UNITED STATES COURT OF APPEALS FOR THE
THIRD CIRCUIT
No. 25-2006
LISA DEBAR, Individually and as personal representative of
the Estate of Cody Hatt,
Appellant
v.
FIRSTENERGY CORP.; FIRSTENERGY GENERATION LLC;
FIRSTENERGY SOLUTIONS CORP.; FIRSTENERGY
PENNSYLVANIA ELECTRIC CO.; FIRSTENERGY SERVICE CO.; ET
AL .
AMENDED PURSUANT TO CLERKS ORDER DATED 7/14/25
_____________________________
On Appeal from the U.S. District Court, E.D. Pa.
Chief Judge Wendy Beetlestone, No. 2:24-cv-05164
Before: RESTREPO, BIBAS, and FISHER, Circuit Judges
Argued: Apr. 20, 2026; Filed: Oct. 14, 2026
_____________________________
OPINION OF THE COURT
FISHER, Circuit Judge.
Cody Hatt suffered fatal injuries while working for a
demolition contractor that was tearing down a power plant in
Pennsylvania known as Hatfield’s Ferry. His mother, as his
survivor and on behalf of his estate, sued the owner and
operators of the plant for negligence. The District Court
dismissed the complaint.
Two Pennsylvania tort law doctrines govern this appeal.
First, when a property owner hires an independent contractor
to work on the property, the owner does not owe a duty to
employees of the contractor. There is an exception when the
owner hires a contractor but retains detailed control over the
job—over not only what is to be done, but how and by whom.
The retained-control exception is difficult to show; an owner
does not retain control by imposing safety requirements or
contract specifications for the work. Here, the plaintiff has not
alleged facts that, if true, would demonstrate that the
defendants retained sufficient control. The second applicable
tort law doctrine is that a landowner has no duty to protect
those invited onto its land from dangers that are open and
obvious. The risks of demolishing the long-disused Hatfield’s
Ferry Power Station were indeed obvious, and the complaint
fails to allege otherwise. We will therefore affirm.
I.
A. Which documents we consider
At the outset, we confront the question of what parts of
the record to consider on appeal. When ruling on a motion to
dismiss, “courts may consider documents integral to or
explicitly relied upon in the complaint, or any undisputedly
2
authentic document that a defendant attaches . . . to a motion
to dismiss if the plaintiff’s claims are based on the document.”
In re Asbestos Prod. Liab. Litig. (No. VI), 822 F.3d 125, 133
n.7 (3d Cir. 2016) (citation modified). The parties attached five
documents to the complaint and the motion to dismiss. All of
them are within bounds for us to consider, but we rely primarily
on the two about which DeBar has expressed no objection: the
demolition contract and the Specification.
The demolition contract. DeBar attached to her
complaint a document titled “Purchase Order,” which was the
demolition contract between North American Dismantling and
FirstEnergy Service. The District Court took this document
into account, and correctly so: the demolition contract is
“integral to or explicitly relied upon in the complaint.” In re
Asbestos Prod., 822 F.3d at 133 n.7.
The Specification. DeBar alleged that FirstEnergy
Service created the “Generation Specification of the Hatfield
Power Plant . . . , which set forth detailed specifications for
how the demolition work was to be performed.” App. 965.
FirstEnergy Service attached to its motion to dismiss a
document titled “FIRSTENERGY GENERATION, LLC
SPECIFICATION FLT-SPEC-XX-XXXX FOR
DEMOLITION OF HATFIELD POWER PLANT,” App.
1052. The District Court did not consider this document
because its title does not exactly match the references in the
complaint. But if the mismatch created doubt, DeBar has
cleared it up on appeal: in her brief, she cites FirstEnergy’s
Specification document, treating it as a source of information
about the parties’ contract. In other words, she does not dispute
3
the Specification’s authenticity. Additionally, DeBar’s claims
are based on this document, which outlines FirstEnergy’s
requirements for the demolition project. So we will consider
the Specification.
The remaining documents. DeBar referenced two other
documents in the complaint but did not attach them: the “FE
Generation Personal Safety Manual” and the FirstEnergy
Service “Code of Conduct.” App. 966. It is unclear whether
either of these documents is among the three FirstEnergy
attached to its motion to dismiss: the “Preliminary Work Plan
for FirstEnergy – Demolition, Hatfield Power Plant,” App.
1137; North American Dismantling’s “Environmental, Health,
Safety and Security Plan and Manual for FirstEnergy Hatfield
Power Plant,” id. at 1169; and the “North American
Dismantling Corp. Safety Program,” id. at 1194. Even if these
attachments are not the documents DeBar referenced in the
complaint, we still may consider them if they are “undisputedly
authentic” and DeBar’s “claims are based on [them].” In re
Asbestos Prod., 822 F.3d at 133 n.7.
DeBar has not questioned the authenticity of the
documents. And her claims are based on the documents,
because—like the demolition contract and Specification—they
lay out the duties of FirstEnergy Service and North American
Dismantling with regard to the Hatfield’s Ferry demolition
project. So we may take these attachments into account as well.
In the District Court, DeBar complained that
FirstEnergy Service “carefully controlled the documents . . .
that it wishe[d] for the Court to consider,” providing some
“while holding back others.” App. 1668 n.2. Even without
4
considering the “Preliminary Work Plan,” the “Environmental,
Health, Safety and Security Plan,” and the “North American
Dismantling Corp. Safety Program”—the documents
FirstEnergy Service “wishe[d] for the Court to consider,” id.—
the complaint fails to state a claim.1
B. Factual and procedural history
1. The plant and the contract
Allegheny Energy Supply owned a coal-fired power
plant, the Hatfield’s Ferry Power Station, in Carmichaels,
Pennsylvania. The plant was operated by FirstEnergy Corp.
and FirstEnergy Service. In 2013, FirstEnergy Corp. and
FirstEnergy Service, under pressure from the Environmental
Protection Agency, decided to shut down coal generation at
Hatfield’s Ferry. In 2022, demolition of the plant began—
including its two cooling towers, which were around 500 feet
high, and its three emissions stacks, which ranged from 540 to
700-plus feet.
FirstEnergy Service contracted with North American
Dismantling to complete more than $4 million worth of
demolition work at the plant. FirstEnergy Service entered into
the contract, titled a “Purchase Order,” “on its own behalf and
on behalf of its affiliates,” who were not named. App. 1009.
FirstEnergy assigned a buyer and a project manager to the
project who used e-mail addresses with the domain
“@firstenergycorp.com.” Id. at 1010. The Specification called
1
Defendants argue persuasively that these documents
further show that the District Court correctly dismissed the
complaint. See Appellee’s Br. 9–13, 40–41.
5
for a “Purchaser’s Engineer” to serve as “the designated
Engineering Representative from the Project Engineering
Department, FirstEnergy Corp.” Id. at 1056. North American
Dismantling was to submit invoices “electronically at the
FirstEnergy Supplier Portal,” which had a
“firstenergycorp.com” web address, and to direct payment
questions to an e-mail address with the
“@firstenergycorp.com” domain. Id. at 1010.
The contract provided that the demolition work was to
be performed “in accordance with [FirstEnergy’s] Generation
Specification of Hatfield Power Plant.” Id. at 1010.
FirstEnergy Service had “unobstructed access to Contractor’s
or any of its Subcontractors’ Work, facilities, procedures and
records for the purpose of observing and reviewing Work
completion and quality.” Id. at 1014. The work was “subject to
[FirstEnergy Service’s] inspection, tests, and count at any time
or place at [FirstEnergy Service’s] discretion.” Id. North
American Dismantling’s employees working at Hatfield were
“subject to [FirstEnergy Service’s] continuing approval,” and
FirstEnergy Service retained the right to “object to any [North
American Dismantling] employee who, in [FirstEnergy
Service’s] opinion, did not meet” the contract criteria “or
whose performance [was] unsatisfactory.” Id. at 1015. If
FirstEnergy Service objected to a North American Dismantling
employee, North American Dismantling was required to
“immediately replace or remove such individual.” Id.
For its part, North American Dismantling agreed that it
would be “considered an independent contractor . . .
responsible for all acts and omissions (negligent or otherwise)
6
of its agents, employees and subcontractors.” Id. at 1013. North
American Dismantling was “alone . . . liable and responsible
for the manner and methods by which the Work [was]
performed and for materials, work force and equipment.” Id.
North American Dismantling “assume[d] full responsibility for
[its] employees’ acts and omissions (negligent or otherwise)”
and was required to “enforce all . . . worker health and safety
and similar requirements.” Id. at 1015.
With regard to safety, North American Dismantling
agreed it was “solely responsible for the safety and health of
its employees” and would “conduct the Work in a manner to
avoid risk of bodily harm to persons or damage to property.”
Id. at 1016. North American Dismantling further committed to
“take all necessary safety and health precautions, and . . . do
everything necessary to prevent accidents or injury to persons
on . . . the premises.” Id. In addition, it would “not require any
employee . . . to work in surroundings or under working
conditions that [were] . . . hazardous, or dangerous to safety or
health.” Id.
North American Dismantling also agreed that it had
“examined the site in all ways pertinent to performance
required by the Specification, and that it [had] informed itself
concerning the physical and geological conditions to be
encountered . . . [and] the character of the Work to be
performed.” Id. at 1027. The Specification further provided
that FirstEnergy Service “assume[d] no responsibility for
buildings and structures to be Demolished. Conditions existing
at time of inspection for bidding purpose [would] be
maintained by [FirstEnergy Service] as far as practical.” Id. at
7
1082.
Drawing on the contract documents, DeBar alleged that
FirstEnergy Service “exerted actual control over the
[demolition] work by instructing and/or directing [North
American Dismantling]” where, when, by what means, and
with what equipment to do the work and by “giving
instructions and/or directions to [North American
Dismantling] personnel as to the manner of doing the actual
demolition work.” Id. at 965. DeBar also alleged that
FirstEnergy Service required North American Dismantling to
comply with a “Code of Conduct” and with the Specification
document, which “set forth detailed specifications for how the
demolition work was to be performed.” Id.
To further support her allegations that FirstEnergy
Service actually controlled the work, DeBar invoked the “FE
Generation Personal Safety Manual.” Id. at 966. And she noted
the assignment to the project of the FirstEnergy Service project
manager and purchaser representative, who oversaw
“contracted personnel to assure compliance with the contract
documents . . . , field construction work and continuous
monitoring of project safety.” Id. at 966, 967. She alleged that
when North American Dismantling “elected to or intended to
do the work in a manner inconsistent with how [FirstEnergy
Service] dictated” in the Specification, Personal Safety
Manual, and Code of Conduct, FirstEnergy Service “forced
strict compliance with [those] documents, thereby exerting
actual control.” Id. at 967. DeBar also alleged that FirstEnergy
Service’s purchaser representative was responsible to, and
actually did, “monitor[] and evaluat[e]” the work and “conduct
8
safety audits,” on the basis of which FirstEnergy Service
“issued instructions and/or directions to [North American
Dismantling] personnel concerning how the work was to be
performed.” Id. at 966–68.
2. The accident
On September 28, 2022, Cody Hatt, an employee of
North American Dismantling, was demolishing one of the
smokestacks at Hatfield’s Ferry. He had been assigned to
“dismantl[e] a metal and/or steel catwalk affixed to the
smokestack. The catwalk catastrophically failed and
collapsed,” and Hatt fell and landed on a different catwalk forty
feet below. Id. at 970. His injuries were “catastrophic” and
“horrifically painful.” Id. at 971. He was taken to the hospital
at West Virginia University where, tragically, he died. Hatt
was twenty-nine years old and is survived by his two minor
children; his father; and his mother, plaintiff Lisa DeBar.
3. Procedural history
In June 2024, DeBar filed a wrongful death and survival
action against numerous defendants in Pennsylvania state
court. FirstEnergy Service removed to the United States
District Court for the Eastern District of Pennsylvania based on
diversity jurisdiction.2 In February 2025, DeBar voluntarily
2
DeBar was, and Hatt had been, a resident of Michigan.
The defendants are all citizens of Ohio. Damages for Hatt’s
injuries, pain and suffering, and loss of future earnings are
more than $75,000. Thus, the District Court had jurisdiction
under 28 U.S.C. § 1332.
9
dismissed her claims against one group of defendants, the
EnergyHarbor defendants.
After DeBar amended her complaint, FirstEnergy,
FirstEnergy Service, and Allegheny Energy Supply moved to
dismiss under Federal Rule of Civil Procedure 12(b)(6) for
failure to state a claim. Debar v. FirstEnergy Corp., No. CV
24-5164, 2025 WL 1241903, at *1 (E.D. Pa. Apr. 29, 2025).
The District Court dismissed the claims against First Energy
and FirstEnergy Service with prejudice, and those against
Allegheny Energy Supply without prejudice. Id. at *5, *7, *8.
Rather than amending again, DeBar elected to stand on her
complaint. Consequently, the District Court converted the
dismissal of the claims against Allegheny Energy Supply to a
with-prejudice dismissal. DeBar appeals.
II.
The District Court had jurisdiction under 28 U.S.C.
§ 1332 (diversity). We have jurisdiction under 28 U.S.C.
§ 1291 (final decisions of district courts).
To be final under § 1291, a district court’s decision must
dispose of all claims against all defendants. Carter v. City of
Phila., 181 F.3d 339, 343 (3d Cir. 1999). In addition, an order
dismissing claims without prejudice is not final. Morton Int’l,
Inc. v. A.E. Staley Mfg. Co., 460 F.3d 470, 477 (3d Cir. 2006).
When DeBar filed this appeal, finality was lacking because the
claims against some defendants, the EnergyHarbor defendants,
had been dismissed without prejudice. After appealing,
however, DeBar “unequivocally renounc[ed] any intention to
take further action against the Energy Harbor Defendants.”
10
Dkt. 17 at 6. Accordingly, all claims are finally adjudicated,
and we have jurisdiction. Tiernan v. Devoe, 923 F.2d 1024,
1031 (3d Cir. 1991).
We review de novo a grant of a motion to dismiss for
failure to state a claim. Abramowski v. Nuvei Corp., 166 F.4th
391, 393 n.2 (3d Cir. 2026).
III.
DeBar argues that the District Court erroneously
dismissed the claims against FirstEnergy Service, FirstEnergy
Corp., and Allegheny Energy Supply. She offers one theory of
liability for each of these defendants. None reveal an error.
A. FirstEnergy Service did not owe a duty to Hatt because he
worked for an independent contractor and FirstEnergy
Service did not retain control of the site
For over a century, it has been settled law in
Pennsylvania “that a landowner who engages an independent
contractor is not responsible for the acts or omissions of such
independent contractor or his employees.” Beil v. Telesis
Const., Inc., 11 A.3d 456, 466 (Pa. 2011) (citing Pender v.
11
Raggs, 35 A. 1135 (Pa. 1896)).3 The very title of an
independent contractor “implies that the contractor is
independent in the manner of doing the work contracted for.”
Id. (quoting Silveus v. Grossman, 161 A. 362, 364 (Pa. 1932)).
An exception to the general rule applies “when the
owner retains control over the manner in which the work is
done.” Id. “The primary question in many premises cases,”
including this one, “is whether the property owner [who hired]
. . . the independent contractor retained sufficient control of the
work to be legally responsible for the harm to the plaintiff.” Id.
Either contractual language or actual conduct can show that the
hiring party retained control. Id. at 467. For the exception to
apply, the hiring party “must have retained at least some degree
of control over the manner in which the work is done.” Id. at
3
The parties have not advanced any arguments about
two issues, which we note here, and as to which we accept their
mutual conclusions. First, choice of law: the parties and the
District Court have treated Pennsylvania law as controlling.
We follow suit. See Williams v. BASF Catalysts LLC, 765 F.3d
306, 316–17 (3d Cir. 2014). Second, although many
Pennsylvania retained-control cases involve landowner
defendants, FirstEnergy Service operated Hatfield’s Ferry
Power Station rather than owning it. Regardless, the retained-
control rule applies. As the District Court explained,
Pennsylvania “case law amply illustrates that the rule is not
limited to [landowners],” but applies generally to parties who
hire independent contractors. Debar v. FirstEnergy Corp., No.
CV 24-5164, 2024 WL 5008504, at *3 n.3 (E.D. Pa. Dec. 6,
2024) (collecting cases). We use the terms “owner” and “hiring
party” interchangeably.
12
466 (quoting Restatement (Second) of Torts § 414, cmt. c). The
control must extend to the contractor’s “methods of work, or
as to operative detail,” in such a manner “that the contractor is
not entirely free to do the work in his own way.” Id. at 467
(quoting Restatement § 414, cmt. c). The hiring party does not
retain control merely by reserving “a general right to order the
work stopped or resumed, to inspect its progress or to receive
reports, to make suggestions or recommendations which need
not necessarily be followed, or to prescribe alterations and
deviations.” Id. at 466 (quoting Restatement § 414, cmt. c).
Those who hire contractors often have such rights, which do
not trigger the exception. Id. at 466–67.
The retained-control exception is “narrow[].” Id. at 467.
In particular, “consistent pronouncements by [Pennsylvania]
courts” over the past fifty years establish that “certain safety-
related conduct, including the employment of on-site safety
representatives with the authority to stop work, does not
constitute control of the work site as a matter of law.” Id. at
468. Nor is control established by “a property owner retaining
a certain degree of authority over safety issues, such as
supervising and enforcing safety requirements, and even
imposing its own safety requirements at a work site.” Id. at 469.
Declining to impose liability on owners who pay attention to
work site safety supports Pennsylvania’s “salutary public
policy of encouraging attention to safety matters.” Id. at 468.
In addition, an owner does not retain control by
imposing specifications for the work. An owner has “the right
to direct [the contractor] to perform to contract
expectations. . . . Directing a contractor what to do is not the
13
same as directing a contractor how to do it.” LaChance v.
Michael Baker Corp., 869 A.2d 1054, 1061 n.14 (Pa. Commw.
Ct. 2005). Even exercising ongoing, consultative oversight
does not retain control. See Nertavich v. PPL Elec. Utils., 100
A.3d 221, 224, 232 (Pa. Super. Ct. 2014) (concluding that
control was not retained, even though the owner’s Authorized
Representative functioned as “the daily source of contact . . .
in areas of any question, materials, quality assurance, general
safety, work procedures and schedule”).
The District Court held that DeBar’s allegations are
conclusory or that they do not show retention of control.
Debar, 2025 WL 1241903, at *4–5. DeBar insists her
allegations are not conclusory and adds that the District Court
misapplied federal pleading standards. Neither argument has
merit.
1. The allegations are conclusory and insufficient
According to DeBar, her complaint plausibly alleges
retained control. She highlights her allegations that
FirstEnergy Service “instruct[ed] and/or direct[ed] [North
American Dismantling] where and when to perform its work,”
“the means and methods and/or manner in which the
demolition work was to be done,” and “the equipment to be
used.” Appellant’s Br. 29. We have reviewed, one by one, the
allegations relating to retained control—twenty-four
paragraphs in all. App. 965–68 (Complaint ¶¶ 65–88). The
District Court correctly concluded that DeBar failed to allege
that FirstEnergy retained enough control, and the kind of
control, to be liable. Each of the allegations fails for at least
14
one of the following reasons.
Several of the allegations simply recite elements of the
retained control exception. But “labels and conclusions” do not
allow a complaint to survive a motion to dismiss, nor does “a
formulaic recitation of the elements of a cause of action.” Bell
Atl. Corp. v. Twombly, 550 U.S. 544, 555 (2007). “[T]he
clearest indication that an allegation is conclusory and
unworthy of weight in analyzing the sufficiency of a complaint
is that it embodies a legal point.” Connelly v. Lane Const.
Corp., 809 F.3d 780, 790 (3d Cir. 2016) (disregarding
allegations in an employment discrimination case that the
plaintiff’s supervisors “subjected her to disparate treatment
based on her gender and retaliation for making complaints”).
So DeBar failed to state a claim when she alleged that
FirstEnergy Service “exerted actual control over the Project
work by instructing and/or directing [North American
Dismantling] as to the means, methods, and or manner in
which the demolition work was to be done,” App. 965 (¶ 67),
and that FirstEnergy Service’s “personnel issued instructions
and directions to [North American Dismantling] personnel
concerning how the work was to be performed.” Id. at 967
(¶ 82); see also id. at 965–67 (¶¶ 65–66, 68–69, 71, 81, 88).
Several of the allegations state that FirstEnergy Service
imposed safety requirements or inspections. But an owner that
“retain[s] a certain degree of authority over safety issues, such
as supervising and enforcing safety requirements, and even
imposing its own safety requirements at a work site,” does not
retain control. Beil, 11 A.3d at 469. So DeBar failed to state a
claim when she alleged that FirstEnergy Service “enforced the
15
FE Generation Personal Safety Manual, which set forth
detailed safety requirements for the Project work,” App. 966
(¶ 74), and when she alleged that FirstEnergy’s purchaser
representative “was responsible to conduct safety audits, and
actually did so and on the basis of those safety audits issued
instructions and/or directions to [North American
Dismantling] personnel concerning how the work was to be
performed,” id. at 968 (¶ 87); see also id. at 966–67 (¶¶ 77, 78–
79, 82–83, 85).
Several of the allegations state that FirstEnergy Service
provided North American Dismantling with detailed
specifications for the work. But an owner has “the right to
direct [the contractor] to perform to contract expectations. . . .
Directing a contractor what to do is not the same as directing a
contractor how to do it.” LaChance, 869 A.2d at 1061 n.14. So
DeBar failed to state a claim when she alleged that FirstEnergy
Service’s “Purchaser Representative was ‘responsible for the
oversight of contracted personnel to assure compliance with
the contract documents.” Id. at 967 (¶ 85); see also id. at 966–
68 (¶¶ 72–73, 77, 81–83, 88).
Several of the allegations state that FirstEnergy Service
employed a project manager and purchaser representative who
were assigned to the job, and that FirstEnergy Service
monitored and approved the demolition work. But an owner
does not retain control merely by reserving “a general right to
. . . inspect . . . progress or to receive reports.” Beil, 11 A.3d at
466 (quoting Restatement § 414, cmt. c). An owner also does
not retain control by assigning its employee to a job—even an
employee who remains in daily contact with the contractor
16
regarding materials, quality, safety, procedures, and schedule.
Nertavich, 100 A.3d at 224, 232; see also Beil, 11 A.3d at 469;
LaChance, 869 A.2d at 1062. So DeBar failed to state a claim
when she alleged that “the Project work was subject to
[FirstEnergy Service’s] approval,” App. 967 (¶ 84), and that
FirstEnergy Service assigned a project manager and purchaser
representative to the job, id. at 966 (¶ 75–77), who
“monitor[ed] and evaluat[ed] the Project work,” id. at 967
(¶ 86), and “over[saw] the [North American Dismantling]
personnel and control[led] their work in order to assure
compliance” with FirstEnergy’s requirements, id. at 966
(¶ 78).
Several of the allegations invoke the Code of Conduct.
We do not have this document in the record, and the complaint
does not allege how the Code of Conduct demonstrated that
FirstEnergy Service retained control. Conclusory allegations
do not permit a complaint to survive a motion to dismiss. See
Twombly, 550 U.S. at 557. So DeBar failed to state a claim
when she alleged that the Code of Conduct shows that
FirstEnergy retained control of the site. App. 965–67 (¶¶ 70,
77–78, 82–83).
Finally, a few of the allegations quote the following
provision of the demolition contract:
The Purchaser Representative(s) serves as the
primary interface between the Contractor, station
personnel, and other corporate support functions.
This individual is responsible for the oversight of
contracted personnel to assure compliance with
the contract documents (purchase order,
17
specification and contract), field construction
work and continuous monitoring of project
safety.
App. 1029 (emphasis added). Truncating the language of this
provision to focus on the emphasized phrase, DeBar alleged
that the “Purchaser Representative was ‘responsible for . . .
field construction work.’” Id. at 966 (¶ 79); see also id. at 967
(¶ 80).
A plaintiff is entitled to reasonable inferences that may
be drawn from her complaint. Iqbal, 556 U.S. at 678. But the
inference DeBar asks us to draw—that, through the
emphasized phrase, FirstEnergy Service retained control of the
entire job—is not reasonable. The provision states that the
Purchaser Representative “is responsible for the oversight of”
three matters: “[1] contracted personnel to assure compliance
with the contract documents . . . , [2] field construction work[,]
and [3] continuous monitoring of project safety.” App. 1029.
Being responsible for work is different from being responsible
for oversight of work, and general oversight does not
demonstrate control. See Beil, 11 A.3d at 466; Nertavich, 100
A.3d at 232. The phrase “field construction work” must be read
in light of its modifying phrase, “oversight of”—particularly
given the context provided by the rest of the contract
documents. North American Dismantling agreed that it was
“considered an independent contractor,” id. at 1013; that it was
“alone . . . liable and responsible for the manner and methods
by which the Work [was] performed,” id.; and that it
“assume[d] full responsibility for [its] employees’ acts and
omissions (negligent or otherwise),” id. at 1015.
18
In sum, none of the allegations show that FirstEnergy
Service retained control of the job site. See App. 965–68
(¶¶ 65–88). The dissent would hold that DeBar stated a claim
and cites in particular Beil, 11 A.3d at 456. There, it is true, the
Pennsylvania Supreme Court held only that “certain safety-
related conduct . . . does not constitute control of the work site
as a matter of law,” and did “not rule out the possibility that, in
certain circumstances not present in [Beil], a property owner’s
actions concerning safety matters could constitute sufficient
control.” 11 A.3d at 468, 469 n.4 (emphasis added).
But DeBar has not alleged “circumstances not present
in” Beil. Id. at 469 n.4. Similar to this case, the owner in Beil
“designated one of its employees . . . as its project manager.”
Id. at 458–59. The project manager was deeply enough
involved with ongoing work that he “was consulted about
placement of the scaffolding” from which the plaintiff fell “to
make sure that it was in a safe position.” Id. at 467. And the
Beil owner “controlled safety matters at the site” to such a
degree that the independent contractor was required “to
comply with any safety directions or rules reasonably issued
by the [owner] . . . , whether or not [the independent
contractor] agree[d] that those directions or rules [were]
actually required in order to comply with applicable law.” Id.
at 467 (citation omitted). Even under those circumstances, the
owner did not retain control under Pennsylvania law. Id. at 468.
DeBar has not alleged any safety-related conduct or oversight
by North American Demolition that went beyond the facts of
Beil. Beil therefore does not allow us to conclude that DeBar
alleged that FirstEnergy Service retained control of the
19
demolition site.
2. The District Court did not misapply pleading standards
DeBar argues that the District Court “summarily cast
aside [her] well-pled factual allegations” and “inappropriately
held [her] to a heightened pleading standard.” Appellant’s Br.
30–31. According to DeBar, she could not meet this “improper
burden” without discovery, especially because Hatt died and
cannot provide information. Id. at 31. In support, she cites
Fowler v. UPMC Shadyside, 578 F.3d 203 (3d Cir. 2009).
Fowler explained the pleading standard under the
Supreme Court’s then-new Iqbal decision. Id. at 209–11. We
reversed the dismissal of the complaint because the plaintiff
plausibly stated a claim: “The complaint [pled] how, when, and
where UPMC allegedly discriminated against Fowler.” Id. at
212. Fowler alleged that she was injured on the job; that she
was restricted to sedentary work; that she got a clerical
position; that the position was eliminated; and that despite
multiple job applications and calls to Human Resources, she
was never contacted about any open sedentary positions. Id.
The District Court held Fowler could not “prove” she was
disabled, and we corrected that error by noting that a plaintiff
need not prove anything to survive a motion to dismiss—she
“need only put forth allegations that raise a reasonable
expectation that discovery will reveal evidence of the
necessary elements” of her claim. Id. at 213 (citation
modified).
DeBar argues that the District Court committed the
same error here as in Fowler. But the above examination of
20
each retained-control allegation shows that DeBar has not
offered the kinds of specific factual allegations Fowler did—
she did not allege “how, when, and where” FirstEnergy Service
retained control of the work. See Fowler, 578 F.3d at 212. She
alleged only that FirstEnergy Service had contract
specifications for the work and imposed safety requirements—
but, under Pennsylvania law, such allegations do not show
retained control. See Part III.A.1., above.
Tragically, the individual at the center of this case is
dead and unable to aid the factual investigation. But DeBar
does not provide any authority to support the notion that
insufficiently pled claims are given extra leeway if the case
involves a fatality.
Finally, DeBar argues that the District Court erred
because it “relied exclusively on cases decided at the summary
judgment or judgment as a matter of law stage to hold that” the
complaint was insufficient. Appellant’s Br. 34. Generally,
Pennsylvania case law contemplates the retained-control
determination being made at a later stage of the case. See, e.g.,
Beil, 11 A.3d at 467 (affirming judgment as a matter of law
entered after trial). We conclude, however, that dismissal was
not erroneous here.
Twombly offers helpful insight. The question there was
whether the plaintiff sufficiently pled an antitrust claim:
conspiracy in restraint of trade. Twombly, 550 U.S. at 553–54.
The Supreme Court explained that, because legal parallel
conduct can look like illegal conspiracy, “we have previously
hedged against false inferences from identical behavior at a
number of points in the trial sequence.” Id. at 554. After trial,
21
a plaintiff “is not entitled to a directed verdict” where the
“evidence show[s] nothing beyond parallel conduct.” Id. “[A]t
the summary judgment stage a . . . plaintiff’s offer of
conspiracy evidence must tend to rule out the possibility that
the defendants were acting independently.” Id. Then the Court
moved to the key issue, “the antecedent question of what a
plaintiff must plead in order to state a claim.” Id. The Court
modified the directed-verdict and summary-judgment
standards and held that “stating . . . a claim requires a
complaint with enough factual matter (taken as true) to suggest
that an agreement was made,” that is, “enough fact to raise a
reasonable expectation that discovery will reveal evidence of
illegal agreement.” Id. at 556. The answer to the question at
hand was provided by looking to the established summary-
judgment and directed-verdict standards and translating them
to arrive at the correct standard for a motion to dismiss.
Twombly’s logic demonstrates that retained-control
cases resolved at summary judgment, or after trial, are neither
controlling on their precise terms nor irrelevant. Undertaking
the same analytical exercise as in Twombly, we can discern
what DeBar needed to allege to survive a motion to dismiss.
We begin with the rule that judgment notwithstanding the
verdict is appropriate where “there is a dearth of evidence [at
trial] that would establish that the [owner] controlled the
manner or operative detail of the . . . work.” Beil, 11 A.3d at
471. Moving back a step in the litigation sequence, at summary
judgment the question is whether “there is a genuine issue of
material fact concerning [the owner’s] retention of control of
the worksite.” Farabaugh v. Pa. Tpk. Comm’n, 911 A.2d 1264,
22
1275 (Pa. 2006). Backing up once more to the pleading stage,
the question on a motion to dismiss is whether the “complaint
[contains] enough factual matter (taken as true) to suggest that”
the owner retained control, that is, “enough fact to raise a
reasonable expectation that discovery will reveal evidence of”
the owner’s control. See Twombly, 550 U.S. at 556. As in
Twombly, translating established standards for judgment
notwithstanding the verdict and for summary judgment leads
us to the correct standard on a motion to dismiss.
As explained above, DeBar’s allegations—including
that FirstEnergy Service had safety standards, employed a
project manager, and imposed contract specifications—would
not, even if eventually proven to be true, demonstrate that
FirstEnergy Service retained control of the demolition work.
Therefore, it was not error to dismiss the claims against
FirstEnergy Service.
The dissent agrees with DeBar that because resolution
of the retained-control question at a later stage of the case is
more common, it was error to grant the motion to dismiss.
Emphasizing the well-established difference in standards
between a motion to dismiss and a motion for summary
judgment, the dissent notes that a claim “might appear
plausible in light of the well-pled facts in the complaint, only
to appear deficient at the summary judgment stage.” In re Ins.
Brokerage Antitrust Litig., 618 F.3d 300, 323 n.21 (3d Cir.
2010). Here, we do not question the plausibility of DeBar’s
allegations; we give her the benefit of every doubt, as we must.
Connelly, 809 F.3d at 790. The reason her complaint fails is
because even if it is all true, which it very well may be,
23
FirstEnergy Service would not be liable.
The dissent takes issue with the fact that we look to
summary-judgment and judgment-as-a-matter-of-law cases to
discern the correct motion-to-dismiss standard. See Twombly,
550 U.S. at 564–66. Granting that our case law advises against
uncritically doing so, we have not arrived at our conclusion
uncritically. Rather, we have carefully followed the lead of the
Supreme Court when faced with a similar question.
B. FirstEnergy Corp. is not vicariously liable for tortious
conduct
DeBar argues that FirstEnergy Corp. is vicariously
liable for the negligence of FirstEnergy Service Corp.
However, as explained, FirstEnergy Service committed no
negligence for which FirstEnergy Corp. could be vicariously
responsible. Therefore, DeBar has not stated a claim against
FirstEnergy Corp.
FirstEnergy Corp. moved to dismiss only once, and the
District Court granted the motion with prejudice. If DeBar had
requested leave to amend her claims against FirstEnergy Corp.,
it may have been reasonable for the District Court to grant the
request. See Arthur v. Maersk, Inc., 434 F.3d 196, 204 (3d Cir.
2006) (leave to amend is generally granted absent “undue
delay, bad faith, [or] futility”). But far from seeking to amend,
DeBar filed notice that “after carefully weighing the merits of
repleading against immediate appellate review,” she elected to
“stand on the . . . [c]omplaint.” App. 1734. Therefore, the
District Court did not err in dismissing with prejudice the
claims against FirstEnergy Corp.
24
C. Allegheny Energy Supply did not owe a duty to Hatt
because the danger was open and obvious
DeBar argues that Allegheny Energy Supply was liable
because it owned the Hatfield’s Ferry Power Station. Under
Pennsylvania law, landowners “owe a duty to protect invitees
from foreseeable harm,” but not when the “danger is known or
obvious” to the invitees. Carrender v. Fitterer, 469 A.2d 120,
123 (Pa. 1983) (citation omitted). This rule continues to apply
when the invitee is a contractor: “An owner of land who
delivers temporary possession of a portion of the land to an
independent contractor owes no duty to the employees of the
independent contractor with respect to an obviously dangerous
condition.” Brletich v. U.S. Steel Corp., 285 A.2d 133, 136 (Pa.
1971) (quoting Hader v. Coplay Cement Mfg. Co., 189 A.2d
271, 277 (Pa. 1963)). The Pennsylvania Supreme Court has
reiterated th