Krasko v. Konkos
CourtConnecticut Appellate Court
Date FiledNovember 10, 2026
DocketAC48824
JudgeMoll; Seeley; Palmer
StatusPublished
đ° News Coverage: Read the LAWS.com news report on this case
Full Opinion
************************************************
The âofficially releasedâ date that appears near the
beginning of an opinion is the date the opinion will be
published in the Connecticut Law Journal or the date it
is released as a slip opinion. The operative date for the
beginning of all time periods for the filing of postopinion
motions and petitions for certification is the âofficially
releasedâ date appearing in the opinion.
All opinions are subject to modification and technical
correction prior to official publication in the Connecti-
cut Law Journal and subsequently in the Connecticut
Reports or Connecticut Appellate Reports. In the event
of discrepancies between the advance release version of
an opinion and the version appearing in the Connecticut
Law Journal and subsequently in the Connecticut Reports
or Connecticut Appellate Reports, the latest version is
to be considered authoritative.
The syllabus and procedural history accompanying an
opinion that appear in the Connecticut Law Journal and
subsequently in the Connecticut Reports or Connecticut
Appellate Reports are copyrighted by the Secretary of the
State, State of Connecticut, and may not be reproduced
or distributed without the express written permission of
the Commission on Official Legal Publications, Judicial
Branch, State of Connecticut.
************************************************
Krasko v. Konkos
ROBERT J. KRASKO ET AL. v.
ROBERT KONKOS ET AL.
(AC 48824)
Moll, Seeley and Palmer, Js.
Syllabus
The defendants, owners of certain real property that is subject to a right-
of-way easement benefitting the plaintiffsâ neighboring property, appealed
from the trial courtâs judgment ordering the defendants to authorize the
removal of a utility pole that is located in the easement area so that the
plaintiffs could widen their driveway. The defendants claimed, inter alia,
that the court erred in finding that their refusal to consent to the removal
of the pole was an obstruction of the plaintiffsâ easement. Held:
The trial court did not err in concluding that the defendantsâ refusal to
consent to the removal of the utility pole constituted an obstruction of the
plaintiffsâ easement, as the court properly applied the reasonable use analysis
articulated in Williams v. Green Power Ventures, LLC (221 Conn. App. 657),
the courtâs analysis of whether the plaintiffsâ proposed use of the easement
was reasonably necessary was sound, the majority of the courtâs factual find-
ings were not clearly erroneous, and any erroneous findings were harmless.
The trial court did not err by ordering unpleaded declaratory relief as claimed
by the defendants but, rather, properly awarded injunctive relief as requested
by the plaintiffs in their operative complaint, as the judgment directed the
defendants to take a specific action, namely, to authorize the utility companies
to remove the utility pole and to transfer the defendantsâ electrical service to
a different utility pole, rather than merely establishing the existing rights
and legal relations of the parties, and the purpose of the order was to stop
the defendantsâ interference with the plaintiffsâ use and enjoyment of the
easement, which is a classic purpose of an injunction.
Argued September 9âofficially released November 10, 2026
Procedural History
Action seeking, inter alia, an injunction requiring
the named defendant et al. to consent to the relocation
of a utility pole that obstructed the plaintiffsâ ease-
ment, and for other relief, brought to the Superior Court
in the judicial district of Fairfield, where the court,
Stevens, J., granted the plaintiffsâ motions to cite in
Frontier Communications Corporation et al. as party
defendants; thereafter, the named defendant et al. filed
a counterclaim; subsequently, the court, Hon. Dale W.
Radcliffe, judge trial referee, granted the plaintiffsâ
Krasko v. Konkos
motion to cite in Owned Wealth, LLC, et al. as party
defendants; thereafter, the plaintiffs withdrew their
complaint against the defendant Margaret Mary Kane;
subsequently, the court, Hon. Dale W. Radcliffe, judge
trial referee, granted the plaintiffsâ motion to enforce
a settlement agreement, and the named defendant et al.
appealed to this court, Elgo, Moll and Suarez, Js., which
reversed the judgment of the trial court and remanded
the case with direction to deny the plaintiffsâ motion
to enforce the settlement agreement; thereafter, the
court, Hon. Kenneth B. Povodator, judge trial referee,
rendered judgment for the plaintiffs with respect to the
complaint and with respect to counts three through six
of the counterclaim filed by the named defendant et al.,
from which the named defendant et al. appealed to this
court; subsequently, the court, Hon. Kenneth B. Povo-
dator, judge trial referee, dismissed counts one and two
of the counterclaim filed by the named defendant et al.
Appeal dismissed in part; affirmed.
Alexander Copp, for the appellants (named defendant
et al.).
Alan R. Spirer, for the appellees (plaintiffs).
Opinion
MOLL, J. This long running dispute over a utility pole
returns to us on appeal from the Superior Court follow-
ing this courtâs remand in a prior appeal. See Krasko v.
Konkos, 224 Conn. App. 589, 611, 314 A.3d 34 (2024).
The defendants Robert Konkos (Konkos), Chelsea Konkos
(Chelsea), 105 Honeysuckle Trust, dated March 9, 2021,
Owned Wealth, LLC, as trustee, and Owned Wealth,
LLC,1 now appeal from the trial courtâs judgment
1
âThe plaintiffs initially commenced the underlying action against
only [Konkos and Chelsea]. On January 22, 2020, the plaintiffs moved
to cite in Frontier Communications Corporation (Frontier) and Margaret
Mary Kane as defendants in the underlying action. On February 3, 2020,
the [trial] court, Stevens, J., granted the plaintiffsâ motions and added
Frontier and Kane as defendants to the underlying action. On July 6,
2022, the plaintiffs moved to cite in 105 Honeysuckle Trust, dated
March 9, 2021, Owned Wealth, LLC, as trustee, and Owned Wealth,
Krasko v. Konkos
rendered after a bench trial in favor of the plaintiffs,
Robert J. Krasko and Francis L. OâNeill,2 ordering the
defendants to authorize the removal of a utility pole in
order to allow the plaintiffs to widen their driveway. On
appeal, the defendants claim that the trial court erred
in (1) ruling that their refusal to consent to the removal
of the utility pole was an obstruction of the plaintiffsâ
easement and (2) granting unpleaded declaratory relief.
We affirm the judgment of the trial court.
The following facts, as either found by the court or
undisputed by the parties, and procedural history are rel-
evant to our resolution of this appeal. The plaintiffs are
the owners of real property located at 115 Honeysuckle
Hill Lane in Easton (plaintiffsâ property). The defen-
dants are the owners3 of the abutting property located
at 105 Honeysuckle Hill Lane in Easton (defendantsâ
property). The properties were originally laid out in a
1978 subdivision map, which designated the defendantsâ
property as lot 7 and the plaintiffsâ property as lot 8.
Lot 7 adjoins Honeysuckle Hill Lane, but lot 8 does not;
thus, the subdivision map contains a right-of-way over
lot 7, twenty-five feet wide, that connects lot 8 with the
public road. The properties were once commonly owned.
During the period of common ownership, a house was
constructed on lot 7, while lot 8 remained undeveloped. A
utility pole (original pole) was placed on lot 7, close to the
LLC, as additional defendants. . . . On July 18, 2022, the court, Hon.
Dale W. Radcliffe, judge trial referee, granted the plaintiffsâ motion.
On September 20, 2022, the plaintiffs withdrew their complaint against
Kane.â Krasko v. Konkos, supra, 224 Conn. App. 591 n.1. Frontier is
nominally a defendant in the underlying action; however, no claim has
been made by the plaintiffs against Frontier. Frontier and Kane are not
participating in this appeal. In the interest of simplicity, we refer to
Konkos, Chelsea, 105 Honeysuckle Trust, dated March 9, 2021, Owned
Wealth, LLC, as trustee, and Owned Wealth, LLC, collectively as the
defendants.
2
Francis L. OâNeill is referred to as Francis Krasko in parts of the
record.
3
105 Honeysuckle Trust, dated March 9, 2021, Owned Wealth, LLC,
as trustee, and Owned Wealth, LLC, are the current legal owners of the
defendantsâ property, while Konkos and Chelsea are the former owners
and current beneficial owners of the defendantsâ property.
Krasko v. Konkos
center of the right-of-way, to provide utility service to
the house. The original pole is jointly owned by Frontier
Communications Corporation (Frontier), which provides
telephone service, and The United Illuminating Company
(UI),4 which provides electrical service (collectively,
utility companies).
In 2015, the then owner of both lots, John M. Barry,
as trustee of the Richard A. Barry Testamentary Trust
(trustee), planned to sell lot 8 for development. A sur-
veyor prepared a site plan, dated December 16, 2015 (site
plan), for the development of a single-family house on
lot 8 for Margaret Mary Kane, a prospective buyer. The
site plan indicated that a driveway would be constructed
across the right-of-way on lot 7 to service the new home
on lot 8, with the original pole located in the proposed
path of the driveway. The site plan also contained a nota-
tion stating âEXISTING POLE TO BE RELOCATEDâ
and included a proposed location for a new utility pole.
The record does not indicate whether the site plan was
shared with the trustee.
On December 29, 2015, the trustee, as the owner of
lots 7 and 8, executed an Easement and Mutual Drive-
way Agreement (easement agreement). The easement
agreement granted and conveyed âto the owner of [l]ot
8, its successors and assigns, a perpetual easement over,
under and across [the] 25 [foot] Right of Way to [l]ot 8:
a. for ingress and egress to and from Honeysuckle Hill
Lane on foot and by motor vehicle; including the right
to construct a driveway in common with lot 7; b. for the
installation, maintenance, replacement and repair of
all utilities, including without limitation, water, gas,
cable TV, telephone, and electricity . . . .â The easement
agreement further specified âthat the owners of [l]ot
7 will at no time obstruct in any manner the owners of
[l]ot 8âs access to [l]ot 8 in, under or over the 25 [foot]
Right of Way . . . .â The easement agreement was duly
recorded in the Easton land records. On that same day,
the trustee conveyed the defendantsâ property to Konkos
4
UI is not a party to this action.
Krasko v. Konkos
and Chelsea by warranty deed. The trusteeâs deed speci-
fied that the defendantsâ property was subject to the
easement agreement, as well as an overlapping utility
easement now owned by Frontier.5
At some point thereafter, the trustee conveyed lot 8
to Kane. A single-family home was then built on lot 8,
and a driveway was constructed within the easement
area to service the new home. During the development
of lot 8, a new utility pole (new pole), somewhat close to
the original pole, was installed to provide utility service
to the newly built home. The original pole was never
removed or relocated, and it continues to provide util-
ity service to the defendantsâ property. Subsequently,
the plaintiffs purchased lot 8 from Kane. The current
driveway servicing the plaintiffsâ property is adjacent
to the original pole.
The plaintiffs commenced the present action on August
9, 2019. In their operative complaint, dated October 18,
2024, the plaintiffs alleged that they âhave a perpetual
easement over, under and across a twenty-five (25) foot
right-of-way to the plaintiffsâ [property] and which ease-
ment burdens the defendantsâ [property] as set forth in
[the easement agreement] . . . . The plaintiffsâ ability to
use the easement is obstructed by the location of [the
original pole] owned and maintained by Frontier and
located within the right-of-way that is the subject of
the easement. . . . The removal of the [original] pole,
which obstructs the plaintiffsâ driveway, requires that
electrical service to the defendantsâ house be transferred
from the [original] pole to the new . . . pole. . . . Despite
due demand, the defendants have failed and refused to
consent to allowing Frontier to relocate the [original
pole] . . . .â
Throughout most of the present action, the parties
believed that moving the defendantsâ electrical service
from the original pole to the new pole would require the
defendants to upgrade the electrical service to their
5
The utility easement was originally granted to Southern New Eng-
land Telephone Company and now belongs to Frontier as its successor.
Krasko v. Konkos
home to meet current code standards. Accordingly,
at prior stages of the action, the plaintiffsâ prayer for
relief requested âa mandatory injunction requiring
the defendants to upgrade their electrical connection
between their house and the [new] pole so that the said
connection complies with the current building code . . . .â
Upgrading the electrical connection would have required
installation of new cables from the new pole to the
defendantsâ home, which would in turn have required
excavation of the defendantsâ driveway and yardâa
significant expense and inconvenience for the defendants.
Following extensive motions practice, discovery, and a
prior appeal,6 however, on August 28, 2024, the plain-
tiffsâ counsel sent a letter to the defendantsâ counsel
explaining that, instead of upgrading their electrical
connection, the defendants could simply transfer their
existing electrical connection from the original pole to
the new pole; accordingly, the plaintiffs proposed a new
scope of work. The new proposal (splice box proposal)
would involve disconnecting the defendantsâ existing
cable from the original pole, running the existing cable
through a seven foot trench between the original pole
and the new pole, installing a splice box at the base of
the new pole, and installing a conduit from the splice
box to the UI connection on the new pole. The splice box
proposal would involve a relatively minimal interruption
in electrical service to the defendantsâ home while the
work was completed. The plaintiffs then amended their
complaint to the operative version, the prayer for relief
in which requested a mandatory injunction ordering the
6
In the prior appeal, the defendants claimed that the trial court, Hon.
Dale W. Radcliffe, judge trial referee, erred in granting the plaintiffsâ
motion to enforce a settlement agreement pursuant to Audubon Parking
Associates Ltd. Partnership v. Barclay & Stubbs, Inc., 225 Conn. 804,
812, 626 A.2d 729 (1993). Krasko v. Konkos, supra, 224 Conn. App.
594, 604. This court agreed with the defendants, concluding that â[t]he
record is clear that the parties did not reach a clear and unambiguous
agreement.â Id., 611.
Krasko v. Konkos
defendants to authorize the removal of the original pole
and the work described in the splice box proposal.7
The defendants filed their operative answer and special
defenses on November 14, 2024. In addition to denying
the plaintiffsâ substantive allegations, the defendants
raised what they characterized as eight special defenses.
On November 15, 2024, the plaintiffs filed a reply deny-
ing all allegations of the defendantsâ special defenses and
stating that they were not cognizable special defenses.
The case was tried to the court, Hon. Kenneth B. Povo-
dator, judge trial referee, on November 20 and 21, 2024.
Both Krasko and Konkos testified at trial, as did a repre-
sentative of Frontier and experts hired by both parties.
The parties presented numerous exhibits, including the
easement agreement, the site plan, the pertinent deeds,
written communications between the parties, and photo-
graphs showing vehicles using the plaintiffsâ driveway.
On May 21, 2025, the court rendered judgment in favor
of the plaintiffs as to their operative complaint. The court
determined that the plaintiffsâ proposed use of the ease-
ment to remove the original pole in order to widen their
driveway was reasonable and/or reasonably necessary.8
The court assessed the reasonableness of the proposed
use by analyzing four factors: â[1] the amount of harm
caused, [2] its foreseeability, [3] the purpose or motive
with which the act was done, and [4] the consideration
of whether the utility of the use of the land outweighed
the gravity of the harm resulting.â (Internal quotation
7
The operative complaint asked the court for injunctive relief in the
alternative: â1. That the court issue a mandatory injunction requiring
the defendants . . . to consent to the removal of the [original] pole that
obstructs the easement, and consent to [the splice box proposal] . . . .
2. In the alternative, that the court issue a mandatory injunction requir-
ing the defendants to upgrade their electrical connection between their
house and the [new] pole . . . .â The second claim, however, requiring
the upgrade of the defendantsâ electrical connection, was abandoned
for purposes of trial. As such, the plaintiffsâ only claim at trial was for
an injunction requiring the defendants to authorize the work described
in the splice box proposal.
8
The court used the terms âreasonably necessaryâ and âreasonableâ
use interchangeably. See footnote 10 of this opinion.
Krasko v. Konkos
marks omitted.) Williams v. Green Power Ventures, LLC,
221 Conn. App. 657, 685â86, 303 A.3d 13 (2023), cert.
denied, 348 Conn. 938, 307 A.3d 273 (2024). The court
found that there was no real risk of any significant harm
to the defendants because the removal of the original pole
could be accomplished by simply moving the defendantsâ
existing electrical service to the new pole, as described
in the splice box proposal, with only a relatively minimal
interruption of service. The court then found that it
was foreseeable that the original pole would not remain
in its original location. As to the third factor, the court
found that the plaintiffs were motivated by a desire to
comply with the local zoning regulations for the width of
a driveway and the need for vehicles to avoid being stuck
between the original pole and a relatively steep drop-off
on the other side of the driveway, and that the alterna-
tive solution proposed by the defendantsâto expand the
driveway on the other sideâwas not reasonable because
of engineering challenges. Finally, the court determined
that the utility of the use of the land by the plaintiffs
in widening the driveway would outweigh the minimal
burden on the defendants if the work were completed. The
court went on to reject the defendantsâ special defenses.
The court ordered the defendants to provide authoriza-
tion to remove the original pole and to splice the power
line from the new pole to the existing cable(s) serving the
defendantsâ property, as well as to transfer any other
service as may be required by elimination of the original
pole, as described in the splice box proposal. This appeal
followed.9 Additional facts and procedural history will
be set forth as necessary.
The defendants raise two claims on appeal, namely,
that the court erred in (1) concluding that the defendantsâ
9
In its decision disposing of the plaintiffsâ operative complaint, the
trial court also rendered judgment in the plaintiffsâ favor on counts three
through six of a six count counterclaim filed by the defendants, with the
court expressly declining to rule on the first and second counts because
it was unclear whether those counts were ripe for adjudication, and the
parties had not yet briefed the issue of ripeness. In their appeal to this
court, filed June 9, 2025, the defendants also challenged the judgment
rendered in favor of the plaintiffs on counts three through six of the
Krasko v. Konkos
failure to consent to removing the original pole consti-
tuted an obstruction of the plaintiffsâ easement, and (2)
ordering unpleaded declaratory relief. We address each
claim in turn.
I
The defendantsâ first claim on appeal is that the trial
court on remand erred in concluding that their refusal
to consent to removing the original pole constituted an
obstruction of the plaintiffsâ easement. In support of
this claim, the defendants argue that the court applied
the wrong legal standard. The defendants then argue
that, when the issues are analyzed under the purportedly
correct standard, âthe plaintiffs failed to establish that
the removal of the original pole was reasonably neces-
sary for the continued enjoyment of [their] right-of-way
and would not unreasonably burden the defendantsâ
property.â In support of this argument, the defendants
assert that certain factual findings made by the court
were clearly erroneous. Additionally, the defendants
argue that the court erred in finding that the original
pole constitutes an â âobstructionâ â for purposes of the
counterclaim. At that time, the trial court had not yet ruled on counts
one and two of the counterclaim. On June 16, 2025, the trial court ren-
dered judgment dismissing counts one and two of the counterclaim as
not ripe for adjudication. The defendants did not amend their appeal.
On November 3, 2025, this court ordered the parties to file memoranda
addressing âwhether the portion of this appeal challenging the trial
courtâs judgment in favor of the plaintiffs on counts three through
six of the defendantsâ counterclaim should be dismissed for lack of a
final judgment because counts one and two of the counterclaim were
still pending against the plaintiffs when this appeal was filed and the
defendants did not amend their appeal after the trial court rendered a
final judgment on the counterclaim.â See Ahern v. Board of Education,
219 Conn. App. 404, 418â21, 295 A.3d 496 (2023); see also Practice
Book §§ 61-3 and 61-4. In their memoranda, both parties agreed that that
portion of the appeal may be dismissed for lack of a final judgment. On
December 3, 2025, this court dismissed the portion of the appeal chal-
lenging the trial courtâs judgment in favor of the plaintiffs on counts
three through six of the counterclaim. Thus, only the defendantsâ chal-
lenge to the trial courtâs judgment rendered on the plaintiffsâ operative
complaint is before us on appeal.
Krasko v. Konkos
easement because the original pole predates the easement
agreement. We address each argument in turn.
A
We first address the defendantsâ argument that the
court applied the wrong legal standard in analyzing the
issues. Specifically, the defendants contend that the
court erred by analyzing the plaintiffsâ claims in terms
of whether a proposed use of the easement is reasonably
necessary, applying the factors this court articulated
in Williams v. Green Power Ventures, LLC, supra, 221
Conn. App. 685â86. We disagree with the defendants and
conclude that the court applied the proper legal standard.
Whether the trial court applied the correct legal stan-
dard is a question of law over which this courtâs review
is plenary. See Mirjavadi v. Vakilzadeh, 310 Conn. 176,
183, 74 A.3d 1278 (2013) (â[i]t is well established that
[t]he . . . determination of the proper legal standard in
any given case is a question of law subject to [an appel-
late courtâs] plenary reviewâ (internal quotation marks
omitted)).
We begin with the general legal principles relating
to easements. âIt is well settled that [a]n easement cre-
ates a nonpossessory right to enter and use land in the
possession of another and obligates the possessor not to
interfere with the rules authorized by the easement. . . .
[T]he benefit of an easement . . . is considered a nonpos-
sessory interest in land because it generally authorizes
limited uses of the burdened property for a particular
purpose. . . . [E]asements are not ownership interests
but rather privileges to use [the] land of another in [a]
certain manner for [a] certain purpose . . . .â (Internal
quotation marks omitted.) Cheshire Land Trust, LLC v.
Casey, 156 Conn. App. 833, 844, 115 A.3d 497 (2015).
âEasements are classified as either easements appurte-
nant or easements in gross. . . . Two distinct estates are
involved in an easement appurtenant: the dominant to
which the easement belongs and the servient upon which
the obligation rests.â (Internal quotation marks omitted.)
Krasko v. Konkos
Il Giardino, LLC v. Belle Haven Land Co., 254 Conn.
502, 512, 757 A.2d 1103 (2000).
The rights of the dominant estate holder and the servi-
ent estate holder âare not absolute, but are so limited,
each by the other, that there may be a reasonable enjoy-
ment of both.â (Internal quotation marks omitted.) Kuras
v. Kope, 205 Conn. 332, 342, 533 A.2d 1202 (1987). âOf
necessity, the interests of the owner of the easement often
conflict with the interests of the owner of the burdened
estate. By law, however, each of the parties owes certain
duties to the other.â (Internal quotation marks omit-
ted.) 57 Broad Street Stamford, LLC v. Summer House
Owners, LLC, 184 Conn. App. 834, 847, 195 A.3d 1143
(2018). âExcept as limited by the terms of the servitude
. . . the holder of an easement . . . is entitled to use the
servient estate in a manner that is reasonably necessary10
for the convenient enjoyment of the servitude. . . . Like-
wise, [e]xcept as limited by the terms of the servitude .
. . the holder of the servient estate is entitled to make
any use of the servient estate that does not unreasonably
interfere with enjoyment of the servitude.â (Footnote
10
As the trial court observed, this court has used âreasonably nec-
essary,â âreasonableness of the use,â and other similar terms inter-
changeably in the easement context. See, e.g., Williams v. Green Power
Ventures, LLC, supra, 221 Conn. App. 685â86 (â[T]he scope of the
easement is such that it may be used for those purposes reasonably
necessary to the full enjoyment of the premises to which the right-of-
way is appurtenant. Whether a particular use is reasonable is a question
of fact and must be determined on a case by case basis, considering all
the relevant circumstances . . . .â (Emphasis added; internal quotation
marks omitted.)); Francini v. Goodspeed Airport, LLC, 164 Conn. App.
279, 293, 134 A.3d 1278 (2016) (âGenerally, [a right-of-way] granted
or reserved in general terms may be used for any purpose reasonably
necessary for the party entitled to use it. . . . The grant being gen-
eral in terms, it must be construed to include any reasonable use to
which the land may be devoted.â (Emphasis added; internal quotation
marks omitted.)), affâd, 327 Conn. 431, 174 A.3d 779 (2018); Hagist
v. Washburn, 16 Conn. App. 83, 86, 546 A.2d 947 (1988) (âIt is well
established that a right-of-way granted in general terms may be used for
any purpose reasonably necessary for the party entitled to use it. . . .
Moreover, the issue of what constitutes reasonable use is a question
of fact . . . .â (Citations omitted; emphasis added; internal quotation
marks omitted.)).
Krasko v. Konkos
added; internal quotation marks omitted.) Freidheim v.
McLaughlin, 217 Conn. App. 767, 779, 290 A.3d 801
(2023). âThe manner, frequency, and intensity of the
[dominant estate holderâs] use of the servient estate may
change over time to . . . accommodate normal develop-
ment of the dominant estate . . . .â (Internal quotation
marks omitted.) Zhang v. Omnipoint Communications
Enterprises, Inc., 272 Conn. 627, 637, 866 A.2d 588
(2005). âThe use of an easement must be reasonable
and as little burdensome to the servient estate as the
nature of the easement and the purpose will permit. . .
. Ordinarily when [judicial] opinions speak of the use of
an easement, it arises in right-of-way cases. Thus use
frequently involves the amount of traffic over the ease-
ment or alterations to the land to make it passable. . . .
This is not to overlook, however, that [t]he owner of an
easement has all rights incident or necessary to its proper
enjoyment, [although] nothing more.â (Emphasis added;
internal quotation marks omitted.) Ringel v. Gottlieb,
233 Conn. App. 798, 804, 342 A.3d 1039, cert. granted,
353 Conn. 930, 346 A.3d 514 (2025).
In light of these principles, this court explained in
Williams that resolving a claim of interference with
use and enjoyment of an easement requires a three part
analysis. Williams v. Green Power Ventures, LLC, supra,
221 Conn. App. 686. â[T]he trial court [must] determine
(1) the character, extent, and scope of the easement
granted to the plaintiffs, (2) whether the plaintiffsâ use
of the easement [is] reasonable in light of the character
and extent of the easement, and (3) whether the defen-
dantsâ actions [have] interfered with the plaintiffsâ use
of the easement.â Id. This court further explained that
â[w]hether a particular use is reasonable is a question
of fact and must be determined on a case by case basis,
considering all the relevant circumstances, including
such factors as [1] the amount of harm caused, [2] its
foreseeability, [3] the purpose or motive with which the
act was done, and [4] the consideration of whether the
utility of the use of the land outweighed the gravity of
Krasko v. Konkos
the harm resulting.â (Internal quotation marks omit-
ted.) Id., 685â86.
In the present case, there is no dispute that the plain-
tiffs, as the owners of the former lot 8, hold a valid ease-
ment appurtenant over the defendantsâ property, the
former lot 7. In the parlance of easements, the plaintiffsâ
property is the dominant estate, and the defendantsâ
property is the servient estate. There is also no dispute
as to the general character, extent, and scope of the
easement. The easement agreement incorporates a pre-
existing twenty-five foot right-of-way âfor all lawful
purposesâ and specifically gives the plaintiffs the right
to âingress and egress to and from [the public street] on
foot and by motor vehicle; including the right to construct
a driveway in common with [the defendantsâ property]â
within the twenty-five foot right-of-way. (Emphasis
added.) Rather, the present case centers on a specific
proposed use of the easement by the plaintiffs, as hold-
ers of the dominant estate: to remove the original pole
so that they can expand their driveway into the area
currently occupied by the original pole. This proposed
use falls within the general character and scope of the
easement. See, e.g., State v. Quintiliano, 206 Conn.
App. 712, 724, 261 A.3d 31 (recognizing âthe right of a
dominant estate holder of a right-of-way easement . . .
to remove obstructions placed in the right-of-way that
materially interfere with his or her reasonable enjoyment
of the easementâ), cert. denied, 339 Conn. 918, 262 A.3d
136 (2021). There is also no dispute that the defendantsâ
refusal to authorize the transfer of their utility service
interferes with the removal of the original pole. Thus,
the dispositive issue is whether the proposed use is rea-
sonable or reasonably necessary for the enjoyment of the
plaintiffsâ rights under the easement.
The trial court assessed the reasonableness of the pro-
posed use by applying the four factors that this court
recited in Williams v. Green Power Ventures, LLC, supra,
221 Conn. App. 685â86. The defendants attempt to
distinguish Williams by pointing out that the issue in
Krasko v. Konkos
Williams was whether the dominant estate holderâs
proposed use was within the scope of the easement. This
distinction is both accurate and immaterial. The trial
court in Williams interpreted the applicable deed as
allowing foot passage only and concluded that the ease-
ment holdersâ use of the easement for vehicular travel
was outside of its scope. Id., 677â78. On appeal, this court
held that the trial court had misinterpreted the deed:
vehicular travel was within the scope of the easement.
Id., 686. The four reasonableness factors recited in Wil-
liams were never applied in Williams itself; rather, this
court explained that those were the factors the trial court
should have applied but did not because it misinterpreted
the deed. Id. Here, however, there was no dispute as to
the overall scope of the easement, such that the trial
court analyzed the specific proposed use of the easement
under the four reasonableness factors.
The defendants contend that the question before the
trial court was whether the removal of the original pole
â(1) [is] reasonably necessary for the continued enjoy-
ment of the right-of-way, and (2) would not unreasonably
burden the [servient] property.â (Emphasis in original;
footnote omitted.) Somers v. LeVasseur, 230 Conn. 560,
567, 645 A.2d 993 (1994). We observe, however, that
both requirements set forth in Somers are function-
ally contained within the reasonableness factors from
Williams, which require the court to consider both the
proposed useâs foreseeability, purpose, and benefit to the
dominant estate in light of the scope of the easement and
the harm to the servient estate that would result from
the proposed use. See id.; Williams v. Green Power Ven-
tures, LLC, supra, 221 Conn. App. 685â86. Indeed, in
the present case, the court made express factual findings,
both that the proposed use was reasonable and that the
harm to the servient estate would be minimal. Thus, the
quoted language from Somers does not establish a test
meaningfully different from the test applied by the court.
We conclude that the reasonable use analysis articu-
lated in Williams was the correct standard for the court
Krasko v. Konkos
to apply in the present case. The defendants have not
identified a meaningfully different legal standard that
the court should have applied, let alone explained why
their preferred standard is correct. Thus, the defendantsâ
claim fails.
B
We next turn to the defendantsâ claim that the plain-
tiffs have not carried their burden of showing that their
proposed use of the easement is reasonably necessary
and that the trial court erred in determining that the
defendantsâ refusal to consent to removal of the original
pole was an obstruction of the easement. In support of
this claim, the defendants challenge several subsidiary
factual findings. We conclude that the courtâs reason-
ableness analysis was sound, that the majority of its
factual findings were not clearly erroneous, and that
any erroneous findings were harmless. Accordingly, we
disagree with the defendants.
The following additional facts and procedural history
are relevant to our resolution of this claim. At trial, the
plaintiffs presented the testimony of Stephen Gemmell,
a representative of Frontier. Gemmell testified about
Frontierâs role as the co-owner, installer, and âcusto-
dianâ of the original pole and the new pole. Gemmell also
testified as to what the splice box proposal would entail,
who would perform the work, and the risks of the proj-
ect based on his own experience working for Frontier,
as well as his understanding based on a conversation he
had with his counterpart at UI. Gemmell explained that
the Public Utility Regulatory Authority has policies
relating to the removal of âdouble utility polesâ and that
the original pole and the new pole constitute a âdouble
utility poleâ situation.
The plaintiffs also presented the testimony of James
Luczak, a registered professional engineer. Luczak testi-
fied that the plaintiffsâ driveway is more than 200 feet
long and that the Easton Zoning Regulations require
driveways of that length to have a width of at least twelve
Krasko v. Konkos
feet. Luczak measured the âtravel wayâ of the driveway11
as being eight and one-half feet wide. Luczak testified
that, on the side of the plaintiffsâ driveway opposite
the original pole, there is a seven foot vertical drop-off,
which he characterized as a âsteep slope.â He explained
that, if the original pole were not removed, the other
way to widen the driveway to twelve feet would be to
expand the driveway on the side opposite the original
pole, which, because of the seven foot drop-off, would
require the construction of a retaining wall of substantial
size and strength. Luczakâs expert report, which was
admitted as a full exhibit, specified that the retaining
wall would need to be approximately 175 feet long and
seven feet high. Luczakâs report also indicated that,
with the driveway in its current state, there is a risk of
injury from falling or driving off the seven foot drop-off
opposite the original pole.
The defendants presented the testimony of two experts:
Carl Cianci, a consulting structural engineer, and Nick
Sarro, a building consultant and professional estimator.
Cianci testified that he measured the travel way of the
plaintiffsâ driveway at eleven feet, six inches. He also
testified that the drop-off on the side of the driveway
opposite the original pole was four to five feet, which
was not something over which he would want to drive a
car. Cianci testified that, to widen the driveway to twelve
feet on the side opposite the original pole, a small retain-
ing wall, no more than twenty feet long, would need to
be constructed. Cianci also testified that the plaintiffsâ
driveway is more than 200 feet long. Sarro testified that
widening the driveway on the side opposite the original
pole would require a retaining wall four to five feet high
and twenty feet long and that an engineer would need
11
Luczak defined the âtravel wayâ of a driveway as the portion of the
driveway that can be comfortably navigated by a vehicle, including
considerations for turns, passing, and snow removal.
Krasko v. Konkos
to design such a retaining wall. Sarro also testified that
trenching for electric utility lines is âroutineâ work.
Krasko and Konkos also testified at trial. Krasko testi-
fied that some delivery trucks had been unable to make
it past the original pole up the driveway and that he had
safety concerns about using the driveway, especially in
snow and ice. He also testified to his understanding that
the utility companies were willing to move forward with
the splice box proposal. Konkos testified that he had
numerous concerns about the utility work requested by
the plaintiffs, including cost, potential loss of electrical
service, and damage to the defendantsâ property. Konkos
also testified that he has seen numerous trucks make it
up the plaintiffsâ driveway, past the original pole, and
that he has seen trucks have issues going up the driveway
only when backing up instead of going forward. Konkos
testified that he was aware of the easement agreement
when he bought the house and was generally aware that
a house would be built on lot 8 at some point. He also
acknowledged that the work in the splice box proposal
would be done within the easement area and would be
completed by a licensed electrician.
The court admitted the following documents, among
others, as full exhibits: (1) photographs showing vehicles
using (or attempting to use) the plaintiffsâ driveway; (2)
historical maps of the plaintiffsâ and the defendantsâ
properties, including the original subdivision map and
the site plan; (3) a 2020 survey map showing the state
of the plaintiffsâ and the defendantsâ properties, which
indicates that both the original pole and the new pole
are within the easement area; and (4) releva