busch, Zurbuch & Thompson, PLLC Public Service Commission of West
Elkins, West Virginia Virginia
Attorney for Petitioner Canaan Valley
Public Service District
CHIEF JUSTICE BUNN delivered the Opinion of the Court.
SYLLABUS BY THE COURT
1. “In reviewing an Intermediate Court of Appeals’ decision from a
circuit court’s grant of a motion to dismiss, this Court applies a de novo standard of
review.” Syllabus Point 1, Folse v. Rollyson, 251 W. Va. 566, 915 S.E.2d 344 (2025).
2. “‘The trial court, in appraising the sufficiency of a complaint on a
Rule 12(b)(6) motion, should not dismiss the complaint unless it appears beyond doubt that
the plaintiff can prove no set of facts in support of his claim which would entitle him to
relief. Conley v. Gibson, 355 U.S. 41, 45-46, 78 S. Ct. 99, 2 L. Ed. 2d 80 (1957).’ Syllabus
Point 3, Chapman v. Kane Transfer Co., 160 W. Va. 530, 236 S.E.2d 207 (1977).”
Syllabus Point 2, Mountaineer Fire & Rescue Equipment, LLC v. City National Bank of
West Virginia, 244 W. Va. 508, 854 S.E.2d 870 (2020).
3. “The Public Service Commission was created by the Legislature for
the purpose of exercising regulatory authority over public utilities. Its function is to require
such entities to perform in a manner designed to safeguard the interests of the public and
the utilities. Its primary purpose is to serve the interests of the public. Boggs v. Public
Service Commission, 154 W. Va. 146, 174 S.E.2d 331 (1970).” Syllabus Point 1, West
Virginia-Citizen Action Group v. Public Service Commission, 175 W. Va. 39, 330 S.E.2d
849 (1985).
i
BUNN, Chief Justice:
While this case has a complex procedural history, ultimately, we consider the
extent of the Public Service Commission’s statutory authority to void a contract concerning
a public utility. Petitioners Timberline Four Seasons Utilities, Inc. (“Timberline Utilities”)
and the Canaan Valley Public Service District1 (collectively “the Timberline defendants”)
appeal the October 30, 2023 opinion issued by the Intermediate Court of Appeals (“ICA”),
which reversed the circuit court’s dismissal of a breach of contract claim against them.
In 2017, Timberline Utilities and an affiliated entity entered into a contract
with First US Funding, whose servicing agent eventually became respondent Kapitus
Servicing, Inc. (“Kapitus”), and pursuant to the contract, Kapitus agreed to provide
$130,000 in exchange for future receipts from the entities up to a certain amount.
Timberline Utilities and the affiliated corporation did not meet their obligations under the
contract, and in a subsequent bankruptcy proceeding, the bankruptcy court overruled
Timberline Utilities’ objection to Kapitus’s claim. The bankruptcy court dismissed the
proceeding at Timberline Utilities’ request. Kapitus then sued the Timberline defendants
for breach of contract, alongside other claims, in the Circuit Court of Tucker County, and
the case was referred to the Business Division. Meanwhile, before Timberline filed its
1
In the underlying suit, Canaan Valley Public Service District was sued both
individually and in its capacity as Receiver of Timberline Utilities, in the Circuit Court of
Tucker County.
1
answer, the Public Service Commission (“PSC” or “Commission”), in a detailed order,
found that the contract between Kapitus and Timberline Utilities was against the public
interest and void. The business court then dismissed Kapitus’s breach of contract claim
against the Timberline defendants, pursuant to Rule 12(b)(6) of the West Virginia Rules of
Civil Procedure, deferring to the PSC’s order that declared the contract void.
Kapitus appealed and the ICA reversed the business court’s order dismissing
the breach of contract claim, ruling that the bankruptcy court’s determination regarding
Kapitus’s claim against Timberline Utilities was res judicata, binding the business court
and the PSC. The Timberline defendants appealed to this Court.
We find that the ICA erred by reversing the business court’s dismissal of the
breach of contract claim. As detailed below, in dismissing the claim, the business court
properly took notice of the PSC order voiding the contract. Because the PSC order declared
the contract void, there was no contract to breach and Kapitus’s complaint against the
Timberline defendants alleging breach of contract failed to state a claim upon which relief
could be granted.2 We therefore reverse the ICA and remand the case to the business court
for the dismissal of Kapitus’s breach of contract claim.
2
This Court acknowledges the participation in this case of the Public Service
Commission of West Virginia, which filed an amicus curiae brief. We appreciate its
participation in this appeal and have considered its arguments in deciding the issues.
2
I.
FACTUAL AND PROCEDURAL HISTORY
In April 2017, Timberline Four Seasons Resort Management Company, Inc.,
and Timberline Utilities, the two companies doing business as Timberline Four Seasons
Resort Management Company (“Timberline”), entered into a revenue based factoring
agreement (the “contract”) with First US Funding.3 At the time the parties entered the
contract, Kapitus’s predecessor serviced First US Funding.
In exchange for $130,000, Timberline agreed to pay “future receipts,
accounts, contract rights and other obligations arising from or relating to the payment of
monies” from “customers’ [sic] and/or other third party payors” until Timberline paid
$169,000 to Kapitus. Additionally, Kapitus received a security interest in Timberline’s
property. Kapitus asserts that it paid Timberline the required $130,000 in May 2017,
pursuant to the contract, and that Timberline stopped making payments in June 2017,
paying only $42,794 toward the indebtedness.
In March 2019, the Circuit Court of Tucker County placed Timberline
Utilities in receivership at the request of the PSC, the agency that regulates public utilities
3
Because this case is ongoing before the lower court, we recite the facts from
the record for purposes of addressing the issues raised in this appeal only. We make no
further conclusions regarding these facts.
3
in the State of West Virginia. In support of the receivership, the court explained that on
February 21, 2019, the PSC
concluded as a matter of law that the ownership and
management of [Timberline Utilities] is grossly and willfully
inefficient; the ownership and management of [Timberline
Utilities] has demonstrated that it is unable or unwilling to
adequately serve its customers; and that the ownership and
management of [Timberline Utilities] is irresponsible and
unresponsive to the needs of its customers[.]
The court appointed the Canaan Valley Public Service District as the receiver for
Timberline Utilities.
Subsequently, in March 2021, Timberline Utilities filed for Chapter 11
bankruptcy in the United States Bankruptcy Court for the Northern District of West
Virginia and Kapitus filed a proof of claim in that proceeding. In re Timberline Four
Seasons Utilities, Inc., 2:21-BK-00125, 2021 WL 4952613, at *2 (Bankr. N.D.W. Va. Oct.
25, 2021). Timberline Utilities objected, arguing that the agreement between Kapitus and
Timberline Utilities “was unenforceable due to lack of PSC approval[.]” Id.4 The
4
The United States Court of Appeals for the Fourth Circuit has explained the
structure for establishing the valid claim in the context of a Chapter 11 bankruptcy
proceeding:
The Bankruptcy Code establishes a burden-shifting
framework for proving the amount and validity of a claim. The
creditor’s filing of a proof of claim constitutes prima facie
evidence of the amount and validity of the claim. 11 U.S.C.
§ 502(a); Fed. R. Bankr. P. 3001(f). The burden then shifts to
the debtor to object to the claim. 11 U.S.C. § 502(b); [In re
4
bankruptcy court initially overruled Timberline Utilities’ objection to Kapitus’s claim in
August 2021. In October 2021, in response to a motion for reconsideration filed by
Timberline Utilities,5 the bankruptcy court again overruled Timberline Utilities’ objection
to Kapitus’s claim after reconsidering the merits and found “that the agreement is voidable
in favor of Kapitus and can be enforced at Kapitus’s discretion.” Id. at *10.6 The
bankruptcy court further found that Kapitus had “a valid security interest” in Timberline
Utilities’ accounts receivable. Id. The bankruptcy court determined that the contract was
“still binding on the parties so long as it is a valid and enforceable contract notwithstanding
Johnson, 960 F.2d 396, 404 (4th Cir. 1992)]. The debtor must
introduce evidence to rebut the claim’s presumptive validity.
Fed. R. Bankr. P. 9017; Fed. R. Evid. 301; [4 Collier on
Bankruptcy ¶ 501.02[3][d] (15th ed. rev. 2004)]. If the debtor
carries its burden, the creditor has the ultimate burden of
proving the amount and validity of the claim by a
preponderance of the evidence. Id. at ¶ 502.02[3][f].
In re Harford Sands Inc., 372 F.3d 637, 640 (4th Cir. 2004) (footnote omitted).
5
Timberline Utilities asked the bankruptcy court first “to reconsider its
finding that Kapitus’s claim is supported by a judgment entered in the Commonwealth of
Virginia on January 28, 2020[,]” and secondly, objected to the proof of claim “on the
grounds that the agreement upon which it is based is void for illegality.” In re Timberline
Four Seasons Utilities, Inc., 2:21-BK-00125, 2021 WL 4952613, at *1 (Bankr. N.D.W.
Va. Oct. 25, 2021). The bankruptcy court reconsidered its finding regarding the Virginia
judgment and “ultimately set aside the Virginia judgment because the judgment is void as
to the Debtor.” Id. at *6. However, then the court turned to the issue regarding the validity
of the contract. See id.
6
A review of the bankruptcy court’s memorandum opinion reveals that no
party invoked an adversary proceeding regarding the contract before that court. See Fed.
R. Bankr. P. 7001 (entitled “Types of Adversary Proceedings”).
5
the lack of PSC approval” and, similarly, that “the agreement is valid notwithstanding the
lack of PSC authority.” Id. at *7-8. The bankruptcy court also found that “[n]othing in the
record insinuates that . . . the public served by the utility suffered any detriment as a result
of the agreement” and that any alleged public detriment “was offset to some degree by the
financing provided by Kapitus.” Id. at *8.
While the bankruptcy proceeding was pending, the PSC filed a motion in the
bankruptcy court for a ruling that its actions were exempt from the automatic bankruptcy
stay. The bankruptcy court granted the PSC’s motion on December 15, 2021. In a later
order, the PSC described this motion as seeking “permission from the Bankruptcy Court to
take regulatory action related to certain contracts.”
In late 2021 to early 2022, several significant developments took place
relevant to our analysis: (1) the PSC initiated its investigation of Timberline Utilities’
contracts; (2) the bankruptcy court dismissed the bankruptcy matter at Timberline Utilities’
request; (3) Kapitus filed its civil suit against Timberline Utilities in the circuit court, which
was referred to the business court; (4) the PSC entered an order voiding the contract and
security agreement between Timberline Utilities and Kapitus as against the public interest;
and (5) the Timberline defendants filed a motion to dismiss with the business court. We
discuss these events in more detail below.
6
On December 17, 2021, the PSC began investigating certain contracts
entered into by Timberline Utilities. The investigation originated in part upon the discovery
of “significant financial irregularities and improper actions on the part of former
management including significant high cost financing type arrangements that were
intended to only benefit [Timberline Utilities’] affiliates and not the Utility itself.”7 The
PSC directed that Kapitus be given notice of the PSC’s investigation and that the notice of
investigation be published in Tucker County.
On December 28, 2021, Timberline Utilities requested dismissal of the
bankruptcy matter without appealing the bankruptcy court’s order regarding Kapitus’s
claim. The bankruptcy court dismissed the case in January 2022.
On March 7, 2022, Kapitus filed its lawsuit against Timberline Utilities and
Canaan Valley Public Service District alleging breach of contract, fraud, unjust
enrichment, fraudulent transfer, breach of fiduciary duties, tortious interference,
conversion, and civil conspiracy, and also seeking a declaratory judgment. The case was
assigned to the business court division.
7
These quotations are from the PSC’s final order approved on April 10,
2022, discussed in detail below.
7
On March 21, 2022, a PSC administrative law judge submitted a
recommended decision to the PSC, which became a final PSC order on April 10, 2022. In
that order, the PSC found that the contract between Timberline Utilities and Kapitus was
void “as contrary to the public interest of the State of West Virginia pursuant to West
Virginia Code §24-2-12.”8 Likewise, the PSC also determined that the corresponding
security agreement and guaranty between Timberline Utilities and Kapitus was void
because “it violates the public interest of the State of West Virginia pursuant to West
Virginia Code §24-2-12.”
In reaching these conclusions, the PSC determined that the contract at issue
(along with other contracts) “involve[d] a scheme to improperly enrich affiliated
corporations” and “impoverish[ed] [Timberline Utilities’] utility assets and burden[ed] the
Utility with obligations related to obtaining cash infusions for affiliated corporations.” The
PSC noted that Timberline Utilities “in all likelihood did not even need an infusion of
money” and instead “[t]he real purpose of the transactions was the illegal and improper
scheme to use the assets and ratepayers of [Timberline Utilities] to prop up failing
affiliates.” The PSC heard evidence that the funds from Kapitus never reached the control
or accounts of the utility. Still, the PSC found that the contract, on its face, was “clearly
8
West Virginia Code § 24-2-12, discussed at length below, addresses the
PSC’s approval of utility contracts, among other matters.
8
against the public interest even without any improper transfers of the proceeds to
affiliates.”
The PSC order further noted that had the utility proposed this contract to the
PSC, “approval would have certainly been denied.” The PSC found that the contract was
“contrary to the public interest” because its high costs “would be unnecessary for any utility
operating in West Virginia[,]” as utilities can receive emergency interim rate relief from
the PSC, and because the contract was “designed to assist the improper disembowelment
of financial resources necessary for [Timberline Utilities] to function in order to improperly
benefit affiliates.” The contract was also contrary to the State’s interests because the
contract “reduce[d] the capacity of [Timberline Utilities] to continue to provide essential
public services to its customers” and the contract was “an effort to circumvent the
prohibitions established in the law that prohibit utilities in this State to engage in improper
affiliate transactions.”
The PSC found that, of the funds disbursed under the contract, “$10,700 of
the cash paid by First US Funding for the future receivables of [Timberline Utilities] went
to pay something which cannot be determined[,]” $1,200 went to transactional fees, and no
evidence in the bank records indicated that the remaining $118,000 “ever reach[ed]”
Timberline Utilities. Furthermore, in its findings of fact, the PSC determined that “[t]here
9
was no evidence in the financial records that any proceeds from the Kapitus (First US)
transaction were entered into the control or accounts of [Timberline Utilities].”
On April 11, 2022, the day after the PSC’s order became final, the Timberline
defendants filed a motion with the business court to dismiss all of the complaint’s
allegations pursuant to West Virginia Rule of Civil Procedure 12(b)(6). The Timberline
defendants claimed that the transactions underlying the complaint were void pursuant to
West Virginia Code § 24-2-12 because the transactions required approval from the PSC,
which was neither sought nor obtained; the transactions were contrary to the public interest;
and, after an investigation, the PSC declared the agreements between Kapitus and
Timberline Utilities void. Kapitus opposed the motion to dismiss on various grounds but
primarily argued that res judicata applied to the bankruptcy court’s earlier findings. Kapitus
also argued that even if the business court found that the PSC order controlled as to the
breach of contract claim, it would not affect the rest of the claims in Kapitus’s complaint.9
The business court granted the motion to dismiss, but only as to Kapitus’s
breach of contract claim. The court reasoned that this Court had interpreted West Virginia
Code § 24-2-12 in Lockard v. City of Salem, 127 W. Va. 237, 32 S.E.2d 568 (1944), to
9
Neither party suggested that Timberline defendants’ motion was not
properly the subject of a Rule 12(b)(6) motion.
10
require prior PSC approval “before the sale of property of the utility and/or entering into
any financial transaction with an affiliate of the utility.” The court further recognized that
all public utilities are subject to the supervision of the PSC and that the PSC’s orders
regarding utilities are entitled to deference. The court rejected Kapitus’s argument that it
was bound by the findings contained in the bankruptcy court’s order. As to the other counts
in the complaint, the court denied the motion to dismiss.10
Kapitus then appealed the business court’s dismissal of the breach of contract
claim to ICA. The ICA reversed the business court’s order, rejecting the business court’s
determination that the PSC’s finding that the contract was void required dismissal of the
breach of contract claim. Instead, the ICA determined that the federal bankruptcy court’s
decision regarding the validity of Kapitus’s claim should have had a preclusive effect
before the business court as to Kapitus’s allegation that Timberline Utilities breached its
contract, even after the PSC subsequently found the contract void and against the public
interest. Kapitus Servicing, Inc. v. Timberline Four Seasons Utilities, Inc., 249 W. Va. 70,
79, 894 S.E.2d 547, 556 (Ct. App. 2023). The ICA focused its analysis on what it described
10
The court also certified that its dismissal order regarding the breach of
contract claim was a final, appealable order subject to West Virginia Rule of Civil
Procedure 54(b) and there was no just reason for delay. No party before this Court
challenges this certification, and “the circuit court’s certification is entitled to substantial
deference, disrupted only when ‘clearly unreasonable.’” Hopkins v. Sutphin, 253 W. Va.
372, ___, 931 S.E.2d 772, 783 (2026) (quoting Province v. Province, 196 W. Va. 473, 479,
473 S.E.2d 894, 900 (1996)). Seeing no indication that the certification is clearly
unreasonable, we consider this appeal.
11
as “one central question[,]” which it found “dispositive of the case[,]” and concluded that
the business court erred by “failing to find that the bankruptcy court’s October 25, 2021,
order was res judicata as to the current dispute between the parties.” Id. at 76, 894 S.E.2d
at 553. The ICA reasoned that, because Timberline Utilities did not appeal the bankruptcy
court’s order and thus once the “determination became final, the PSC was precluded from
making a determination to the contrary.” Id. at 79, 894 S.E.2d at 556. Timberline Utilities
then appealed the ICA’s determination to this Court.
II.
STANDARD OF REVIEW
“In reviewing an Intermediate Court of Appeals’ decision from a circuit
court’s grant of a motion to dismiss, this Court applies a de novo standard of review.” Syl.
Pt. 1, Folse v. Rollyson, 251 W. Va. 566, 915 S.E.2d 344 (2025).
III.
DISCUSSION
On appeal, the Timberline defendants, in essence, argue that the business
court properly deferred to the PSC’s determination that the contract was void, in
recognition of the PSC’s statutory authority over utility contracts.11 Moreover, they
11
The Timberline defendants also assert, as an assignment of error, that
Kapitus waived any argument that the PSC’s order was res judicata in the underlying case
12
essentially assert that the ICA erred by applying res judicata to the bankruptcy court’s
decision. We agree.
A. The Business Court Properly Dismissed the Breach of Contract Claim
In conducting de novo review, we first discuss the relevant considerations a
court must make when determining whether to dismiss a claim pursuant to West Virginia
Rule of Civil Procedure 12(b)(6). Under those standards, and in recognition of the State’s
power to declare a public utility’s contract void by delegation to the PSC, we conclude that
the business court properly dismissed the breach of contract claim in light of the PSC’s
declaration that the contract between the parties was void.
As noted above, this case arises from the business court’s dismissal of the
breach of contract claim in Kapitus’s complaint pursuant to Rule 12(b)(6) for failure to
state a claim. As we have often stated, “[t]he trial court, in appraising the sufficiency of a
complaint on a Rule 12(b)(6) motion, should not dismiss the complaint unless it appears
beyond doubt that the plaintiff can prove no set of facts in support of his claim which would
entitle him to relief.” Syl. Pt. 2, Mountaineer Fire & Rescue Equip., LLC v. City Nat’l Bank
of W. Va., 244 W. Va. 508, 854 S.E.2d 870 (2020) (quoting Syl. Pt. 3, Chapman v. Kane
because Kapitus had the opportunity to appear before the PSC and could have raised
numerous “hypothetical arguments” in that proceeding. Because we review the circuit
court’s determination de novo, and also find that the circuit court did not err in dismissing
the breach of contract claim on other grounds, we need not reach this assignment of error.
13
Transfer Co., 160 W. Va. 530, 236 S.E.2d 207 (1977), which cites Conley v. Gibson, 355
U.S. 41, 45-46 (1957)). Generally, when a court considers a Rule 12(b)(6) motion, the court
“should confine [its] review to the four corners of the complaint or other disputed pleading
and may not consider extraneous documents.” Id. at 526, 854 S.E.2d at 888. Likewise,
when considering a motion to dismiss, the court must expressly disregard documents that
are not implicitly or explicitly referred to by the pleading. See Syl. Pt. 6, id. Still, a court
may take judicial notice of proceedings in the public record when considering a motion to
dismiss, particularly when the opposing party does not dispute their factual accuracy. See
Gulas v. Infocision Mgmt. Corp., 215 W. Va. 225, 229 n.4, 599 S.E.2d 648, 652 n.4 (2004)
(per curiam); see also Sturm v. Bd. of Educ. of Kanawha Cnty., 223 W. Va. 277, 283 n.9,
672 S.E.2d 606, 612 n.9 (2008) (recognizing that “[a] court may look to matters of public
record in deciding a Rule 12(b)(6) motion” and quoting Boateng v. InterAmerican Univ.,
Inc., 210 F.3d 56, 60 (1st Cir. 2000)). And here, while Kapitus disputes whether the PSC
could declare the contract void after the bankruptcy court considered the issue, Kapitus
does not dispute the authenticity of the PSC’s order nor did it argue that this matter could
not be considered in a Rule 12(b)(6) motion to dismiss or corresponding order.
To analyze whether the business court erred in deferring to the PSC’s order,
we must consider the PSC’s power to declare utility contracts void. As a foremost principle,
public utilities and their contracts are subject to state regulation. In Preston County Light
& Power Co. v. Renick, the Court explained that “all contracts made by a utility relating to
14
the public service must be deemed to be entered into in contemplation of the exercise by
the state of its regulatory power whenever the public interest may make it necessary[.]”
145 W. Va. 115, 129, 113 S.E.2d 378, 387 (1960). The state agency with regulatory power
over public utilities is, in West Virginia, the PSC. Delardas v. Morgantown Water
Comm’n, 148 W. Va. 776, 784, 137 S.E.2d 426, 432 (1964) (“This Court has consistently
held that the policy of the law of this State is that all public utilities, whether publicly or
privately owned, shall be subject to the supervision of the public service commission.”).
As the Court has long recognized, “[t]he Public Service Commission was created by the
Legislature for the purpose of exercising regulatory authority over public utilities. Its
function is to require such entities to perform in a manner designed to safeguard the
interests of the public and the utilities. Its primary purpose is to serve the interests of the
public.” Syl. Pt. 1, West Virginia-Citizen Action Group v. Pub. Serv. Comm’n, 175 W. Va.
39, 330 S.E.2d 849 (1985) (citing Boggs v. Public Service Commission, 154 W. Va. 146,
174 S.E.2d 331 (1970)).
In that vein, “all contracts made by a utility are subject to review by the
[Public Service] Commission.” City of S. Charleston v. W. Va. Pub. Serv. Comm’n, 204
W. Va. 566, 570, 514 S.E.2d 622, 626 (1999) (per curiam) (considering the PSC’s action
on a contract between two utilities). West Virginia Code § 24-2-12 specifically addresses
15
when a utility must seek the PSC’s approval to enter a contract and it provides, in relevant
part:12
Unless the consent and approval of the Public Service
Commission of West Virginia is first obtained: . . . (c) no public
utility subject to the provisions of this chapter, except railroads
other than street railroads, may assign, transfer, lease, sell, or
otherwise dispose of its franchises, licenses, permits, plants,
equipment, business or other property or any part thereof, but
this shall not be construed to prevent the sale, lease, assignment
or transfer by any public utility of any tangible personal
property which is not necessary or useful, nor will become
necessary or useful in the future, in the performance of its
duties to the public; . . . (f) no public utility subject to the
provisions of this chapter, except railroads other than street
railroads, may, by any means, direct or indirect, enter into any
contract or arrangement for management, construction,
engineering, supply or financial services or for the furnishing
of any other service, property or thing, with any affiliated
corporation, person or interest[.]
Applying West Virginia Code § 24-2-12, this Court has held that the failure to obtain the
consent and approval of the PSC of a utility contract makes that contract void. See Syl. Pt.
2, Lockard v. City of Salem, 127 W. Va. 237, 32 S.E.2d 568 (1944).13 West Virginia Code
12
West Virginia Code § 24-2-12 is entitled “What acts may not be done
without consent of commission; consent in advance of exemption of transactions; when
sale, etc., of franchises, mergers, etc., void.”
13
In relevant part, Syllabus Point 2, Lockard v. City of Salem, 127 W. Va.
237, 32 S.E.2d 568 (1944), provides:
a municipal corporation cannot sell, lease or otherwise dispose
of its municipal water system without having first obtained the
consent and approval of the Public Service Commission, or the
waiver thereof, and a purported contract whereby a municipal
corporation undertakes to lease to an individual its water
16
§ 24-2-12 also recognizes that, if the public interest is adversely affected, transactions
including sales, transfers of property, and contracts are void:
Every assignment, transfer, lease, sale or other
disposition of the whole or any part of the franchises, licenses,
permits, plant, equipment, business or other property of any
public utility, or any merger or consolidation thereof and every
contract, purchase of stock, arrangement, transfer or
acquisition of control or other transaction referred to in this
section made otherwise than as hereinbefore provided shall be
void to the extent that the interests of the public in this state are
adversely affected, but this shall not be construed to relieve any
utility from any duty required by this section.
W. Va. Code § 24-2-12.
In explaining the PSC’s regulatory power, the Court has noted that where
utilities are a party to a contract, “[p]rivate contract rights must yield to the public welfare,
where the latter is appropriately declared and defined and the two conflict.” Syl. Pt. 9, Mill
Creek Coal & Coke Co. v. Pub. Serv. Comm’n, 84 W. Va. 662, 100 S.E. 557 (1919).14
system for a definite term, executed without such consent and
approval, or the waiver thereof, is void, and will not ground an
action for claimed future profits based upon an alleged breach
of contract.
14
In Mill Creek Coal & Coke Co. v. Public Service Commission, the Court
considered the regulation of contracts for electricity that were “entered into before the
Public Service Commission Act was enacted,” with favorable rates lower than the rates
approved by the PSC due to war. 84 W. Va. 662, 677, 100 S.E. 557, 564 (1919). The Court
found that it would not treat those earlier contracts differently, as that “would be to permit
private contracts to dispossess the state of a portion of its police power, where the statute
enacted pursuant to that power was subsequent to such contracts.” Id. at 677-78, 100 S.E.
at 564. The Court explained that allowing this preference would have an effect of
17
Moreover, “the same policy that forbids to a utility total freedom of action likewise limits
the extent to which contracts with a utility will be recognized when the public need
necessitates a partial or total annulment.” Id. at 676, 100 S.E. at 563. Accordingly, when
the PSC reviews a utility’s contract, it “may modify or void any clause in the contract that
the Commission determines is adverse to public interest.” City of S. Charleston, 204 W.
Va. at 571, 514 S.E.2d at 627 (collecting cases).
Here, the parties do not dispute that Timberline Utilities is subject to PSC
regulation and that the PSC’s order indicates that the contract is void and not in the public
interest. The PSC specifically concluded that the contract should be declared void “as to
any application to [Timberline Utilities], as contrary to the public interest pursuant to West
Virginia Code §24-2-12[,]” alongside the security agreement. The PSC also found that the
contract was not submitted to the PSC by Timberline Utilities before entering into the
contract. In its order, the PSC recounted myriad issues with the contract, including the
“illegal and improper” scheme behind the contract, how the funds from the contract never
“recogniz[ing] the contract action of individuals as of superior dignity to the police power
of the state, a result tantamount to a denial of sovereignty in the state in the exercise of one
of its most sacred and sovereign powers.” Id. at 678; 100 S.E. at 564. The Court found this
argument “untenable.” Id.; see also id. at 676-77, 100 S.E. at 563 (“The duty of the utility
to subordinate its right of control over rates in the interest of the public welfare is balanced
by a corresponding duty on the part of individuals contracting with such utility to
subordinate their rights of contract to the same public welfare. The police power of the
state is impartial between utility and contractors, requiring both to surrender rights for the
general weal.”).
18
reached the utility, how utilities do not need high-cost loans because utilities can receive
emergency interim rate relief from the PSC, alongside specific reasons that the contract
was against the public and State interests.15
Turning to the motion to dismiss before the business court, because the PSC
declared the contract and related security agreement between Kapitus and Timberline
Utilities void, the business court properly took judicial notice of the PSC’s order and found
that there was no contract that the Timberline defendants could have breached. See Gulas,
215 W. Va. at 229 n.4, 599 S.E.2d at 652 n.4. In West Virginia, a breach of contract claim
“requires proof of the formation of a contract, a breach of the terms of that contract, and
resulting damages.” Sneberger v. Morrison, 235 W. Va. 654, 669, 776 S.E.2d 156, 171
(2015) (citing Syl. Pt. 1, State ex rel. Thornhill Group, Inc. v. King, 233 W. Va. 564, 759
S.E.2d 795 (2014)). A void contract, however, means it “is of no legal effect, so that there
is really no contract in existence at all.” Ryder v. Ryder, No. 18-0865, 2020 WL 1674226,
at *5 (W. Va. Apr. 6, 2020) (memorandum decision) (quoting Void Contract, Black’s Law
Dictionary (11th ed. 2019)).
15
Given that the PSC’s order listed these many specific reasons for finding
that the contract (and related security agreement) were against the public interest, Kapitus’s
argument that the PSC determined that the contract was void only because of the parties’
failure to submit the contract to the PSC for prior approval is inaccurate.
19
The business court properly considered the allegations in Count One of the
complaint alleging breach of contract, recognized the PSC’s statutory authority to examine
and declare utility contracts void, took judicial notice of the PSC’s order declaring the
contract void, and finally concluded, in effect, that Kapitus could “prove no set of facts in
support of [its] claim which would entitle [it] to relief.” Syl. Pt. 2, in part, Mountaineer
Fire & Rescue Equip., 244 W. Va. 508, 854 S.E.2d 870 (quoting Syl. Pt. 3, Chapman, 160
W. Va. 530, 236 S.E.2d 207). Thus, the business court did not err in dismissing the count
alleging the breach of contract.
B. The ICA Erred by Determining that the Bankruptcy Court’s Decision
Was Res Judicata as to the Contract Between the Parties and,
in Effect, Stripped the PSC’s Statutory Power
Having found that the business court properly recognized that the PSC
voided the contract and appropriately dismissed the breach of contract claim, we now turn
to the ICA’s erroneous determination that the bankruptcy court’s decision was res judicata
relating to that contract. In reaching its conclusion, the ICA ignored the PSC’s authority
over public utilities and discounted the bankruptcy court’s wil