Commissioner of Environmental Protection v. Farricielli
CourtSupreme Court of Connecticut
Date FiledFebruary 19, 2013
DocketSC18596
JudgeRogers; Norcott; Palmer; Zarella; Eveleigh; Harper
StatusPublished
📰 News Coverage: Read the LAWS.com news report on this case
Full Opinion
******************************************************
The ‘‘officially released’’ date that appears near the
beginning of each opinion is the date the opinion will
be published in the Connecticut Law Journal or the
date it was released as a slip opinion. The operative
date for the beginning of all time periods for filing
postopinion motions and petitions for certification is
the ‘‘officially released’’ date appearing in the opinion.
In no event will any such motions be accepted before
the ‘‘officially released’’ date.
All opinions are subject to modification and technical
correction prior to official publication in the Connecti-
cut Reports and Connecticut Appellate Reports. In the
event of discrepancies between the electronic version
of an opinion and the print version appearing in the
Connecticut Law Journal and subsequently in the Con-
necticut Reports or Connecticut Appellate Reports, the
latest print version is to be considered authoritative.
The syllabus and procedural history accompanying
the opinion as it appears on the Commission on Official
Legal Publications Electronic Bulletin Board Service
and in the Connecticut Law Journal and bound volumes
of official reports are copyrighted by the Secretary of
the State, State of Connecticut, and may not be repro-
duced and distributed without the express written per-
mission of the Commission on Official Legal
Publications, Judicial Branch, State of Connecticut.
******************************************************
COMMISSIONER OF ENVIRONMENTAL
PROTECTION ET AL. v. JOSEPH J.
FARRICIELLI ET AL.
(SC 18596)
Rogers, C. J., and Norcott, Palmer, Zarella, Eveleigh and Harper, Js.*
Argued October 31, 2012—officially released February 19, 2013
Kenneth A. Votre, for the plaintiff in error (Modern
Materials Corporation).
Kimberly P. Massicotte, assistant attorney general,
with whom were Matthew I. Levine, assistant attorney
general, and, on the brief, George Jepsen, attorney gen-
eral, and Krista E. Trousdale, assistant attorney gen-
eral, for the defendant in error (commissioner of
environmental protection).
Opinion
NORCOTT, J. This is the latest chapter in the efforts
of the plaintiffs, including the named plaintiff and defen-
dant in error, the commissioner of environmental pro-
tection (commissioner),1 to close and remediate an area
commonly known as the ‘‘tire pond,’’ a solid waste dis-
posal area straddling the Hamden and North Haven
town boundaries that is on land owned by the defen-
dants, Joseph Farricielli and various corporate entities
that he owns or controls (corporations).2 The nonparty
plaintiff in error, Modern Materials Corporation (Mod-
ern), which conducts its business on land leased from
State Five Industrial Park, Inc. (State Five), that con-
tains a portion of the tire pond, brings this writ of error3
from the judgment of the trial court ordering it to vacate
that land in order to effectuate the environmental reme-
diation that the trial court had ordered in the action
underlying this writ of error (underlying action). Mod-
ern contends that the trial court improperly ordered it
to vacate because: (1) the trial court lacked the author-
ity to enforce the injunctions ordered in the underlying
action against Modern because it has never been a party
to that action or acted in privity with a party thereto;
(2) such an order was not necessary to effectuate the
remediation; and (3) the trial court violated Modern’s
due process rights under the federal and state constitu-
tions when it enforced the orders in the underlying
action without first giving Modern the opportunity to
contest the validity of those orders at a hearing. We
disagree and, accordingly, dismiss the writ of error.
The record, as described in part by our previous opin-
ions in various appeals concerning the tire pond, reveals
the following background facts and procedural history.
Farricielli ‘‘and his corporations own four contiguous
parcels of property, three of which are located in the
town of Hamden and one in the town of North Haven
[parcels]. The parcels are bordered by the Quinnipiac
River on the east and by State Street on the west. Tidal
marshes abut the properties to the north and south,
and two of the parcels contain ponds. One of the ponds,
which is known as the [‘tire pond’] because [Farricielli]
and his corporations used it for the unauthorized dis-
posal of approximately 15 million used tires, is sepa-
rated from the Quinnipiac River and adjoining
marshlands by a narrow dike. Since the 1970s, [Farricie-
lli] and his corporations maintained various solid waste
disposal operations on these properties, and, on occa-
sion, leased the parcels to other businesses for similar
uses. [Farricielli’s] corporations and his various tenants
used the land for, among other things, the sorting,
recycling, reduction and disposal of construction and
demolition waste, pumice, used tires and other refuse.
One tenant operated a landfill on one of the parcels,
and [Farricielli] and his corporations maintained offices
and scales on another of the parcels.’’ Rocque v. Farri-
cielli, 269 Conn. 187, 192, 848 A.2d 1206 (2004).
‘‘Beginning as early as 1974, the plaintiffs in this case
became concerned over the unauthorized and other-
wise illegal activities of [Farricielli], his corporations
and his tenants.4 Several attempts were made to bring
[Farricielli], his corporations and tenants into compli-
ance with state statutes and town ordinances, which,
among other things, required [Farricielli] and his corpo-
rations to secure the appropriate permits and to abide
by their requirements. In December, 1995, [Hamden]
obtained a temporary injunction against [Farricielli] and
his corporations, and it was on this order that the stipu-
lated judgment involved in this case was based. In
March, 1999, [Hamden] obtained a cease and desist
order, which it also requested the court to enforce in
the present case.
‘‘In February, 1998, the commissioner issued a con-
sent order designed to go into effect on May 28, 1998,
which was signed by [Farricielli] on behalf of himself
individually and on behalf of his corporations [consent
order]. Simply stated, the consent order required [Farri-
cielli] and his corporations to cease the operation of
all unpermitted solid waste facilities and to remediate
the tire pond. Their subsequent failure to comply ade-
quately, or, in some cases, at all, with the terms of the
consent order, along with the violation of the stipulated
judgment and the cease and desist order obtained by
[Hamden], constitute the basis of [the underlying
action].’’ Id., 192–94.
The commissioner commenced the underlying action
on July 9, 1999, by filing ‘‘a complaint, which subse-
quently was amended four times, against [Farricielli]
and his corporations alleging flagrant and persistent
violations of General Statutes §§ 22a-44 (b), 22a-108,
22a-208a, 22a-208b, 22a-208c and 22a-430, concerning
the operation of their unpermitted solid waste disposal
areas. Specifically, the commissioner sought: an order
from the trial court enforcing the terms of the commis-
sioner’s 1998 consent order with [Farricielli] and his
corporations, which was designed to end ongoing statu-
tory violations; a temporary and permanent injunction
requiring [Farricielli] and his corporations to cease their
illegal activities; and an order requiring [Farricielli] and
his corporations to pay civil penalties for each day of
each alleged violation. The town and its zoning enforce-
ment officer subsequently intervened as party plaintiffs
in the action, and the plaintiffs filed a joint amended
complaint seeking, in addition to all of the aforemen-
tioned remedies, enforcement of an existing cease and
desist order and the stipulated judgment in effect
between [Hamden] and [Farricielli] and his corpora-
tions, which was designed to end ongoing violations of
various zoning ordinances.’’ Id., 191–92.
‘‘Following a lengthy court trial [before Hon. Robert
Hale, judge trial referee]5 and the filing of posthearing
briefs, the trial court found for the plaintiffs on all
counts and ordered [Farricielli] to comply with the
terms of the consent order, the stipulated judgment,
and the cease and desist order, and to pay civil penalties
for his ongoing violations of state and local laws [2001
judgment]. [Farricielli] subsequently filed motions for
reargument and for a stay of the injunctions ordered
by the court pending an appeal, both of which were
denied.’’6 Id., 194. This court affirmed the underlying
judgment in an opinion released on June 1, 2004. Id.,
190–91.
With respect to the three specific parcels of the defen-
dants’ land at issue herein, known as parcels A, B and
C, the tire pond is located on parcel B, which lies in
both North Haven and Hamden, and which is bordered
on the east by the Quinnipiac River and on the west
by State Street. Parcel A lies south of parcel B and is
entirely in Hamden. Parcel C, which is located between
parcels A and B, is a narrow strip that lies entirely in
Hamden. Parcel C is owned by State Five, who, in turn,
received its interest in that parcel from its corporate
predecessor, Look Investment Agency, Inc. (Look). In
February, 2000, Farricielli, through one of his corpora-
tions, the defendant Tire Salvage, Inc. (Tire Salvage),
conveyed a 6.8 acre strip of land in the southern portion
of the tire pond on parcel B to Look, causing it to
become part of parcel C.7 Further, in June, 2003, Farri-
cielli licensed a three acre portion of the tire pond in
parcel B to Look for the sum of $1 (license agreement).
Modern became involved with this property in June,
2003, while the appeal to this court in the underlying
action was pending. Specifically, on June 11, 2003, State
Five leased the 6.8 acre strip on parcel C to Modern
for an initial five year plus seven month term, ending
on February 28, 2009. The lease also included a five
year renewal option, which Modern since has exercised.
Modern subsequently recorded this lease on the Ham-
den land records pursuant to General Statutes § 47-19.8
State Five also assigned to Modern a portion of the
license agreement, thus permitting Modern to occupy
the three acre strip of land on parcel B as a sublicensee.
Modern currently uses its leased premises on parcel C
and this small portion of parcel B to recycle, screen and
resell construction materials such as gravel, concrete,
asphalt and earth materials.
Subsequent to the execution of Modern’s lease, the
commissioner filed a motion for contempt in 2004, alleg-
ing that the defendants had failed to complete the reme-
diation of the tire pond as required by the 2001 judgment
and that Farricielli had engaged in personal conduct
that directly had interfered with the commissioner’s
efforts to complete the remediation. Although the trial
court denied the commissioner’s motion for contempt,
despite ‘‘evidence that [Farricielli] engaged in serious
harassment’’ of the commissioner and two of its con-
tractors engaged in remediation, the court also deter-
mined that ‘‘further clarification, guidance and
strengthening of its injunction [was] required’’ and
issued numerous supplemental orders as an amend-
ment to the underlying judgment. These supplemental
orders, issued by memorandum of decision on October
7, 2004 (2004 order), inter alia, ‘‘enjoin[ed] all persons
who are given notice thereof, from preventing the com-
missioner, his agents, employees and contractors from
having full and complete access to the [t]ire [p]ond and/
or [p]arcel A, and from interfering with actions taken
by the commissioner pursuant to paragraph 3 of the
September 21, 2001 judgment.’’9 (Emphasis added.) In
October, 2004, the commissioner served Modern with
a notice of judgment containing both the 2001 judgment
and the 2004 order.
In October, 2007, in the interest of continuing to close
and remediate the tire pond after complications had
resulted from the loss of fill material from a major
construction project in Boston, Massachusetts, and in
the interest of resolving both the underlying action and
a separate civil action that the commissioner had com-
menced against State Five seeking to hold State Five
and its president, Jean L. Farricielli, Farricielli’s wife,
liable for the defendants’ financial obligations pursuant
to the underlying judgment; see generally Commis-
sioner of Environmental Protection v. State Five
Industrial Park, Inc., 304 Conn. 128, 37 A.3d 724
(2012);10 the parties negotiated and consented to the
entry of the first supplementary postjudgment order
(2007 order) by the trial court, Sheldon, J. The 2007
order specifically and permanently enjoined the defen-
dants from interfering with the closure of the tire pond,
as well as directly or indirectly ‘‘deriving any monetary
gain from parcel B’’; and ‘‘participating in the manage-
ment or control of parcel B, except as directed by the
commissioner.’’ The 2007 order did, however, specifi-
cally contemplate Modern’s role as a lessee of premises
at the tire pond, as it permitted the defendants ‘‘until
otherwise ordered by the court, [to] continue to receive
lease payments from Modern . . . for its lawful occu-
pancy of parcel B. [The defendants shall not] accept
from Modern . . . any lease payments in advance of
greater than one month.’’11
Subsequently, in June, 2009, upon the commissioner’s
application, the trial court ordered Modern to appear
and show cause why the commissioner’s motion for
the enforcement of court orders should not be granted.
In its motion for enforcement, the commissioner sought
an order directing Modern to vacate, within sixty days
of the court’s order, the portions of the tire pond that
Modern occupies, including that portion of the property
it occupied pursuant to its lease agreement with State
Five. The commissioner argued that the closure plan
could not be effectuated with Modern’s operations in
place because they interfered with the placement of
fill material and drainage through the installation of
sediment traps. Modern argued in response, however,
that it was not a party to the underlying action, that its
lease predates any of the applicable orders therein and
that its closure is not necessary for the remediation of
the tire pond.
The trial court granted the commissioner’s motion,
concluding that Modern was on notice of the consent
order and the various judgments in the underlying
action because: (1) the consent order had been
recorded on the land records prior to the execution of
the lease and that Modern had entered into that lease
in 2003 while litigation was pending against the prop-
erty; (2) Modern had been served with the 2004 order
enjoining ‘‘all persons who are given notice thereof’’
from interfering with access to the tire pond or parcel A;
(3) the portions of the 2007 order referring to Modern’s
lease emphasize that the parties to the lease are subject
to the court’s orders and that it is a temporary arrange-
ment; and (4) due process was satisfied, despite the
fact that Modern was not made a party to the underlying
action, because Modern had been properly served in
connection with the commissioner’s motion to show
cause and had participated at the hearings on the
motion to enforce the orders in the underlying action.
Thus, the trial court granted the commissioner’s motion
and enjoined Modern and its ‘‘officers, employees, attor-
neys, agents and anyone acting in concert with it or on
its behalf . . . from interfering with the closure of the
property known as the tire pond,’’ and further directed
Modern, within sixty days of an order by the commis-
sioner, to ‘‘vacate the space it is occupying that is
defined as ‘the lease premises’ in the notice of lease
recorded on the town of Hamden land records in volume
2626, page 204.’’ This writ of error followed.12
In this writ of error, Modern contends that the trial
court improperly enforced the injunctions ordered in
the underlying action against it because: (1) Modern is
not and never has been a defendant therein, and the
trial court never found it in privity or acting in concert
with a party thereto; (2) it was not necessary to order
Modern to vacate its leased premises to effectuate the
remediation; and (3) Modern’s due process rights were
violated when the trial court, in essence, terminated its
lease without first affording it an opportunity to be
heard as to the validity of its lease and the underlying
court orders. We address each claim in turn.
I
We begin with the principal issue in this writ of error,
namely, Modern’s claim that the trial court improperly
enforced the previously ordered injunctions against it
because it was not a party to the underlying action.
Modern contends that, because it was never made a
party to the underlying action, the court had personal
jurisdiction over it only in relation to the commission-
er’s 2009 motion to show cause that is the subject of
this writ of error. Relying on the common law discussed
in, inter alia, DeMartino v. Monroe Little League, Inc.,
192 Conn. 271, 471 A.2d 638 (1984), and Clancy v.
Clancy, 26 Conn. Sup. 46, 212 A.2d 79 (1965), Modern
further contends that, because it was not a party to the
underlying action and had only an arm’s-length business
relationship with any of the defendants, the trial court
lacked the authority to enforce the previously ordered
injunctions against it in the absence of a factual finding
that it was in privity or acted in concert with any of
the defendants in this case. Finally, Modern argues in
its reply brief that the commissioner’s recordation of
the 1998 consent order did not create an encumbrance
that would affect its rights because the terms of that
order did not prohibit the leasing of the property or
refer specifically to the parcels occupied by Modern
and, moreover, that this case is about the enforcement
of the 2001 judgment in the underlying action and that
the 2001 judgment was not recorded prior to Modern
obtaining its property interest from State Five.
In response, the commissioner, relying on, inter alia,
Beach v. Osborne, 74 Conn. 405, 412, 50 A. 1019 (1902),
contends that Modern is bound by the injunctions
ordered in the underlying action because it entered into
its 2003 lease with State Five with notice of pending
proceedings that could affect its interest, given that the
consent order had been recorded on the Hamden land
records, thus providing notice of the terms thereof to
the defendants’ ‘‘heirs, successors and assigns’’ pursu-
ant to General Statutes § 22a-225 (e),13 relating to solid
waste management, and General Statutes § 22a-434,14
relating to water pollution control. The commissioner
emphasizes further that it was imperative for Modern
to act cautiously in leasing its property because the
2001 judgment in the underlying action was still the
subject of litigation at the time that the lease was exe-
cuted. Finally, the commissioner contends that the trial
court has the inherent authority to protect and vindicate
its prior judgments by fashioning orders that bind non-
parties, such as Modern, who have notice of the pro-
ceedings and possessory rights that are coextensive
with parties to the proceedings. As a corollary, the
commissioner posits that the facts as found by the trial
court are sufficient to sustain the legal conclusion that
Modern’s identity of interest has rendered it in privity
with the defendants for purposes of determining its
right to occupy the tire pond. We agree with the commis-
sioner, and conclude that, regardless of whether the
recorded consent order operated as a legal encum-
brance on Modern’s leased property, based on the facts
of this case, the trial court had the inherent authority to
vindicate its judgment in the underlying action ordering
injunctive relief and remediation of the environmental
hazard on the defendants’ land by enforcing those
orders against a tenant who took possession of the land
during the pendency of the litigation.
We begin by setting forth the applicable standard of
review. As the parties agree, whether a trial court has
the power to issue an order binding a nonparty to previ-
ous injunctions is a question of law subject to plenary
review, albeit one that is dependent on the particular
facts of the case. See AvalonBay Communities, Inc.
v. Planning & Zoning Commission, 260 Conn. 232,
239–40, 796 A.2d 1164 (2002) (‘‘[w]hether the trial court
had the power to issue the order, as distinct from the
question of whether the trial court properly exercised
that power, is a question involving the scope of the trial
court’s inherent powers and, as such, is a question of
law’’); DeMartino v. Monroe Little League, Inc., supra,
192 Conn. 276 and n.8 (‘‘[w]hether one not named in
an injunctive decree may nevertheless be bound by it
depends on the facts of each case’’ [internal quotation
marks omitted]), quoting Vuitton et Fils S.A. v. Carou-
sel Handbags, 592 F.2d 126, 130 (2d Cir. 1979).
The parties further agree as to the generally applica-
ble governing principles, namely, that ‘‘[p]ersons who
are beyond the scope of an injunction are, of course,
not bound by it and are free to ignore it. . . . At com-
mon law an injunction decree bound not only the par-
ties defendant but also those identified with them in
interest, in privity with them, represented by them or
subject to their control. . . . The law is clear that a
person may be bound by the terms of an injunction,
even though not a party to the action, if he has notice
or knowledge of the order and is within the class of
persons whose conduct is entitled to be restrained or
who acts in concert with such persons.’’ (Citations
omitted; emphasis added; internal quotation marks
omitted.) DeMartino v. Monroe Little League, Inc.,
supra, 192 Conn. 276–77, discussing, inter alia, Regal
Knitwear Co. v. National Labor Relations Board, 324
U.S. 9, 14, 65 S. Ct. 478, 89 L. Ed. 661 (1945); Alemite
Mfg. Corp. v. Staff, 42 F.2d 832, 833 (2d Cir. 1930);
Clancy v. Clancy, supra, 26 Conn. Sup. 50.
Modern does not argue in its principal brief that it
lacked actual or constructive notice of the operative
judgments or orders herein for purposes of the notice
element of this general legal principle. Instead, Modern
contends that it was not made a party to the underlying
action for purposes of affording the trial court personal
jurisdiction over it.15 Thus, we turn instead to the ques-
tion of whether Modern’s status as a tenant of State
Five renders it identified in interest, in privity with,
represented by or subject to the control of the defen-
dants, in a manner sufficient to render an injunction
enforceable against it as a nonparty. Our analysis
begins, then, with the ‘‘difficult to define’’ concept of
privity, which ‘‘exists to ensure that the interests of the
party against whom collateral estoppel [or res judicata]
is being asserted have been adequately represented
because of his purported privity with a party at the
initial proceeding. . . . A key consideration in
determining the existence of privity is the sharing of
the same legal right by the parties allegedly in privity.’’
(Emphasis added; internal quotation marks omitted.)
Joe’s Pizza, Inc. v. Aetna Life & Casualty Co., 236
Conn. 863, 868, 675 A.2d 441 (1996); see also authorities
cited in footnote 21 of this opinion.
Application of this principle demonstrates that Mod-
ern’s status as a tenant of State Five renders it in privity
with the defendants in the underlying action as a matter
of law. Put differently, there is a key legal right that is
shared by State Five and Modern, namely, the right to
occupy and use certain portions of the tire pond. Black
letter principles of landlord-tenant law establish that
Modern’s possessory rights under the lease derive from
those of its landlord, State Five, which, in turn, derived
its interest in the property from the prior transfers by
Farricielli and Tire Salvage to Look, State Five’s corpo-
rate predecessor. See, e.g., Message Center Manage-
ment, Inc. v. Commissioner of Revenue Services, 50
Conn. Sup. 317, 327, 927 A.2d 378 (2006), aff’d, 282
Conn. 706, 923 A.2d 735 (2007); see also 49 Am. Jur.
2d, Landlord and Tenant § 1 (2006) (‘‘[a] landlord-tenant
relationship is created when there is: [1] a reversion in
the landlord; [2] creation of an estate in the tenant
either at will or for a term less than that which the
landlord holds; [3] transfer of exclusive possession and
control to the tenant; and [4] a contract’’); 49 Am. Jur.
2d, supra, § 3 (‘‘[i]n a lessor-lessee relationship, the
lessor relinquishes physical possession of the property
to the lessee, while retaining legal title to the property’’).
Indeed, not to view Modern as aligned in interest
with its landlord, State Five, who took possession of
significant portions of parcels B and C and the tire pond
while the underlying action was pending, through its
corporate predecessor Look, who had taken its posses-
sion from the corporate defendant Tire Salvage, would
operate to frustrate the trial court’s power to order
injunctive relief to address an environmental hazard
on the defendants’ land. We find guidance in a well
established line of nuisance cases that recognize the
legal interests shared by landlords and tenants and,
assuming proper notice, treat injunctions, like that
issued in this case, as in rem orders that bind nonparties
with possessory rights to the property. Those courts
recognize that to decide otherwise would eviscerate
the courts’ power to vindicate their judgments by per-
mitting defendants to evade injunctions by simply trans-
ferring an interest in the subject property to a third
party through a lease or other similar conveyance.
The seminal case on this point is Silvers v. Traverse,
82 Iowa 52, 55, 47 N.W. 888 (1891), wherein the Iowa
Supreme Court upheld a finding of contempt against a
nonparty lessee of a party who had been enjoined from
using the leased premises for liquor sales, despite the
fact that the nonparty lacked actual knowledge of the
injunction. The court observed that the underlying
‘‘action for an injunction pertained to and affected real
estate . . . . This action is notice to all the world of
the matter involved therein; and all persons dealing
with the property, or acquiring an interest therein, after
the proceedings were instituted, are charged with
notice of the proceedings. . . . The decree was against
[the] plaintiff’s lessor, who was the defendant in the
suit. It affected his right and interest in the property;
that is, it limited and cut off his power to use the
property for the unlawful keeping and sale of intoxicat-
ing liquors. The decree was a restriction upon the use
of the property which followed it as a burden, and, as
it were, an incumbrance. Surely the plaintiff, in taking
the property, took it subject to this restriction and
burden.’’ (Citation omitted; emphasis added.) Id., 55–56.
The court emphasized that viewing the injunction as
anything other than an encumbrance on the lessor’s
right and interest in the property would render ‘‘vain’’
‘‘the attempt to enforce injunctions to abate nuisances
of all kinds . . . . The defendant perpetrating the nui-
sance could wholly defeat the law by leasing or transfer-
ring the property to one who had no notice thereof. He
could begin anew the perpetration, and could only be
enjoined by a new action, and when so enjoined he
could in a like manner transfer the property and so
on indefinitely, defeating the law, to the scandal of
public justice, and the oppression of the people.’’
(Emphasis added.) Id., 56.
Similarly, in State v. Porter, 76 Kan. 411, 413–14, 91
P. 1073 (1907), the Kansas Supreme Court followed
Silvers v. Traverse, supra, 82 Iowa 52, and upheld the
nonparty tenants’ contempt convictions, despite their
lack of actual knowledge or notice of the underlying
order against the maintenance of a nuisance in the
building, namely, the violation of state liquor laws. In so
concluding, the Kansas court observed that the tenants
‘‘had possession of the building in which, but a few
months before, the owner, his codefendants ‘and all
other persons whomsoever’ were enjoined from main-
taining just such a nuisance as [tenants] were main-
taining. In wilfully embarking upon an unlawful
business they might well be presumed to have scanned
every possible source of danger and to have not over-
looked so public a proceeding as the injunction suit. It
is more probable that they thought they had cunningly
evaded it. It matters not. The proceedings of the courts
for the maintenance of order and the enforcement of
law are not thus to be trifled with. The decree of injunc-
tion was against the defendants in that suit, and in
a sense was ad rem—against the property, or rather
against a certain illegal use of the property. It cut
off perpetually the use of the property for any of the
purposes which the prohibitory liquor law of this state
denounces as a nuisance. Thereafter not only the par-
ties to that suit but all persons using the property for
any of such unlawful purposes did so at their peril. The
judgment is a limitation upon the use of the property of
which all subsequent owners or occupants must take
notice.’’ (Emphasis added.) State v. Porter, supra,
413–14; see also State ex rel. Knittle v. Will, 86 Kan.
561, 562, 121 P. 362 (1912) (‘‘An injunction against the
owner of property is not only binding upon him but
also upon those who may take or hold under him. It
is, in one sense, an incumbrance on the property, and
the owner who has been enjoined can not, by transfer-
ring it to another, by grant, lease or otherwise, free it
from the limitation imposed by the injunction.’’); State
v. Terry, 99 Wash. 1, 3, 6, 168 P. 513 (1917) (upholding
nonparty tenant’s contempt conviction for violating
injunction prohibiting landlord from operating brothel
because when ‘‘the decree of injunction is not only in
personam against the defendants in the injunction suit,
but also operates in rem against specific property, or
rather against a given illegal use of such property, the
decree is a limitation upon the use of the property
of which all subsequent owners, lessees, or occupants
must take notice’’ and to ‘‘hold otherwise would be
to render the perpetual injunction authorized by our
statute an empty formality through the ease with which
it might be avoided by the mere leasing of the prop-
erty’’); cf. Swetland v. Curry, 188 F.2d 841, 843 (6th
Cir. 1951) (nonparty county commissioners could not
be held in contempt for violating injunction forbidding
use of land for airport purposes because acquisition of
that land by eminent domain eliminated ‘‘[t]he element
of contract and meeting of the minds necessary to deriv-
ative title’’); Savage v. Winfield, 152 Fla. 165, 167–68, 11
So. 2d 302 (1943) (Chapman, J., dissenting) (contempt
conviction against nonparty tenant for operation of
boatyard in violation of injunction should be reversed
because tenant was not properly served with injunction
or made party to suit and tenancy preexisted litigation
and filing of lis pendens).16 These common-law princi-
ples remain good law today. See Meyer v. Jones, 696
N.W.2d 611, 616 (Iowa 2005) (doctrine applicable
through lis pendens statute applicable to court proceed-
ings rather than findings by municipal hearing officers);
Hutcheson v. Iowa District Court, 480 N.W.2d 260, 264
(Iowa 1992) (‘‘[t]he thrust of these holdings, that a non-
party to an injunction or order may still be held to be
in contempt of the injunction or order, is consistent
with contempt law in other jurisdictions’’); see generally
annot., 7 A.L.R.4th 893 (1981) (collecting cases).
This venerable line of state cases providing for the
in rem enforcement of injunctions against the mainte-
nance of nuisances or other statutory violations is con-
sistent with federal case law applying rule 65 (d) of the
Federal Rules of Civil Procedure,17 which ‘‘is derived
from the common-law doctrine that a decree of injunc-
tion not only binds the parties defendant but also those
identified with them in interest, in privity with them,
represented by them or subject to their control.’’ (Inter-
nal quotation marks omitted.) Golden State Bottling
Co. v. National Labor Relations Board, 414 U.S. 168,
179, 94 S. Ct. 414, 38 L. Ed. 2d 388 (1973); see also
United States v. Paccione, 964 F.2d 1269, 1275 (2d Cir.)
(concluding that, in a federal racketeering case, district
court had authority to hold nonparty in contempt who
had ‘‘interfered with the res, the disposition of which
the district court had specifically restricted, and who
consciously impeded the rights, obligations and efforts
of the parties bound by the court’s order from
attempting to comply with valid court orders’’), cert.
denied, 505 U.S. 1220, 112 S. Ct. 3029, 120 L. Ed. 2d 900
(1992); United Food & Commercial Workers Local 545
Health & Welfare Fund v. Health Enterprises of
America, Inc., 543 F. Sup. 340, 347 (E.D. Mo. 1982)
(‘‘Geriatric Center, as sublessee, is in privity with [the
defendant], and it had notice of this [c]ourt’s judgment
. . . . Accordingly, [Geriatric Center] is bound [under
rule 65 (d)] to comply with the terms of the injunction
issued therein.’’).
Moreover, the United States Supreme Court has rec-
ognized that District Courts’ equitable authority to
enforce injunctions against nonparties under rule 65
(d) of the Federal Rules of Civil Procedure is broader
‘‘in furtherance of the public interest than . . . when
only private interests are involved.’’ (Internal quotation
marks omitted.) Golden State Bottling Co. v. National
Labor Relations Board, supra, 414 U.S. 180; see also
id. (‘‘a bona fide purchaser, acquiring, with knowledge
that the wrong remains unremedied, the employing
enterprise which was the locus of the unfair labor prac-
tice, may be considered in privity with its predecessor
for purposes of rule 65 [d]’’); United States v. Hall, 472
F.2d 261, 267 (5th Cir. 1972) (describing rule 65 [d]
as ‘‘a codification rather than a limitation of courts’
common-law powers, [which] cannot be read to restrict
the inherent power of a court to protect its ability to
render a binding judgment’’).
Indeed, in United States v. Hall, supra, 472 F.2d 267,
the United States Court of Appeals for the Fifth Circuit
emphasized that rule 65 (d) of the Federal Rules of Civil
Procedure does not preclude the issuance of in rem
injunctions because it ‘‘was intended to embody rather
than to limit . . . common law powers.’’ The court then
concluded that the District Court had the inherent
power to protect its judgment ordering the desegrega-
tion of a school by holding a nonparty protester, ‘‘in
a position to upset the court’s adjudication’’; Id.; in
contempt for violating an injunction of which he had
notice because his ‘‘[d]isruption of the orderly operation
of the school system, in the form of a racial dispute,
would thus negate the plaintiffs’ constitutional right
and the defendant’s constitutional duty. In short, the
activities of persons contributing to racial disorder at
[the school] imperiled the court’s fundamental power
to make a binding adjudication between the parties
properly before it.’’ Id., 265. Put differently, the key
to permitting the enforcement of injunctions against
nonparties under rule 65 (d) is whether failure to do
so will ‘‘interfere with court’s power’’ over the public
interest or the parties to the case. See Doctor’s Associ-
ates, Inc. v. Reinert & Duree, P.C., 191 F.3d 297, 303
n.4 (2d Cir. 1999) (injunction precluding nonparty fran-
chisees from bringing civil actions was not permissible
under rule 65 [d] because it ‘‘precludes nonparties from
bringing actions that in no way interfere with the court’s
power over [the] defendants’’).
This public interest extends to the environment, as
the United States District Court, in enjoining nonparty
city agencies from interfering with previous court
orders granting relief in an action brought under the
federal Clean Water Act, 33 U.S.C. § 1365, observed that
it ‘‘has broad discretion to fashion remedies that will
protect and effectuate its judgments, particularly when
the public interest is involved. . . . Persons who were
not parties to the original action may be enjoined from
interfering with the implementation of court orders
which establish and protect public rights.’’ (Citations
omitted.) Mumford Cove Assn. v. Groton, 647 F. Sup.
671, 691 (D. Conn. 1986); see also Natural Resources
Defense Council, Inc. v. Texaco Refining & Marketing,
Inc., 719 F. Sup. 281, 291 (D. Del. 1989) (water pollution
injunction issued under federal Water Pollution Control
Act, 33 U.S.C. § 1251 et seq., is enforceable pursuant
to rule 65 [d] of the Federal Rules of Civil Procedure
against nonparty who became partner in operation of
party’s refinery after initiation of action because holding
otherwise ‘‘would have the effect of enabling a succes-
sor permit holder which had acquired the refinery with
knowledge of ongoing violations to evade enforce-
ment’’), vacated on other grounds, 906 F.2d 934 (3d Cir.
1990); Mumford Cove Assn., Inc. v. Groton, supra, 691
(‘‘[t]he actions of the [c]ity, its agencies and officials,
and some of its residents, threaten to interfere with
this court’s efforts to remedy pollution of federally-
protected waters of the United States’’).
Under these lines of cases, we conclude that, consis-
tent with due process and Modern’s notice of the trial
court’s orders rendered in the underlying action, the
trial court had the inherent power to enforce its pre-
viously ordered injunctions against Modern despite its
nonparty status.18 Consistent with the trial court’s apt
observation that, ‘‘it would certainly frustrate our judi-
cial system if one subject to an injunction were able to
avoid that injunction by simply transferring the parcel
subject also to such injunction to a new corporation,’’19
we conclude that the injunctions in this case must be
viewed as in rem in nature with respect to subsequent
tenants such as Modern, even when rendered in perso-
nam against the defendants in the underlying action.20
Thus, tenants who subsequently enter properties
affected by injunctions imposed by courts to protect
the public interest share the necessary identity of legal
interest with the owners of such properties to render
those orders enforceable against them as nonparties.21
Moreover, to conclude otherwise would relieve the
defendants from their assurances to the trial court,
made in 1999, that it was not necessary to join Look,
State Five’s corporate predecessor, as a party in this
case because Look and other corporate defendants
would not interfere with any subsequent court orders
requiring the remediation of the tire pond. See footnote
18 of this opinion. Accordingly, the trial court properly
determined that it had the authority to vindicate its
previous orders directing the remediation of the tire
pond by: (1) enjoining ‘‘Modern . . . and its officers,
employees, attorneys, agents and anyone acting in con-
cert with it or on its behalf [from] interfering with the
closure of the property known as the tire pond’’; and (2)
directing Modern to vacate the leased premises within
sixty days of an order by the commissioner.
II
Modern next contends that the trial court improperly
found that it was necessary for Modern to move its
operations in order for the commissioner to accomplish
the remediation of the tire pond. Specifically, Modern
relies on the testimony of Coy Angelo, the chief of
operations for Gateway Terminal, who was responsible
for coordinating the transportation and placement of
fill material for the tire pond site and Earl Tucker,
Modern’s president, to establish that no remediation
work presently is occurring or imminent on the tire
pond