Full Opinion

Reversed and remanded and Opinion filed November 24, 2026. In The Fourteenth Court of Appeals NO. 14-25-00255-CV GLORIA V. SALINAS, Appellant V. HOWARD A. LANG JUNIOR, Appellee On Appeal from the 80th District Court Harris County, Texas Trial Court Cause No. 2022-38621 OPINION This dispute concerns residential property at 4931 Michael Drive in Harris County purchased for $47,500 and the attendant payment obligation. In the plaintiff’s view after 20 years she had overpaid by some amount. From the defendant’s view she had paid up to 97%, leaving her owing somewhere between $5,401.32 to $8,047.67. She sued for what could only be a relatively small amount compared to the judgment assessed against her. This spurred in motion a series of events such that she went unrepresented during high-stakes summary-judgment proceedings and lost. Attorneys’ fees totaling $45,000 were assessed against her. We reverse and remand. I. FACTUAL AND PROCEDURAL BACKGROUND On November 18, 2006, Plaintiff-Appellant Gloria Salinas assumed the purchaser’s rights and obligations to Defendant-Appellee Howard Lang under an April 30, 2001 contract for deed. The contract reflected a $40,000 principal balance, ten-percent annual interest, and 240 monthly principal-and-interest payments, plus escrow payments for taxes and insurance. The seller retained title until all amounts due were paid and then was required to provide a general warranty deed. The parties dispute whether Salinas satisfied her payment obligations. Salinas contends that she paid more than $130,000 and satisfied the debt on March 2, 2020, about fifteen months before the May 31, 2021 maturity date. Salinas contends that she continued paying because she was unaware whether the debt had been satisfied. Salinas also contends that Lang failed to credit some payments, misapplied principal payments, and increased the number of remaining payments shown on annual statements without her consent. Lang maintains that Salinas frequently paid late, incurred late fees, stopped paying in November 2021, and owed a balance at maturity. The Lawsuit Salinas sued Lang on June 28, 2022, alleging that she had paid the contract in full; Lang answered and counterclaimed, alleging that she had not. Salinas’s live pleading included claims for breach of contract, trespass-to-try-title, and executory-contract claims. Lang’s counterclaim was for breach of contract. 1 1 Based on Lang’s calculation, Salinas had satisfied about 97% of her payment 2 Lang filed a hybrid traditional and no-evidence motion for summary judgment in May 2023 on Salinas’s contract and Property Code claims, and on his breach-of-contract counterclaim. Salinas responded and filed supporting evidence, but the motion was passed and never considered by the court. On September 23, 2024, Lang later filed another similar motion, his “Motion for Partial and No-Evidence Summary Judgment,” which is the impetus for this appeal. While there is no notice of submission or notice of oral hearing in the file, the parties do not dispute that the motion was set for oral hearing on November, 11, 2024, which the record indicates in fact occurred. After Lang’s dispositive motion was filed but before the hearing and before Salinas’s response was due, the trial court granted Salinas’s counsel’s motion to withdraw on October 22, 2024. At the November 11 hearing, Salinas appeared on her own behalf and told the court she received notice of the order granting her counsel’s withdrawal on November 5, six days before the summary-judgment hearing. The court disputed her account of late notice by reference to information on file that Salinas’s attorneys had contacted her of their withdrawal. Salinas had filed her response on the eve of the hearing along with various responsive exhibits; no affidavit or declaration was provided to authenticate many of the exhibits which were not self-authenticating documents. At the November 11 hearing, the trial court, implicitly satisfied that Lang’s motion stood firmly on its own—conclusively addressing all elements (but the damage element) of his breach of contract counter-claim and sufficiently identifying elements of all of Salinas’s claims—announced it was ruling by default and granted Lang’s motion on account of Salina’s untimely response: THE COURT: Okay. So, unfortunately, the rules apply to everyone in obligation. 3 this courtroom the same, and because there was no response on file timely to Defendant’s motion, as a matter of law, I grant Defendant’s motion.2 The same day the court signed an order granting Lang’s summary-judgment motion. However, contrary to the court’s in-court statements, among the court’s recitals were its consideration of “Plaintiff’s response (if any), . . .and all admissible and competent evidence on file.” After a bench trial on attorney’s fees, on December 27, 2024, the court issued its final judgment, awarding Lang $5,401.32 in actual damages on his breach of contract claim, prejudgment interest, $45,000 in attorney’s fees, and conditional appellate attorney’s fees. During the litigation, Lang delivered an executed and notarized general warranty deed and a $2,000 check to Salinas’s attorney. Though Salinas rejected the check, she asks that we take judicial notice she recorded the deed on April 11, 2025 (four days after she filed her notice of appeal). II. ISSUES AND ANALYSIS On appeal, Salinas challenges the trial court’s summary judgment order as to her claims for declaratory relief concerning title, breach of contract, trespass to try title, and violations of the Executory Contract for Conveyance Act, as well as Lang’s breach-of-contract counterclaim. A. Standard of review and applicable law Standard of Review Lang’s summary-judgment motion was a hybrid, combining a no-evidence 2 Immediately after this announcement the court admonished Salinas to speak with an attorney, and discussed setting the trial date for what remained, which Lang’s attorney described as “our damage issue, which is our attorney’s fees, and the amount she overpaid.” 4 motion with a traditional motion for summary judgment. We review both traditional and no-evidence summary judgments de novo. See Boerjan v. Rodriguez, 436 S.W.3d 307, 310 (Tex. 2014) (per curiam). Summary Judgments In the partial traditional summary judgment component of his hybrid motion, Lang sought summary judgment on liability for his breach-of-contract counterclaim against Salinas, with damages—including reasonable and necessary attorneys’ fees—to be determined at trial. To obtain a traditional summary judgment, the movant must produce evidence showing that no genuine issue of material fact exists and that it is entitled to judgment as a matter of law. See Town of Shady Shores v. Swanson, 590 S.W.3d 544, 551 (Tex. 2019). If the movant produces evidence conclusively establishing its right to summary judgment, then the burden of proof shifts to the non-movant to present grounds for avoiding summary judgment, including evidence sufficient to raise a genuine issue of material fact, if the non-movant so contends. Wyrick v. Bus. Bank of Tex., N.A., 577 S.W.3d 336, 346 (Tex. App.—Houston [14th Dist.] 2019, no pet.). The nonmovant may raise a genuine issue of material fact by producing more than a scintilla of evidence establishing the existence of the challenged element. Town of Shady Shores, 590 S.W.3d at 551. In the no-evidence component of his motion, Lang moved to dismiss Salinas’s claims for trespass to try title, breach of contract, and violations of the Executory Contract for Conveyance Act.3 In a no-evidence motion for summary judgment, the movant asserts that there is no evidence of one or more essential 3 Although not challenged by this appeal, Lang also challenged Salinas’s claims for violations of the Texas Deceptive Trade Practices Act, violations of the Texas Debt Collection Act, violations of the Texas Fraud in Real Estate and Stock Transactions Act, and statutory and common-law usury. 5 elements of the claim or defense for which the nonmovant bears the burden of proof at trial. Tex. R. Civ. P. 166a(i); see Timpte Indus., Inc. v. Gish, 286 S.W.3d 306, 310 (Tex. 2009). The burden then shifts to the nonmovant to present evidence raising a genuine issue of material fact as to the elements specified in the motion. See Mack Trucks, Inc. v. Tamez, 206 S.W.3d 572, 582 (Tex. 2006). We will affirm a no-evidence summary judgment when (a) there is a complete absence of evidence of a vital fact, (b) the court is barred by rules of law or of evidence from giving weight to the only evidence offered to prove a vital fact, (c) the evidence offered to prove a vital fact is no more than a mere scintilla, or (d) the evidence conclusively establishes the opposite of the vital fact. See City of Keller v. Wilson, 168 S.W.3d 802, 816 (Tex. 2005). Executory Contracts An executory contract, or a “contract for deed,” is a real-estate transaction that allows the seller of the property to retain title until the purchaser has paid for the property in full. Flores v. Millennium Interests, Ltd., 185 S.W.3d 427, 429 (Tex. 2005); Bryant v. Cady, 445 S.W.3d 815, 819 (Tex. App.—Texarkana 2014, no pet.) (“An executory contract for real property typically results in the buyer being entitled to immediate possession of the property on the making of a down payment.”). “A contract for deed differs from a conventional contract for the sale of realty, in which the seller and purchaser mutually agree to complete payment and title transfer on a date certain at which time the purchaser generally obtains both title and possession.” Bryant, 445 S.W.3d at 819; Graves v. Diehl, 958 S.W.2d 468, 471 (Tex. App.—Houston [14th Dist.] 1997, no pet.) (noting that under contract for deed, title remains with seller until purchase price is paid in full, which typically occurs in installments over course of years). A contract for deed “serves to provide persons unable to obtain conventional mortgage financing an 6 alternative means of purchasing real property.” Shook v. Walden, 368 S.W.3d 604, 625 (Tex. App.—Austin 2012, pet. denied); Ferrara v. Nutt, 555 S.W.3d 227, 236 (Tex. App.—Houston [1st Dist.] 2018, no pet.). Texas Property Code Chapter 5, Subchapter D governs certain executory contracts for the conveyance of real property. See Tex. Prop. Code Ann. §§ 5.061– .086; Smith v. Davis, 462 S.W.3d 604, 609 (Tex. App.—Tyler 2015, pet. denied) (stating that executory contracts for residential properties are “highly regulated by the legislature”). Subchapter D imposes several procedural requirements, including notice and disclosure requirements, remedies upon default, and the purchaser’s right to cancel the contract. See, e.g., Tex. Prop. Code Ann. §§ 5.063, .064, .069, .071, .074; Morton v. Nguyen, 412 S.W.3d 506, 510 (Tex. 2013). Section 5.077 requires an executory-contract seller to furnish the purchaser each January— postmarked by January 31 if mailed—with an annual accounting stating the amounts paid and owed, the number of remaining payments, specified tax and insurance information, and any required accounting of insurance proceeds, and it imposes liquidated damages and reasonable attorney’s fees for noncompliance, with the obligation continuing after the purchaser obtains title. Tex. Prop. Code Ann. § 5.077. Section 5.079 treats a recorded executory contract as a deed with a vendor’s lien for the unpaid contract price, implies a general warranty unless the contract limits it, and—if the contract has neither been recorded nor converted under Section 5.081—requires the seller to transfer recorded legal title to the purchaser within 30 days after receiving final payment, subject to statutory liquidated damages and reasonable attorney’s fees for noncompliance. Tex. Prop. Code § 5.079. Section 5.081 permits a purchaser under an executory contract to convert the purchaser’s interest, at any time and without penalty or charge, into recorded legal title by either tendering the unpaid balance—upon which the seller 7 must transfer title—or delivering a substantially compliant promissory note on the contract’s existing financial terms, upon which the seller must, within ten days, either provide a legally sufficient written refusal or arrange execution of a deed and corresponding deed of trust. Tex. Prop. Code § 5.081. B. Scope of Review Considerations 1. Events Defining the Summary Judgment Record Salinas asks that we consider her summary judgment response (and supporting evidence) to the original summary judgment motion and her late-filed response to the second summary judgment motion. Several things occurred in the trial court connected to its entry of summary judgment dismissing Salinas’s claims that led to the disruption of a complete review of all filings. She became crosswise with her attorney and the retained accounting expert and independently filed a series of motions seeking to preclude Lang’s ability to depose her accounting expert. On her former attorney’s second motion (which the court granted conditional upon de-designating Salinas’s expert accountant) the court issued an order granting the withdrawal of Salinas’s attorney while the summary judgment motion was pending. At the hearing Salinas argued for the court to consider her late-filed response; she claimed she did not know she was unrepresented until after the summary-judgment deadline passed.4 She told the court that she had sought to retain other counsel during the interim but was refused because her counsel had not been withdrawn formally from the case. If Salinas did in fact receive delayed notice of the order granting the attorney’s withdrawal and had been relying on her former attorney to respond, no 4 Lang’s attorney recounted that Salinas had previously been notified of the hearing date and earmarked November 4, 2024 as her response deadline in his client’s response to Salinas’s emergency motion to extend deadlines. 8 competent evidence of this was provided to the court to justify excusing the missed deadline. 5 The court’s order granting Lang’s summary-judgment motion states: After considering Defendant’s Traditional and No Evidence Motion for Partial Summary Judgment, Plaintiff’s response (if any), all replies (if any), pleadings, legal authorities, objections, and all admissible and competent evidence on file, the Motion is GRANTED. Even if we presume that after analysis of the court’s statements at the hearing versus its recital that the trial court did not consider Salina’s late-filed summary judgment response, 6,7 we cannot equally presume that Salinas’s response and responsive evidence previously filed in response to Lang’s original motion for summary judgment were not before the trial court. The trial court’s recital supports the conclusion that the trial court’s record fairly includes consideration of any response and all evidence on file. The trial court’s statements at the summary judgment hearing if relevant to the limiting scope of the summary-judgment record only signify exclusion of Salinas’s late response to the amended motion, not her response to the original motion that had already been on file. The second motion filed by Lang was an amended motion of his original motion in all but its name, as it was based on the same grounds (with 5 On a proper showing of good cause, we could consider a motion for new trial with sworn evidence demonstrating the facts illustrating her lack of notice. Though Salinas filed a motion for new trial supported by evidence, the admissible evidence addressed the merits of the summary judgment, not good cause for missing her response deadline. 6 E.g. an analysis seeking “an affirmative indication that the trial court permitted the late filing” under B.C. v. Steak N Shake Operations, Inc., 598 S.W.3d 256, 259 (Tex. 2020). 7 Salinas’s late-filed response does not include an affidavit such that most of her evidence was not authenticated. If we did consider the late-filed evidence, because Lang has raised an authentication challenge on appeal, we would be limited to reviewing the self-authenticating exhibits filed as well as exhibits of items produced in discovery. 9 minor variations) as the original motion targeting the same claims. Salinas already had placed on file her response and responsive evidence addressing the core arguments asserted in the original and repeated in the second summary-judgment motion. With a response readily available to evaluate the merits of that motion, the court was poised to rule on the merits. This court’s recent opinion in Neutrality, Inc. v. Perituza Software Sols. further supports this result as it illustrates that a nonmovant’s timely response and evidence to an original summary-judgment motion remain part of the reviewable summary-judgment record when later amended motions do not substantially alter the summary-judgment grounds and no response is filed to the amended motion. See Neutrality, Inc. v. Perituza Software Sols., LLC, No. 14-25-00212-CV, 2026 WL 1876163, at *1 (Tex. App.—Houston [14th Dist.] June 30, 2026, no pet.). In that case, Perituza filed successive amended motions, but none substantially changed the claims, and appellants did not respond to the second amended motion. Id. at *1. The appellant’s earlier summary-judgment response included the CEO’s affidavit stating that he signed only in his corporate capacity as Neutrality’s chief executive officer and made no personal guaranty. Id. at *2. That affidavit remained “on file” when the trial court ruled and was properly considered with all other evidence on file. Id. The court rejected the contention that appellants had to file a new response merely because Perituza amended its motion without materially changing its summary-judgment grounds. See id. This court reversed since there was summary judgment evidence that the CEO acted in a corporate capacity with therefore no personal liability. As a result, Perituza failed to establish breach of contract against the CEO as a matter of law. See id. The facts of this case align with Neutrality, Inc. Accordingly, we consider Salinas’s response and supporting evidence to the amended motion as part of the 10 summary-judgment record. See id. at 2; see also Mitschke v. Borromeo, 645 S.W.3d 251, 260 (Tex. 2022) (“Texas law greatly favors resolving litigation on the merits rather than on procedural technicalities.”); see also Dudley Constr., Ltd. v. Act Pipe & Supply, Inc., 545 S.W.3d 532, 538 (Tex. 2018) (“Whenever possible, we reject form-over-substance requirements that favor procedural machinations over reaching the merits of a case.”). Thus, we presume without deciding that the recital language controls, and consider whether the court properly granted summary judgment despite the declaration and evidence filed in response to the first summary judgment motion. 2. The summary-judgment record Lang sought traditional partial summary judgment on liability for his breach- of-contract counterclaim, arguing that the contract-for-deed assignment was enforceable; that Salinas materially breached by failing to pay all amounts due by the May 31, 2021 maturity date; that her prior material breach excused his obligation to deliver a warranty deed; and that, in any event, he tendered a fully executed deed and a $2,000 check for her claimed overpayment on November 16, 2023. 8 The traditional grounds were supported by the April 30, 2001 Contract for Deed (which required 240 monthly principal-and-interest payments, escrow payments, late fees, and reimbursement of certain seller advances), the November 18, 2006 assignment by which Salinas accepted the original buyer’s contractual obligations, Lang’s affidavit and annual accounting records, the November 2023 tender letter, the executed deed, and the $2,000 check, requests for admission concerning untimely payments and unpaid property taxes, and the defense 8 He asserted that Salinas’s nonpayment caused unliquidated damages, leaving the amount of damages and attorney’s fees for trial. 11 accountant’s affidavit and calculations. Lang also moved for no-evidence summary judgment. As to trespass to try title, he challenged evidence that he unlawfully dispossessed Salinas or withheld possession; as to breach of contract, evidence that he breached; and as to the Executory Contract for Conveyance Act, evidence supporting failures to transfer title, convert Salinas’s interest, provide annual statements, satisfy recording requirements, or make required disclosures. Salinas’s original 2023 summary judgment response addresses the grounds asserted by the 2024 motion. Her declaration states as follows: 1. I am Plaintiff in the above styled cause. On November 18, 2006, I entered into an Assignment for Contract for Deed with Defendant Howard A. Lang (the “Assignment”) to purchase a house located at 4931 Michael Drive (the “Property”). 2. Pursuant to the Assignment, I assumed the terms, rights, covenants and conditions under the Contract for Deed dated April 30, 2001 (the “Contract for Deed”). True and correct copies of the Contract for Deed and the Assignment are attached hereto and incorporated herein fully as Ex. A-1. The Contract for Deed included a note in the principal amount of $40,000 with annual interest at the rate of 10% to be paid in 240 monthly payments in the amount of $386.01. 3. In addition to the monthly payments for the principal and interest, the Contract for Deed required me to make monthly escrow payments to Defendant for the payment of taxes and insurance on the Property. 4. The original purchaser under the Contract for Deed was my relative, Sendy Salinas Velasquez. I made the payments on the Contract for Deed to Defendant on behalf of Ms. Velasquez from the date of the first payment until it was assigned to me. Therefore, I have records of the payments made on the Contract for Deed from the date of its inception on April 30, 2001 through the date of the Assignment in addition to all the payments I made after the Contract for Deed was assigned to me. 5. According to the statements Defendant provided me, Defendant charged me $28,182.91 in property taxes from 2001-2021 and 12 $13,395.43 in insurance premiums from 2001-2021. 6. I obtained copies of the property tax statements from the Harris County Tax Assessor Collector’s office for the years 2001-2021, and after adding up each year, I discovered that the total amount owed assessed by the tax assessor/collector over the course of the loan was only $27,071.01; therefore, Defendant overcharged me $1,111.88 in property taxes. 7. I attempted to get copies of all the invoices for the insurance premiums from 2001-2021; however, I was only able to locate invoices from 2010 forward from Southern Vanguard Insurance Co. I compared the amount Defendant charged me with the $11,913.54 amount I owed according to the invoices I received from the insurance company together with the amounts Defendant charged me for 2001- 2009, and I realized that once again Defendant had overcharged me at least $1,481.88. 8. Additionally, I added up the amounts Defendant’s statements listed as late charges over the course of the Contract for Deed, and he charged me a total $2,977.48 in late fees. 9. Also, I made at least four (4) specific payments to Defendant and indicated on those payments to apply the amount paid to principal, but the Defendant cashed these checks and failed to properly account for these payments. True and correct copies of these additional principal payments are attached hereto and incorporated herein fully as Ex. A-2. 10. In summary, according to my calculations of the statements Defendant provided to me, by his own numbers I was required to pay the grand total of $136,965.74 over the 240 months to cover the principal, interest, property taxes, insurance, and accumulated late fees. Also, according to the sum total of Defendant’s statements, Defendant shows that I paid $136,720.87 over the course of the loan. Therefore, according to Defendant’s own numbers, the most I could possibly owe would be the $244.87 difference, and not the $16,351.45 he claims in his Motion for Summary Judgment. 11. I have reviewed my records, and over the course of the Contract for Deed, my calculations show that in fact I paid $138,314.87 over the course of the Contract for Deed. A detailed summary of my payments showing the date the payment was made along with the check/serial number is attached hereto and incorporated herein fully as Ex. A-3. A detailed summary of my accounting for the complete 13 transaction is attached hereto and incorporated herein fully as Ex. A-4. 12. I never consented to any amendments of the Contract for Deed, including any extension or lengthening of its payment terms. Many times, over the course of the Contract for Deed, I attempted to meet with Defendant to discuss these discrepancies raised above; however, Defendant refused and continues to refuse to meet with me to resolve the discrepancies. I have written proof of all my attempts to ask to meet with Defendant and have produced copies of such in this lawsuit. The Defendant either ignored my requests and/or refused to speak with me about his accounting. Consequently, my only recourse to correct Defendant’s inaccurate accounting and to obtain the deed to my home as agreed, was to file this lawsuit. C. Disposition of Issues We consider whether Salinas’s available competent evidence on file, namely her declaration and exhibits attached, effectively challenge the grounds stated in the summary-judgment motion. 1. Whether the court erred by granting partial traditional summary judgment in favor of Lang’s breach-of-contract claim and by granting the no-evidence summary-judgment motion against Salinas’ claim In her second issue she challenges the trial court’s order granting the summary-judgment motions dismissing her claim and ruling favorably on Lang’s counterclaim for breach of contract. To recover on a breach of contract claim, the claimant must establish (1) the existence of a valid contract, (2) performance or tendered performance by the claimant, (3) breach of the contract by the other party, and (4) damages sustained by the claimant as a result of the breach. See TotalEnergies Petrochemicals & Ref. USA, Inc. v. Kinder Morgan Petcoke, LP, 658 S.W.3d 647, 660 (Tex. App.—Houston [14th Dist.] 2022, pet. denied). Neither party disputes a valid contract existed. Salinas claims that she fully performed the Contract for Deed, but Lang breached by misaccounting for and overcharging payments and refusing to convey title. Lang counterclaims that 14 Salinas materially breached the Contract for Deed by failing to pay all amounts due. Both Lang’s and Salinas’ breach of contract claims hinge on facts establishing Salinas’ payment under the Contract for Deed, and Lang’s no- evidence challenge to Salinas’ breach of contract only challenges the breach element, asserting that Salinas has no evidence Lang breached the Contract for Deed because she did not fully pay the amount owed. In her original response, Salinas disputed both breach and damages. She declared that her records show payments of $138,314.87. Lang’s statements allegedly show that only $136,965.74 was required and that she paid $136,720.87. Even under Lang’s figures, only $244.87 was arguably unpaid, not the $16,351.45 claimed. Her declaration and payment schedule therefore provide evidence disputing both breach and the amount of the alleged damages. Apart from evidence of payment, her declaration addresses other significant facts related to the element of breach. Salinas itemized the total late fees assessed to her ($2,977.48) based on Defendant’s statements. Neither Lang nor his expert specifies or analyzes the total late fees actually charged or responds to Salinas’s assertion regarding the amount or calculation of these fees. Salinas also offered evidence of faulty accounting. She declared that Lang cashed at least four checks designated for principal but failed to account for them properly. Copies were attached to her declaration. The affidavits of Lang and Wendler do not engage with or refute Salinas’s numerical analyses, do not compare her payment calculations to theirs, nor do they break down or analyze where discrepancies may exist. Her specific payment-allocation examples give a factfinder grounds to dispute the accuracy of Lang’s accounting and claimed balance. There is also evidence of an unauthorized contract change. The contract 15 allowed amendment only through a written instrument signed by both parties. Salinas declared that she never agreed to extend the payment term. Statements showing that the remaining payments inexplicably rose create a factual dispute over whether Lang changed the contract and breached it. Salinas also asserted she was overcharged for property taxes by $1,111.88 and for insurance premiums by $1,481.88. Neither the affidavit from Lang nor his expert addresses or rebuts her specific overcharge claims. Salinas claimed in her declaration she made repeated attempts to meet with Lang and submitted written requests for meetings to resolve her payment accounting disputes; she asserted that Lang refused or ignored these requests and only litigation prompted further review. Appellee’s affidavits do not mention, deny, or respond to these asserted efforts by Salinas to resolve the discrepancies informally or to the existence of contemporaneous written requests. Lang’s expert, Allen W. Wendler, a certified public accountant, outlined the methodology he used to compute amounts, and opined that, under either payment history, Salinas had not paid all amounts due by May 31, 2021 and remained indebted under the contract; as of her final payment on November 16, 2021, his calculations showed an outstanding balance of $5,401.32 using Salinas’s records and $8,047.67 using Lang’s records. Wendler however does not specifically address, test, or discuss Salinas’s claims of overcharges, missing principal payments, or excess payments made. The trial court never determined that expert testimony was necessary to resolve the arithmetic discussed in the case. We agree expert testimony could be helpful to illuminate some accounting principals, but we disagree with Lang that the record establishes that the subject matter reaches a level beyond helpful to “necessary.” Wendler’s testimony does not eclipse consideration Salinas’ 16 testimony by virtue of expertise. McGalliard v. Kuhlmann, 722 S.W.2d 694, 697 (Tex. 1986) (“Even uncontroverted expert opinion testimony is not conclusive unless the subject is one for experts or skilled witnesses alone.”); Dillon on Behalf of Estate of Culpepper v. King, No. 05-20-00215-CV, 2022 WL 1401403, at *17 (Tex. App.—Dallas May 4, 2022, no pet.) (holding that the factfinder is entitled to disbelieve witnesses and to accept lay testimony over that of experts, and that capacity to contract is not a subject for which expert testimony is required). Moreover, as discussed above, neither Wendler (nor Lang) address various vital factual considerations on the issue of breach. Resolving any doubts in favor of Salinas, we conclude from her declaration that a fact issue exists regarding whether she timely fulfilled her payment obligation to Lang under the Contract for Deed. See Moreno v. Langston, No. 13- 13-00003-CV, 2015 WL 3637849, at *3 (Tex. App.—Corpus Christi–Edinburg June 11, 2015, no pet.) (reversing no-evidence and traditional summary judgment on breach of land sale contract where plaintiff’s affidavit attesting that he made all payments until defendant refused to accept payment in May 2009 created more than a scintilla of probative evidence of performance); see also City of Keller, 168 S.W.3d at 825. Salinas’s declaration creates more than a scintilla of probative evidence that she performed under the contract. See Forbes Inc. v. Granada Biosciences, Inc., 124 S.W.3d 167, 172 (Tex. 2003). Therefore, the trial court should have denied both Lang’s traditional (on his breach-of-contract counterclaim) and his no-evidence motion (on Salinas’s breach of contract claim) for summary judgment, wherein Lang alleged untimeliness of payment as a breach of contract. Salinas’s second issue is sustained. 2. Whether the court erred by granting Lang’s no-evidence summary 17 judgment dismissing Salinas’s claim for trespass to try title The elements of a trespass-to-try-title action include: (1) the parties’ real names and residences; (2) a legally sufficient description of the premises; (3) the plaintiff’s claimed interest; (4) that plaintiff possesses the premises or is entitled to possession; (5) that the defendant unlawfully entered and dispossessed the plaintiff of the premises and withholds possession; and (6) a prayer for relief. Tex. R. Civ. P. 783(a)–(e), (g); Stelly v. DeLoach, 644 S.W.3d 657, 659 (Tex. 2022). Lang’s no-evidence motion targeted the fifth element of Salinas’s trespass- to-try-title claim—“that the defendant unlawfully entered and dispossessed the plaintiff of the premises and withholds possession.” The trial court implicitly concluded that Salinas failed to provide some evidence to support this element. In her third issue, Salinas argues that her evidence of full payment or overpayment raised a fact issue on the challenged possession and unlawful-withholding elements of her trespass-to-try-title claim. Salinas’s declaration introduces vital factual detail—including her reconciliation with public records, specific dollar amounts allegedly overcharged for taxes and insurance, specific principal payments she claims were not properly applied, her complete payment ledger, and her efforts to communicate and resolve disputes with Lang—which remain unaddressed and uncontested in both Lang’s and Wendler’s affidavits. Neither affidavit offers a point-by-point response or engages with these factual claims. Moreover, there is no other evidence in the record that specifically rebuts Salinas’s calculations, claimed overcharges, allegedly uncredited principal payments, payment total, or denial of an agreed extension. As such, the facts Salinas discusses relating to overcharges, payment applications, accounting discrepancies, and her communications—central to whether she has paid the full amount due—are left unaddressed by Lang’s motion 18 and supporting evidence. Accordingly, we find Salinas’s declaration creates more than a scintilla of probative evidence that she paid under the contract such that dispossession was unlawful. See Khan v. Yazdchi, No. 01-02-00918-CV, 2003 WL 21513628, at *4 (Tex. App.—Houston [1st Dist.] July 3, 2003, no pet.) (reversing no-evidence summary judgment in a trespass to try title action where the purchaser presented affidavit evidence of payment of the $32,000 purchase price, execution of a deed by the vendor using an alias, and delivery of the deed by fax, holding that these affidavits constituted some evidence of superior title sufficient to defeat the no- evidence motion). Salinas’s third issue is sustained. 3. Whether the court erred when it dismissed Salinas’s declaratory judgment action for clear title Salinas’s first issue challenges the trial court’s bundling of her declaratory judgment claim in its summary judgment order granting Lang’s motion which did not address that claim. Indeed, Lang’s motion omitted any reference to Salinas’ claim for declaratory judgment to “clear title to the Property that is the subject of this suit.” The court granted the motion in its entirety, then subsequently entered judgment on Lang’s motion for judgment which recited damages $5,401.32 and included an affidavit for attorney’s fees. Lang’s motion sought attorney’s fees as authorized under the Contract for Deed’s provision allowing attorney’s fees on the contract’s enforcement, and the court found $45,000 of those fees reasonable and necessary. “Ordinarily, when a trial court grants more relief than requested or grants summary judgment on issues that were not raised in the motion, we reverse and 19 remand the case to the trial court.” Jannise v. Enter. Products Operating LLC, No. 14-18-00516-CV, 2019 WL 3432171, at *8 (Tex. App.—Houston [14th Dist.] July 30, 2019, no pet.). Although a trial court errs in granting a summary judgment on a cause of action not expressly presented by written motion, the error is harmless when the omitted cause of action is precluded as a matter of law by other grounds raised in the case. Cont’l Cas. Co. v. Am. Safety Cas. Ins. Co., 365 S.W.3d 165, 173 (Tex. App.—Houston [14th Dist.] 2012, pet. denied) citing G & H Towing Co. v. Magee, 347 S.W.3d 293, 296–97 (Tex. 2011). Today, particularly in light of our other rulings reversing the trial court, we cannot conclude the error is harmless. Salinas’s first issue is sustained, and the declaratory judgment is reversed and remanded. 4. Whether the court erred by granting Lang’s no-evidence summary judgment motion dismissing Salinas’s claims for violations of the Executory Contract for Conveyance Act Salinas’s fourth issue has three components, which relate to the trial court’s order granting summary judgment on her claims against Lang for three violations of the Executory Contract for Conveyance Act: (i) Texas Property Code Section 5.079; (ii) Texas Property Code Section 5.081; and (iii) Texas Property Code Section 5.077. Lang did not dispute the scope or applicability of Subchapter D, which governs executory contracts for residential real property. (i) Texas Property Code Section 5.079 Section 5.079 imposes liability on a seller who fails to timely transfer recorded, legal title after receiving the purchaser’s final payment. Tex. Prop. Code § 5.079. In his no-evidence motion Lang targeted an absence of proof of Salinas’s final payment or full contractual performance. The motion contends that Salinas