IN THE COMMONWEALTH COURT OF PENNSYLVANIA
Consolidated Rail Corporation, :
Petitioner :
:
v. :
:
Pennsylvania Public Utility :
Commission, : No. 131 C.D. 2025
Respondent : Argued: April 13, 2026
BEFORE: HONORABLE ANNE E. COVEY, Judge
HONORABLE LORI A. DUMAS, Judge
HONORABLE STELLA M. TSAI, Judge
OPINION
BY JUDGE TSAI FILED: June 3, 2026
Consolidated Rail Corporation (Conrail) petitions for review of the
declaratory order of the Pennsylvania Public Utility Commission (PUC) concerning
Conrail’s rights and obligations with respect to the inspection and maintenance of
drainage facilities of a railroad bridge over Interstate 95 (I-95) in Philadelphia. For
the reasons set forth below, we vacate and remand.
I. BACKGROUND
Conrail is a railroad company that owns and operates the Delair branch rail
line, which passes over I-95 at an above-grade crossing on a two-span, riveted girder
bridge known as the Delair Bridge. Petition, ¶ 1, Reproduced Record (R.R.) 3a-4a.
On June 11, 2018, multiple motor vehicles collided on I-95 in the vicinity of the
Delair Bridge. Id., ¶¶ 16-17, R.R. 8a. In ensuing lawsuits filed in the Court of
Common Pleas of Philadelphia County (Philadelphia Litigation), the plaintiffs in
those matters (Plaintiffs) alleged that ponding water on I-95, attributable to the
failure by Conrail and the Pennsylvania Department of Transportation (PennDOT)
to properly inspect and maintain the drainage system on the Delair Bridge,
contributed to the cause of the collisions. Id., ¶ 17, R.R. 8a.
After PennDOT took the position in the Philadelphia Litigation that Conrail
bore responsibility for inspection of the Delair Bridge drainage system, Conrail filed
the instant petition for declaratory order.1 Id., ¶ 18, R.R. 8a. Specifically, Conrail
sought to clarify Conrail’s and PennDOT’s rights and responsibilities pursuant to a
January 17, 1966 order (1966 Order) approving the construction of a portion of State
Highway Route 1000, later known as I-95, by PennDOT’s predecessor, the
Pennsylvania Department of Highways.2 Id., ¶¶ 4-8, R.R. 4a-6a. At that time,
Conrail’s predecessor, the Pennsylvania Railroad Company,3 operated freight and
1
PUC is vested with exclusive jurisdiction to allocate costs and maintenance
responsibilities associated with railroad-highway crossings to any concerned public utility,
municipal corporation, or the Commonwealth. Norfolk S. Ry. Co. v. Pub. Util. Comm’n, 971 A.2d
545, 550 (Pa. Cmwlth. 2009); see also 66 Pa. C.S. §§ 2702(b) (“[PUC] is hereby vested with
exclusive power . . . to determine and prescribe . . . the manner and conditions in or under which
[rail-highway] crossings shall be maintained, operated, and protected to effectuate the prevention
of accidents and the promotion of the safety of the public.”), 2704(a) (setting forth general rule
with respect to PUC’s authority to allocate costs associated with rail-highway crossings).
2
The portion of I-95 addressed in the 1966 Order was “Section D-1 of the new
expressway[, which would] extend[] a distance of about 0.9 of a mile between Luzerne and
Margaret Streets in the city and, at a location immediately south of Frankford Creek and west of
Thompson Street.” 1966 Order, at 1, R.R. 11a. In addition to PennDOT and Conrail, the 1966
Order also addressed the rights and responsibilities of the City of Philadelphia and gas, electric,
and telephone utility companies related to the highway construction project.
3
Conrail explained in its petition:
In 1968, the Pennsylvania Railroad and New York Central Railroad merged to
become the Pennsylvania New York Central Transportation Company, effective
February 1, 1968. On May 8, 1968, it adopted the name Penn Central Company
(“Penn Central”). [Conrail], established by Congress under the Regional Rail
Reorganization Act of 1973, took over the operations of six bankrupt northeastern
railroads, including Penn Central. Conrail commenced operations on April 1, 1976.
Petition, at 2 n.2, R.R. 4a. For ease of discussion, we refer to the Department of Highways and
the Pennsylvania Railroad Company by their current names, except when quoting the 1966 Order.
2
passenger railroad service on the Delair branch, which crossed over Thompson
Street in Philadelphia via an existing 50-foot rail bridge. 1966 Order, at 1, 3, R.R.
11a, 13a. PennDOT sought PUC’s approval for the relocation of Thompson Street
and construction of an eight-lane expressway under the existing railroad right-of-
way, the construction of a new rail bridge to span the expressway, and “the allocation
of costs and expenses incident thereto.” Id., at 1-4, R.R. 11a-14a.
As described in the preamble of the 1966 Order, PennDOT proposed the
construction of a temporary structure to allow rail traffic to continue for the duration
of the project and a permanent, 167-foot railroad bridge to cross the finished
expressway, i.e., the Delair Bridge. Id., at 3-4, R.R. 13a-14a. Furthermore,
[t]he department, upon completion of the improvement, will maintain
State Highway Route 1000 and the roadway of Thompson Street
between curbs. The department also will maintain the substructure
of the railroad bridge but suggests that the railroad company
should maintain the superstructure and the bearings of the bridge.
. . . . The railroad company will release damages for any of its operating
right-of-way taken, injured, or destroyed by reason of the construction
of the improvement. The company, upon completion of the project, will
maintain its altered and relocated facilities but does not agree to
maintain any portion of the bridge structure carrying its tracks over the
expressway. The principal maintenance need for the superstructure of
the bridge will be painting the bridge members and with the anticipated
highway traffic of 110,000 vehicles daily on the highway the company
avers that it will be practically impossible to paint the bridge or do any
work that requires access from the expressway. We are of the opinion
that the maintenance of the structure that will carry the facilities of
the carrier should be the responsibility of the company and will so
order.
Id., at 5-6, R.R. 15a-16a (emphasis added).
With respect to the construction of the railroad bridge, PUC ordered as
follows:
3
6. That Department of Highways, at its initial cost and expense,
furnish all material and do all work necessary to construct the
bridge over Frankford Creek, the temporary and permanent railroad
bridges over State Highway Route 1000, their approaches, and
drainage facilities pertinent thereto in accordance with the approved
plans, and, in addition, relocate and reconstruct certain designated
electrification structures, communication, and signal duct lines of the
railroad company required to permit the construction of the
improvement as shown on the approved plans.
Id., ¶ 6, R.R. 17a (emphasis added). The 1966 Order also set forth the following
obligations regarding the maintenance of the to-be-constructed Delair Bridge:
30. That upon completion of the construction of the crossing project
and its opening to public use, The Pennsylvania Railroad Company,
furnish all material and do all work necessary thereafter to maintain its
tracks, catenary and transmission system, communication and signal
system, and other facilities located on its right[-]of[-]way and, in
addition, maintain the entire superstructure including the fixed and
expansion bearings of the new bridge carrying its tracks over and
above State Highway Route 1000.
....
33. That upon completion of the construction of the crossing project
and its opening to public use, Department of Highways, at its sole cost
and expense, furnish all material and do all work necessary thereafter
to maintain the remainder of the crossing project, including the
entire substructure of the new railroad bridge, the substructure and
superstructure of the bridge carrying State Highway Route 1000 over
Frankford Creek, the paved roadway between curbs of relocated
Thompson Street and all drainage facilities pertinent to the
improvement.
Id., ¶¶ 30, 33, R.R. 33a (emphasis added).
Conrail requested in its petition that PUC issue a declaratory order confirming
PennDOT’s obligation under the 1966 Order to inspect and maintain the drainage
facilities of the Delair Bridge. PennDOT filed an answer requesting that the petition
be denied. PUC directed that Conrail serve a copy of the petition on Plaintiffs in the
Philadelphia Litigation. Plaintiffs filed an answer also seeking denial of the petition
4
or, in the alternative, that PUC find that the 1966 Order created a shared
responsibility among Conrail and PennDOT to inspect and maintain the drainage
facilities. Plaintiffs noted that Conrail admitted in answers to interrogatories that it
was responsible for ensuring the drainage system was draining water off the bridge
and inspecting the drainpipe and Conrail’s corporate designee testified in his
deposition that a portion of the drainpipe was part of the bridge superstructure.
Plaintiffs’ Answer, ¶ 7, Exhibit C, at 51, 64, Exhibit F, ¶¶ 26-27, R.R. 87a, 136a-
137a, 152a.
On January 2, 2025, PUC issued an opinion and order, which granted
Conrail’s request for a declaratory order but found that Conrail, not PennDOT, bore
responsibility for the Delair Bridge’s drainage facilities. Opinion and Order, at 12-
13, R.R. 199a-200a. PUC first found that the preamble and paragraph 30 of the 1966
Order clearly assigned Conrail the responsibility to maintain the bridge
superstructure. Id., at 11, R.R. 198a. Next, PUC reasoned that Conrail benefits from
the drainage of water and debris from the bridge and controls the drainage facilities,
which are attached to the superstructure. Id., at 12, R.R. 199a.
PUC further determined that the reference in paragraph 33 of the 1966 Order
to PennDOT’s responsibility for maintenance of drainage facilities applied only to
relocated Thompson Street and not drainage for the entire highway and bridge
project. Id., at 12, R.R. 199a. In support, PUC found the absence of an Oxford
comma4 in the phrase “the paved roadway between curbs of relocated Thompson
Street and all drainage facilities pertinent to the improvement” indicates that the
4
The Oxford (or serial) comma rule “requires a comma before a coordinating conjunction
in a series with three or more items.” Marcello, David A., The Case of the Serial Comma: What
Can Plain-Language Drafting Tell Legislative Drafters? 19 Scribes J. Legal Writing 127, 128
(2020).
5
drainage facilities referred to in paragraph 33 related to the Thompson Street
improvement alone. Id.; 1966 Order, ¶ 33, R.R. 33a. PUC additionally observed
that the singular reference to an “improvement” reflected the intention to assign
PennDOT responsibility for one aspect of the overall project, that is, the drainage
facility associated with the Thompson Street relocation. Opinion and Order, at 12,
R.R. 199a.
II. ISSUES ON APPEAL
Conrail filed the instant petition for review in this Court, raising two issues.5
Conrail first argues that the declaratory order must be reversed because PUC
disregarded the rules of construction set forth in the Statutory Construction Act of
1972 (Statutory Construction Act or Act)6 when interpreting the 1966 Order.
Second, Conrail contends that the determination that Conrail bears responsibility for
maintenance and inspection of the Delair Bridge drainage facilities was contrary to
the plain language of the 1966 Order that assigned this responsibility to PennDOT
and was based on a faulty finding that Conrail exclusively benefits from and controls
the drainage system.7
5
For ease of analysis, we have condensed Conrail’s second and third issues into one.
6
1 Pa. C.S. §§ 1501-1991.
7
Conrail additionally asserts that Plaintiffs attached to their answer Conrail’s “preliminary
answers to interrogatories in the Philadelphia Litigation” and PUC “misleadingly conclude[d]”
from those answers that Conrail admitted responsibility for the proper functioning of the drainage
facilities. Conrail’s Brief at 20 n.3; Plaintiffs’ Answer, Exhibit F, R.R. 143a-60a. Conrail attached
to its brief its supplemental interrogatory answers, in which it denied any such responsibility.
Conrail’s Brief, Addendum B.
Because Conrail failed to seek correction of the record or object to Plaintiffs’ submission
before the agency below, it has waived any challenge to the composition of the certified record in
this Court. See HIKO Energy, LLC v. Pa. Pub. Util. Comm’n, 209 A.3d 246, 261 (Pa. 2019)
(noting that “a party waives appellate review of a claim when it fails to raise the issue before an
administrative tribunal rendering a final decision”). Moreover, we may not consider Conrail’s
6
PUC and PennDOT8 respond that the rules of statutory construction do not
apply to PUC’s interpretation of its own prior orders; instead, under established
caselaw, this Court may not overturn PUC’s interpretation of its orders unless the
result is clearly erroneous, arbitrary, and lacks evidentiary support. PUC and
PennDOT contend that, applying this deferential standard, this Court must affirm
the declaratory order as it was based on the plain language of the 1966 Order,
admitted facts, and PUC’s expertise and experience in the matters of rail crossings.9
III. DISCUSSION
A. Standard of Review
Initially, we agree with PUC and PennDOT that our review is sharply
constrained in this case and the rules of statutory construction are not applicable.
Generally, our standard of review of a PUC order is limited to determining whether
substantial evidence supports the necessary findings of fact and whether an error of
supplemental interrogatory answers attached to its brief, as our review is limited to the record
certified by the agency. Myers v. Pa. Pub. Util. Comm’n, 306 A.3d 963, 968 n.3 (Pa. Cmwlth.
2023). In any event, we note that PUC cited Conrail’s interrogatory answers in a footnote but did
not expressly rely on the answers in determining Conrail’s responsibility with respect to the
drainage facilities. Opinion and Order, at 12 n.9, R.R. 199a. In its brief, PUC stated that it “relied
upon the 1966 Order’s plain language and only cited Conrail’s [interrogatory answers] as
additional support for its conclusion.” PUC Brief at 28 (emphasis omitted).
8
Plaintiffs initially filed a notice of intervention in this appeal but later withdrew, citing
the settlement of the Philadelphia Litigation.
9
PennDOT additionally asserts that Conrail sought clarification regarding the inspection
and maintenance of the drainage facilities on the Delair Bridge, but the 1966 Order only assigned
maintenance responsibility and did not address inspection of the facilities. Therefore, PennDOT
contends that this Court may affirm PUC’s determination in the first instance regarding inspection
of the Delair Bridge’s drainage facilities pursuant to its exclusive jurisdiction over rail-highway
crossings. PennDOT Brief at 12 (citing 66 Pa. C.S. §§ 2702(b), 2704(a)). However, PUC did not
premise its ruling on the distinction between inspection and maintenance responsibilities, nor did
PUC assert that it was exercising its jurisdiction to assign responsibility to Conrail outside the
scope of the 1966 Order. Therefore, we need not address PennDOT’s alternate rationale for
affirmance.
7
law, violation of constitutional rights, or violation of PUC’s procedures occurred.
Borough of Middletown v. Pa. Pub. Util. Comm’n, 301 A.3d 965, 974 (Pa. Cmwlth.
2023). However, we apply a more restrictive standard in cases where PUC construes
its prior orders because, “as an administrative agency, [it] is peculiarly fitted to
interpret its own orders.” Pittsburgh-Johnstown-Altoona Express, Inc. v. Pa. Pub.
Util. Comm’n, 554 A.2d 137, 144 (Pa. Cmwlth. 1989) (quoting Del. Valley Transp.
Co. v. Pa. Pub. Util. Comm’n, 400 A.2d 678, 679 (Pa. Cmwlth. 1979)). “In
recognition of this principle a court will not set aside a construction placed upon its
own orders by [PUC] unless the result is clearly erroneous, arbitrary, and
unsupported by evidence.” Id. (quoting Del. Valley Transp., 400 A.2d at 679); see
also Tenant Union Representative Network v. Pa. Pub. Util. Comm’n (Pa. Cmwlth.,
No. 10 C.D. 2023, filed Apr. 2, 2024), 2024 WL 1395268, slip op. at 14 (same).10
Furthermore, PUC’s authority to issue a declaratory order under the Public
Utility Code (Code)11 is entrusted to its “sound discretion.” 66 Pa. C.S. § 331(f)
(“[PUC], with like effect as in the case of other orders, and in its sound discretion,
may issue a declaratory order to terminate a controversy or remove uncertainty.”).
When “evaluating the ‘reasonableness’ of any discretionary agency action, appellate
courts accord deference to agencies and reverse agency determinations only if they
were made in bad faith or if they constituted a manifest or flagrant abuse of discretion
or a purely arbitrary execution of the agency’s duties or functions.” Lawrence v. Pa.
Pub. Util. Comm’n, 348 A.3d 108, 128 (Pa. 2025) (citation omitted). “When [PUC]
disposes of an issue involving its special expertise and requiring the exercise of
10
Unreported panel decisions of this Court issued after January 15, 2008, may be cited as
persuasive authority. See Commonwealth Court Internal Operating Procedures § 414(a), 210 Pa.
Code § 69.414(a).
11
66 Pa. C.S. §§ 101-3316.
8
discretionary judgment, absent an error of law or total lack of supporting evidence,
the Court will not substitute its judgment for that of [PUC].” United States Steel
Corp. v. Pa. Pub. Util. Comm’n, 850 A.2d 783, 790 (Pa. Cmwlth.) (en banc), appeal
denied, 863 A.2d 1151 (Pa. 2004).
The cases Conrail cites in urging this Court to apply a de novo standard of
review and consider the rules of statutory construction are inapposite, as each relates
to PUC’s interpretation of Code provisions and regulations enacted thereunder. See
McCloskey v. Pa. Pub. Util. Comm’n, 255 A.3d 416, 423 n.13 (Pa. 2021) (noting
that review of PUC’s interpretation of a Code provision presented a pure question of
law involving de novo review and applying provisions of Statutory Construction
Act); Popowsky v. Pa. Pub. Util. Comm’n, 910 A.2d 38, 48 (Pa. 2006) (stating
appellate issues pertaining to PUC’s interpretation of Code provisions and
regulations promulgated thereunder pose questions of law). Here, PUC was not
called upon to interpret the provisions of the Code or any other statute or regulation
but instead the provisions of the 1966 Order that allocated costs and responsibilities
between PennDOT and Conrail for inspection and maintenance of the Delair Bridge.
The Statutory Construction Act, by its express terms, limits its application to
interpretation of statutes, regulations, and public documents that incorporate the Act
and does not extend to interpretation of agency orders. 1 Pa. C.S. § 1502; see also
Pinto v. Workers’ Comp. Appeal Bd. (Main Line Healthcare) (Pa. Cmwlth., No. 739
C.D. 2018, filed Feb. 22, 2019), 2019 WL 855677, slip op. at 11 n.8 (declining to
apply rules of statutory construction to interpret administrative order). Therefore,
the deferential review applicable to PUC’s interpretation of its own prior orders is
the appropriate standard in this case. See Chappell v. Pa. Pub. Util. Comm’n, 425
A.2d 873, 875-76 (Pa. Cmwlth. 1981) (noting deferential standard of review when
9
addressing PUC’s interpretation of its own orders but applying rules of statutory
construction as PUC decision under review interpreted statutory exemption under
the Code).
B. Merits
Turning to the merits, Conrail argues that PUC erroneously narrowed the
construction of the assignment to PennDOT of responsibility for “all drainage
facilities pertinent to the improvement” in paragraph 33 of the 1966 Order to only
drainage on Thompson Street. 1966 Order, ¶ 33, R.R. 33a. Conrail asserts that
paragraph 33 constitutes a “‘catch all’ for maintenance duties not otherwise
assigned” and is the only place in the 1966 Order where maintenance of drainage
facilities is mentioned. Conrail’s Brief at 18. Conrail contends that PUC ignored
the plain meaning of “the improvement” used throughout the 1966 Order—in the
singular—to refer to the entire crossing project addressed in the order, including the
construction of State Highway Route 1000 (i.e., I-95) underneath the railroad right-
of-way and the alteration of the Thompson Street crossing under the then-existing
rail bridge. Conrail further notes that paragraph 30, which delegated certain
responsibilities to Conrail, did not mention drainage of the Delair Bridge and only
assigned the company responsibility for maintenance of the bridge’s superstructure
and bearings. Id., ¶ 30, R.R. 33a (providing that Conrail has responsibility to
“maintain the entire superstructure including the fixed and expansion bearings of the
new bridge carrying its tracks over and above” I-95).
Conrail also asserts that PUC erroneously found that the company exclusively
benefits from the drainage facilities, as the company contends that the drainage
facilities move water away from the bridge and I-95 and thus also benefit the public
who uses the expressway. Conrail further argues that nothing in the 1966 Order
10
supports PUC’s conclusion that the drainage system is part of the Delair Bridge
superstructure and exclusively within Conrail’s control. Rather, Conrail maintains
that photographs and diagrams submitted to PUC by Plaintiffs show that the
downspout from the bridge attaches to the substructure, which would place it within
PennDOT’s control. See Plaintiffs’ Answer, ¶ 7, R.R. 86a.
After careful review, we are constrained to conclude that PUC’s interpretation
of the 1966 Order as assigning Conrail responsibility for inspection and maintenance
of the drainage facilities on the Delair Bridge was clearly erroneous, arbitrary, and
unsupported by evidence. Lawrence, 348 A.3d at 128; Pittsburgh-Johnstown-
Altoona Express, 554 A.2d at 144. PUC relied on three portions of the 1966 Order
in arriving at its determination: (1) the statement in the preamble of the order that
PUC is “of the opinion that the maintenance of the structure that will carry the
facilities of the carrier should be the responsibility of the [railroad] company and
will so order;” (2) the assignment to Conrail in paragraph 30 of maintenance of the
superstructure and bearings of the Delair Bridge; and (3) the assignment to
PennDOT in paragraph 33 of maintenance of “all drainage facilities pertinent to the
improvement,” which PUC avers only applies to drainage for relocated Thompson
Street based on the fact that this phrase was not set off by an Oxford comma. 1966
Order, at 6, ¶¶ 30, 33, R.R. 16a, 33a. Upon close examination of the text, none of
the cited portions of the 1966 Order supports PUC’s resolution of this matter.
First, the discussion of Conrail’s responsibility for maintenance of the “the
structure that will carry the facilities of the carrier” appears in the preamble of the
1966 Order, which sets forth the parties’ positions on future maintenance
responsibility for the Delair Bridge. PennDOT recognized its responsibility to
maintain the substructure “but suggest[ed] that the railroad company should
11
maintain the superstructure and bearings of the bridge,” while Conrail rejected future
responsibility for “any portion of the bridge structure” due to the difficulties
associated with performing repairs over an active highway. Id., at 5-6, R.R. 15a-
16a. PUC sided with PennDOT. Accordingly, paragraph 30 specifically delineated
Conrail’s responsibility to “maintain the entire superstructure including the fixed
and expansion bearings of the new bridge.” Id., ¶ 30, R.R. 33a. Nothing in either
the cited portion of the preamble or paragraph 30 reflects that PUC intended to assign
Conrail any responsibility with respect to the drainage facilities of the new Delair
Bridge.
By contrast, the 1966 Order twice designates PennDOT as having
responsibility for the “drainage facilities pertinent” to the work contemplated by the
order. In paragraph 6 of the order—which PUC entirely overlooks in its declaratory
order analysis—PennDOT is made responsible to “furnish all material and do all
work necessary to construct the bridge over Frankford Creek, the temporary and
permanent railroad bridges over State Highway Route 1000, their approaches, and
drainage facilities pertinent thereto in accordance with the approved plans.” Id.,
¶ 6, R.R. 17a (emphasis added). Notably, paragraph 6 does not discuss drainage
facilities for Thompson Street12 but rather solely addresses responsibility for
construction of drainage facilities of the highway and rail bridges, including the as-
yet-unbuilt Delair Bridge. Paragraph 33 then, using nearly identical language,
assigns PennDOT responsibility for maintenance of “the remainder of the crossing
project” not assigned to Conrail or any other party to the order, “including the entire
12
The sole discussion in the 1966 Order of drainage of Thompson Street appears in
paragraph 13 of the 1966 Order, which states that the City of Philadelphia, not PennDOT, shall “at
its initial cost and expense, furnish all material and do all work necessary to relocate its 12-inch
sanitary sewer line located in the bed of Thompson Street and required by reason of the
construction of the improvement.” 1966 Order, ¶ 13, R.R. 28a.
12
substructure of the new railroad bridge, the substructure and superstructure of the
bridge carrying State Highway Route 1000 over Frankford Creek, the paved
roadway between curbs of relocated Thompson Street and all drainage facilities
pertinent to the improvement.” Id., ¶ 33, R.R. 33a (emphasis added).
PUC presents two textual arguments why the reference to “all drainage
facilities” in paragraph 33 only pertains to drainage of relocated Thompson Street:
the absence of an Oxford comma preceding the discussion of the drainage facilities
and the reference to a singular “improvement.” Neither claim withstands scrutiny.
While PUC generally used Oxford commas in lists of three or more items in the 1966
Order, it did not do so on every occasion.13 Even assuming PUC intentionally
omitted the Oxford comma in paragraph 33, PUC ignores the logical conclusion of
its argument, that it would have unintentionally omitted an “and” prior to the
reference to the Thompson Street work.14 Our review reveals that the 1966 Order
consistently uses a conjunction—“and” or “or”—before the final item in every list
of three or more items. Moreover, PUC repeatedly refers in the 1966 Order to the
13
See, e.g., 1966 Order, at 4-5 (“The department agrees to reimburse the company for the
costs incurred in furnishing watchmen, flagmen and inspectors . . . .”), ¶ 23 (providing that
PennDOT shall pay compensation “for property taken, injured or destroyed by reason of the
construction of the crossing project in accordance with this order”), R.R. 14a-15a, 30a.
14
Thus, if the Oxford comma was intentionally omitted in paragraph 33, an “and” should
have been inserted as follows:
33. That upon completion of the construction of the crossing project and its opening
to public use, Department of Highways, at its sole cost and expense, furnish all
material and do all work necessary thereafter to maintain the remainder of the
crossing project, including the entire substructure of the new railroad bridge, the
substructure and superstructure of the bridge carrying State Highway Route 1000
over Frankford Creek, [and] the paved roadway between curbs of relocated
Thompson Street and all drainage facilities pertinent to the improvement.
1966 Order, ¶ 33, R.R. 33a.
13
entirety of the contemplated rail-highway crossing project as “the improvement,” in
the singular.15 As Conrail explains, “there is not a single instance in the 1966 Order
where . . . PUC refers to any one aspect of the total construction project governed by
the 1966 Order as a singular improvement, or the individual portions of the project
together as multiple improvements.” Conrail Brief at 9-10.
Therefore, our review of the plain text of the 1966 Order leads us to the
inescapable conclusion that PUC assigned responsibility for maintenance of all
drainage facilities associated with the rail-highway crossing—including the drainage
facilities for the Delair Bridge—to PennDOT. Paragraph 30 assigns Conrail
maintenance responsibility for only the superstructure and bearings of the bridge and
does not mention the drainage facilities associated with the bridge. Paragraph 33,
on the other hand, assigns PennDOT responsibility to “maintain the remainder of the
crossing project, including the entire substructure of the new railroad bridge . . . and
all drainage facilities pertinent to the improvement.” 1966 Order, at 6, ¶ 33, R.R.
33a. Read in the context of the entire 1966 Order, it is clear that the reference in
paragraph 33 to “all drainage facilities pertinent to the improvement,” encompassed
all the drainage facilities for the full construction project, including the drainage for
the Delair Bridge. Id.
In its declaratory order, PUC also weighed Conrail’s “control” of the drainage
facilities and its receipt of benefits from the drainage of water and debris from the
15
See, e.g., 1966 Order, at 2 (“It is estimated by the department that the average daily traffic
that will use the new highway at the site of the improvement by 1975 will be 110,000 motor
vehicles.”), 5 (“The department, upon completion of the improvement, will maintain State
Highway Route 1000 and the roadway of Thompson Street between curbs.”), 8 (“City of
Philadelphia has no objection to the construction of the improvement as proposed by the
applicant.”), ¶ 5 (ordering that “the following described properties be and hereby severally taken
and appropriated for the purpose of the improvement in accordance with the plan attached hereto”),
R.R. 12a, 15a, 18a, 21a.
14
bridge. Opinion and Order, at 12, R.R. 199a. PUC’s consideration of such factors
is within its special expertise as the exclusive arbiter of maintenance and operation
of rail crossings. Norfolk, 971 A.2d at 550-51. PUC does not explain, however,
how it took these factors into account when drafting the 1966 Order, which was the
sole issue PUC addressed in the declaratory order. Notably, the 1966 Order is devoid
of any discussion as to which party controls or receives the primary benefit from the
drainage facilities. Similarly, we need not address the testimony of Conrail’s and
PennDOT’s corporate designees in the Philadelphia Litigation regarding
responsibility for inspection and maintenance of the drainage facilities where PUC
did not rely on this testimony and the post-1966 practice and understandings of the
parties were beyond PUC’s purview.16
IV. CONCLUSION
Accordingly, we vacate PUC’s declaratory order assigning inspection and
maintenance responsibility over the Delair Bridge drainage facilities to Conrail and
remand with direction that PUC enter an order finding that the 1966 Order assigned
such responsibilities to PennDOT.
__________________________________
STELLA M. TSAI, Judge
16
Our resolution of this appeal is without prejudice to PUC exercising its broad discretion
in the matter of rail-highway crossings in a subsequent proceeding to prospectively reassign
maintenance and inspection duties for the Delair Bridge drainage facilities.
15
IN THE COMMONWEALTH COURT OF PENNSYLVANIA
Consolidated Rail Corporation, :
Petitioner :
:
v. :
:
Pennsylvania Public Utility :
Commission, :
Respondent : No. 131 C.D. 2025
ORDER
AND NOW, this 3rd day of June, 2026, the January 2, 2025 order of the
Pennsylvania Public Utility Commission (PUC) is hereby VACATED. This matter
is remanded to PUC for further proceedings in accordance with this Opinion.
Jurisdiction relinquished.
__________________________________
STELLA M. TSAI, Judge