BARRY v. United States
CourtUnited States Court of Federal Claims
Date FiledOctober 23, 2026
Docket25-453
JudgeArmando O. Bonilla
StatusPublished
📰 News Coverage: Read the LAWS.com news report on this case
Full Opinion
In the United States Court of Federal Claims
FOR PUBLICATION
No. 25-453L
(Filed: October 23, 2026)
)
M. L. ONNA BARRY, et al., )
)
Plaintiffs, )
)
v. )
)
UNITED STATES, )
)
Defendant. )
)
Steven M. Wald, Stewart, Wald & Smith, LLC, St. Louis, Missouri, for plaintiffs.
With him on the briefs were Michael J. Smith and Allison P. Bettlach (argued),
Stewart, Wald & Smith, LLC, St. Louis, Missouri; and Thomas S. Stewart and
Reed W. Ripley, Stewart, Wald & Smith, LLC, Prairie Village, KS.
Kenneth G. Long (argued), Senior Attorney, Environmental Enforcement Section,
Environment & Natural Resources Division, U.S. Department of Justice,
Washington, DC, for defendant. With him on the briefs was Adam R. F. Gustafson,
Principal Deputy Assistant Attorney General, U.S. Department of Justice,
Washington, DC.
OPINION AND ORDER1
BONILLA, Judge.
Landowners in Henderson and Transylvania counties, North Carolina, seek
just compensation under the Fifth Amendment for the government’s alleged taking
of their property stemming from the conversion of a rail corridor into a public linear
park under the National Trail Systems Act (Trails Act), 16 U.S.C. §§ 1241–51.
Pending before the Court are cross-motions for summary judgment addressing
liability. The central question is whether plaintiffs owned a cognizable property
1 This case was transferred to the undersigned for adjudication on September 2, 2026, pursuant to
Rule 40.1(b) of the Rules of the United States Court of Federal Claims (RCFC).
interest in the contested land on the date of the alleged taking. The short answer is
no. Accordingly, plaintiffs’ motion is denied, and defendant’s cross-motion is granted.
BACKGROUND
The critical facts of this case date back to the late nineteenth century. In early
1891, the North Carolina General Assembly chartered the Hendersonville and
Brevard Railway, Telegraph and Telephone Company (HBR).2 The shortline railroad
and communications company acquired the assets of the abandoned French Broad
Valley Railroad Company and its name from the intended 21.6-mile route between
Hendersonville and Brevard.3 To secure the land on which to build the rail line
(rail corridor), HBR executed a series of deeds between 1894 and 1895 (source deeds),
nine of which are at issue here.4 After HBR went bankrupt in 1897, the railroad’s
assets, including the rail corridor, were purchased at auction by J. Frances Hayes for
$95,000, passed to the Toxaway Company, and reorganized as the Transylvania
Railroad Company. In the early 1900s, the Southern Railway purchased a controlling
interest in the railroad, absorbing the Transylvania Railroad Company in 1906.5 In
1982, Southern Railway merged with the Norfolk and Western Railway to form the
Norfolk Southern Railway Company (NSRC). See Norfolk S. Corp.–Control–Norfolk
& W. Ry. Co. and S. Ry. Co., 366 I.C.C. 173 (1982). Watco Companies, LLC acquired
the railroad assets in June 2014 and formed the Blue Ridge Southern Railroad
(Blue Ridge). See 79 Fed. Reg. 40204 (July 11, 2014); ECF 15-6 (Quitclaim Deed 1596-
628 from NSRC to Blue Ridge (July 25, 2014)).
On October 26, 2020, Blue Ridge and Ecusta Rails2Trails LLC (Ecusta) signed
an Interim Trail Use/Railbanking Purchase Agreement, through which Blue Ridge
agreed to sell its rights and interest in, and title to, the inactive 19.1-mile rail corridor
2 An Act to Incorporate the Hendersonville and Brevard Railway, Telegraph and Telephone Company,
ch. 360, 1891 N.C. Sess. Laws 431, available at ECF 15-1 at 3–6.
3 Jerry Ledford, A Brief History of the Railroad from Hendersonville to Lake Toxaway, Etowa NC
Heritage, available at https://perma.cc/U6HL-ELG9.
4 HBR’s charter authorized the railroad:
to acquire, hold, sell and convey real and personal property to such an extent as to
them may seem proper, and take title thereto in the name of the corporation, and
convey the same through their officers in the same way that other corporations are
now by law authorized to convey real estate : Provided, that the said corporation shall
not at any time hold more than ten thousand acres of land.
1891 N.C. Sess. Laws 431 § 2.
5 See In Transylvania County (1861–1911), The Transylvania Heritage Museum, available at
https://perma.cc/R9A7-VGE9; Ledford, supra note 3; John Leynes, Hendersonville & Brevard Railroad
Telegraph & Telephone Co., Ry. & Locomotive Hist. Soc’y, Inc. (Southeast Chapter), no. 114, Aug. 2009,
at 2, available at https://perma.cc/H9GV-3LEN.
2
to Ecusta pursuant to the Trails Act for $7.76 million.6 Blue Ridge initiated a formal
exemption proceeding on April 7, 2021, filing a Verified Notice of Exemption with the
Surface Transportation Board (STB) pursuant to 49 C.F.R. § 1152.50. While the April
7, 2021 notice nominally sought authority to abandon the 19.1-mile rail corridor, Blue
Ridge made clear that it was “seeking abandonment authorization to render the Line
eligible for an interim trail[] use pursuant to 16 U.S.C. §1247(d). . . . [Blue Ridge] does
not intend to consummate abandonment of the line.” ECF 13-2 at 6; accord id. at 5
(“[Blue Ridge] anticipates that abandonment authorization will facilitate interim use
of the Line as a public recreational trail, consistent with 16 U.S.C. § 1247(d).”). The
STB granted the exemption on April 27, 2021, with an effective date of May 27, 2021.
Consistent with Blue Ridge’s April 7, 2021 representation, Blue Ridge and Ecusta
filed a Joint Petition for Interim Trail Use and Notification of Trail Use/Railbanking
Agreement on June 16, 2021.7 The STB issued the requested Notice of Interim Trail
Use or Abandonment (NITU) on June 29, 2021. The same day, Blue Ridge and Ecusta
notified the STB that they had reached a Trail Use Agreement. Blue Ridge then
executed a special warranty deed on August 12, 2021, transferring the rail corridor
to Ecusta “in fee simple.” ECF 15-8 at 3.
On March 11, 2025, seven residents and a local volunteer fire department of
Henderson and Transylvania counties filed this Fifth Amendment takings action.8
The parties agree the remaining plaintiffs owned land adjacent to the rail corridor on
June 29, 2021, when the STB issued the NITU. The conflict lies in the property
interest HBR acquired from the predecessors-in-title to the plaintiffs 132 years ago:
Plaintiff Source Deed Date ECF 15
M. L. Onna Barry J. W. & Onnie Morgan Aug. 22, 1894 Ex. 9
Sherri Leigh Bethel J. H. Ripley Oct. 22, 1894 Ex. 10
Hugh F. & C. A. Johnson Aug. 23, 1894 Ex. 11
M. J. & C. B. Allen Aug. 23, 1894 Ex. 12
Kimberly Collins Fielding Cantrell Aug. 23, 1894 Ex. 13
Wm. N. & E. C. Corn Aug. 23, 1894 Ex. 14
Jeffrey Hart Butler & S. E. Capps Aug. 23, 1894 Ex. 15
Kevin Landrum J. H. Ripley Oct. 22, 1894 Ex. 10
6 Ecusta is “a subsidiary of Conserving Carolina, . . . formed to acquire the railbanked corridor with
the support of local and state grants and private donors.” Our History, Friends of the Ecusta Trail,
available at https://perma.cc/N6JF-B3RU. The community-based effort “to repurpose the abandoned
19+ mile [railway] spur . . . and transform it into a multi-use greenway” dates to 2009. Id.
7 The STB’s April 27, 2021 grant of abandonment exemption included a May 7, 2021 deadline for filing
for interim trail use/rail banking requests. ECF 13-3 at 3. The STB excused Blue Ridge and Ecusta’s
late filing for good cause. Compare ECF 13-4 at 3 (“Good Cause for Late-Filed Request”), with
ECF 13-1 at 2 (issuing Notice of Interim Trail Use or Abandonment notwithstanding untimely
request).
8 The original plaintiffs included Henderson County residents M. L. Onna Barry, Sherri Leigh Bethel,
Kimberly Collins, Jeffrey Hart, Kevin Landrum, and James Quinn; Transylvania County resident
Ronald Lyday; and the Little River Volunteer Fire Department, located in Transylvania County. On
April 1, 2026, Messrs. Quinn and Lyday voluntarily dismissed their claims without prejudice.
3
Little River Volunteer G. W. & Mattie Allison Nov. 2, 1894 Ex. 16
Fire Department W. M. & S. M. Allison Nov. 2, 1894 Ex. 17
If, as the government contends, HBR acquired the contested land in fee simple
under the 1894 source deeds, plaintiffs would not have a cognizable property interest
in the contested rail corridor. Conversely, if as plaintiffs maintain, HBR acquired
only a right-of-way easement for the limited purpose of operating the planned
railroad—by deed or through prescriptive easement—the STB’s June 29, 2021
facilitation of the rail-to-trail conversion could constitute a permanent taking of
plaintiffs’ properties. Cf. Barron v. United States, __ F.4th __, No. 25-1179, 2026 WL
3160493, at *2 (Fed. Cir. Oct. 22, 2026) (“If [the deeds] conveyed an interest in fee
simple, there was no reversionary interest left to the Landowners’ predecessors-in-
interest, [and] no taking occurred . . . . Conversely, if they conveyed only an easement
for railroad use, there was a reversionary interest, and . . . the Claims Court [must]
determine the nature and status of the easement.” (citations omitted)). Plaintiffs
seek to recover the fair market value of their extinguished property rights.
DISCUSSION
I. Standard of Review
Summary judgment is appropriate “if the movant shows that there is no
genuine dispute as to any material fact and the movant is entitled to judgment as a
matter of law.” RCFC 56(a). A genuine dispute exists where a reasonable factfinder
“could return a verdict for the nonmoving party.” Anderson v. Liberty Lobby, Inc.,
477 U.S. 242, 248 (1986). Material facts, in turn, are those “that might affect the
outcome of the suit.” Id. In deciding motions for summary judgment, the Court must
draw all inferences in the light most favorable to the nonmoving party, evaluating
each motion on its own merits. Matsushita Elec. Indus. Co. v. Zenith Radio Corp.,
475 U.S. 574, 587–88 (1986) (quoting United States v. Diebold, Inc., 369 U.S. 654, 655
(1962)); Mingus Constructors, Inc. v. United States, 812 F.2d 1387, 1391 (Fed. Cir.
1987).
The moving party bears the initial burden to demonstrate the absence of any
genuine issue of material fact. See Celotex Corp. v. Catrett, 477 U.S. 317, 323 (1986).
That burden can be met by showing “there is an absence of evidence to support the
nonmoving party’s case.” Dairyland Power Coop. v. United States, 16 F.3d 1197, 1202
(Fed. Cir. 1994) (citing Celotex, 477 U.S. at 325). “Once the moving party has satisfied
its initial burden, the opposing party must establish a genuine issue of material fact
and cannot rest on mere allegations, but must present actual evidence.” Crown
Operations Int’l, Ltd. v. Solutia Inc., 289 F.3d 1367, 1375 (Fed. Cir. 2002) (citing
Anderson, 477 U.S. at 248). Summary judgment is warranted when “the record taken
as a whole could not lead a rational trier of fact to find for the non-moving party.”
Matsushita, 475 U.S. at 587.
4
II. Fifth Amendment Taking
A compensable Fifth Amendment claim requires a cognizable interest in the
property allegedly taken. Palmyra Pac. Seafoods, LLC v. United States, 561 F.3d
1361, 1364 (Fed. Cir. 2009) (citing Phillips v. Wash. Legal Found., 524 U.S. 156, 164
(1998)). In Trails Act cases, the initial inquiry is whether the railroad acquired
fee simple title in the land underlying the contested rail corridor or merely secured a
railway easement over the owner’s burdened freehold estate. Preseault v. United
States, 100 F.3d 1525, 1533–34 (Fed. Cir. 1996) (en banc). Where the railroad secured
only right-of-way easements, two follow-on questions remain:
[W]ere the terms of the easements limited to use for railroad purposes,
or did they include future use as public recreational trails; and . . . even
if the grants of the [r]ailroad’s easements were broad enough to
encompass recreational trails, had these easements terminated prior to
the alleged taking so that the property owners at that time held fee
simples unencumbered by the easements[?]
Id. at 1533. Property rights in rails-to-trails cases are governed by the relevant
state’s law. Castillo v. United States, 952 F.3d 1311, 1319 (Fed. Cir. 2020) (citation
omitted). In this case, North Carolina law governs.
Plaintiffs’ principal argument is that unresolved latent ambiguities in the 1894
source deeds render them unenforceable, leaving HBR and its successors-in-interest
with a prescriptive railroad easement across plaintiffs’ burdened freehold estates.
Plaintiffs alternatively assert that the 1894 source deeds, to the extent enforceable,
conveyed only a railroad right-of-way easement and, further, that the public trail
sanctioned by the STB exceeded the scope of any conveyed easement.9
Before turning to these arguments, the Court addresses the representativeness
of the October 22, 1894 J. H. Ripley deed. Both parties accepted the Ripley deed as
an exemplar source deed. And, as noted in the chart above, it is the source deed for
two of the six remaining plaintiffs (i.e., Bethel and Landrum). The conveyance from
“J H Ripley to R.R. Co” provides:
In consideration of the benefits to be [by me] derived from the
construction of its Railroad through my premises in said state and
county particularly described as follows—that property in the town of
Hendersonville known as the Ripley tan yard property and the property
above Erraits Mill known as Fuller Ford property and of one dollar for
me in hand paid thereupon whereof is hereby acknowledged. I
J.H. Ripley of said county to give[,] grant[,] bargain[,] sell[,] and convey
9 Plaintiffs declined to assert that any railway easements terminated prior to the date of the claimed
taking. ECF 13 at 17 n.2.
5
to the Hendersonville and Brevard Railway Telegraph and Telephone
Company and its successors forever a strip of land of sufficient width
upon which to locate[,] construct[,] and operate and maintain a standard
gauge rail road through said premises which is or may be staked or
marked out by the engineer or engineers of said company and indicated
upon the map by him or them and the president of said company placed
on file in the office of the Clerk of said Henderson County as required by
law such strip so marked out and indicated to be the land hereby
conveyed provided that this deed shall be void unless said railroad
company shall have constructed a railroad through said premises on or
before the first day of August 1895. Witness my hand & seal this the
twenty[-]second day of Oct. A.D. 1894.
ECF 13-34 at 2–3; ECF 15-10 at 2–4.10
The Court notes that while both parties treated the Ripley deed as
representative in their briefs, there are a couple of salient differences among the
source deeds. In fact, during oral argument, the parties concentrated on the
August 23, 1894 Fielding Cantrell deed, which transferred “a strip of land 75 feet
wide provided that said rail road shall be completed and in operation on or before the
first day of January 1897 . . . .”11 ECF 15-13. Among the source deeds, only the
Cantrell deed refers to a specific width rather than to the more generic “strip of land
of sufficient width.”
Although neither party mentioned this fact, the deeds also provide different
deadlines for when the railroad must be “constructed” for the deed to be valid:12
Source Deed Date Deadline ECF 15
J. W. & Onnie Morgan Aug. 22, 1894 Jan. 1, 1897 Ex. 9
J. H. Ripley Oct. 22, 1894 Aug. 1, 1895 Ex. 10
Hugh F. & C. A. Johnson Aug. 23, 1894 Jan. 1, 1897 Ex. 11
M. J. & C. B. Allen Aug. 23, 1894 Jan. 1, 1897 Ex. 12
Fielding Cantrell Aug. 23, 1894 Jan. 1, 1897 Ex. 13
Wm. N. & E. C. Corn Aug. 23, 1894 Jan. 1, 1897 Ex. 14
Butler & S. E. Capps Aug. 23, 1894 Jan. 1, 1897 Ex. 15
G. W. & Mattie Allison Nov. 2, 1894 Jan. 1, 1897 Ex. 16
W. M. & S. M. Allison Nov. 2, 1894 Jan. 1, 1895 Ex. 17
10 See also ECF 13 at 24 (providing a substantively identical transcription).
11 At oral argument, plaintiffs read the width as “25 feet” while the government read the width as
“75 feet.” If the deed were to read 25, there might be a taking as to the difference between the 25 feet
conveyed in fee simple and the 75 feet represented on the 1916 Interstate Commerce Commission
valuation map, which is discussed in greater detail infra. See ECF 15-18 at 7. The plaintiffs did not
make, and have therefore waived, this argument.
12 The Cantrell deed, unlike the other deeds, specifies that the railroad must be “completed and in
operation,” ECF 15-13 (emphasis added), and not just “constructed,” ECF 15-9, ECF 15-10, ECF 15-11,
ECF 15-12, ECF 15-14, ECF 15-15, ECF 15-16, ECF 15-17.
6
The Court takes judicial notice of the fact that contemporaneous accounts record the
rail corridor being completed during the summer of 1895.13 Neither party contends
the deeds were voided for failure to timely construct the railroad.
A. Latent Ambiguity
Plaintiffs argue the original source deeds contain latent ambiguities regarding,
in turn, the description of the parent parcels from which the conveyances stemmed,
and the specific “strip of land” within the parent parcels conveyed to the railroad.
This Court has considered—and rejected—claims by neighboring landowners in
Henderson County, North Carolina, that the description of the parent parcel in the
same Ripley source deed is void for vagueness, explaining:
Of consequence, the deed references “that property in the town of
Hendersonville known as the Ripley tanyard property and the property
above Erraits Mill known as [F]uller [F]ord property.” Reference to other
property in a deed as a method of describing land has been upheld in
North Carolina. For example, in McCotter v. Barnes, the deed described
the property as “a tract or parcel of land . . . situated, lying and being in
the county and State aforesaid and in No. 3 township adjoining the lands
of C. A. Flowers, S. H. Muse and others . . . .” Further, in McCotter, the
court rejected the idea that a more precise metes and bounds description
was necessary. The Ripley [d]eed, like the McCotter one, describes the
land by reference to other property. Accordingly, the Court finds the
Ripley [d]eed, like the other source deeds, has sufficient detail to identify
the property and is therefore a valid deed.
Bevirt v. United States, 177 Fed. Cl. 275, 281–82 (2025) (first alteration in original)
(footnote omitted) (first quoting ECF 13-34 at 2;14 then quoting McCotter v. Barnes,
101 S.E.2d 330, 332 (N.C. 1958); and then citing McCotter, 101 S.E.2d at 334–35),
reconsideration denied, 180 Fed. Cl. 217 (2026), appeal dismissed per stipulation,
No. 26-1703 (Fed. Cir. Oct. 16, 2026). To be clear, in rejecting plaintiffs’ claims,
Judge Hadji’s evaluation focused on whether the description of the parent parcel was
13 The Railroad Gazette tracked the progress of the construction: On May 31, 1895: “The
[Hendersonville & Brevard] road will be completed by July 10, it is announced.” 27 Railroad Gazette:
A Journal of Transportation, Engineering and Railroad News 354 (New York, 32 Park Place 1895),
available at https://babel.hathitrust.org/cgi/pt?id=chi.15967696&seq=1 (last visited Oct. 22, 2026). On
July 12, 1895: “[T]he track w[ill] be laid into the terminus at Brevard, N.C., by Aug. 1, or soon after
that date.” Id. at 473. On August 2, 1895: “The road is now practically completed.” Id. at 523. On
November 8, 1895: “This railroad has been formally opened for regular freight and passenger traffic
for its entire length of 21 miles, from Hendersonville, to Brevard, N.C.” Id. at 747.
14 For clarity, this cite refers to the identical October 22, 1894 J. H. Ripley deed used as the exemplar
source deed in both this case and Bevirt.
7
patently ambiguous. See id. at 281. Here, even assuming the description is latently
ambiguous, the ambiguity is easily resolved.
North Carolina caselaw is clear that “a latent ambiguity raises a question of
identity. If the ambiguity is latent, evidence dehors [outside of] the contract is both
competent and necessary.” Lane v. Coe, 136 S.E.2d 269, 273 (N.C. 1964). Describing
property by its commonly known name suffices to admit evidence identifying it.
See Carolina Power & Light Co. v. Waters, 133 S.E.2d 450, 452 (N.C. 1963) (“Where
property either real or personal has a known and commonly used and recognized
name, the use of this name to describe and identify the property sold is an adequate
description, that is, it is sufficient to permit the introduction of evidence to show that
the property claimed is in fact the property named.”). There is no question as to
whether it is possible to identify the parent parcels from the descriptions in the source
deeds; plaintiffs themselves have successfully done so, and the government agrees
with their identifications.
Instead, the source deeds’ identification of the specific “strip of land” within
the parent parcels conveyed to the railroad presents a less easily resolvable latent
ambiguity under North Carolina law. “A description is said to be latently ambiguous
if it is insufficient in itself to identify the property but refers to something extrinsic
by which identification might possibly be made.” Lane, 136 S.E.2d at 273. The
relevant portion of the exemplar Ripley deed purports to convey:
a strip of land of sufficient width upon which to locate[,] construct[,] and
operate and maintain a standard gauge rail road . . . which is or may be
staked or marked out by the engineer or engineers of said company and
indicated upon the map by him or them and the president of said
company placed on file in the office of the Clerk of said Henderson County
as required by law . . . .
ECF 13-34 at 2–3 (emphasis added); ECF 15-10 at 2–4 (same). On its face, the source
deed references a complementary railroad engineer’s or engineers’ map and physical
markers “staked or marked out by the engineer or engineers”—which may or may not
predate the deed—to identify the specific “strip of land” conveyed. Cf. Duckett v.
Lyda, 26 S.E.2d 918, 919 (N.C. 1943) (“[A deed] must set forth a subject matter, either
certain in itself or capable of being reduced to a certainty by a recurrence to something
extrinsic to which the deed refers.” (citations omitted)). The greater difficulty in
resolving this latent ambiguity compared to the identification of its parent parcel
stems from the deed’s apparent reliance on the referenced engineers’ maps.
Neither party produced the cited engineers’ maps.15 And notwithstanding the
actual construction of the rail corridor and its subsequent operation for some
15 During oral argument, counsel related the exhaustive efforts undertaken to locate the engineers’
maps.
8
125 years, no definitive evidence is presented that the engineers’ maps were created;
or, if they were, that they were duly filed with the county clerk and later lost or
destroyed.16 Against this backdrop, plaintiffs contend that the source deeds suffer
from an unresolved latent ambiguity, relegating HBR’s interest in the corridor to a
prescriptive railway right-of-way easement.
In takings cases, plaintiffs bear the ultimate burden of proving their property
interest. CCA Assocs. v. United States, 667 F.3d 1239, 1245 (Fed. Cir. 2011);
accord Estate of Hage v. United States, 687 F.3d 1281, 1291 (Fed. Cir. 2012) (“It is the
[plaintiffs’] burden to establish cognizable property interests for the purposes of their
takings claims.”). The government, however, relies on the source deeds to rebut
plaintiffs’ claimed ownership interest in the disputed rail corridor. North Carolina
law places the burden of fitting a deed’s description to the land on the party relying
on the deed. See Lane, 136 S.E.2d at 274 (“The burden was upon the [proponent of
the deed] to identify the property referred to in the contract.”). As discussed infra,
the government carried its burden: the rail corridor’s location is undisputed; the
valuation maps, on which plaintiffs also rely, identify the parent parcels and the rail
corridor; and plaintiffs offered no evidence “tending to show impossibility of
identification,” which Lane permits the deed’s opponent to offer. See id. at 273.
Plaintiffs’ theory of the case is that the latent ambiguity in the source deeds
can only be resolved by the railroad engineers’ maps referenced in them. Because the
engineers’ maps cannot be found, the argument goes, the latent ambiguity cannot be
resolved, and the deeds are thus void. Although facially appealing, the North
Carolina Supreme Court previously addressed a remarkably similar situation: a deed
granted to a railroad a tract of land specified by a particular survey that was not in
evidence. See Tighe v. Seaboard Air Line R.R. Co., 97 S.E. 164, 166 (N.C. 1918). In
that case, the deed conveyed “so much of an acre tract of his land (describing the land)
as may be taken in constructing the connection between the Raleigh & Gaston and
North Carolina Railroad Company according to the survey made by Ed Myers, civil
engineer.” Id. (emphasis added). In North Carolina, a railroad could enter land and
build a railroad without permission of the landowner. William T. Joyner, Railroads—
Right-of-Way—Statutory Limitation Barring Recovery Therefor, 27 N.C. L. Rev. 579,
580 (1949) (collecting cases). The owner could then bring a statutory action for
compensation. Id. (collecting cases). In such a proceeding, either party could request
to limit the width of the right of way, but if neither party did so, then the railroad
acquired a right of way of the maximum width that it could condemn under its charter
or, if its charter was silent on this point, to fifty feet on either side, as provided by
16 See Postal Tel. Cable Co. v. S. Ry. Co., 89 F. 190, 193 (C.C.W.D.N.C. 1898) (“It was also insisted that
section 1952 [of N.C. Code of 1883] provides for maps of the route to be made and filed in the office of
the clerk of the court of the county through which the road may run. This provision applies to steps
antecedent to the filing of the petition for condemnation, indicating the proposed route, and allowing
objections to be made, so that it may be altered, if necessary.”); id. at 195 (noting that “section 1952
[was] repealed” in 1893).
9
general law. Id. (collecting cases). The Tighe court found that because the deed
referenced a survey, the width of the right of way was “restricted to the boundary
described in its deed.” Tighe, 97 S.E. at 167. As the Myers survey was not in evidence,
the court remarked that “the presumption is that Ed Myers, the civil engineer, laid
out the right of way to the full 80 or 100 feet width, as authorized by the charter,”
but that this presumption “is subject to the evidence tending to show that only
one-quarter of an acre was used and occupied by the railroad company under the
Ed Myers survey . . . .” Tighe, 97 S.E. at 166.17 The court found that the evidence
was in fact sufficient to rebut the presumption.
Applying the logic of Tighe to this case, the rebuttable presumption is that the
missing engineers’ maps documented that the railroad had 50 feet on either side
under general law (except as to the Cantrell deed, which fixed the total width at
75 feet) because the HBR charter was silent as to width. While Tighe did not
explicitly address whether the absence of the Myers survey rendered the deed void
because of a latent ambiguity, the question of the deed’s validity is analytically prior
to that of its construction. Logic dictates that, if the absence of the survey rendered
the deed void, there would be no need for a rule governing how much land an absent
survey should be presumed to convey.
The reason the missing Myers survey did not threaten the validity of the deed
in Tighe presents a puzzle on first impression.18 It is a basic rule of property that “a
deed conveying land within the meaning of the statute of frauds must contain a
description of the land, the subject matter of the deed, either certain in itself or
capable of being reduced to certainty by reference to something extrinsic to which the
deed refers.” Cherry v. Roanoke Tobacco Warehouse Co., 75 S.E.2d 124, 128 (N.C.
1953). “[A]nd the deed must speak for itself; it cannot be added to, varied or
contradicted by parol evidence.” Dail v. Jones, 85 N.C. 221, 223 (1881) (citing Wilson
17 Although not material to the decision reached today, Tighe is seemingly internally inconsistent as
to the number of feet authorized by the railroad charters in that case. Compare Tighe, 97 S.E. at 166
(“80 or 100 feet width, as authorized by the charter”), with id. (“the 80 feet authorized right of way
under the Raleigh & Gaston Railroad Company charter, or the 200 feet right of way authorized by the
North Carolina Railroad Company charter”).
18 The Court considered sua sponte certifying the question to the North Carolina Supreme Court, only
to realize that the Tar Heel State remains the only state lacking a federal certification mechanism.
See Stahle v. CTS Corp., 817 F.3d 96, 113 (4th Cir. 2016) (Thacker, J., concurring) (collecting cases);
D. Martin Warf & Lorin J. Lapidus, Closing the Certified Question Loop: An Approach for Establishing
a Constitutional Certification Mechanism in North Carolina, N.C. State Bar J., Summer 2025, at 18,
available at https://perma.cc/2LCF-C6XR; Rachel Koehn Breland, Avoiding Rejection: Studying When
and Why State Courts Decline Certified Questions, 92 Fordham L. Rev. 1429, 1438 (2024) (“Today,
forty-nine states and the District of Columbia have established procedures allowing their courts of last
resort to answer certified questions from federal courts.” (footnotes omitted)). Although the North
Carolina General Assembly introduced House Bill 157, short-titled “Certifying Question Mechanism,”
on February 21, 2017, it was last referred to the Committee on Rules, Calendar, and Operations of the
House on March 1, 2017. See N.C. Gen. Assemb., Reg. Sess. 2017-2018, H.B. 157 (last visited on
Oct. 22, 2026), available at https://perma.cc/9WT4-9RWZ.
10
v. Sandifer, 76 N.C. 347 (1877)). Without the Myers survey, the deed in Tighe cannot
speak as to the boundaries of the interest in land conveyed. When deeds for railroad
rights of way are silent as to width, North Carolina courts have fixed the width
according to the railroad charter or the general statute. See Wearn v. N.C. R.R. Co.,
132 S.E. 576, 578 (N.C. 1926) (“The law of North Carolina, as declared in many
decisions, is to the effect that if a railroad company enters upon land under a deed or
grant from the owner which purports to convey an unrestricted right of way and no
definite quantity or width of land is specified, and thereafter constructs its road
thereon, then it is presumed that the owner has granted to the company the width
designated in the charter or in the general statute.”); accord Heaton v. Kilpatrick,
143 S.E. 644, 645 (N.C. 1928) (“[I]n the absence of restrictions in a deed for a right of
way over land conveyed to said company, the width of such right of way is 200 feet—
that is, 100 feet on each side of the track.”).19 The same principle that a deed
conveying an interest in land must sufficiently describe the land applies to both
easements and fee simple. See Overton v. Boyce, 221 S.E.2d 347, 349 (N.C. 1976) (“A
deed purporting to convey an interest in land is void unless it contains a description
of the land sufficient to identify it or refers to something extrinsic by which the land
may be identified with certainty.” (citing cases)); M. E. Gruber, Inc. v. Eubank,
148 S.E. 246, 248 (N.C. 1929) (“An easement, of course, is an interest in land, and, if
it is created by deed, either by express grant or by reservation, the description thereof
must not be too uncertain, vague and indefinite.” (citing cases)).
When assessing the width of a rail corridor, North Carolina courts take a
capacious approach to the admissibility of extrinsic evidence. In Tighe, for example,
the court found that the jury properly considered “evidence tending to show that only
one-quarter of an acre was used and occupied by the railroad company . . . .” 97 S.E.
at 166. In another case, a deed “g[ave], granted, and surrendered” to a railroad
company “so much and no more of the lands belonging to, owned, or held by
[the grantors]” as the company “would have a right to condemn” for its use. Seaboard
Air Line R.R. Co. v. Olive, 55 S.E. 263, 265 (N.C. 1906). As here, the deed identified
the land to be conveyed by reference to the as-yet-unconstructed railroad. The Olive
court determined that it “must hold either that it is void for uncertainty, or find some
standard by which to apply the maxim, ‘Id certum est quod certum reddi potest’”—
that is certain which can be made certain. Id. at 267 (emphasis added). The court
concluded “that the deed was a valid grant of a right-of-way, and that, read in the
light of the [charter and background] statutes, its width was 100 feet, or 50 feet on
each side of the center of the track.” Id. at 268.
North Carolina courts’ flexibility in constructing deeds is rooted in a principled
preference in favor of upholding deeds: “The courts seek to sustain a deed if possible
19 North Carolina provides that a deed granting a right of way to a railroad can convey either an
easement or fee simple title, depending on context, see McCotter, 101 S.E.2d at 335. Wearn and Heaton
concern easements, however, and it is not certain that a North Carolina court would apply a statutory
presumption of width to a deed granting fee simple title to a railroad.
11
on the assumption that the parties intended to convey and receive land or they would
never have been involved in the first place.” Deutsche Bank Nat’l Tr. Co. v. Gaydos,
921 S.E.2d 165, 170 (N.C. Ct. App. 2025) (quoting Chi. Title Ins. Co. v. Wetherington,
490 S.E.2d 593, 597 (N.C. Ct. App. 1997)). See also Duckett, 26 S.E.2d at 919 (“It is
presumed that the grantor in a deed of conveyance intended to convey something,
and the deed will be upheld unless the description is so vague or contradictory that it
cannot be ascertained what thing in particular is meant.” (citations omitted)).
“Although a description of real property must adequately identify the subject
property, the law will support a deed if possible.” In re Thompson, 799 S.E.2d 658,
662 (N.C. Ct. App. 2017). See also Olive, 55 S.E. at 267 (“The maxim, ‘Ut res magis
valeat quam pereat’ [let the thing have effect rather than perish], admonishes us that
it is our duty to uphold the deed, if by reasonable construction, it can be done.”
(emphasis added)). Put simply, North Carolina courts have labored to uphold deeds.
See, e.g., Chi. Title Ins. Co., 490 S.E.2d at 597 (“[T]here is ample evidence to support
a finding that the [parties] were aware of the location of the residence tract despite
the ambiguity contained in the description in the deed. Therefore, the trial court’s
finding and conclusion that the deed was void because of this ambiguity was in
error.”).
The Court considers it likely that the railroad engineers’ maps in question were
drafted and either not properly filed with the county clerk or later misplaced, lost, or
destroyed. The source deeds envision the railroad to “be staked or marked out by the
engineer or engineers of said company and indicated upon the map by him or them.”
ECF 13-34 at 2–3; ECF 15-10 at 2–4. The company did in fact build the railroad. It
follows that the engineers likely staked or marked out a path before construction.
After all, these engineering marvels are not constructed by laying tracks in the dark.
If these logical deductions are correct, a “survey referenced in a deed becomes a part
thereof and need not be recorded.” Edwards v. Hill, 703 S.E.2d 452, 455 (N.C. Ct.
App. 2010) (citing Kaperonis v. Highway Comm’n, 133 S.E.2d 464 (N.C. 1963)).
“When a deed is lost or destroyed, there is no question its loss and contents may be
proved by secondary evidence; but in all cases the best evidence, of which the nature
of the case will admit, must be produced—a copy, for instance, if there be one, but if
none, then parol evidence of its contents may be given.” Cowles v. Hardin, 91 N.C.
231, 233 (1884) (citations omitted). All that said, notwithstanding the undersigned’s
musings, neither party has adduced concrete evidence that the railroad engineers’
maps in question ever existed.
In any case, the source deeds do not point to the railroad engineers’ maps alone.
They also point to the physical staking or marking out of the railroad—and to the
railroad itself. The parties do not dispute the location of the railroad. North Carolina
law is clear that physical landmarks can be used to fix the location of property. Where
the parties to the sale contemporaneously fixed the bounds of a property, the physical
boundaries control. See S.S.M. Realty Co. v. Boren, 190 S.E. 733, 734 (N.C. 1937) (“It
is settled beyond a controversy in [North Carolina] that a line surveyed and marked
out and agreed upon by the parties at the time of the execution of the deed will control
12
the course and distance set out in the instrument.” (quoting Millikin v. Sessoms,
92 S.E. 359, 361 (N.C. 1917) (per curiam)); id. (“[C]ourse and distance, or even what
is considered in law a more certain or controlling call, must yield to evidence, if
believed, that the parties, at the time of the execution of a deed, actually ran and
located a different line from that called for, such evidence being admissible to show
the description of the line to be a mistake.” (quoting Cox v. McGowan, 21 S.E. 108,