Rivera v. Guerrero
CourtSupreme Court of The Commonwealth of The Northern Mariana Islands
Date FiledDecember 22, 1993
Docket93-015
JudgeDela Cruz, Villagomez, Atalig
StatusPublished
📰 News Coverage: Read the LAWS.com news report on this case
Full Opinion
Rivera v. Guerrero, 4 N.M.I. 79 (1993)
Vicente N. Rivera, for himself
and as president of Investment
Group International (I.G.I.),
Taiwan Harbour Engineering
Construction Company, Ltd.,
Chi Yung Enterprises Company, Ltd.,
Kuo’s Construction Company, Ltd.,
and Chi Man Enterprises
Company, Ltd., doing business as
Taiwan Marine Group,
Plaintiffs/Appellants,
v.
Jesus M. Guerrero, Chairman,
Commonwealth Ports Authority,
and Samsung Engineering
and Construction Company,
Defendants/Appellees.
Appeal No. 93-015
Civil Action No. 93-0157
December 22, 1993
Argued and Subm itted October 8, 1993
Counsel for appellants Vicente N. Rivera and Taiwan M arine Group: Reynaldo Yana, Saipan.
Counsel for appellee J.M . Guerrero: Stephen Nutting, Saipan.
Counsel for appellee Samsung Engineering & Construction Com pany: Douglas Cushnie, Saipan.
BEFORE: DELA CRUZ, Chief Justice, and VILLAGOM EZ and ATALIG, Justices.
VILLAGOM EZ, Justice:
This is an appeal by the plaintiffs, Vicente Rivera and Taiwan M arine Group (collectively “Rivera”),
from the dismissal of their com plaint. The trial court dismissed the com plaint for lack of subject matter
jurisdiction, for failure to state a claim upon which relief could be granted, and because there is no factual dispute
that the rejection of Rivera’s proposal by the Com m onwealth Ports Authority (CPA) was neither arbitrary nor
capricious.
W e have jurisdiction over this appeal under the Com m onwealth Judicial Reorganization Act of 1989.1
W e affirm the dism issal of Rivera’s com plaint on the ground that the Superior Court lacked jurisdiction.
1
See 1 CMC § 3102(a).
ISSUES AND STANDARD OF REVIEW
Rivera raises the following three issues for our review:
1. W hether the trial court erred in ruling that it lacked subject matter jurisdiction due to Rivera’s failure
to exhaust his adm inistrative remedy.
2. W hether the trial court erred in ruling that the com plaint failed to state a claim upon which relief could
be granted with respect to Rivera’s claim that his constitutional rights to due process and equal protection under
the law were violated by CPA.
3. W hether the trial court erred in ruling that CPA’s rejection of Rivera’s proposal was neither arbitrary
nor capricious as a matter of law.
The first issue, as stated by Rivera, does not adequately or accurately reflect what actually happened at
the adm inistrative level. Rivera did not sim ply file a protest with CPA and then proceed to court for judicial
review without exhausting his adm inistrative remedy. Instead, he filed an untim ely protest. Then, four days later,
he abandoned his administrative protest and filed a separate action in court. Thus, the issue, m ore accurately
stated, is whether Rivera’s failure to file a tim ely protest with the CPA precludes judicial review of his com plaint.
Because we affirm the dism issal based on lack of subject matter jurisdiction, we do not address the
second and third issues.2 Dismissals made pursuant to Com. R. Civ. P. 12(b)(1) are subject to de novo review.3
FACTUAL AND
PROCEDURAL BACKGROUND
In response to a request for proposals published by the Com m onwealth Ports Authority (CPA), Rivera
subm itted a proposal to serve as contractor for the Saipan Harbor Im provem ent Project (“Harbor Project”).
Rivera’s proposal was determ ined by CPA ’s contracting officer to be non-responsive to certain requirements set
forth in the request for proposals, unclear in several respects, and five m illion dollars higher than the lowest
responsive proposal.
CPA form ally rejected Rivera’s proposal on December 24, 1992, following the review by and advice of
CPA consultants. On that day, Rivera received written notice from the CPA chairm an, acting in his capacity as
contracting officer, that Rivera’s proposal had been rejected and that the CPA board of directors (“board”) would
pursue negotiations with the four com panies that were deem ed qualified to participate in the contract bidding.
CPA, acting pursuant to its procurem ent regulations, subsequently awarded the Harbor Project contract to
Sam sung Engineering and Construction Com pany (“Sam sung”), which CPA determined to be the lowest
responsive and responsible bidder.
Sam sung and CPA executed a contract for the Harbor Project on January 28, 1993. That sam e day, CPA
received Rivera’s “Official and Form al Protest of Award of Contract for Im provement and Developm ent of the
Saipan Harbor, and Questionable/Illegal Conduct by the CPA,” dated January 27, 1993. In his form al protest,
Rivera requested that “negotiations be held and that [Rivera’s] com pany will be included.” 4
Although the CPA procurement regulations provide that proposers such as Rivera m ay protest 5 the
2
W e note here that when the Superior Court determines that it has no subject matter jurisdiction and
dismisses a complaint under Com. R. Civ. P. 12(b)(1), the court should proceed no further. See United States v.
40.60 Acres of Land, 483 F.2d 927, 928 (9th Cir. 1973).
3
5A Charles A. W right & Arthur R. Miller, F EDERAL P R AC TIC E A N D P R O C ED U R E § 1350 (2d ed. 1990);
Aquino v. Tinian Cockfighting Bd., 3 N.M.I. 284, 291-92 (1992); Seman v. Aldan, 3 CR 152, 155 (D.N.M.I. 1987).
4
Letter from Vicente N. Rivera, President, Investment Group International, to Jesus M. Guerrero, Board of
Directors Chairman and Contracting Officer, Commonwealth Ports Authority (Jan. 27, 1993) in Supplemental
Excerpts of Record of Appellees/Cross-Appellants at tab 5.
5
The CPA regulations use the term “protest” to describe the first stage of the administrative appeal process
established in its regulations. The protest serves as the first step in the overall process of administrative appeal. W e
use the words “protest” and “appeal” interchangeably for purposes of this opinion.
Rivera v. Guerrero, 4 N.M.I. 79 (1993)
rejection of their proposals within ten days, Rivera did not subm it his protest until thirty-four days after the
rejection of his proposal. Then, instead of proceeding with his adm inistrative protest, Rivera filed a com plaint in
the Superior Court on February 1, 1993. In his com plaint, Rivera seeks only to have CPA’s contract with
Sam sung declared void, and requests attorney’s fees.
On February 2, 1993, CPA notified Rivera in writing that his letter of protest had been received, but
would not be considered “a form al protest/grievance as it was not received [by CPA] within 10 days from the date
[Rivera] received CPA’s letter [of rejection] dated Decem ber 24, 1992.” 6 CPA subsequently moved to dismiss
Rivera’s com plaint in the Superior Court pursuant to Com . R. Civ. P. 12(b)(1), 12(b)(6), and 56(b). The trial court
dism issed the complaint based on each of the three grounds asserted by CPA. Rivera tim ely appealed.
ANALYSIS
CPA rejected Rivera’s proposal on Decem ber 24, 1992. Rivera subsequently filed an untim ely protest
with CPA. He then filed the present action. For the following reasons, we affirm the dism issal of Rivera’s
com plaint for lack of jurisdiction under Com . R. Civ. P. 12(b)(1). W e base our decision on Rivera’s failure to
meet the deadline for filing a protest with CPA.
A. The Effect of the Untimely Protest under CPA Regulations
CPA advised Rivera on February 2, 1993, that his form al letter of protest would not be considered
because it was not filed within ten days of CPA’s rejection of Rivera’s proposal. The trial court likewise correctly
found that Rivera’s protest was untim ely. 7
The Com m onwealth Ports Authority Act (“the Act”) 8 provides the standards for contracting and bidding. 9
It also em powers the CPA “[t]o adopt and enforce rules and regulations for the orderly, safe, and sanitary
operation of its ports.” 10
Under regulations prom ulgated by CPA, “[a]ny actual or prospective bidder, offeror, or contractor who is
aggrieved in connection with the solicitation or award of a contract m ay protest to the Executive Director.” 11
Protests must be received in writing by the executive director within ten days after the aggrieved person “knows or
should have known of the facts giving rise thereto.” 12
The executive director is obligated to consider all protests or objections, whether subm itted before or after
6
Letter from Roman T. Tudela, Executive Director, Commonwealth Ports Authority, to Vicente N. Rivera,
President, Investment Group International (Feb. 2, 1993).
7
Findings of Fact ¶ 5, Rivera v. Guerrero, Civ. No. 93-0157 (N.M.I. Super. Ct. Mar. 15, 1993) (order). An
agency’s dismissal of an intra-agency appeal for failure to file in a timely fashion does not bar a reviewing court
from examining the timeliness of the appeal. See Smith v. Prokop, 496 F. Supp. 861, 863 (N.D. Ohio 1980).
8
2 CMC § 2121 et seq.
9
2 CMC § 2132.
10
2 CMC § 2122(j).
11
Commonwealth Ports Authority Procurement Rules and Regulations [hereinafter “CPA Regulations”] §
10.1(1)(a), 10 Com. Reg. 5642-43 (Aug. 15, 1988).
12
Id.
an award of a contract.13 W ithin thirty days, the executive director must decide the protest or certify that the
complexity of the m atter requires a longer tim e.14 An appeal from the executive director’s decision then m ay be
taken, “to the appeal com m ittee . . . provided that the party taking the appeal has first subm itted a written protest to
the Executive Director as provided in section 10.1 . . . and the Executive Director has denied the protest or has
failed to act on the protest within the tim e provided for in section 10.1(1)(c).” 15 The appeal com m ittee m ust
receive the written appeal within ten days after the appellant receives the Executive Director’s decision.16
On Decem ber 24, 1992, Rivera received written notice of the contracting officer’s rejection of his
proposal. He had ten days within which to file a written objection to that decision. However, as the trial court
found, Rivera m ailed his form al protest on January 27, 1993, long after the ten days had expired.
The tim e lim it for filing an intra-agency appeal is mandatory and jurisdictional. 17 The protest was thus
barred from adm inistrative consideration.
B. The Effect of the Untimely Administrative Protest on the Court’s Jurisdiction
A court lacks jurisdiction to review adm inistrative decisions not tim ely appealed during the administrative
process.18 Thus, Rivera’s untim ely protest bars not only further adm inistrative consideration, but also judicial
review.
Rivera contends, how ever, that he need not have exhausted his adm inistrative remedies, a process which
would have begun with a tim ely filed protest, because exhaustion would have been futile. He advances four
argum ents in support of his position.
First, Rivera asserts that CPA has no power to declare the CPA-Sam sung contract void because CPA
itself is a party to the contract. This argum ent contradicts the express provisions of the CPA regulations.
The CPA regulations provide that if, before CPA awards a contract, it receives a protest against award of
the contract, then CPA must: (1) withhold the award pending disposition of the protest, unless a lim ited exception
applies,19 and (2) cancel or revise the solicitation or proposed award if CPA determ ines that the solicitation or
proposed award violates a law or regulation. 20
If CPA receives a protest challenging a contract after it has been awarded, CPA may: (1) ratify and affirm
the contract or term inate it and com pensate the awardee, if the latter has not acted in bad faith or fraudulently,21 or
(2) declare the contract null and void, or ratify and affirm the contract and seek dam ages as appropriate, if the
person awarded the contract has acted fraudulently or in bad faith. 22 This survey of CPA regulations m akes it
13
Id.
14
Id. § 10.1(1)(c), 10 Com. Reg. 5643.
15
Id. § 10.2(1), 10 Com. Reg. 5645.
16
Id. § 10.2(3), 10 Com. Reg. 5645.
17
See Nansay Micronesia Corp. v. Govendo, 3 N.M.I. 12, 18-19 (1992) (Coastal Resources Management
board lacked jurisdiction to hear untimely appeal of agency’s permit decision); see also Da Cruz v. Immigration &
Naturalization Serv., 4 F.3d 721, 722 (9th Cir. 1993).
18
See Nansay, 3 N.M.I. at 19-20; see also Da Cruz, 4 F.3d at 722-23 (court lacked jurisdiction to review
administrative law judge’s decision because agency did not timely appeal to its own board of appeals).
19
CPA Regulations, supra note 11, § 10.1(2)-(5), 10 Com. Reg. 5644, 5646.
20
Id. § 10.3(1), 10 Com. Reg. 5648.
21
Id. § 10.3(2)(a), 10 Com. Reg. 5648.
22
Id. § 10.3(2)(b), 10 Com. Reg. 5648.
Rivera v. Guerrero, 4 N.M.I. 79 (1993)
abundantly clear that CPA has not only the authority, but also the duty, to consider and act upon protests and
requests that are properly filed.
Second, Rivera argues that CPA cannot be expected to invalidate its own illegal action. Again, this
argum ent is unpersuasive because CPA regulations require that the agency determ ine whether it has violated a law
or regulation and, if so, that it cancel or revise the solicitation, proposed award, or contract award. 23 W e have to
presum e that CPA would follow this regulatory directive and invalidate any of its own actions that it finds to be
illegal. Only if it fails to do so may judicial review follow.
Third, Rivera claim s that his allegations that his right to due process and equal protection raise
constitutional issues which only a court may adjudicate. Rivera argues that he need not, therefore, have presented
his grievances to CPA. This argum ent has no merit.
As a general rule, the m ere presence of a constitutional claim does not bar operation of the doctrine of
exhaustion of adm inistrative remedies. 24 Courts have m ade exceptions to the exhaustion doctrine in instances
where a plaintiff brings constitutional challenges to the validity of a statute or ordinance under which the agency
acts, and demonstrates positively what the administrative decision would be, or that the administrative remedy
would be inadequate or irreparably harm ful, in his or her particular case.25 In this instance, however, Rivera is not
challenging the constitutionality of the Act or the CPA regulations, nor has he demonstrated positively that
following the procedures required here would afford him inadequate relief or cause him irreparable harm. Thus,
the constitutional claim s raised by Rivera are not of the type which fall within the exception to the exhaustion rule.
Rivera cites Torres v. Marianas Pub. Land Corp., 3 N.M .I. 484 (1993), for the proposition that one who is
aggrieved by an agency’s action need not exhaust his or her adm inistrative remedies where the person believes that
his or her constitutional rights have been infringed by the agency. Torres, how ever, does not stand for that
proposition. In Torres, a citizen of the Northern M arianas (Torres) sued a private com pany (Nakam oto
Enterprises) to prevent it from violating his right to a clean and healthful public environm ent, as guaranteed by
N.M .I. Const. art. I, § 9. 26 W ith respect to that cause of action, Torres, unlike Rivera, was not aggrieved by an
agency action.
In Torres, the plaintiff alleged that the construction of a large hotel in a particular area of Saipan, under
the term s of a lease agreem ent between Nakam oto Enterprises and the M arianas Public Land Corporation, would
adversely impact the environm ent and violate his constitutional right to a clean and healthful public environm ent.27
The defendants in Torres urged the court to dism iss the action for lack of subject matter jurisdiction on the ground
that the plaintiff had not exhausted his adm inistrative remedies by waiting until the Office of Coastal Resources
M anagement (“CRM ”), which was not a party to the lawsuit, decided whether to issue a perm it for the hotel. The
trial court dism issed for failure to exhaust.
On appeal, we determ ined that since N.M .I. Const. art. I, § 9 is self-executing,28 the plaintiff did not have
to wait for a ruling from CRM , the non-party agency. Neither a statute nor regulations required that Torres wait
for such a ruling. Following our earlier ruling in Govendo v. Marianas Pub. Land Corp., 2 N.M .I. 482 (1992), that
23
See id. § 10.3, 10 Com. Reg. 5648.
24
See, e.g., Aircraft & Diesel Equip. Corp. v. Hirsch, 331 U.S. 752, 67 S. Ct. 1493, 91 L. Ed. 796 (1947).
25
See, e.g., American Fed. of Gov’t Employees v. Acree, 475 F.2d 1289, 1292 (D.C.Cir. 1973); Ogo Ass’n.
v. City of Torrance, 112 Cal. Rptr. 761, 763 (Ct. App. 1974).
26
This constitutional guarantee provides, in pertinent part, “[e]ach person has a right to a clean and
healthful public environment in all areas, including the land, air, and water.” N.M.I. Const. art. I, § 9, cl. 1.
27
Torres v. Marianas Pub. Land Corp., 3 N.M.I. 484, 486-87 (1993).
28
See Govendo v. Marianas Pub. Land Corp., 2 N.M.I. 482, 502 n.16 (1992).
a strong public policy supports strict enforcem ent of rights secured by N.M .I. Const. art. I, § 9,29 we held in Torres
that the plaintiff’s cause of action was viable.30
In the present case, Rivera alleges that the agency’s action in awarding the contract to Samsung violated
his rights to due process and equal protection of the law. The CPA rules and regulations provide for claim s such
as this to undergo review at the administrative level. However, Rivera failed to tim ely lodge his adm inistrative
appeal, and thereby precluded CPA from considering the m erits of his protest. His case is distinguishable from
Torres.
Fourth, Rivera argues that even if he is required to exhaust his adm inistrative remedies, he could not have
executed his adm inistrative appeal because his bid was rejected by J.M . Guerrero, the board chairm an and
contracting officer, who alone could not make the rejection decision. Rivera asserts that only the CPA board is
authorized to act on a proposal and, since the board never rejected his bid, there is no action by the board from
which Rivera may appeal. This argum ent lacks merit in light of express CPA regulations.31
Even if Guerrero lacked the authority to reject a proposal, Rivera incorrectly assumes that CPA
regulations perm it a party to protest only board actions. The regulations expressly provide that “[a]ny . . . bidder .
. . who is aggrieved in connection with the solicitation or award of a contract may protest to the Executive
Director.” 32 If Rivera’s bid was im properly rejected because the rejection should have been made by the board,
then Rivera became an “aggrieved” party and he should have tim ely protested the rejection.
If Rivera had subm itted his protest within the requisite tim e period, it would have been reviewed by the
executive director, whose decision in turn would have been subject to review by the appeal com m ittee. Rivera
then could have proceeded to court for review of the com m ittee’s decision. Having failed to tim ely appeal
adm inistratively, he may not appeal now to the court.
C. Judicial Review under the Commonwealth Administrative Procedure Act (APA)33
Although the parties did not raise or discuss the issue of finality under the APA, we note that the APA
provides for judicial review of “[a]gency action made reviewable by statute and final agency action for which there
is no other adequate remedy in a court.” 34 An aggrieved party may seek such review within thirty days after the
agency issues its final decision about the m atter in question.35
In the instant case, CPA’s December 24, 1992, notice to Rivera of the rejection of his proposal might or
m ight not be deemed final agency action.36 If it was a non-final CPA action, then Rivera could not seek review
under the APA, which authorizes review only of final agency decisions.
If the Decem ber 24, 1992, rejection was a final CPA action, then Rivera had thirty days within which to
seek judicial review of the rejection. He would not have had to exhaust his adm inistrative remedy under such
29
See id. 2 N.M.I. at 501-02.
30
See Torres, 3 N.M.I. at 492.
31
CPA formally amended its procurement rules and regulations to authorize the chairman of the board to
negotiate and execute a contract for the Saipan Harbor Improvement Project. See Commonwealth Ports Authority,
Public Notice, Commonwealth Ports Authority Emergency Amendment to Section 2.3(1) of the Commonwealth
Ports Authority’s Procurement Rules and Regulations, 14 Com. Reg. 9769-75 (Oct. 15, 1992).
32
CPA Regulations, supra note 11, § 10.1(1)(a), 10 Com. Reg. 5642-43.
33
1 CMC § 9101 et seq.
34
See 1 CMC § 9112(d) (emphasis added).
35
The APA specifies that, unless otherwise precluded by statute, “[a] person suffering legal wrong because
of agency action, or adversely affected or aggrieved by agency action, is entitled to judicial review of the action
within 30 days thereafter in the Commonwealth Trial Court.” See 1 CMC § 9112(a) -(b) (emphasis added).
36
W e raise this issue without deciding it here.
Rivera v. Guerrero, 4 N.M.I. 79 (1993)
circumstances.37 Rivera, however, did not file his action in court until thirty-nine days after he received notice of
the rejection of his proposal. Consequently, even if he could have sought judicial review of the rejection of his
proposal as final agency action under the APA, Rivera’s court action was untim ely.
CONCLUSION
For the above reasons, the dism issal of Rivera’s com plaint for lack of subject matter jurisdiction is hereby
AFFIRM ED.
37
Parties seeking review under the APA must first exhaust all intra-agency appeals expressly mandated
either by statute or by the agency’s regulations. Such exhaustion requirements create jurisdictional prerequisites to
proceeding to court. See Montgomery v. Rumsfeld, 572 F.2d 250, 252-53 (9th Cir. 1978); Lopez v. Civil Serv.
Comm’n, 283 Cal. Rptr. 447, 449-51 (Ct. App. 1991). W here no statute or regulation mandates exhaustion, a court
may proceed to review the agency’s final decision under the APA, and may not impose additional exhaustion
requirements. See Darby v. Cisneros, 509 U.S. __, 113 S. Ct. 2539, 2445, 125 L. Ed. 2d 113, 123 (1993).