Full Opinion

FOR PUBLICATION UNITED STATES COURT OF APPEALS FOR THE NINTH CIRCUIT LOS MOLINOS MUTUAL WATER No. 25-2302 COMPANY; STANFORD VINA D.C. No. RANCH IRRIGATION COMPANY; 2:21-cv-01961- PEYTON PACIFIC PROPERTIES, DAD-DMC LLC, Plaintiffs - Appellants, OPINION v. ERIK EKDAHL; EILEEN SOBECK; E. JOAQUIN ESQUIVEL, Board Chair; DORENE D’ADAMO; SEAN MAGUIRE; LAUREL FIRESTONE; NICHOLE MORGAN, Defendants - Appellees. Appeal from the United States District Court for the Eastern District of California Dale A. Drozd, District Judge, Presiding Argued and Submitted August 11, 2026 Reno, Nevada Filed November 24, 2026 2 LOS MOLINOS MUTUAL WATER CO. V. EKDAHL Before: John B. Owens, Danielle J. Forrest, and Lawrence VanDyke, Circuit Judges. Opinion by Judge VanDyke SUMMARY * Procedural Due Process The panel reversed the district court’s order dismissing the due process claims of Stanford Vina Ranch Irrigation Co., Los Molinos Mutual Water Co., and Peyton Pacific, LLC (collectively, “Plaintiffs”), in their action challenging 2021 and 2022 emergency regulations and water curtailment orders promulgated by the California State Water Resources Control Board (“SWRCB”), and remanded. Plaintiffs are companies that hold the majority of riparian water rights in California’s Deer Creek and Mill Creek. In 2021 and 2022, in response to drought conditions, the SWRCB adopted emergency regulations and curtailment orders that ordered the twenty-two water rights holders on those creeks to reduce or stop diverting water. Plaintiffs allege that in both 2021 and 2022, they requested and were denied evidentiary hearings and the opportunity to cross-examine the SWRCB and California Department of Fish and Wildlife employees who testified in favor of the emergency orders. Instead, Plaintiffs were * This summary constitutes no part of the opinion of the court. It has been prepared by court staff for the convenience of the reader. LOS MOLINOS MUTUAL WATER CO. V. EKDAHL 3 allowed only five minutes during the public comment period at the 2021 meeting. Plaintiffs sued in federal district court, raising, among others, procedural due process claims under the Fourteenth Amendment and takings claims under the Fifth Amendment, and seeking injunctive and declaratory relief. Addressing jurisdiction, the panel held that Plaintiffs’ claims were not moot. Although the 2021 and 2022 emergency regulations and curtailment orders are no longer in effect, the capable of repetition yet evading review exception applies here because: (1) the one-year duration of the emergency regulations and the eight-month duration of the curtailment orders are plainly too short to allow full litigation before the regulations and orders cease; and (2) Plaintiffs’ allegations are sufficient to show some indication that the challenged conduct will be repeated where between 2014 and 2022 Defendants enacted similar emergency regulations and curtailment orders four separate times and drought conditions likely will reoccur. Turning to Plaintiffs’ procedural due process claim, the panel concluded that Plaintiffs plausibly alleged a protected property interest in their adjudicated water rights to divert water from Deer and Mill Creeks. The panel next concluded that the district court erred by characterizing Defendants’ emergency regulations and curtailment orders as legislative, rather than adjudicatory. Defendants’ actions were adjudicatory because they severely altered the permissible uses of Plaintiffs’ individual water rights, and the twenty-two water rights holders here are not so numerous in an absolute sense that it would be “impracticable” to allow them more than five minutes to meaningfully describe how the proposed 4 LOS MOLINOS MUTUAL WATER CO. V. EKDAHL governmental action will uniquely impact them. Because the emergency regulations and curtailment orders were adjudicatory, due process required a meaningful pre- deprivation hearing—which Plaintiffs did not receive. Accordingly, the panel held that Plaintiffs adequately pled procedural due process claims, and the district court erred in dismissing those claims. The panel also reversed the district court’s dismissal of Plaintiffs’ request for declaratory relief with respect to their procedural due process claims. The panel affirmed the district court’s dismissal of Plaintiffs’ takings claims in a concurrently filed memorandum disposition. COUNSEL Jackson A. Minasian (argued) and Paul R. Minasian, Minasian Law LLP, Oroville, California, for Plaintiff- Appellants. Margaret V. Tides (argued), Scott D. Cavanuagh, and Colin D. Smithey, Deputy Attorneys General; Sierra S. Arballo, Supervising Deputy Attorney General; Myung J. Park, Acting Senior Assistant Attorney General; Rob Bonta, California Attorney General; Office of the California Attorney General, Sacramento, California; for Defendants- Appellees. LOS MOLINOS MUTUAL WATER CO. V. EKDAHL 5 OPINION VANDYKE, Circuit Judge: The plaintiffs in this case appeal from the district court’s dismissal of their procedural due process and takings claims. We reverse the dismissal of the due process claims and remand. 1 I. Background Stanford Vina Ranch Irrigation Co., Los Molinos Mutual Water Co., and Peyton Pacific, LLC (collectively, “Plaintiffs”) are companies that hold the lion’s share of riparian water rights in California’s Deer Creek and Mill Creek, each of which runs for about sixty miles. Stanford Vina has the right to use “approximately 66% of the flow of Deer Creek,” which it uses for agricultural purposes over a 5,700-acre area. Los Molinos Mutual Water Co. holds rights to about 70% of the water diverted from Mill Creek, which it also uses for agricultural purposes, and Peyten Pacific holds water rights to an unspecified amount of Mill Creek flows. The State Water Resources Control Board (“SWRCB”) is an agency that regulates water rights for all of California. Defendants Esquivel, D’Adamo, Maguire, Firestone, and Morgan are members of the SWRCB, and defendants Ekdahl and Sobeck are its officers. In 2014 and 2015, in response to drought conditions, Defendants and their predecessors adopted emergency regulations curtailing “nearly all off-stream diversions on Mill, Deer, and Antelope Creeks.” After California issued 1 In a concurrently filed memorandum disposition, we affirm the district court’s dismissal of Plaintiffs’ takings claims. 6 LOS MOLINOS MUTUAL WATER CO. V. EKDAHL an emergency drought proclamation in May 2021, instructing the SWRCB to evaluate the minimum instream flow required to protect fish, the SWRCB again adopted emergency regulations and curtailment orders. On September 1, 2021, the SWRCB issued a Notice of Opportunity for Public Comment on draft emergency regulation for Mill and Deer Creeks, with comments due within a week. At a regularly scheduled meeting three weeks later, in which Plaintiffs participated to the extent allowed, Defendants issued a year-long resolution that adopted a revised version of the draft emergency regulation. The resolution emphasized the importance of Mill and Deer Creeks to salmon and steelhead migration and determined that any water diversion that “would cause or threaten to cause flows to fall beneath the draught emergency minimum flows” was an “unreasonable use” of water. Authorized by the resolution, in October 2021, Defendant Ekdahl issued curtailment orders for Deer and Mill Creeks to meet the minimum flow targets set under the emergency regulation, ordering the twenty-two water rights holders on those creeks to reduce or stop diverting water. Plaintiffs allege, and Defendants do not dispute, that only the water rights holders on Mill and Deer Creeks were subjected to the 2021 emergency regulation and curtailment orders. The curtailment orders established a $1,000 daily penalty for violations and a $2,500 penalty for every acre-foot diverted. Plaintiffs sought reconsideration of the curtailment orders, but their requests were denied. The curtailment orders were in effect for eight months. Plaintiffs allege that the emergency regulation and curtailment orders prevented them “from exercising their vested water rights,” requiring them “to bypass all or substantially all of the flows of Deer LOS MOLINOS MUTUAL WATER CO. V. EKDAHL 7 Creek and Mill Creek” that they ordinarily diverted for agricultural purposes. A similar process occurred in 2022. On August 5, 2022, the SWRCB issued a notice that it planned to readopt emergency regulations and set a comment deadline of August 11. Five days after the deadline, the emergency regulations were readopted. New curtailment orders followed. Plaintiffs again requested and again were denied reconsideration. Like the 2021 curtailment orders, the 2022 curtailment orders lasted eight months. Plaintiffs allege that, in both 2021 and 2022, they requested and were denied evidentiary hearings and the opportunity to cross-examine the SWRCB and California Department of Fish and Wildlife (“CDFW”) employees who testified in favor of the emergency orders. Instead, Plaintiffs were allowed only five minutes during the public comment period at the 2021 meeting. 2 In October 2021, Plaintiffs sued in federal district court, raising, among others, procedural due process claims under the Fourteenth Amendment and takings claims under the Fifth Amendment, and seeking injunctive and declaratory relief prohibiting Defendants from adopting or enforcing similar “emergency regulations and/or curtailment orders without holding a due process evidentiary hearing and without payment of just compensation for the taking of real property and real property rights.” The district court dismissed the procedural due process claims, concluding that the emergency regulations and curtailment orders were “legislative” and not “adjudicatory,” so no evidentiary 2 Plaintiffs’ allegations do not indicate to what extent they were allowed to participate in the 2022 meeting. 8 LOS MOLINOS MUTUAL WATER CO. V. EKDAHL hearing was required. It also dismissed the takings claims as barred by Eleventh Amendment sovereign immunity. Concluding that Plaintiffs’ request for declaratory relief rose or fell with their procedural due process and takings claims, the district court also found Plaintiffs ineligible for declaratory relief. Plaintiffs voluntarily dismissed their remaining claims, and timely appealed. II. Jurisdiction and Standard of Review We have jurisdiction to review the district court’s final dismissal order under 28 U.S.C. § 1291. “We review de novo a district court’s order granting a motion to dismiss for failure to state a claim.” Depot, Inc. v. Caring for Montanans, Inc., 915 F.3d 643, 652 (9th Cir. 2019). Dismissal should be affirmed “where there is no cognizable legal theory or an absence of sufficient facts alleged to support a cognizable legal theory.” Id. (citation omitted). At the motion-to-dismiss stage, “we accept as true all well- pleaded factual allegations,” but “are not required to accept as true legal conclusions couched as factual allegations.” Parents for Priv. v. Barr, 949 F.3d 1210, 1221 (9th Cir. 2020) (citation omitted). III. Discussion A. As a threshold matter, we must determine whether we have jurisdiction. This court lacks jurisdiction to hear moot claims. Feldman v. Bomar, 518 F.3d 637, 642 (9th Cir. 2008). An action is moot when “the issues presented are no longer live and … the parties lack a legally cognizable interest” in a remedy. Alaska Ctr. for Env’t v. U.S. Forest Serv., 189 F.3d 851, 854 (9th Cir. 1999). LOS MOLINOS MUTUAL WATER CO. V. EKDAHL 9 It is uncontested that the 2021 and 2022 emergency regulations and curtailment orders are no longer in effect. If that were all, Plaintiffs’ claims would be moot. But Plaintiffs invoke the “capable of repetition, yet evading review” exception, Weinstein v. Bradford, 423 U.S. 147, 149 (1975), which applies when “(1) the duration of the challenged action is too short to allow full litigation before it ceases, and (2) there is a reasonable expectation that the plaintiffs will be subjected to it again.” Feldman, 518 F.3d at 644 (citation omitted). The first element of that exception is undisputed. The one-year duration of the emergency regulations and the eight-month duration of the curtailment orders are plainly “too short to allow full litigation” before the regulations and orders cease. Id. Few cases will resolve within a year. Indeed, here it took seventeen months for the district court to rule on Defendants’ first motion to dismiss. To meet the second element, a plaintiff must show “some indication” supporting a reasonable expectation that the challenged conduct will recur, but they need not show that a defendant’s future conduct would be a carbon copy of their past conduct. Alaska Ctr. for Env’t, 189 F.3d at 856. It suffices that a plaintiff will likely suffer “the same or very similar harm.” Alcoa, Inc. v. Bonneville Power Admin., 698 F.3d 774, 786 (9th Cir. 2012). Plaintiffs satisfy this element here. Between 2014 and 2022, Defendants enacted similar emergency regulations and curtailment orders four separate times. Each round of emergency regulations was tied to drought-driven conditions on annual fish migration. Drought conditions obviously could, and likely will, reoccur. That the 2014 and 2015 regulations covered one additional creek does not 10 LOS MOLINOS MUTUAL WATER CO. V. EKDAHL meaningfully distinguish them: Plaintiffs still suffered the same harm. Defendants provide no argument that the prior regulations and emergency orders permanently resolved the issue or that similar action is unlikely in future droughts. Plaintiffs’ allegations therefore suffice to show “some indication that the challenged conduct will be repeated.” Dep’t of Fish & Game v. Fed. Subsistence Bd., 62 F.4th 1177, 1182 (9th Cir. 2023) (citation omitted). Accordingly, the capable of repetition yet evading review exception applies, and we have jurisdiction. B. Procedural due process constrains government decisions that “deprive individuals of liberty or property interests within the meaning of the Due Process Clause of the … Fourteenth Amendment.” Mathews v. Eldridge, 424 U.S. 319, 332 (1976) (citation modified). A procedural due process claim requires “(1) a protectible liberty or property interest … and (2) a denial of adequate procedural protections.” Thornton v. City of St. Helens, 425 F.3d 1158, 1164 (9th Cir. 2005) (citation omitted). The first element is straightforward in this case. A protected property interest exists when there is a “reasonable expectation of entitlement … from an independent source such as state law.” Wedges/Ledges of Cal., Inc. v. City of Phoenix, 24 F.3d 56, 62 (9th Cir. 1994) (citation omitted). Here, Plaintiffs plausibly alleged that they hold adjudicated water rights to divert water from Deer and Mill Creeks. Defendants’ own curtailment orders explicitly acknowledged these “active water rights” in Deer and Mill Creeks, and California law recognizes water rights as protectable property interests. See United States v. State Water Res. Control Bd., 227 Cal. Rptr. 161, 168 (Cal. Ct. LOS MOLINOS MUTUAL WATER CO. V. EKDAHL 11 App. 1986). Plaintiffs’ allegations thus easily satisfy the first element. The second element is more complicated because due process requirements are not “technical” and can turn on “time, place, and circumstances.” Mathews, 424 U.S. at 334 (citation omitted). To assess whether there was a “denial of adequate procedural protections” here, Thornton, 425 F.3d at 1164, we must ask whether the emergency regulations and curtailment orders should be considered adjudicatory or legislative, and then determine whether, in light of that characterization, the process provided was sufficient, see Halverson v. Skagit Cnty., 42 F.3d 1257, 1260–61 (9th Cir. 1994). When the challenged action is deemed legislative, “due process is satisfied when the legislative body performs its responsibilities in the normal manner prescribed by law.” Id. at 1260 (citation omitted). But if the challenged action is deemed adjudicatory, due process “requires notice and an opportunity for some kind of hearing prior to the deprivation of a significant property interest.” Id. (alteration and citation omitted). An adequate hearing must allow a party “to be heard ‘at a meaningful time and in a meaningful manner.’” Mathews, 424 U.S. at 333 (quoting Armstrong v. Manzo, 380 U.S. 545, 552 (1965)). In dismissing Plaintiffs’ procedural due process claims, the district court focused exclusively on this second element, holding that the emergency regulations and curtailment orders were legislative, rather than adjudicatory. As a result, the district court concluded that Plaintiffs were not entitled to a due process hearing and received all the process they were due. 3 We conclude that the district court erred by 3 Plaintiffs do not contest the adequacy of the notice they received; they argue only that they were not afforded a constitutionally adequate 12 LOS MOLINOS MUTUAL WATER CO. V. EKDAHL characterizing Defendants’ emergency regulations and curtailment orders as legislative, rather than adjudicatory, and consequently erred in holding that Plaintiffs received all the process they were due. Whether an action is legislative or adjudicatory turns on “the character of the action, rather than its label.” Harris v. Cnty. of Riverside, 904 F.2d 497, 501 (9th Cir. 1990). Actions affecting large areas with undifferentiated populations are considered legislative. See Halverson, 42 F.3d at 1261. These actions do not require individualized hearings: Merely performing “responsibilities in the normal manner prescribed by law” satisfies due process. Hotel & Motel Ass’n of Oakland v. City of Oakland, 344 F.3d 959, 969 (9th Cir. 2003) (quoting Halverson, 42 F.3d at 1260). By contrast, adjudicatory actions target or “exceptionally affect” a few persons on an “individual basis.” Id. (quoting Harris, 904 F.2d at 502); see also Halverson, 42 F.3d at 1261. And for these actions, due process demands notice and a pre-deprivation hearing. Halverson, 42 F.3d 1260. These rules trace back to Bi-Metallic Investment Co. v. State Board of Equalization, where the plaintiffs attempted to enjoin state entities from imposing a city-wide tax increase on the ground that they were not given an “opportunity to be heard.” 239 U.S. 441, 444 (1915). The Supreme Court held that the Due Process Clause did not entitle the plaintiffs to a hearing because “[w]here a rule of conduct applies to more than a few people, it is impracticable that everyone should have a direct voice in its adoption.” Id. at 445. The Court distinguished Londoner v. Denver, 210 U.S. 373, 374, 386 (1908), which held that landowners who lived along a street were entitled to a hearing before a tax to hearing. LOS MOLINOS MUTUAL WATER CO. V. EKDAHL 13 fund the paving of that street could be imposed on them. Bi- Metallic, 239 U.S. at 445–46. Londoner, the Bi-Metallic Court explained, had required a hearing because “[a] relatively small number of persons was concerned, who were exceptionally affected … upon individual grounds.” Bi- Metallic, 239 U.S. at 446 (citing Londoner, 210 U.S. 373). But because the challenged action in Bi-Metallic affected everyone who owned taxable property in Denver, the Court concluded that there had to be “a limit to individual argument in such matters if government is to go on.” Id. at 445. Our court has applied the Bi-Metallic rule several times. In Harris, rezoning that “severely alter[ed] the permissible uses” of the plaintiff’s and his neighbor’s land—and no one else’s—was deemed adjudicatory. 904 F.2d at 502. Though the plaintiff was not the only entity affected by the rezoning decision, because that decision “concerned a relatively small number of persons,” we concluded the plaintiff was “exceptionally affected” on an “individual basis,” entitling him to notice and a pre-deprivation hearing. Id. at 502–03. By contrast, in Halverson, flood-control decisions potentially affecting large areas with thousands of people were deemed legislative, and due process did not entitle the plaintiffs there to a hearing. 42 F.3d at 1259–61. Similarly, in City of Oakland, an ordinance imposing habitability standards on all Oakland hotels was considered legislative because it was a “garden variety statute affecting an entire class” of hotels, not a “targeted” restriction on “one or a few” establishments. 344 F.3d at 969. And unlike in Harris, where the zoning decision “severely alter[ed] the permissible uses” of two individuals’ land, 904 F.2d at 502, the ordinance in City of Oakland merely required “the complete range of hostelries” in a broad geographic area to 14 LOS MOLINOS MUTUAL WATER CO. V. EKDAHL comply with basic habitability standards. 344 F.3d at 969. So the City of Oakland plaintiffs were not entitled to a hearing. Id. at 970. And again in Samson, a moratorium on dock permits applying “generally” to all shoreline property owners in the city was deemed legislative. Samson v. City of Bainbridge Island, 683 F.3d 1051, 1061 (9th Cir. 2012). So there too, the plaintiffs were not entitled to a due process hearing. Id. The takeaway from these cases is that two factors control which side of the line Defendants’ actions fall on: the severity of the individualized impact on Plaintiffs and the relative size of the affected group. Here, both of those factors favor Plaintiffs. Like the rezoning in Harris, Defendants’ actions here did not incidentally regulate Plaintiffs’ individual water rights, but “severely alter[ed] the[ir] permissible uses.” Harris, 904 F.3d at 502. The emergency regulations and curtailment orders required Plaintiffs “to bypass all or substantially all of the flows of Deer Creek and Mill Creek,” essentially eliminating any exercise of their water rights to those flows. The impact on Plaintiffs’ property rights is therefore different from the regulatory requirement in City of Oakland that a large number of hotels merely conform to “the most basic habitability and nuisance standards.” 344 F.3d at 970. The harder issue—and the crux of the due process claims in this case—is whether the size of the group here is “a few,” or more than “a few.” Id. at 969; Halverson, 42 F.3d at 1261; Harris, 904 F.3d at 502. We conclude that twenty-two water rights holders on Mill and Deer Creeks are “a few.” First, whether the group size is “a few” or more than “a few” for due process purposes is necessarily informed by the hearing requirement that attaches to governmental LOS MOLINOS MUTUAL WATER CO. V. EKDAHL 15 adjudicatory decision-making. The reason for requiring hearings for adjudicatory but not legislative decision- making is fundamentally a practical one: As the Supreme Court explained, hearings become “impracticable” when the affected group is too large to give “a direct voice” in the adoption of a challenged regulation. Bi-Metallic, 239 U.S. at 445. The twenty-two water rights holders here are not so numerous in an absolute sense that it would be “impracticable” to allow them more than five minutes to meaningfully describe how the proposed governmental action will uniquely impact them. Id. This conclusion is supported by comparing the circumstances here to those in the cases holding that the number of people impacted made individualized process impracticable. See Bi-Metallic, 239 U.S. at 445–46 (all owners of taxable property in Denver); Halverson, 42 F.3d at 1261 (thousands of property owners); City of Oakland, 344 F.3d at 969 (all hotels in the large city of Oakland); Samson, 683 F.3d at 1061 (all shoreline property owners on Bainbridge Island, Washington). And second, Plaintiffs allege that only the twenty-two water rights holders on Deer and Mill Creeks were covered by the emergency regulations and curtailment orders. That is a “relatively small number of persons,” to use the Supreme Court’s language. Bi-Metallic, 239 U.S. at 446 (emphasis added). A regulation that impacts only twenty-two of all the water rights holders in California suggests that Defendants’ conduct here was more “targeted,” City of Oakland, 344 F.3d at 969, and “directed,” Halverson, 42 F.3d at 1261, than the broadly applicable policies challenged in Bi-Metallic, Halverson, City of Oakland, and Samson. 16 LOS MOLINOS MUTUAL WATER CO. V. EKDAHL Because the emergency regulations and curtailment orders were adjudicatory, due process required a meaningful pre-deprivation hearing—which Plaintiffs did not receive. Mathews, 424 U.S. at 333; Halverson, 42 F.3d at 1260; City of Oakland, 344 F.3d at 969; Samson, 683 F.3d at 1060. Plaintiffs alleged they were given only a five-minute public comment period, with no opportunity to examine the SWRCB and CDFW witnesses supporting the regulations. Five minutes without cross-examination is not a hearing “at a meaningful time and in a meaningful manner.” Mathews, 424 U.S. at 333 (citations omitted); see Goldberg v. Kelly, 397 U.S. 254, 269 (1970) (finding that cross-examination is required “where important decisions turn on questions of fact”); Interstate Com. Comm’n v. Louisville & Nash. R.R. Co., 227 U.S. 88, 93 (1913) (“[M]anifestly there is no hearing when the party … is not given an opportunity to test, explain, or refute.”). Accepting Plaintiffs’ allegations as true, they adequately pled procedural due process claims, and the district court erred in dismissing those claims. C. We also reverse and remand the district court’s dismissal of Plaintiffs’ request for declaratory relief with respect to their procedural due process claims. Because the Declaratory Judgment Act provides no independent cause of action, the district court’s dismissal of Plaintiffs’ request for declaratory relief was tied to its dismissal of Plaintiffs’ procedural due process claim. REVERSED and REMANDED.