The ‘‘officially released’’ date that appears near the
beginning of each opinion is the date the opinion will
be published in the Connecticut Law Journal or the
date it was released as a slip opinion. The operative
date for the beginning of all time periods for filing
postopinion motions and petitions for certification is
the ‘‘officially released’’ date appearing in the opinion.
In no event will any such motions be accepted before
the ‘‘officially released’’ date.
All opinions are subject to modification and technical
correction prior to official publication in the Connecti-
cut Reports and Connecticut Appellate Reports. In the
event of discrepancies between the electronic version
of an opinion and the print version appearing in the
Connecticut Law Journal and subsequently in the Con-
necticut Reports or Connecticut Appellate Reports, the
latest print version is to be considered authoritative.
The syllabus and procedural history accompanying
the opinion as it appears on the Commission on Official
Legal Publications Electronic Bulletin Board Service
and in the Connecticut Law Journal and bound volumes
of official reports are copyrighted by the Secretary of
the State, State of Connecticut, and may not be repro-
duced and distributed without the express written per-
mission of the Commission on Official Legal
Publications, Judicial Branch, State of Connecticut.
******************************************************
CARL SHANAHAN v. DEPARTMENT OF
ENVIRONMENTAL PROTECTION
ET AL.
(SC 18575)
Norcott, Palmer, Zarella, McLachlan, Eveleigh and Harper, Js.
Argued January 5—officially released July 24, 2012
James A. Wade, with whom was John P. Casey, for
the appellant (plaintiff).
Mary K. Lenehan, assistant attorney general, with
whom were David Wrinn, assistant attorney general,
and, on the brief, George Jepsen, attorney general, and
Carmel Motherway, assistant attorney general, for the
appellees (defendants).
Opinion
HARPER, J. This appeal raises several issues regard-
ing the scope of the jurisdiction of the named defendant,
the department of environmental protection (depart-
ment),1 to regulate activity ‘‘in the tidal, coastal or navi-
gable waters of the state waterward of the high tide
line.’’ General Statutes § 22a-359 (a);2 see General Stat-
utes § 22a-361 (a) (1).3 The plaintiff, Carl Shanahan,
appeals4 from the trial court’s judgment denying his
administrative appeal contesting the department’s
order directing the plaintiff to remove a seawall that
he had constructed on his property along Long Island
Sound without having obtained a permit in accordance
with § 22a-361. The plaintiff specifically contends that:
(1) the trial court improperly concluded that substantial
evidence supported the department’s determination
that the seawall lies ‘‘waterward of the high tide line’’
and is thus within the jurisdiction of the department;
(2) the trial court improperly concluded that ‘‘high tide
line,’’ as defined in § 22a-359, is not unconstitutionally
vague; (3) the trial court improperly denied the plain-
tiff’s motion to obtain discovery with respect to his
claim of unconstitutional vagueness; and (4) even if
substantial evidence shows that portions of the seawall
were built waterward of the high tide line, the trial court
improperly failed to consider whether the department’s
jurisdiction to order the plaintiff to remove the seawall
extends to portions of the seawall that have not been
shown to be ‘‘waterward of the high tide line.’’ We
conclude that the trial court properly concluded that
substantial evidence shows at least part of the plaintiff’s
seawall was constructed waterward of the high tide
line, properly concluded that § 22a-359 is not unconsti-
tutionally vague as applied to the plaintiff’s seawall,
and properly denied the plaintiff’s discovery request.
We further conclude that, in the absence of a finding by
the department that the entire seawall was constructed
waterward of the high tide line, the trial court improp-
erly determined that the department had jurisdiction
under § 22a-361 to order removal of the entire seawall.
Accordingly, we affirm in part and reverse in part the
trial court’s judgment with direction to remand the case
to the department for further proceedings.
To provide context for the claims raised in the present
case and the specific facts relevant to those claims, we
begin by briefly outlining the contours of the statutory
scheme governing activities along the Connecticut
coastline in order to protect coastal resources. First,
the legislature has enumerated several activities that
are subject to regulation by the department if conducted
‘‘waterward of the high tide line.’’ General Statutes
§ 22a-359 (a); see General Statutes § 22a-361 (a) (1).
Specifically, § 22a-361 (a) (1) directs a property owner
seeking, inter alia, to ‘‘erect any structure,’’ ‘‘maintain
any structure’’ or ‘‘carry out any work incidental
thereto’’ along the Connecticut coast ‘‘waterward of the
high tide line’’ to obtain a permit from the commissioner
of environmental protection (commissioner) and agree
to carry out any conditions deemed necessary to the
implementation of that permit. See footnote 3 of this
opinion. Any violation of this provision is considered
a public nuisance for which the department may issue
a cease and desist order.5 General Statutes §§ 22a-362
and 22a-363f. The term ‘‘high tide line’’ as used in § 22a-
361 (a) is statutorily defined as ‘‘a line or mark left upon
tide flats, beaches, or along shore objects that indicates
the intersection of the land with the water’s surface at
the maximum height reached by a rising tide. The mark
may be determined by (1) a line of oil or scum along
shore objects, (2) a more or less continuous deposit of
fine shell or debris on the foreshore or berm, (3) physi-
cal markings or characteristics, vegetation lines, tidal
gauge, or (4) by any other suitable means delineating
the general height reached by a rising tide. The term
includes spring high tides and other high tides that
occur with periodic frequency but does not include
storm surges in which there is a departure from the
normal or predicted reach of the tide due to the piling
up of water against a coast by strong winds such as
those accompanying a hurricane or other intense
storm.’’ General Statutes § 22a-359 (c).
In addition to the requirements of § 22a-361, coastal
activity may also be subject to regulation under the
Coastal Management Act (act), General Statutes § 22a-
90 et seq. Among the act’s goals is the management of
coastal bluffs, which play an integral role in maintaining
a balanced pattern of erosion and sedimentation along
the coastline. General Statutes § 22a-92 (b) (2) (A). In
addition to providing a significant source of sediment
for other coastal features, bluffs also support unique
plant communities, provide wildlife habitats, and pro-
tect against coastal flooding. The act’s policies specifi-
cally declare that the natural contours of bluffs should
be preserved and that activities altering the natural
supply of sediment from bluffs should be disapproved.
General Statutes § 22a-92 (b) (2) (A). The act establishes
a ‘‘coastal boundary’’; General Statutes § 22a-94 (b); and
requires property owners wishing to construct, inter
alia, any shoreline flood and erosion control structure
that is within the coastal boundary to submit a coastal
site plan for approval by the local zoning authority.6
General Statutes § 22a-109.
With this regulatory framework in mind, we turn to
the specific facts as found by the department or
revealed by the record and the procedural history rele-
vant to this appeal. The plaintiff’s residence property,
which lies along Long Island Sound in the city of Stam-
ford (city), sits on top of a prominent bluff that rises
approximately forty feet from sea level. In 1995, at the
plaintiff’s request, a department analyst visited the
property and informed the plaintiff that his land, which
at the time was partially protected by an existing sea-
wall running along approximately 125 of its 290 feet of
waterfront, had been subject to significant erosion over
the past several decades. The department analyst fur-
ther indicated that, although the plaintiff’s house was
not presently in danger and the policies articulated in
the act discouraged structural erosion control measures
under such circumstances, a structural solution may
be appropriate in the plaintiff’s case. The analyst recom-
mended that the plaintiff hire a consulting engineer to
further analyze the conditions at the site in preparation
for a preapplication meeting with the department
regarding potential solutions to the erosion problem.
In 2004, the plaintiff hired Rocco V. D’Andrea, Inc.
(D’Andrea), and Ocean and Coastal Consultants, Inc.
(Coastal Consultants), to survey the property and to
design an erosion control plan, respectively. The first
aspect of the resulting plan was to seek a permit from
the department to repair the existing seawall, situated
at the north end of the plaintiff’s property, which undis-
putedly lies waterward of the high tide line. A survey
accompanying the permit application depicted a ‘‘high
tide line’’ at an elevation of 5.7 feet;7 the survey further
reflected this line meeting the existing seawall at its
southern edge and following an irregular course south-
ward.8 The 5.7 foot elevation number, drawn from data
published by the United States Army Corps of Engi-
neers, reflected the predicted height of the highest
yearly occurring tidal flood. The department approved
the proposed repairs and included a copy of the survey
in its certificate of permission.
Following the approval of repairs to the existing sea-
wall, the plaintiff, representatives from D’Andrea and
Coastal Consultants, a department liaison, and a mem-
ber of the city’s zoning board (board) met on the plain-
tiff’s property to discuss further erosion control
measures. After the meeting, the department liaison
informed the plaintiff that the erosion control measure
proposed by Coastal Consultants, which involved
armoring the bluff with large rocks arranged in tiers to
form a slope, was inconsistent with the requirements
of the act because it would not preserve the existing
contours of the bluff and would significantly reduce
the natural rate of erosion, thereby failing to maintain
the natural relationship between erosion and deposit
of material.
Subsequent to this exchange, the plaintiff, again aided
by D’Andrea and Coastal Consultants, developed an
erosion control plan that did not revise the structure
to remedy the defects identified by the department liai-
son but instead was intended to strategically position
the stone structure landward of the high tide line and
thus outside of the department’s jurisdiction. In devel-
oping this plan, D’Andrea conducted an additional sur-
vey of the plaintiff’s property, which reflected a high
tide line consistent with the 5.7 foot elevation figure
on which the plaintiff previously had relied.9 According
to D’Andrea, this high tide line reflected the ‘‘predicted’’
or ‘‘mathematical tides, which under average weather
conditions we should expect to see’’ as extrapolated
from nineteen years of observed tidal data provided by
the National Oceanic and Atmospheric Administration.
D’Andrea concluded that the level of atmospheric pres-
sure could cause actual water levels to depart several
inches above or below the predicted tidal level, such
that a shift from low to high atmospheric pressure could
result in a swing in water levels of up to one foot. The
nineteen years of data taken from the National Oceanic
and Atmospheric Administration, however, effectively
‘‘smoothes out’’ these meteorological variances, which,
according to D’Andrea, are treated as ‘‘storm surge’’
that should not be factored into the definition of the
high tide line. In accordance with this view that all
departures from the predicted tide level represent dis-
qualified storm surge, D’Andrea characterized the
observation based means of measuring the high tide
line contemplated by § 22a-359—including observation
of debris lines, marks on rocks and direct observation of
water levels—as disfavored determinants of last resort.
Relying on D’Andrea’s survey, Coastal Consultants
developed a plan that called for building a new seawall
directly south of the existing seawall, but set back ten
feet landward from the waterward edge of the existing
seawall, at an elevation of 6.8 feet. Because the southern
end of the existing seawall was situated at an elevation
of 5.7 feet, the plan called for the two seawalls to be
joined by an additional wall running landward from the
southern edge of the existing seawall to the northern
edge of the new seawall.
The plaintiff thereafter filed Coastal Consultants’
coastal site plan with the board for its approval. In
accordance with General Statutes § 22a-109 (d), a copy
of the site plan was referred to the department for
its comments and recommendations. In response, the
department liaison sent a letter to the board, copied
to Coastal Consultants, urging the board to reject the
proposed plan due to its numerous inconsistencies with
the act. The letter also disputed the high tide line
reflected on the plan, citing tide gauge records showing
that high tides in the area of the plaintiff’s property
rose to a much higher elevation than indicated on the
plaintiff’s plans and contended that the high tide line
would have to be reevaluated on the basis of actual
conditions at the site. At a subsequent meeting of the
board, the department liaison spoke against the plan,
again expressing a view that the plaintiff’s plans under-
estimated the location of the high tide line, which,
according to the department’s data and observations,
was likely actually to lie at an elevation of 6.5 or 7 feet
rather than 5.7 feet as reflected in the plaintiff’s plans.
Following this meeting, the plaintiff had conversa-
tions with certain members of the board that led him
to believe the board would approve the site plan. The
board in fact drafted a motion approving the plaintiff’s
plan, but that approval was to be subject to a number
of conditions, including that the plaintiff submit revised
plans placing the structure at an elevation of at least
6.8 feet, that the plaintiff’s design engineer certify that
the plans meet certain criteria, that the design engineer
supervise the construction and certify that it conforms
to the approved plan, and that the plaintiff reimburse
the city for a peer review of the final plans by an inde-
pendent consulting engineer. Although the plaintiff
claimed to have seen the motion shortly after it was
produced, the board never approved the motion or sent
notice to the plaintiff of a decision on his site plan.10
Approximately one month after the board meeting,
apparently in anticipation of the board’s approval of
the site plan, the plaintiff commissioned D’Andrea to
place a line of stakes at an elevation of 6.8 feet in the
southern part of his property where the plan called for
the new seawall to be built and to produce a survey
reflecting this line.11 Shortly thereafter, despite the fact
that he had not yet received written notice of the board’s
decision, the plaintiff authorized a construction con-
tractor, E.T. Kennedy Coastal Construction (Kennedy),
to begin construction of the seawall. In constructing
the seawall, Kennedy plainly disregarded Coastal Con-
sultants’ site plan for which the plaintiff anticipated
receiving approval. Kennedy had refused to build the
seawall to the plan’s specifications partially on the
ground that, in its view, the ten foot setback from the
existing seawall called for would have created sharp
angles that would have been vulnerable to a strong
storm surge. According to Kennedy, the seawall it con-
structed waterward of that depicted in Coastal Consul-
tants’ plan, with the plaintiff’s permission, was
structurally superior because it curved gradually sea-
ward to meet the existing wall at its southern seaward
edge. The new seawall also differed from Coastal Con-
sultants’ plan of armoring the bluff with large rocks
arranged in tiers to form a slope in that it is composed
of interlocking boulders weighing five to eight tons,
and is steeply pitched, but not vertical. For additional
protection, large boulders also were placed on the
waterfront side of the seawall. Kennedy recognized that
it had built the seawall at, or landward of, the stakes
placed by D’Andrea at an elevation of 6.8 feet. Kennedy
did not have finalized drawings from which it built the
seawall, it did not have an engineer at the site during
construction,12 and it did not utilize any survey while
building the seawall.
Several months after the board meeting—and after
the plaintiff had begun the unauthorized construction of
the new seawall—an independent consulting engineer
hired by the board issued its peer review report of
the coastal site plan submitted by the plaintiff for the
board’s approval. The report concluded, inter alia, that
the high tide line at the plaintiff’s property lies at a
much higher elevation than the 5.7 feet indicated in
the plaintiff’s site plan and that historic tidal records
indicate that tide heights exceeded 5.7 feet approxi-
mately twenty-two times during the previous year.
According to the report, this historic data, coupled with
observation of shoreline debris, indicated that the high
tide line would be more appropriately placed at an
elevation of approximately 6.8 feet.13 Soon after issuing
this report to the board, a member of the independent
consulting firm alerted the department that the plaintiff
had begun construction work on the seawall.
In response to this information, a department liaison
visited the plaintiff’s property and observed that sub-
stantial portions of the seawall had already been com-
pleted, that the seawall being built was waterward of
the location indicated in the coastal site plan submitted
to the board and that water could be seen up against
the seawall. The department liaison took a number of
photographs, some of which show pools of water touch-
ing the part of the seawall depicted or seaweed at the
base of the part of the seawall depicted. Approximately
one week later, a second department official visited the
plaintiff’s property and determined, based on the water
level and the presence of a line of debris against the
seawall and tidally influenced vegetation on either side
of the property, that the seawall had been constructed
waterward of the high tide line. Photographs taken by
the department at this time also show water touching
the part of the seawall depicted and the presence of
plant matter lodged in the seawall.
Following these events, the department official
issued a notice of violation instructing the plaintiff to
submit ‘‘a plan for review and approval to remove the
unauthorized stone seawall and restore the pre-existing
vegetated bluff . . . .’’ In response, the plaintiff submit-
ted two surveys of the newly constructed seawall,
asserting that these surveys were evidence that the wall
had been constructed at an elevation of 6.8 feet, land-
ward of the high tide line, and was therefore outside
of the department’s jurisdiction. Despite this assertion,
both surveys plainly depict a portion of the new seawall
lying waterward of the marked high tide line of 5.7 feet;
one of the surveys, conducted two months after the
first, depicts a significant portion of the seawall—
approximately 90 of the 160 feet—as lying waterward
of the marked high tide line.14 Department officers also
conducted several site visits subsequent to the issuance
of the notice of violation; photographs taken on these
occasions depict water touching the seawall for much
of its length, which, in the department’s view, confirmed
that the seawall lay waterward of the high tide line. On
one occasion, a department official observed water,
approximately 1 foot deep, along 80 to 100 feet of the
seawall. Correspondence from the plaintiff’s counsel
following the department’s issuance of the notice of
violation contended that any portions of the seawall
then below an elevation of 6.8 feet had been built out-
side of the department’s jurisdiction but that the eleva-
tion of portions of the property in front of the seawall
had been altered postconstruction by changes in the
contours of the shoreline and by certain actions the
plaintiff had undertaken following visits by the depart-
ment officials.15
Approximately one month after the issuance of the
notice of violation, the department issued an order
directing the plaintiff to submit for review and approval
a written plan for removal of the seawall and restoration
of the site. As the source of its jurisdiction and authority,
the order cited General Statutes §§ 22a-616 and 22a-361
(a) (1).17 The plaintiff appealed from the removal order,
and an administrative hearing ensued. At the hearing,
the plaintiff asserted that the seawall was built land-
ward of the high tide line and thus outside of the depart-
ment’s jurisdiction, that the definition of high tide line
in § 22a-359 conferred an unreasonable degree of dis-
cretion on the department, that the department had
acted arbitrarily and capriciously in determining that
the seawall was located waterward of the high tide line,
and that, even if part of the seawall does lie waterward
of the high tide line, the department’s jurisdiction does
not extend to portions of the seawall that are not water-
ward of the high tide line.
The department hearing officer sustained the order.
In concluding that the department had jurisdiction to
issue the order, the officer first found that the seawall
had been built substantially waterward of the high tide
line, citing testimony by department officials and photo-
graphic evidence credibly establishing that ‘‘water
comes in contact with almost the entire wall on a regular
basis,’’ as well as the plaintiff’s own surveys demonstra-
ting that 70 to 92 feet of the 120 foot seawall lies water-
ward of the high tide line. The hearing officer did not
credit either the plaintiff’s testimony that the seawall
had been built at the planned elevation of 6.8 feet or
that topographical shifts after construction were
responsible for causing water to reach the seawall. The
hearing officer declined to consider the plaintiff’s con-
stitutional challenge to the statute; see Cumberland
Farms, Inc. v. Groton, 262 Conn. 45, 64, 808 A.2d 1107
(2002) (citing ‘‘well established common-law principle
that administrative agencies lack the authority to deter-
mine constitutional questions’’); and further concluded
that the department did not act arbitrarily. Finally, the
hearing officer concluded that the department’s juris-
diction was not limited to only those portions of the
seawall waterward of the high tide line on the ground
that, in light of work performed during construction of
the entire wall waterward of the high tide, the depart-
ment can exercise jurisdiction pursuant to the ‘‘work
incidental thereto’’ part of § 22a-361 (a) (1).
The plaintiff then appealed from the department’s
decision to the Superior Court, naming the department
and the attorney general as defendants and claiming
that: in light of evidence that properly could be deemed
probative, substantial evidence did not support the
department’s determination; the ‘‘high tide line’’ stan-
dard under § 22a-359 is unconstitutionally vague, as
evidenced, inter alia, by the more concretely objective
standard under its federal counterpart; and the removal
order should be held in abeyance pending a determina-
tion of what parts of the seawall are waterward of the
high tide line because the department lacks jurisdiction
over those parts of the seawall that are landward of
the high tide line. While that appeal was pending, the
plaintiff moved for permission to take a deposition of
certain department employees in order to supplement
the record and to develop a factual background for his
claim that § 22a-359 is unconstitutionally vague. The
court denied the motion on the ground that the record
already contained sufficient testimony and documen-
tary evidence with respect to the relevant statutes.
On appeal to the Superior Court pursuant to General
Statutes § 4-183 (a), the court concluded that the depart-
ment had produced substantial evidence supporting its
jurisdiction. In so concluding, the court rejected the
plaintiff’s contention that determination of the location
of the high tide line required expert testimony and that
the department was estopped from claiming that the
high tide line lies above 5.7 feet because the department
had accepted this figure in an earlier application submit-
ted by the plaintiff relating to the existing seawall. The
court further concluded that § 22a-359 is not unconstitu-
tionally vague because a person of ordinary intelligence
would know, based on the objectively obvious indicia
referred to in the statute, where the high tide line hit
and that the department’s requisite site visits would
provide concrete confirmation of that fact. With respect
to the issue of the department’s jurisdiction over those
portions of the seawall that are landward of the high
tide line, the court concluded that the plaintiff’s claim
that proceedings could not continue until the depart-
ment determined which portions of the seawall lie
waterward of the high tide line was premature because
the plaintiff had not yet submitted a plan to the depart-
ment that would determine the extent of the removal
of the wall required. This appeal followed. Additional
facts will be set forth as necessary.
I
The plaintiff first claims that the trial court improp-
erly concluded that substantial evidence supported the
department’s determination that the plaintiff’s seawall
was constructed waterward of the high tide line and
therefore falls within the department’s jurisdiction. The
plaintiff specifically contends that: (1) substantial evi-
dence shows the seawall was not constructed water-
ward of the high tide line and evidence to the contrary
is not reliable; (2) the department improperly rejected
expert testimony presented by the plaintiff; and (3) the
department should be estopped from asserting that the
high tide line lies anywhere other than an elevation of
5.7 feet in light of its approval of the plaintiff’s applica-
tion to repair the preexisting seawall that reflected that
high tide line elevation. We disagree with the plaintiff.
Before addressing the substance of the plaintiff’s
claims, we reiterate the well established standards gov-
erning our highly deferential review of administrative
agency decisions regarding questions of fact. ‘‘The sub-
stantial evidence rule governs judicial review of admin-
istrative fact-finding under [the Uniform Administrative
Procedure Act]. General Statutes § 4-183 (j) (5) and (6).
Substantial evidence exists if the administrative record
affords a substantial basis of fact from which the fact in
issue can be reasonably inferred. . . . This substantial
evidence standard is highly deferential and permits less
judicial scrutiny than a clearly erroneous or weight of
the evidence standard of review. . . . The reviewing
court must take into account [that there is] contradic-
tory evidence in the record . . . but the possibility of
drawing two inconsistent conclusions from the evi-
dence does not prevent an administrative agency’s find-
ing from being supported by substantial evidence . . . .
The burden is on the [plaintiff] to demonstrate that the
[department’s] factual conclusions were not supported
by the weight of substantial evidence on the whole
record. (Citations omitted; internal quotation marks
omitted.) Connecticut Light & Power Co. v. Dept. of
Public Utility Control, 266 Conn. 108, 124–25, 830 A.2d
1121 (2003).
A
The plaintiff’s primary contention on appeal is that
the newly constructed seawall on his property was not
built waterward of the ‘‘ ‘high tide line’ ’’ as defined by
§ 22a-359 (c). At the outset, we note that, even if we
were to assume that all of the plaintiff’s contentions
regarding the location of the high tide line and the
location of his seawall are correct, this very evidence
appears to place a portion of the seawall waterward of
the high tide line. In his application to repair the existing
seawall, work that he acknowledged would occur
waterward of the high tide line, the plaintiff indicated
that the southern edge of the existing seawall met the
high tide line of 5.7 feet. The new seawall constructed
by the plaintiff, as indicated by the plaintiff’s subsequent
surveys and his contractor’s testimony, also meets the
existing seawall at its southern edge and slopes land-
ward more gradually than the high tide line depicted
in the surveys. Thus, as all of the ‘‘as-built’’ surveys
presented by the plaintiff indicate, a length of seawall
of at least approximately twenty feet lies seaward of
the high tide line claimed by the plaintiff.18 We therefore
find substantial evidence, even in the plaintiff’s own
submissions, that a portion of the seawall was con-
structed waterward of the high tide line.
Further demonstrating that at least portions of the
seawall lie waterward of the high tide line, the depart-
ment has provided testimony and photographic and
video evidence, obtained from multiple site visits, not
only of debris and plant matter lodged in the seawall,
but also of seawater coming into direct contact with
the seawall. Because these facts are consistent with the
criteria deemed relevant under § 22a-359, these facts
objectively demonstrate that portions of the new sea-
wall are waterward of the high tide line. See General
Statutes § 22a-359 (c) (‘‘‘[H]igh tide line’ means a line
or mark left upon tide flats, beaches, or along shore
objects that indicates the intersection of the land with
the water’s surface at the maximum height reached by
a rising tide. The mark may be determined by [1] a line
of oil or scum along shore objects, [2] a more or less
continuous deposit of fine shell or debris on the fore-
shore or berm, [3] physical markings or characteristics,
vegetation lines, tidal gauge, or [4] by any other suitable
means delineating the general height reached by a ris-
ing tide.’’).
In response to this evidence, the plaintiff makes two
objections, which we consider in turn. First, the plaintiff
claims that the visual observations of department offi-
cials, which were made at several discrete moments
in time, lack sufficient context to provide substantial
evidence of the location of the high tide line, particularly
in the face of competing long-term statistical data pre-
sented by the plaintiff. We agree with the plaintiff that
the observed height of the water at any given moment
is not sufficient to determine ‘‘the maximum height
reached by a rising tide’’; General Statutes § 22a-359 (c);
but the plaintiff fails to appreciate that the uncertainty
operates only in one direction: the maximum height of
the water might always be higher than what is observed,
but it must be at least as high as what is observed under
nonextreme weather conditions.19
By its plain meaning, the term ‘‘high tide line’’ as used
in § 22a-359 refers to the highest point at which the
water’s surface intersects with the land over the course
of the entire yearly tidal cycle, excluding only the
extraordinary conditions created by a hurricane or
other intense storm. The definition expressly extends
the line landward to include locations that come into
contact with the ocean only during the single highest
tide of the year. Further, the provision’s explicit exclu-
sion of intense storms from the calculation belies any
suggestion that water heights associated with more
ordinary meteorologically influenced variability are
also implicitly excluded. From this definition we draw
the inescapable inference that if, absent intense storm
activity, the water level at high tide ever reaches a given
location, that location is necessarily waterward of the
high tide line as defined by § 22a-359 (c). The photo-
graphic and video evidence presented by the depart-
ment provides sufficient context to show that no
hurricane or other intense storm was responsible for
the water levels observed on those site visits. Because
the plaintiff’s argument is predicated on the improper
assumption that ordinary meteorological variations that
affect water level are not excluded from the statutory
definition of the high tide line, his argument that the
department’s observations cannot constitute substan-
tial evidence similarly fails.
Second, the plaintiff asserts that changes over time
have altered the elevation of the land at which the
seawall was built and that these changes call into ques-
tion the probative value of the department’s observa-
tions of water coming into contact with the seawall.
Although the plaintiff’s own submissions similarly indi-
cate that seawater comes into contact with the sea-
wall—indeed, as-built surveys submitted by the plaintiff
show approximately seventy to ninety feet of the sea-
wall waterward of even the high tide line claimed by
the plaintiff—he contends that the seawall was in fact
built outside of the department’s jurisdiction and that
it was not until the plaintiff undertook action at the
direction of the department that water ever reached
the seawall.
The record reveals the following evidence proffered
by the plaintiff with respect to this issue. According to
testimony by the plaintiff, Jeff Westermeyer, a depart-
ment official, visited the plaintiff’s property approxi-
mately one month prior to his issuance of the notice
of violation. Westermeyer called the plaintiff following
that visit and informed him that some large boulders
that had been placed in front of the seawall were clearly
waterward of the high tide line and would have to be
removed. The plaintiff then instructed his contractor to
remove the boulders. Following this removal of material
and some storm activity, the plaintiff claims, the topog-
raphy of the land in front of the seawall shifted, allowing
water to come into contact with the seawall. This con-
tention is supported by the testimony of the plaintiff’s
contractor that water did not ever touch the seawall
during construction, but that, after the removal of the
boulders and the subsequent storm activity, water did
begin to touch the seawall when the project was nearly
complete. The plaintiff’s surveyor, D’Andrea, also sub-
mitted surveys purporting to show that shifting topogra-
phy waterward of the seawall was responsible for the
elevation changes claimed by the plaintiff.
We agree with the plaintiff that a structure originally
built outside of the department’s jurisdiction would not
become subject to a removal order simply because shift-
ing topography brought the structure waterward of the
high tide line;20 however, the hearing officer was free
to properly conclude that such is not the case here.
Photographic evidence presented by the department
demonstrates that water and debris could be seen up
against the seawall even during the relatively early
stages of its construction, prior to the claimed disrup-
tion of the land in front of the seawall. This photo-
graphic evidence is consistent with the plaintiff’s
survey, taken while the seawall was being constructed,
that shows a portion of the seawall waterward even of
the high tide line marked on that survey. These facts
alone are sufficient to render the plaintiff’s theory
regarding the shifting topography in front of the seawall
irrelevant to the question of whether a portion of the
seawall was built waterward of the high tide line. More-
over, in light of the evidence provided by the depart-
ment consistently showing water touching the seawall,
the hearing officer was free to—and did—reject the
plaintiff’s evidence of topographic shifts as uncon-
vincing.
To the extent that the developments surrounding the
plaintiff’s placement and subsequent removal of boul-
ders waterward of the high tide line are relevant, they
are only to exemplify why a regulatory permitting pro-
cess provides necessary environmental safeguards. As
the plaintiff’s contractor acknowledged, in removing
the offending boulders with an excavator bucket, which
he described as ‘‘not dentistry,’’ he displaced preex-
isting material on the shoreline. When asked whether he
could state with precision how much shoreline material
was moved, he replied, ‘‘[n]o precision, I can’t tell you.’’
By contrast, the notice of violation, issued several
weeks after the plaintiff claimed he had the boulders
removed, specifically instructed the plaintiff to submit
‘‘a plan for review and approval to remove the unautho-
rized stone seawall and restore the pre-existing vege-
tated bluff . . . .’’ Had the plaintiff’s project complied
with planning and review requirements at any point, he
would not have proceeded in such a destructive and
incautious manner.
B
The plaintiff also claims that the administrative hear-
ing officer improperly rejected the expert testimony he
presented regarding the location of the high tide line,
when the department presented no expert testimony
to conclusively establish that fact. The plaintiff specifi-
cally contends that, in order to determine the depart-
ment’s jurisdiction, there first must be a determination
of the high tide line, which is a technically complex
matter requiring expert evidence, and then that line
must be related to the location of the seawall. Only
when supported by such technical determinations,
according to the plaintiff, would visual observations of
physical evidence, such as pools of water and tidal
vegetation on the seawall, be relevant. We disagree.
The plaintiff’s argument originates from a mistaken
premise: the critical question in the present case is not,
as the plaintiff suggests, ‘‘where is the high tide line?’’
but, rather, ‘‘was this seawall constructed waterward
of the high tide line?’’ In this case, the numerous photo-
graphs showing direct evidence of water coming into
contact with the seawall and the multitude of surveys
of the plaintiff’s property consistently showing at least
part of the seawall waterward of even the 5.7 foot eleva-
tion claimed by the plaintiff to be the high tide line
provide more than sufficient nontechnical evidence to
determine that the seawall lies waterward of the high
tide line.
We recognize that, although the statutorily approved
indicators of the high tide line—including oil or scum
along shore objects, more or less continuous deposits
of fine shell or debris, physical markings or characteris-
tics, vegetation lines and tidal gauge—do not necessar-
ily require specialized expertise for determination, in
some cases technical sophistication may be required to
evaluate conflicting evidence regarding the ambiguous
implications of these indicators, particularly when it is
not possible directly to observe that water comes into
contact with a given spot. Had the plaintiff’s seawall
been constructed ten feet landward of the existing sea-
wall, as proposed in the plans submitted to the board,
we would perhaps be faced with such a hard case. In
the case of the seawall as actually built, we plainly are
not. Thus, although the parties in this case presented
conflicting evidence, some of which was technical in
nature, regarding the presence of tidal vegetation at the
location where the seawall was built and regarding the
reliability of several tidal measurements offered by the
department indicating a high tide line well above 5.7
feet, the hearing officer did not need to rely on such
evidence t