In Re: Condemnation by the Pa. Turnpike Commission
CourtCommonwealth Court of Pennsylvania
Date FiledNovember 17, 2026
Docket1357 C.D. 2024
JudgeCovey
StatusUnpublished
📰 News Coverage: Read the LAWS.com news report on this case
Full Opinion
IN THE COMMONWEALTH COURT OF PENNSYLVANIA
In Re: Condemnation by the :
Pennsylvania Turnpike Commission :
of Property Located in the Borough :
of West Mifflin, County of Allegheny, :
Commonwealth of Pennsylvania, :
for the Construction of the :
Mon-Fayette Expressway, PA Route :
51 to I-376 Project, a Partial Take :
(Part of Block and Lot Nos. :
239-D-20, 239-D-25 and 239-D-30) :
: No. 1357 C.D. 2024
Appeal of: IBIS Kennywood, LLC : Submitted: June 16, 2026
BEFORE: HONORABLE ANNE E. COVEY, Judge
HONORABLE STACY WALLACE, Judge
HONORABLE STELLA M. TSAI, Judge
OPINION NOT REPORTED
MEMORANDUM OPINION BY
JUDGE COVEY FILED: November 17, 2026
IBIS Kennywood, LLC (Kennywood) appeals from the Allegheny
County (County) Common Pleas Court’s (trial court) September 19, 2024 order
overruling its preliminary objections (Preliminary Objections) to the Pennsylvania
Turnpike Commission’s (Commission) condemnation notice. Essentially,
Kennywood presents one issue for this Court’s review: whether the trial court erred
as a matter of law and abused its discretion by concluding that the Commission
satisfied the notice requirements of Section 305(c)(9) of the Eminent Domain Code
(Code).1 After review, this Court affirms.
1
26 Pa.C.S. § 305(c)(9).
Kennywood owns land and buildings located in the County, identified
as Lot and Block Nos. 239-D-20, 239-D-25, and 239-D-30 (collectively, the
Property). The Property is improved by a large regional shopping center which
contains a grocery store, a gas station with a convenience store, and retail shops.
Kennywood has used the Property for commercial and rental purposes since
Kennywood purchased it. On March 31, 2021, the Commission filed a Declaration
of Taking (Declaration) which purportedly seeks to take portions of the Property, on
both a temporary and permanent basis, to construct the Mon-Fayette Expressway,
State Route 51 to Interstate 376 (I-376). Specifically, the Declaration seeks to take:
(1) .426 acre, as a required right-of-way; (2) 1.997 acres, as a required temporary
construction easement; (3) .146 acre, as a required drainage easement; (4) .834 acre,
as a required slope easement; and (5) 2.859 acres, as a required substitute right-of-
way for Duquesne Light Company (collectively, Condemned Parcel).
On April 30, 2021, Kennywood filed the Preliminary Objections to the
Declaration, alleging therein that the specified plot plans (Plot Plans) did not comply
with Section 305(c)(9) of the Code. The trial court ordered discovery and a viewing
of the Property. Subsequently, Kennywood deposed Commission Engineer Thomas
Lench (Lench). Kennywood attached exhibits to Lench’s deposition transcript,
including detailed plans regarding the proposed construction, which included the
Plot Plans. Following discovery, the trial court stated it would not hold a hearing
and would decide the case on the briefs, transcripts, and exhibits. On October 1,
2021, the trial court overruled the Preliminary Objections. On October 19, 2021,
Kennywood appealed from the trial court’s order to this Court.2
2
This Court docketed that appeal at Commonwealth Court Docket No. 1167 C.D. 2021.
2
Thereafter, by June 16, 2022 letter, William R. Crawford, P.E.
(Crawford), Vice President of T.W. Engineering,3 conveyed a “summary of the
actions taken by the . . . Commission [] in response to specific engineering concerns
raised by [Kennywood] as part of the adjudication of the Preliminary Objection[s]
to the [c]ondemnation of [the Property]” (Engineering Summary). Reproduced
Record (R.R.) at 679a. The Engineering Summary notes that the Plot Plans “were
part of a 75% submission (design progress prints) and not contract bid documents.”
Id. In the June 16, 2022 letter, Crawford stated:
It was clear to the [Commission] and its Design
Management Team that several of the engineering
concerns indicated in [Kennywood’s expert, Gateway
Engineers, Inc.’s (Gateway) report] and [Gateway’s
Project Manager, Patrick T.] Cooper’s deposition, had
potential to impact the subject parcel based on the
proposed roadway design contained in the 75% plans. The
[Commission] took these concerns seriously and directed
the Section Designer - EADS, Inc. [(EADS)] - to
reevaluate those design elements of the project. Based on
this reevaluation and the progression of the final design
plans, EADS made modifications to the design elements
identified below between the 75% plans and the
current [f]inal [p]lans, Specifications and Estimates for
Section 53C2 of the Southern Section of the Mon[-
]Fayette Expressway.
R.R. at 679a-680a (emphasis added).
On December 29, 2022, concluding that “[t]he trial court overlooked
that [Kennywood] may challenge the sufficiency of the Section 305 [of the Code]
notice, which requires a plot plan where, as here, a partial taking is at issue[,]” this
Court vacated the trial court’s order and remanded the matter to the trial court to
determine whether the Commission’s Plot Plans complied with Section 305(c)(9) of
3
T.W. Engineering is a subconsultant to the Commission’s contracted engineering firm,
HDR Engineering.
3
the Code, and to issue an order disposing of Kennywood’s Preliminary Objections
(Remand Order).
On February 15, 2023, the trial court issued a supplemental opinion
(Supplemental Opinion), stating therein:
Th[e] [trial c]ourt [] held a hearing asking the []
Commission for a specific plan showing the outline of the
. . . [P]roperty with those areas proposed to be taken by the
[] Commission. The same was supplied and these plans
are attached to this Supplemental Opinion. It is obvious
that this plan shows clearly and unambiguously the
area of the partial tak[ing] that the [] Commission is
proposing. Accordingly, with this filing, the requirement
of [Section] 305(c)(9) [of the Code] has been met. Th[e]
[trial c]ourt has also directed the [] Commission to make a
separate filing under Affidavit that these are the applicable
drawings. This filing is to be filed with the [trial] court.
Accordingly, I believe this concludes the responsibility of
th[e] [trial c]ourt in the above matter.
R.R. at 847a (emphasis added).
On March 15, 2023, Kennywood appealed to this Court from the
Supplemental Opinion.4 Kennywood also filed a Motion to Compel Compliance
with Remand Order, requesting that this Court direct the trial court to resolve the
Preliminary Objections in accordance with this Court’s Remand Order. On August
24, 2023, this Court quashed Kennywood’s appeal as premature because the trial
court had not yet addressed Kennywood’s Preliminary Objections and, thus, no
appealable order existed. On September 19, 2024, the trial court overruled the
Preliminary Objections and referred the matter to a Board of Viewers for an
assessment of damages. On October 9, 2024, Kennywood appealed to this Court.5
4
See Pa. Cmwlth. No. 258 C.D. 2023.
5
This Court’s review “of a decision to condemn property and of the extent of the taking is
to determine whether the trial court’s decision evidences an abuse of discretion or an error of law.”
In re Redevelopment Auth. of the City of Erie, 285 A.3d 986, 990 n.2 (Pa. Cmwlth. 2022).
4
Initially,
“[t]he power of eminent domain is an inherent one
possessed by the Commonwealth, as sovereign, which
permits it to take private property for a public use if the
landowner receives just compensation for the taking.”
Robinson T[wp.] v. Commonwealth, . . . 147 A.3d 536, 586
(Pa. 2016). The Code “provides a complete and exclusive
procedure and law to govern all condemnations of
property for public purposes and the assessment of
damages.” [Section 102 of the Code,] 26 Pa.C.S. § 102.
[This Court has] explained that
[p]reliminary objections in the context of eminent
domain actions serve a different purpose than
preliminary objections filed in other civil actions.
In re Condemnation of .036 Acres, More or Less,
of Land Owned by Wexford Plaza Assoc[s.], 674
A.2d 1204 (Pa. Cmwlth. 1996). Not only are the
[Pennsylvania] Rules of Civil Procedure [(Civil
Rules)] not applicable to eminent domain
proceedings, Gilyard v. Redevelopment Auth[.] of
Phila[.], 780 A.2d 793 (Pa. Cmwlth. 2001), but
preliminary objections filed pursuant to [S]ection
[3]06 of the [Code] serve a very different purpose
than those filed under the . . . Civil [Rules] []. In
eminent domain cases, preliminary objections are
intended as a procedure to resolve expeditiously
the factual and legal challenges to a declaration of
taking before the parties proceed to determine
damages. N[.] Penn Water Auth[.] v. A Certain
Parcel of Land, . . . 650 A.2d 1197 (Pa. Cmwlth.
1994).
In re Condemnation by City of Coatesville, 898 A.2d 1186,
1189 n.7 (Pa. Cmwlth. 2006). Under the Code
[p]reliminary objections shall be limited to and
shall be the exclusive method of challenging[:]
(i) The power or right of the condemnor to
appropriate the condemned property unless it has
been previously adjudicated.
(ii) The sufficiency of the security.
5
(iii) The declaration of taking[.]
(iv) Any other procedures followed by the
condemnor.
[Section 306(a)(3)(i)-(iv) of the Code,] 26 Pa.C.S. §
306(a)(3)(i)-(iv).
In re Condemnation of Premises Owned by Powell, 260 A.3d 298, 307-08 (Pa.
Cmwlth. 2021).
The . . . Code sets forth the requirements of notice that
must be given by a condemnor. It states in relevant part as
follows:
(c) Contents.--The notice to be given the
condemnee shall state:
....
(8) A statement that the condemnee’s property has
been condemned and a reasonable identification of
the property.
(9) In the case of a partial taking, a plot plan
showing the condemnee’s entire property and
the area taken.
(10) A statement of the nature of the title acquired.
(11) A statement specifying where a plan showing
the condemned property may be inspected in the
county in which the property taken is located.
....
[Section 305(c)(8)-(11) of the Code,] 26 Pa.C.S. §
305(c)(8)-(11).
Burns v. Dep’t of Transp., 364 A.3d 461, 466-67 (Pa. Cmwlth. 2025) (italic emphasis
omitted; bold emphasis added).
The importance of an accurate plot plan has been
explained by this Court as follows:
6
The plot plans and property plat filed with the
declaration of taking and served upon a
condemnee are part of and indeed, the heart of a
declaration of taking. It is only by reference to
such plans that one can determine what property is
the subject of condemnation and, in the case of a
partial taking, what part of a property has been
taken.
W[.] Whiteland Assoc[s.] v. [Dep’t of Transp.], 690 A.2d
1266, 1269 (Pa. Cmwlth. 1997) (emphasis added). [The
Pennsylvania] Supreme Court [(Supreme Court)] has held
that where a plot plan does not “establish the extent or
effect of the taking[,]” the condemnee is not bound by the
30-day deadline in Section 306(a) of the . . . Code for filing
preliminary objections to a declaration of taking. Szabo v.
Commonwealth, . . . 202 A.3d 52, 53 (Pa. 2019) (Opinion
Announcing the Judgment of the Court) . . . .
Burns, 364 A.3d at 468 (bold emphasis added).6
6
In Burns, a condemnee appealed from the trial court’s order striking an allegation in the
condemnee’s petition requesting appointment of viewers, which asserted that the Pennsylvania
Department of Transportation’s (PennDOT) declaration of taking did not include an accurate
identification of the condemnee’s property that was actually condemned and, thus, PennDOT also
effected the de facto condemnation of her property. PennDOT’s plot plan depicted the condemned
area of the condemnee’s property and included the rectangular outline of the condemnee’s
dwelling. The plot plan showed the dwelling as entirely excluded from the taking for the expanded
right-of-way. The condemnee obtained her own survey and thereby learned that the expanded
right-of-way ran through the porch and steps of her home. PennDOT argued that the condemnee
had failed to timely file preliminary objections to its declaration of taking within 30 days of its
service under Section 306(a) of the Code.
The Burns Court explained:
[This Court] reject[s] PennDOT’s argument. The [p]lot [p]lan did
not show that the taking included the concrete porch, which is part
of the masonry dwelling. To the contrary, the [p]lot [p]lan showed
that the taking was intentionally designed to avoid the dwelling on
[the c]ondemnee’s property, locating the outer boundary of the new
right-of-way several feet away from the masonry dwelling. The
only reasonable way to read the [p]lot [p]lan is that it placed the
porch within the rectangular footprint of the dwelling. Further, the
only access to the dwelling is to and from that porch. The porch was
not a mere “detail,” and its omission from the [p]lot [p]lan
7
Kennywood contends that the trial court erred because the
Commission’s Plot Plans did not properly reflect the portions of the Property the
Commission is taking and, thus, the Declaration does not satisfy the notice
requirements of Section 305(c)(9) of the Code. Referencing the Commission’s
engineer’s testimony, Kennywood identifies alleged Commission admissions
regarding four Plot Plan defects. According to Kennywood, “the Plot Plans fail to
depict: (i) the location of the temporary construction access; (ii) the location of
temporary and permanent utility relocation easements; (iii) the design of [the
Commission’s] main access driveway; and (iv) the power pole relocation easement.”
Kennywood Br. at 25.
The Commission rejoins that the Plot Plans attached to the Declaration
fully comply with the Code. The Commission emphasizes that in February 2023, it
also filed Plot Plans under Affidavit, per the trial court’s directive. The Commission
further asserts that, contrary to Kennywood’s contentions, the Plot Plans’
modifications during the progression from a 75% completion stage to the final plans,
did not impact the type and/or extent of the taking because the Commission made
no changes to the type of and/or extent of the taking indicated on the Plot Plans
attached to the Declaration.
Powell is instructive here. In Powell, this Court reviewed a trial court’s
decision overruling a property owner’s preliminary objections to the Altoona/Logan
Township Mobile Emergency Medical Department Authority’s (AMED) declaration
of taking for the purpose of installing an electric service powerline to AMED’s new
ambulance station. In ruling that the trial court erred by failing to sustain the
understated the actual contours of PennDOT’s taking and was
misleading.
Burns, 364 A.3d at 468 (quotation marks and citation omitted).
8
property owner’s preliminary objection alleging the declaration of taking did not
adequately describe the property sought to be taken because the plot plan outlined
the entire property without showing the location of the powerline easement, this
Court observed:
Section 302(b)(5) of the Code states that the declaration of
taking shall contain “a description of the property
condemned, sufficient for identification . . . .” 26 Pa.C.S.
§ 302(b)(5). The “description may be a word description
or in plan form.” Milford Trumbauersville Area Sewer
Auth[.] v. Approximately 0.753 Acres of Land, . . . 358
A.2d 450, 454 (Pa. Cmwlth. 1976). [The] Supreme
Court’s decision in Szabo is instructive.
....
The Supreme Court [in Szabo] concluded that under
[S]ection 305 of the Code, [26 Pa.C.S. § 305,] “written
notice shall be given to the condemnee” and “in the case
of a partial taking, a plot plan showing the condemnee’s
entire property and the area taken.” [Szabo, 202 A.3d at]
63 (quoting 26 Pa.C.S. § 305(c)(9)) (emphasis added).
The Supreme Court noted that the plan did not show that
portions of [the property] were to be condemned and did
not identify that land as owned by the condemnees. Id. at
63. Due to the inaccuracy, more of the condemnee’s
land[,] than was identified in the plan[,] was subject to the
taking. [The] Supreme Court held that “[the condemnor]
bore the burden of accurately notifying the owners of land
subject to the taking so that they could protect their
interests and secure just compensation.” Id. at 64.
Powell, 260 A.3d at 311-12 (underline emphasis added).
The Powell Court expounded:
The basic law involved in this matter is not at
issue. . . . Where a description is sufficient so that
one may determine the exact limits of the property
included by reference to a plan, deed or other
similar records, the law is satisfied. Cheney v.
Carver, . . . 88 A.2d 746 [(Pa. 1952)]. Ladner on
Conveyancing in Pennsylvania states in section
9
6:09 at page 152[ ]that, “no deed will be operative
unless the description is sufficient for . . .
identification. While it need not be technically
accurate, the description must be clear and
sufficiently precise to enable a surveyor to
locate and identify the property.”
Dickson [v. Pa. Power & Light Co.], 423 A.2d [711,] 712-
13 [(Pa. Super. 1980)] (emphasis added). . . . The
requirement that property being taken be described in a
manner that is “sufficient for identification” is the same
standard required in all instruments conveying real
property. See Pierro[ v. Pierro], 264 A.2d [692,] 694 [(Pa.
1970)] (some citations omitted) (“It is well settled that
specific performance will not be granted unless the terms
of the agreement are sufficiently set forth and the property
to be conveyed is sufficiently identified and described.
‘Adequate or ample description is that which would enable
a competent surveyor to find the land in question from the
agreement or from the references made in it.’ Prager v.
McAdam, [. . . 161 A.2d 39 (Pa. 1960)].”).
Powell, 260 A.3d at 314-15 (underline emphasis added).
As the trial court observed, the Plot Plans attached to the trial court’s
February 15, 2023 Supplemental Opinion “show[] clearly and unambiguously the
area of the partial take that the [] Commission is proposing.” R.R. at 926a; see also
R.R. at 927a-930a. The Plot Plans are detailed in specific measurements and
easement notations, and includes the required area charts and information. See R.R.
at 927-30. “[B]y reference to [the Plot Plans] . . . one can determine what property
is the subject of condemnation and . . . what part of the [P]roperty has been taken.”
W. Whiteland, 690 A.2d at 1269. Accordingly, the trial court properly concluded
that the Commission complied with Section 305(c)(9) of the Code’s notice
requirements.
For all of the above reasons, the trial court’s order is affirmed.
_________________________________
ANNE E. COVEY, Judge
10
IN THE COMMONWEALTH COURT OF PENNSYLVANIA
In Re: Condemnation by the :
Pennsylvania Turnpike Commission :
of Property Located in the Borough :
of West Mifflin, County of Allegheny, :
Commonwealth of Pennsylvania, :
for the Construction of the :
Mon-Fayette Expressway, PA Route :
51 to I-376 Project, a Partial Take :
(Part of Block and Lot Nos. :
239-D-20, 239-D-25 and 239-D-30) :
: No. 1357 C.D. 2024
Appeal of: IBIS Kennywood, LLC :
ORDER
AND NOW, this 17th day of November, 2026, the Allegheny County
Common Pleas Court’s September 19, 2024 order is affirmed.
_________________________________
ANNE E. COVEY, Judge