Musconetcong Watershed Association v. New Jersey Department of Environmental Protection
CourtNew Jersey Superior Court Appellate Division
Date FiledAugust 3, 2023
DocketA-2491-20
StatusPublished
π° News Coverage: Read the LAWS.com news report on this case
Full Opinion
NOT FOR PUBLICATION WITHOUT THE
APPROVAL OF THE APPELLATE DIVISION
SUPERIOR COURT OF NEW JERSEY
APPELLATE DIVISION
DOCKET NO. A-2491-20
MUSCONETCONG
WATERSHED ASSOCIATION,
APPROVED FOR PUBLICATION
Plaintiff-Appellant, August 3, 2023
APPELLATE DIVISION
v.
NEW JERSEY DEPARTMENT
OF ENVIRONMENTAL
PROTECTION,
Defendant-Respondent,
and
HAMPTON FARM, LLC,
Third-Party Defendant-
Respondent.
_____________________________
Argued June 6, 2023 β Decided August 3, 2023
Before Judges Gilson, Gummer, and Messano.
On appeal from the New Jersey Department of
Environmental Protection.
Daniel A. Greenhouse argued the cause for appellant
(Eastern Environmental Law Center, attorneys; Daniel
A. Greenhouse, on the briefs).
Jason Brandon Kane, Deputy Attorney General, argued
the cause for respondent New Jersey Department of
Environmental Protection (Matthew J. Platkin,
Attorney General, attorney; Melissa H. Raksa,
Assistant Attorney General, of counsel; Jason Brandon
Kane, on the briefs).
Guliet D. Hirsch argued the cause for respondent
Hampton Farm, LLC (Archer & Greiner, PC, attorneys,
join in the brief of respondent New Jersey Department
of Environmental Protection; Guliet D. Hirsch, on the
brief).
The opinion of the court was delivered by
GILSON, P.J.A.D.
On February 23, 2017, the New Jersey Department of Environmental
Protection (DEP) issued a flood hazard area applicability determination (FHA
Determination) to Hampton Farm, LLC (Hampton Farm). Shortly thereafter,
appellant Musconetcong Watershed Association (MW Association) requested
the DEP to conduct an adjudicatory hearing so it could challenge the FHA
Determination. Four years later, on April 6, 2021, the DEP denied that request.
MW Association timely appealed from the April 6, 2021 decision. It also sought
leave to appeal from the February 23, 2017 FHA Determination, contending it
had become final when the DEP denied MW Association's request for a hearing.
On an interlocutory motion, a two-judge panel of this court denied leave. We
now reconsider, reverse that interlocutory ruling, and grant leave to appeal.
A-2491-20
2
We hold that the DEP's FHA Determination became a final agency
decision subject to appeal when the DEP denied MW Association's request for
an adjudicatory hearing to challenge the FHA Determination. At that time, all
administrative remedies were exhausted. Accordingly, on this appeal, we
address both (1) the DEP's April 6, 2021 decision denying MW Association's
request for an adjudicatory hearing; and (2) the DEP's February 23, 2017 FHA
Determination.
We hold that MW Association did not have a right to an adjudicatory
hearing because no statute conferred that right to MW Association, which is a
third-party objector, and MW Association did not have a particularized property
interest warranting a hearing. Accordingly, we affirm the April 6, 2021 final
agency decision.
Because we have reversed the ruling on the interlocutory motion, we give
the DEP two options concerning its FHA Determination. The DEP can either
(1) elect to address MW Association's challenges to its February 23, 2017 FHA
Determination and a new briefing schedule will be issued; or (2) request a
remand so it can expand and update the factual findings supporting its FHA
Determination. The DEP is to select one of those options by submitting a letter
to this court within thirty days from the issuance of this opinion.
A-2491-20
3
I.
We discern the relevant facts and procedural history from the
administrative record, which we had previously limited to the DEP's decision
denying the adjudicatory hearing based on motions filed by the parties.
This appeal arises out of the long-running efforts of Hampton Farm to
develop approximately seventy-seven acres of real property it owns in the
Borough of Hampton (the Property). The Musconetcong River runs along the
Property's northern and western boundaries, and Valley Road runs along its
southern boundary. Hampton Farm also owns a separate parcel of
approximately sixty-seven acres of land located on the southern side of Valley
Road (the Southern Lot). The Southern Lot was not part of Hampton Farm's
application for an FHA Determination.
In the early 1980's, Jacob Haberman, the predecessor in title to Hampton
Farm, filed a builder's remedy action in the Law Division (the Builder's Remedy
Action).1 In the fall of 2015, the Borough of Hampton and Haberman executed
1
Under the Mount Laurel doctrine, "municipalities have a constitutional
obligation to use their zoning power in a manner that creates a 'realistic
opportunity for the construction of [their] fair share' of the region's low - and
moderate-income housing." In re Declaratory Judgment Actions Filed by
Various Muns., 227 N.J. 508, 514 (2017) (alteration in original) (quoting In re
Adoption of N.J.A.C. 5:96 & 5:97 ex rel. N.J. Council on Affordable Hous., 221
A-2491-20
4
an amended settlement agreement in the Builder's Remedy Action, which
allowed the Property to be developed with 333 dwelling units, including forty -
five units for low- and moderate-income households. Following a fairness
hearing, on March 30, 2016, a final judgment was entered in the Builder's
Remedy Action.
As part of the proceedings in the Builder's Remedy Action, MW
Association objected to the proposed site plan for the Property, contending that
it did not account for an onsite tributary of the Musconetcong River. To address
that issue, a provision of the final judgment directed Haberman to file an
application with the DEP for a flood hazard area "verification" for the Property.
Under the Flood Hazard Area Control Act (FHAC Act), N.J.S.A. 58:16A-
50 to -103, and its regulations, N.J.A.C. 7:13-1.1 to -24.11, certain types of
developments are regulated and require permits if the development is in the
flood hazard area or the riparian zone of a regulated water. N.J.A.C. 7:13-2.1
to -2.4. Generally, all waters in this State are regulated. N.J.A.C. 7:13-2.2(a).
The regulations promulgated under the FHAC Act, however, provide that a
N.J. 1, 7 (2015)). "A builder's remedy provides a developer with the means t o
bring 'about ordinance compliance through litigation.'" In re Borough of
Englewood Cliffs, 473 N.J. Super. 189, 197 n.1 (App. Div. 2022) (quoting In re
Township of Bordentown, 471 N.J. Super. 196, 221 (App. Div. 2022)).
A-2491-20
5
"segment of water that has a drainage area of less than [fifty] acres" is not
regulated, provided it "has no discernible channel," "is confined within a
lawfully existing, manmade conveyance structure or drainage feature," "and/or
. . . is not connected to a regulated water." Ibid. A riparian zone exists along
every regulated water, and a flood hazard area exists along every regulated water
that has a drainage area of fifty acres or more. N.J.A.C. 7:13-2.3(a) and (b).
The FHAC Act and its regulations allow the DEP to determine, upon
request, that a flood hazard area permit is not required if a water feature on a
property is not a "regulated water." N.J.A.C. 7:13-2.2 and -2.5. If a regulated
water has a drainage area of less than fifty acres, the water does not have a flood
hazard area that is regulated under the FHAC Act. N.J.A.C. 7:13-2.3(b).
In August 2016, Hampton Farm applied to the DEP for an FHA
Determination. In its application, Hampton Farm sought "to confirm that the
man-made swale emanating near the culvert under Valley Road located on the
south-east portion of the [P]roperty is not a [flood hazard area] regulated water
and that the Musconetcong River is the only [f]lood [h]azard [a]rea . . . regulated
water on the . . . [P]roperty." In the application Hampton Farm also stated:
There is an S-shaped, approximately 350 foot long,
man-made vegetated drainage feature that exists in the
southwest corner of the [P]roperty emanating near the
Valley Road culvert and extending to a point
A-2491-20
6
approximately 200 feet from the north-to-south tree line
located between the cemetery property boundary and
the Musconetcong River. This S-shaped, man-made
vegetated feature has no direct surface connection to
the Musconetcong River and we have calculated the
drainage area to the end of this man-made feature to be
47.1 acres.
On October 6, 2016, the Friends of Musconetcong, an environmental
group related to MW Association, submitted public comments to the DEP,
consisting of a report challenging the sufficiency of Hampton Farm's FHA
Determination application. According to the report, the drainage area of the
water feature on the Property is greater than fifty acres and extends beyond the
Property. In that regard, the report included graphic depictions and analysis
contending that the water feature on the Property connects to and drains into the
Musconetcong River. The Friends of Musconetcong thereafter submitted
additional public comments, asserting that Hampton Farm's application failed to
provide the DEP with the best available topographical mapping and aerial
photographs as required by N.J.A.C. 7:13-2.5(d).
On February 23, 2017, the DEP issued an FHA Determination to Hampton
Farm, stating that a "[f]lood [h]azard [a]rea [p]ermit is not required for the water
feature crossing Valley Road." The DEP concluded "[t]he feature has a drainage
area of less than [fifty] acres and it [is] not connected to a regulated water." The
A-2491-20
7
DEP's FHA Determination did not address the information provided by the
Friends of Musconetcong.
On March 28, 2017, MW Association filed a request with the DEP for an
adjudicatory hearing to challenge the FHA Determination. In the hearing
request, MW Association asserted that Hampton Farm's calculation of the
drainage area was inaccurate and that the application included insufficient
mapping and data to support the FHA Determination.
The DEP did not respond to MW Association's request for a hearing until
four years later. On April 6, 2021, the DEP finally notified MW Association
that it was denying its request for an adjudicatory hearing. The DEP did not
explain why it had waited four years to respond to the request. Instead, it briefly
addressed the FHA Determination:
Although the [DEP] received maps from both Hampton
Farm and the Friends of Musconetcong, the [DEP]
made an independent investigation into the water
feature in order to determine [FHAC Act] applicability.
The [DEP] made several field inspections of the
Property, under different weather conditions: on
October 12, 2016, with dry, pre-frost conditions; on
December 2, 2016, with colder temperatures; and
before and after a rainstorm event on January 23, 2017,
and January 26, 2017, respectively.
Based on these field inspections and its review of the
information submitted, on February 23, 2017, the
[DEP] made the determination that the water feature
A-2491-20
8
has a drainage area of less than [fifty] acres and is not
connected to a regulated water, in accordance with
N.J.A.C. 7:13-2.2(3)iii, and therefore not regulated
under the [FHAC] Act.
The DEP then determined that MW Association did not have a statutory
or constitutional right to an adjudicatory hearing. In that regard, the DEP held
that the FHAC Act "does not grant statutory hearing rights to third[-]party
objectors." The DEP also found that MW Association did not have a
particularized property interest sufficient to require an adjudicatory hearing.
The DEP characterized MW Association's property interest as "a recreational
interest" and concluded that such an interest does not reach the level of
particularity that is constitutionally required for an adjudicatory hearing.
MW Association filed a timely appeal from the DEP's April 6, 2021 final
agency decision. Simultaneously, on May 10, 2021, MW Association moved
for leave to appeal the DEP's February 23, 2017 FHA Determination. MW
Association contended that "[i]t would have been premature . . . to appeal . . .
the February 23, 2017 FHA [Determination] while its administrative hearing
request was pending a decision by [the] DEP." The DEP opposed that motion
and argued that MW Association should have filed an appeal from the FHA
Determination within forty-five days and that "[r]esolution of [MW
A-2491-20
9
Association's] adjudicatory hearing request did not affect the finality of the FHA
[Determination]."
On June 14, 2021, a motion panel of this court denied MW Association's
motion for leave to appeal the February 23, 2017 FHA Determination. That
order stated that the "appeal continues as to the April 6, 2021 decision."
Thereafter, MW Association filed two motions for reconsideration of the
decision precluding it from appealing the February 23, 2017 FHA
Determination. This court denied both motions.
The parties subsequently filed additional motions concerning the
settlement of the record and the scope of issues that could be briefed. On April
11, 2022, and May 23, 2022, we issued orders addressing those motions and
directing MW Association to strike certain arguments and amend its merits brief
so that it was limited to addressing the April 6, 2021 decision.
On May 4, 2023, after all the merits briefs and appendices had been filed,
we issued a letter directing the parties to brief whether the court should
reconsider the June 14, 2021, April 11, 2022, and May 23, 2022 orders
concerning the scope of this appeal. The letter directed the parties to submit
supplemental briefs addressing four issues:
1. Whether [the] DEP's FHA Determination was a
final agency decision, reviewable as of right under our
A-2491-20
10
Court Rules, prior to [the] DEP's April 6, 2021 denial
of plaintiff's request for an adjudicatory hearing?
2. Whether [the] DEP was required to respond to
plaintiff's hearing request within forty-five days of its
FHA Determination to permit plaintiff to timely file an
appeal of [the] DEP's FHA Determination, and, if so,
what should be the remedy for [the] DEP's failure to do
so?
3. Whether there is any time limit within which
[the] DEP must respond to a request for an adjudicatory
hearing, and if there is no limit, whether one should be
established?
[4.] Additionally, [the] DEP and Hampton [Farm]
may address the merits of the underlying February 23,
2017 FHA Determination.
In response, all parties, including Hampton Farm, filed supplemental briefs to
address those issues.
II.
This appeal involves three related issues: (1) when the DEP's February
23, 2017 FHA Determination became final for purposes of appeal; (2) whether
MW Association is entitled to an administrative adjudicatory hearing to
challenge the FHA Determination; and (3) whether the DEP issuance of the FHA
Determination to Hampton Farm was arbitrary, capricious, or unreasonable. The
first and third issues involve a reconsideration of the interlocutory orders we
issued on motions concerning the scope of this appeal.
A-2491-20
11
A. The Finality of the FHA Determination.
The FHAC Act "confers broad authority" on the DEP "to protect the
'safety, health, and general welfare' of the public by 'deliniat[ing] and mark[ing]
flood hazard areas' and subjecting them to 'land use regulations.'" Am.
Cyanamid Co. v. State, Dep't of Env't Prot., 231 N.J. Super. 292, 297 (App. Div.
1989) (alterations in original) (quoting N.J.S.A. 58:16A-50(b)). The FHAC Act
authorizes the DEP to
adopt rules and regulations which delineate as flood
hazard areas such areas as . . . the improper
development and use of which would constitute a threat
to the safety, health, and general welfare from flooding.
These delineations shall identify the various
subportions of the flood hazard area for reasonable and
proper use according to relative risk, including the
delineation of floodways necessary to preserve the
flood carrying capacity of natural streams.
[N.J.S.A. 58:16A-52(a).]
Regulations promulgated under the FHAC Act provide that "[a]ll waters
in New Jersey are regulated . . . [and e]very regulated water possesses a flood
hazard area and/or a riparian zone." N.J.A.C. 7:13-2.2(a). These regulated areas
"generally overlap." N.J.A.C. 7:13-2.3(d). Anyone engaged in broadly defined
"[r]egulated [a]ctivities," see N.J.A.C. 7:13-2.4, "in a regulated area shall do so
A-2491-20
12
only in accordance with" permits or authorizations issued by the DEP. N.J.A.C.
7:13-2.1(b).
As already noted, the FHAC Act and its regulations also allow the DEP to
determine that a flood hazard area permit is not required if it finds the water
feature on a property is not a "regulated water." N.J.A.C. 7:13-2.2 and -2.5.
The Administrative Procedure Act (APA), N.J.S.A. 52:14B-1 to -31, as well as
DEP regulations, allow applicants to request an adjudicatory hearing in
connection with an FHA Determination application. N.J.S.A. 52:14B-2 and -9;
N.J.A.C. 7:13-23.1. A third-party objector can also request an adjudicatory
hearing to challenge an FHA Determination, if that party can demonstrate (1) a
right to a hearing under an applicable statute; or (2) a "particularized property
interest of constitutional significance that is directly affected by an agency's
permitting decision." In re NJPDES Permit No. NJ0025241, 185 N.J. 474, 481-
82 (2006); see also In re Riverview Dev., LLC, 411 N.J. Super. 409, 424 (App.
Div. 2010) (explaining that the "APA strictly limits the situations in which third
parties are entitled to" adjudicatory hearings). Consequently, the question
becomes whether an FHA Determination is final when a third-party objector has
a pending request for an adjudicatory hearing.
A-2491-20
13
Rule 2:2-3(a)(2) "authorizes an appeal as of right to the Appellate
Division from final decisions or actions of any state administrative agency or
officer and to review the validity of any rule promulgated by a state
administrative agency with the exception of certain tax matters." Silviera-
Francisco v. Bd. of Educ. of Elizabeth, 224 N.J. 126, 136 (2016). Rule 2:4-1(b)
provides that "[a]ppeals from final decisions or actions of state administrative
agencies or officers . . . shall be filed within [forty-five] days from the date of
service of the decision or notice of the action taken." Nevertheless, "an agency
action does not become final until all avenues of internal administrative review
have been exhausted." Bouie v. N.J. Dep't of Cmty. Affs., 407 N.J. Super. 518,
527 (App. Div. 2009) (first citing N.J.S.A. 52:14B-12; and then citing R. 2:2-
3(a)(2)). Accordingly, "to decide whether a state agency action was [a] final
action that had to be appealed within forty-five days, [a court] must determine
whether there was any available avenue of internal administrative review." Ibid.
That issue, in turn, requires us to consider the exhaustion-of-administrative-
remedies doctrine.
"Exhaustion of administrative remedies before resort to the courts is a
firmly embedded judicial principle. This principle requires exhausting available
procedures, that is, 'pursuing them to their appropriate conclusion and,
A-2491-20
14
correlatively . . . awaiting their final outcome before seeking judicial
intervention.'" Garrow v. Elizabeth Gen. Hosp. & Dispensary, 79 N.J. 549, 558-
59 (1979) (citation omitted) (quoting Aircraft & Diesel Equip. Corp. v. Hirsch,
331 U.S. 752, 767 (1947)). The exhaustion-of-administrative-remedies doctrine
is "designed to allow administrative bodies to perform their statutory functions
in an orderly manner without preliminary interference from the courts." Brunetti
v. Borough of New Milford, 68 N.J. 576, 588 (1975); see also In re Request to
Modify Prison Sentences, 242 N.J. 357, 379 (2020).
The Court has explained:
[T]he doctrine of exhaustion of administrative remedies
serves three primary goals: (1) the rule ensures that
claims will be heard, as a preliminary matter, by a body
possessing expertise in the area; (2) administrative
exhaustion allows the parties to create a factual record
necessary for meaningful appellate review; and (3) the
agency decision may satisfy the parties and thus obviate
resort to the courts.
[City of Atlantic City v. Laezza, 80 N.J. 255, 265
(1979).]
See also Rosenstein v. State, Dep't of Treasury, Div. of Pension & Benefits, 438
N.J. Super. 491, 498 (App. Div. 2014). Nevertheless, the exhaustion doctrine
"is not absolute and '[e]xceptions are made when the administrative remedies
would be futile, when irreparable harm would result, when jurisdiction of the
A-2491-20
15
agency is doubtful, or when an overriding public interest calls for a prompt
judicial decision.'" Griepenburg v. Township of Ocean, 220 N.J. 239, 261
(2015) (alteration in original) (quoting N.J. Civil Serv. Ass'n v. State, 88 N.J.
605, 613 (1982)).
Applying these principles to the DEP's February 23, 2017 FHA
Determination, we hold that the determination became final for purposes of a
judicial appeal when the DEP denied MW Association's request for an
adjudicatory hearing. When the DEP received the request for a hearing, it had
to determine if MW Association had a statutory right or a particularized property
interest entitling it to a hearing. Until the DEP made that determination, MW
Association's administrative remedies were not exhausted because it might be
accorded a hearing. In that regard, the DEP's FHAC regulations state:
The [DEP] shall notify the requester that the request for
hearing is granted or denied. If the hearing request is
denied, the denial shall provide the reason(s) for the
denial. If the hearing request is granted, the [DEP] shall
refer the matter to the Office of Administrative Law for
a contested case hearing in accordance with the [APA],
N.J.S.A. 52:14B-1 et seq., and the Uniform
Administrative Procedure Rules, N.J.A.C. 1:1.
[N.J.A.C. 7:13-23.1(f).]
The regulations also state:
A-2491-20
16
A final decision issued by the Commissioner after the
hearing in the Office of Administrative Law shall be
considered final agency action for purposes of the
[APA], and shall be subject to judicial review in the
Appellate Division of the Superior Court, as provided
in the Rules of Court.
[N.J.A.C. 7:13-23.1(g).]
The DEP argues that MW Association did not have any administrative
remedies to exhaust because MW Association did not have a right to an
adjudicatory hearing. According to the DEP, a third-party request for an
adjudicatory hearing and a direct appeal are distinct and separate processes and
the request for a hearing is not an exhaustion requirement for a direct appeal.
Thus, the DEP contends a third party can and should pursue both a request for
an adjudicatory hearing and a direct appeal simultaneously. We reject that
argument as a mischaracterization of the potential remedies available to third
parties. Once it filed a request for an adjudicatory hearing, MW Association
could not have pursued a direct appeal because further administrative remedies
could have been available. In other words, while the request was pending, no
one knew whether the DEP would determine that there was a statutory right or
a particularized property interest warranting an adjudicatory hearing.
Moreover, MW Association's request for an adjudicatory hearing was not
a remedy that fell within the ambit of any exception to the exhaustion doctrine.
A-2491-20
17
Granting or denying the request for an adjudicatory hearing is not a pure
question of law because, if granted, further administrative procedures would
occur. No party has claimed that appealing the FHA Determination in 2017 was
necessary to avoid irreparable harm or was futile. Indeed, MW Association did
not seek to appeal in 2017, and Hampton Farm, knowing that there was a
pending request for an adjudicatory hearing, never asked the DEP to rule on the
hearing request. Instead, they both waited four years for the DEP to issue its
decision on MW Association's request for an adjudicatory hearing. There is also
no dispute that the DEP had jurisdiction to rule on the request for an adjudicatory
hearing. Finally, no party contends an overriding public policy called for a
prompt judicial decision, and no interested party sought an earlier judicial
review.
We also point out that there was a practical and simple solution to resolve
the timing issue. The DEP could have made its determination to reject the
request for an adjudicatory hearing shortly after it was filed and not wait, as it
did, for four years.
In making this point, we are aware of the large number of permits and
related requests that the DEP receives and to which it must respond. It is,
however, the DEP's responsibility to make the determination on whether a third-
A-2491-20
18
party objector has the right to an adjudicatory hearing, and the underlying
determination is not final until the DEP makes a ruling on a pending hearing
request.
We acknowledge that we are reversing our interlocutory rulings
concerning the scope of this appeal. We do so because, on a more complete
review, we are convinced that our initial determinations to deny MW
Association's motion for leave to appeal the FHA Determination and our
subsequent determinations on the scope of the appeal were mistaken. Rule 4:42-
2 allows courts to revise interlocutory orders any time before the entry of a final
judgment "in the sound discretion of the court in the interest of justice." Lawson
v. Dewar, 468 N.J. Super. 128, 134 (App. Div. 2021) (quoting R. 4:42-2).
Accordingly, because the FHA Determination became final when the DEP
denied MW Association's request for a hearing, MW Association also had the
right to appeal the February 23, 2017 FHA Determination.
B. Whether the DEP Had a Time Limit to Issue its Decision.
In directing supplemental briefing on the scope of this appeal, we also
directed the parties to address whether there was any time limit for the DEP to
rule on a request for an adjudicatory hearing. The DEP responded by taking the
position that there is no time limit. In that regard, it points out that neither the
A-2491-20
19
FHAC Act nor the regulations promulgated under that act establish a time within
which the DEP must respond. See N.J.A.C. 7:13-23.1. Instead, the DEP
explained that its regulations set a time frame only for a party to request an
adjudicatory hearing. N.J.A.C. 17:13-23.1(b). That regulation directs that any
person requesting an adjudicatory hearing must do so within thirty days "after
public notice of the decision is published in the DEP Bulletin." Ibid.
Accordingly, the DEP argues that we should not establish a time frame for its
decision because to do so would effectively promulgate an agency regulation
without legislative authority.
We agree that we do not have the authority to create a new administrative
rule imposing a time frame for the DEP's decision. Nevertheless, we clarify that
an existing rule gives any interested party the right to petition for a timely ruling
by the DEP. N.J.A.C. 1:1-4.1(a), which is part of the Uniform Administrative
Procedure Rules, states:
After an agency proceeding has commenced, the
agency head shall promptly determine whether the
matter is a contested case. If any party petitions the
agency head to decide whether the matter is contested,
the agency shall make such a determination within
[thirty] days from receipt of the petition and inform all
parties of its determination.
A-2491-20
20
When any party, including a third-party objector, requests an adjudicatory
hearing, that party is effectively contending that the administrative matter is a
contested matter. See In re Xanadu Project at Meadowlands Complex, 415 N.J.
Super. 179, 193 (App. Div. 2010) (explaining a contested case is a proceeding
in which the Constitution or a statute requires an adjudicatory hearing); N.J.S.A.
52:14B-2 (defining "contested case"). Therefore, we hold that any party,
including a third-party objector, has the right to petition the DEP to rule on a
pending request for an adjudicatory hearing under N.J.A.C. 1:1-4.1(a). The DEP
will then have thirty days from receipt of the petition to "inform all parties of its
determination" regarding that request. N.J.A.C. 1:1-4.1(a).
Several considerations support our holding that N.J.A.C. 1:1-4.1(a) is
applicable to a hearing request. First, the DEP itself stated that MW Association
should have filed a petition under N.J.A.C. 1:1-4.1(a). Therefore, the DEP has
conceded that rule applies to a request for an adjudicatory hearing.
Second, applying N.J.A.C. 1:1-4.1(a) to a hearing request is consistent
with the APA. In crafting the APA, the Legislature explained that it wanted to
avoid undue delay in economic development. Accordingly, the Legislature
determined that third-party objectors should not have an automatic right to an
administrative hearing because giving such a right would "give rise to a chaotic
A-2491-20
21
unpredictability and instability that would be most disconcerting to New Jersey's
business climate and would cripple economic development." N.J.S.A. 52:14B-
3.1(c); see also Riverview, 411 N.J. Super. at 424 (explaining that the limits on
third-party objectors were "intended to prevent the processing of permit
applications by state agencies from being bogged down by time-consuming and
costly formal hearings" that "consume substantial public and private
resources"). Accordingly, by applying N.J.A.C. 1:1-4.1(a) to a pending request
for an adjudicatory hearing, applicants, such as Hampton Farm, will be afforded
the protection of petitioning for a timely determination and, thereby, avoiding
undue delays that can bog down their efforts to develop property.
Finally, applying an existing rule that imposes a time frame for a DEP
decision on a hearing request is consistent with well-established principles of
how governmental agencies should act. The public should be able to count on
the DEP to turn square corners by making timely determinations. See Klumpp
v. Borough of Avalon, 202 N.J. 390, 413 (2010) (explaining that "[i]t should go
without saying that turning . . . square corners is minimally what citizens should
be able to expect from their government"). In short, applying N.J.A.C. 1:1 -
4.1(a) would avoid a four-year delay.
A-2491-20
22
C. MW Association's Request for an Adjudicatory Hearing.
A third-party objector's right to an administrative hearing is defined and
circumscribed by the APA. See N.J.S.A. 52:14B-3.1 and -3.3. The APA states
that "[p]ersons who have particularized property interests or who are directly
affected by a permitting decision have constitutional and statutory rights and
remedies." N.J.S.A. 52:14B-3.1(b). A "[t]hird-party," however, is defined in
the APA to be any person other than:
(a) An applicant for any agency license, permit,
certificate, approval, chapter, registration or other form
of permission required by law;
(b) A State agency; or
(c) A person who has particularized property interest
sufficient to require a hearing on constitutional or
statutory grounds.
[N.J.S.A. 52:14B-3.2.]
Accordingly, the APA "prohibit[s] State agencies from promulgating rules and
regulations which would allow third[-]party appeals of permit decisions unless
specifically authorized to do so by federal law or State statute." N.J.S.A.
52:14B-3.1(d); see also N.J.S.A. 52:14B-3.3 (repeating that prohibition).
The DEP concluded that MW Association had neither a statutory nor a
constitutional right to a hearing because it determined that the FHAC Act does
A-2491-20
23
not grant hearing rights to third-party objectors and MW Association does not
have a particularized property interest requiring a hearing on constitutional
grounds. We agree with the DEP's conclusions. 2
The FHAC Act does not give a third-party objector an automatic right to
an adjudicatory hearing. See N.J.S.A. 58:16A-50 to -103. Instead, consistent
with the APA, the regulations promulgated by the DEP under the FHAC Act
state: "Nothing in this subchapter shall be construed to provide a right to an
adjudicatory hearing in contravention of the [APA], at N.J.S.A. 52:14B-3.1
through 3.3." N.J.A.C. 7:13-23.1(e).
MW Association essentially concedes that the FHAC Act and its
regulations do not give it an express right to an adjudicatory hearing.
Nevertheless, MW Association argues that the FHAC Act should be interpreted
2
MW Association filed its request for an adjudicatory hearing on March 28,
2017, but the DEP did not receive that request until March 31, 2017, one day
after MW Association's thirty-day deadline to request a hearing. N.J.A.C. 7:13-
23.1(b). Accordingly, the DEP also found MW Association's request "[could]
be considered untimely" and contends that it did, in fact, consider the request
untimely. We disagree with that conclusion and do not find that the timeliness
of MW Association's filing precluded its request. See D.R. Horton, Inc. v. N.J.
Dep't of Env't Prot., 383 N.J. Super. 405, 408-09 (App. Div. 2006) (holding the
doctrine of substantial compliance applies to a "time limitation on a party
requesting an adjudicatory hearing"). Indeed, it is not clear what prejudice, if
any, the DEP suffered by receiving the request one day after the deadline or why
the DEP took four years to rule on a request it found untimely.
A-2491-20
24
to accord the same right to an adjudicatory hearing as the Water Pollution
Control Act (WPC Act), N.J.S.A. 58:10A-1 to -73. We reject that contention as
inconsistent with the express language of the WPC Act.
The WPC Act expressly allows persons other than the permittee to seek
and obtain an adjudicatory hearing. N.J.S.A. 58:10A-7(e). The WPC Act
provides all interested persons an opportunity to contest a "determination to
grant, deny, modify, suspend or revoke a permit," N.J.S.A. 58:10A-7(d), and
then defines "permit" as a New Jersey Pollutant Discharge Elimination System
(NJPDES) permit, N.J.S.A. 58:10A-3(k). The WPC Act does not reference an
FHAC Act permit. In other words, the right to an adjudicatory hearing under
the WPC Act is limited to challenges to an NJPDES permit and does not apply
to a challenge to an FHA Determination.
MW Association also does not have a constitutional right to a hearing
because it does not have a particularized property interest related to the FHA
Determination given to Hampton Farm. Proximity to the permitted site and a
general fear of future development are insufficient to trigger a right to an
adjudicatory hearing. See, e.g., In re Thomas Orban/Square Props., LLC, 461
N.J. Super. 57, 61 (App. Div. 2019); Spalt v. N.J. Dep't of Env't Prot., 237 N.J.
Super. 206, 212 (App. Div. 1989). For example, we have found that adjacent
A-2491-20
25
property owners had no right to an adjudicatory hearing to contest a freshwater-
wetlands general permit that allowed the property to be commercially
developed. Orban, 461 N.J. Super. at 61. In Orban, the adjacent property
owners claimed that the wetl