Full Opinion

NO. 12-25-00272-CV IN THE COURT OF APPEALS TWELFTH COURT OF APPEALS DISTRICT TYLER, TEXAS GREENVILLE INDEPENDENT § APPEAL FROM THE 196TH SCHOOL DISTRICT, APPELLANT V. § JUDICIAL DISTRICT COURT TEXAS ASSOCIATION OF SCHOOL BOARDS RISK MANAGEMENT FUND, § HUNT COUNTY, TEXAS APPELLEE MEMORANDUM OPINION Greenville Independent School District (the District) appeals the trial court’s partial summary judgment and final judgment rendered in favor of Appellee Texas Association of School Boards Risk Management Fund (the Fund). 1 In two issues, the District argues that the trial court abused its discretion by excluding all evidence of damages and erred in granting the Fund’s traditional motion for partial summary judgment. We affirm. 1 This case was transferred to this Court from the Fifth Court of Appeals in Dallas, Texas, pursuant to a docket equalization order. See TEX. GOV’T CODE ANN. § 73.001. Accordingly, we must decide the case in accordance with the precedent of the transferor court under principles of stare decisis if our decision otherwise would be inconsistent with that court’s precedent. See TEX. R. APP. P. 41.3. BACKGROUND The District owns numerous buildings across numerous campuses located in Greenville, Hunt County, Texas. The District is organized under the laws governing public school districts and is treated as a political subdivision of the State of Texas. 2 The Fund “is a nonprofit, statewide administrative agency consisting of cooperating public school districts in Texas.” 3 The Fund offers self-funded property coverage plans to public school districts and other political subdivisions. The Fund is a shell entity that has no employees and does not conduct business on a daily basis; it consists solely of a nineteen-member, volunteer board that meets in Austin four times each year. It assigns all of its operations, including its claims-handling obligations, to a third-party service provider: the risk management division of the Texas Association of School Boards, Inc. (TASB). TASB assigns a separate, third-party vendor to conduct any claims investigations. In 2012, the District became a member of the Fund’s self-insurance risk pool when it executed the TASB Risk Management Fund Interlocal Participation Agreement with the Fund. The interlocal agreement allowed the District to participate in one or more of the Fund’s available programs, including property, liability, auto, workers’ compensation, and unemployment compensation coverage. During the 2018–2019 school year, the District participated in the Fund’s Property Coverage Agreement, which provided property coverage to the District’s buildings across its campuses. The Property Coverage Agreement included coverage for the District’s buildings against loss by hail, wind, and water damage. The Property Coverage Agreement provided that the Fund would “pay the amount of Direct Physical Loss . . . to Covered Property that is in excess of all applicable deductibles and within the limits of coverage shown in the [Contribution and Coverage Summary] or this Property Coverage Agreement.” The Contribution and Coverage Summary provided $220,490,430 of “Blanket Replacement Cost” Coverage for all District buildings. The District’s deductible for such perils was $250,000.00. The agreement also set forth, in pertinent part, as follows: 2 See Socorro Indep. Sch. Dist. v. Hamilton, 579 S.W.3d 831, 835 (Tex. App.–El Paso 2019, pet. denied). 3 See In re Tex. Ass’n of Sch. Bds., Inc., 169 S.W.3d 653, 655 (Tex. 2005) (orig. proceeding). The Fund has over 1,000 political subdivisions as its members, including Texas school districts, community colleges, and other governmental education organizations. The Fund is not an insurance company but rather, a self-insurance program of governmental units. 2 PART A GENERAL I. The TASB Risk Management Fund (Fund) provides coverage for risk of Direct Physical Loss to Covered Property as outlined in this Property Coverage Agreement. This coverage is contingent on full compliance with the provisions contained in this Property Coverage Agreement, Contribution and Coverage Summary (CCS), and any other participation documents or agreements between the Fund and the Fund Member II. This document is not a contract of insurance. The Fund is not an insurance company. Rather, this Coverage Agreement is an agreement between the Fund and the Fund Member to pay all covered Losses subject to all provisions, including the definitions, terms, conditions, exclusions, deductibles and limits of liability of this Coverage Agreement, and any other participation documents . . . . The Fund, in its sole discretion, shall determine to what extent, if any, coverage applies when a claim is reported to the Fund. III. The following bolded terms are defined and applicable throughout this entire Coverage Agreement: A. Direct Physical Loss (Loss) means sudden, unanticipated and unforeseen Damage or Aesthetic Impairment resulting from an Occurrence. B. Damage means physical harm to Covered Property that substantially reduces its ability to function. Damage does not include physical harm which does change the appearance of Covered Property but does not substantially reduce the service, usefulness, or utility of such Covered Property Final determination of the service, usefulness, or utility of Covered Property shall be at the sole discretion of the Fund. C. Aesthetic Impairment is not Damage but is physical harm that conspicuously and substantially disfeatures Covered Property within an easily observable public view. Final determination of Aesthetic Impairment shall be at the sole discretion of the Fund. D. Occurrence means any single incident or event; or, a series of related incidents or events resulting from the original Occurrence. However, an incident or event involving wind or hail that occurs during a continuous period of 72 hours shall be deemed a single Occurrence. .... PART B PROPERTY COVERAGE I. The Fund will pay for the amount of the Direct Physical Loss (Loss) to Covered Property that is in excess of all applicable deductibles and within the limits of coverage shown in the CCS or this Property Coverage Agreement. All applicable deductibles will be applied separately to each Occurrence. A. The Fund will pay only the Actual Cash Value (ACV) for the Covered Property subjected to Loss until repair or replacement is completed. ACV is computed by subtracting the depreciation of the Covered Property subjected to Loss from the actual replacement cost, using material of like kind and quality, of the Covered Property at the time of Loss. Repair or replacement must be completed within 365 days after the date the Loss was reported to the Fund, unless an extension is requested in writing by the Fund Member and granted by the Fund. The written request must be made within 365 days of the date the Loss was reported to the Fund. If repairs are not made within 365 days, or an extension is not granted, the ACV payment will be the full and final payment for the Loss. 3 Upon completion of repair or replacement, the Fund may pay an additional amount for replacement cost not to exceed the least of the following: 1. Limit(s) or sublimit(s) of liability under this Property Coverage Agreement or applicable CCS; 2. The actual and necessary cost to repair or replace the Covered Property subjected to Loss with material of like kind and quality and for the same use and occupancy of the premises; or 3. The amount actually and necessarily spent to repair or replace the Covered Property subjected to Loss. B. In no event will the Fund pay more than the actual cost incurred by the Fund Member to repair or replace the Covered Property subjected to Loss with material of like kind and quality, or the limits outlined in this Property Coverage Agreement and applicable CCS. .... PART F CONDITIONS I. Failure to comply with any or all of the terms, duties, conditions or requirements of this Property Coverage Agreement may result in a delay or denial of a claim or loss of coverage. II. This Property coverage will apply on the condition that the Fund Member gives the Fund notice of any Loss as soon as possible, but in no event more than 365 days from the date of the Occurrence. Because time is of the essence, the Fund Member agrees that this notice provision is a condition precedent to this coverage, that it is a substantial and material breach of this Coverage Agreement by the Fund Member to report any Loss more than 365 days from the date of the Occurrence, and that no coverage is available to the Fund Member if late reporting occurs. .... XI. The Fund or its designee agrees to administer all claims for which Fund Member has coverage after Fund Member provides timely written notice to the Fund. Fund Member hereby authorizes the Fund or its designee to act in all matters pertaining to handling of claims for which Fund Member has coverage pursuant to this agreement. Fund Member expressly agrees that the Fund has sole authority in all matters pertaining to the administration of claims and grants the Fund or its designee full decision-making authority in all matters. Fund Member further agrees to be fully cooperative in supplying any information reasonably requested by the Fund in the handling of claims. All decisions on individual claims shall be made by the Fund or its designee, including, without limitation, decisions concerning claim values, payment due on the claim, settlement, subrogation, litigation, or appeals. On June 19, 2019, a tornado passed through Greenville, Texas. The next day, the District reported to the Fund that the tornado caused damage to several campuses. 4 That same day, TASB 4 The report specified the damage known at the time as follows: Additional Incident Information: Travis/Sixth Grade Center: Awning blown down, roof facia torn from building, paneling on exterior building blown off, RTU blown over causing gas leak. L.P. Waters 4 assigned Capital Claims Service, Inc. to complete the inspections of the properties. On July 16, following its inspection of District Properties, Capital Claims sent the District notice that the total RCV of the damages was $249, 980.20, and because the District’s deductible exceeded the amount of damages, no payment would be issued on the claim. In April 2020, after the District, through a roofing consultant, notified TASB of damage to Greenville Middle School, TASB recommenced its claim investigation. It hired Polaris Forensics, Inc. to conduct an inspection. Thereafter, TASB determined that any damages still did not exceed the District’s deductible. In June 2020, the district, through the same roofing consultant, reported hail damage to the roof of Crockett Elementary School. TASB hired Caliber Engineering Group d/b/a Caliber Forensics to perform an inspection. Caliber determined that there was no hail damage attributable to the June 2019 storm. Subsequently, the District hired building consultant Forensic Building Sciences, Inc. (FBS) to perform an independent inspection and evaluation for damage of its properties attributable to the storm. FBS determined that the reasonable and necessary cost to repair the damage caused by the tornado was $19,935,172.65. 5 On May 7, 2021, the District filed the underlying suit against the Fund for breach of contract. By its suit, the District sought “actual damages” caused by the Fund’s alleged failure to comply with its contractual obligation to pay for covered damages to its buildings. During the course of proceedings, the Fund filed myriad motions, the primary focus of which were its arguments that the District was not entitled to recover ACV or RCV damages. It first filed a traditional motion for summary judgment, which was denied by a visiting judge. Subsequently, the Fund filed a partial, traditional motion for summary judgment, in which it argued that the District was not entitled to recover alleged RCV damages related to L.P. Waters Early Childhood Learning Center and Greenville High School due to its failure timely to repair or replace the alleged damage under the terms of the contract. The trial court granted this motion. 6 Elementary: Roof shingles blown off Houston Education Center: RTU blown over Lamar Elementary: Roof damage sustained on portable buildings, solar panels blown off of solar unit[.] The District alleges that it later spent approximately $4 Million to repair two roofing systems at L.P. Waters 5 and Greenville High School. 6 The Fund’s motion also included an argument for no-evidence summary judgment. The trial court’s order specifically references the traditional motion for summary judgment in its ruling but makes no ruling on the no- evidence motion. 5 Thereafter, the Fund filed motions in limine, in which it argued that the District should not be allowed to present evidence of its ACV or RCV damages. It also filed a motion pursuant to Texas Rules of Civil Procedure 166(g) and 248, in which it similarly argued that the District was not entitled to recover ACV or RCV damages. The District filed responses to these motions, and in response to the trial court’s request, both parties provided supplemental briefing on the Fund’s motions in limine related to the issue of admissibility 7 of the District’s evidence of ACV and RCV damages. On August 18, 2025, the day of trial, the trial court conducted a pre-trial hearing on what the District described to the court as “the issue of damages.” Following extensive arguments by the parties, the following exchange occurred: THE COURT: Okay. And finally let me ask you, Counsel, exactly what are you asking me for today, your top tier request, if you get everything you want? [District’s Counsel]: My top tier request, Your Honor, is to allow us to submit the damages to the jury that are the most recent price list, which is from, I believe, February of 2025. And that we be entitled to submit the damages on an RCV and an ACV basis for all of the schools, L.P. Waters and the high school where the repairs ‐‐ at least some of the repairs ‐‐ not all the repairs, again, Your Honor, but some of the repairs have been made ‐‐ as well as the other 13 campuses. And then the legal issue of RCV and ACV could be sorted out later. THE COURT: So post‐trial and/or on appeal? [The District’s Counsel]: Correct. THE COURT: Counsel, what are you asking me for? [The Fund’s Counsel]: Your Honor, we’re asking that you strike and exclude any evidence of ACV damages for all the reasons that we’ve briefed for you. They’re not contractually relevant. The prerequisite for entitlement to ACV have not been accomplished by plaintiff, et cetera. We would also ask that the Court exclude and strike any RCV damages for all the reasons that we’ve already briefed the Court, including that none of these ‐‐ none of the bases that support the idea of presenting to the jury either of these theories of damage are supported by pleadings or discovery in this case . . . . .... 7 We recognize that a ruling on a motion in limine is not a final ruling on the admissibility of evidence. See Tempo Tamers, Inc. v. Crow-Houston Four, Ltd., 715 S.W.2d 658, 662 (Tex. App.–Dallas 1986, writ ref’d n.r.e.). However, it is apparent from the record in this case, that despite the characterization of these motions, the parties understood that the trial court was considering the issue of ultimate admissibility or exclusion of the District’s ACV and RCV damages, and the trial court’s ruling at the hearing on these motions specified that the evidence was being excluded. See TEX. R. CIV. P. 71; In re J.Z.P., 484 S.W.3d 924, 924–25 (Tex. 2016) (court will look to substance of motion despite its caption or styling). The District made no objection to the finality of the trial court’s ruling as an exclusion of the evidence. 6 THE COURT: And, Counsel, again, just as to yours, so that I understand, I strike the ACV, I strike the RCV, what do I sign? [The Fund’s Counsel]: An order dismissing the case, Your Honor. .... THE COURT: All right. Y’all give me a few minutes. Thank you. [Recess] THE COURT: All right. Back on the record. Counsel, after review of your pleadings as well as taking into consideration your arguments, and my review again of the contract and the law, the Court grants the objections to the admission of RCV and ACV damages. I’m sorry, that is my firm belief under the law that that’s the appropriate ruling at this time. [The District’s Counsel]: No RCV or ACV? THE COURT: Correct. [The District’s Counsel]: Then obviously, Your Honor, there’s nothing to go forward on the case. THE COURT: Correct. And I’ll sign a judgment and you can start your appeals. Okay. [The District’s Counsel]: Thank you, Your Honor. [The Fund’s Counsel]: Thank you, Your Honor. On August 25, the trial court rendered a final judgment for the Fund, in which it stated, in pertinent part, as follows: On the 18th day of August 2025, at the commencement of trial, the Court held a hearing to address additional matters related to the parties’ proposed admissions of testimony and evidence. After further consideration of the parties’ respective pleadings, the contractual agreement at issue, Defendant’s pending Motion for rulings on matters of law under Texas Rule of Civil Procedure 248, and all responses and arguments of the parties, the Court found that, as a matter of contract law, the contractual provision at issue precludes submission of estimates of Actual Cash Value and Replacement Cost Value damages, and therefore, Plaintiff is precluded from presenting any evidence of its asserted damages underlying its claims against Defendant. This appeal followed. MOTION TO EXCLUDE EVIDENCE OF ACV AND RCV DAMAGES In its first issue, the District argues that the trial court abused its discretion by excluding all evidence of damages based on an erroneous construction of the parties’ agreement. 7 Standard of Review We review a pretrial motion to exclude evidence the same as a ruling on the admission of evidence. See Norfolk S. Ry. Co. v. Bailey, 92 S.W.3d 577, 583 (Tex. App.–Austin 2002, no pet.) (“[a] ruling on a pretrial motion to exclude evidence . . . can be a ruling on the admission of evidence). Rulings on the admission or exclusion of evidence are committed to the trial court’s sound discretion. City of Brownsville v. Alvarado, 897 S.W.2d 750, 753 (Tex. 1995); Beck v. Law Offices of Edwin J. (Ted) Terry, Jr., P.C., 284 S.W.3d 416, 442 (Tex. App.–Austin 2009, no pet.). A trial court abuses its discretion if it rules without regard for any guiding rules or principles. Beck, 897 S.W.3d at 442. We uphold the trial court’s evidentiary ruling if there is any legitimate basis for the ruling. See Owens–Corning Fiberglas Corp. v. Malone, 972 S.W.2d 35, 43 (Tex. 1998). In other words, a trial court does not abuse its discretion by admitting or excluding evidence if it reaches the right result for the wrong reason. See Beck, 284 S.W.3d at 442. Furthermore, for the exclusion of evidence to constitute reversible error, the complaining party must show: (1) that the trial court committed error; and (2) that the error was reasonably calculated to cause and probably did cause rendition of an improper judgment. McCraw v. Maris, 828 S.W.2d 756, 757 (Tex. 1992); Beck, 284 S.W.3d at 442. To the extent the issue of admissibility turns on the question of contractual interpretation, such interpretation is a question of law we review de novo using well- settled, contract-construction principles. See URI, Inc. v. Kleberg Cnty., 543 S.W.3d 755, 763 (Tex. 2018). Scope of the Trial Court’s Ruling The trial court’s consideration of and ultimate ruling on the Fund’s motion to exclude constitutes the culmination of several motions, others of which sought to exclude all or part of the same evidence. For instance, the trial court’s order granting the Fund’s traditional, partial motion for summary judgment ordered that the District’s claims for additional self-insurance benefits based on purported actual costs to repair or replace the roofs of Greenville High School and L.P. Waters be dismissed with prejudice based on the Fund’s argument that those repairs were not completed timely under the terms of the contract, and, thus, the District was not entitled to recover those RCV damages. The Fund made the same argument in its “Limine briefing” requested by the trial court prior to the hearing at issue, though in so doing, it referred to the trial court’s partial summary judgment ruling. In its responsive briefing to the trial court, the District, among other things, (1) argued that it should be allowed to introduce evidence of its RCV and ACV damages to 8 the thirteen campuses at issue in the lawsuit, (2) accused the Fund of ignoring the trial court’s March 2025 order denying the Fund’s motion for summary judgment, and (3) sought to revisit the trial court’s partial motion for summary judgment rendered for the District, which it contended is contrary to the trial court’s March 2025 summary-judgment ruling. Generally, a trial court has plenary jurisdiction to reconsider its interlocutory rulings and retains that jurisdiction until a final judgment or order is entered in the cause and the judgment or order becomes final. See Fruehauf Corp. v. Carrillo, 848 S.W.2d 83, 84 (Tex. 1993); Esty v. Beal Bank S.S.B., 298 S.W.3d 280, 295 (Tex. App.–Dallas 2009, no pet.) (court may reconsider its rulings at any time before its plenary power expires); see also Bellamy v. Allegiance Benefit Plan Mgmt., Inc., 696 S.W.3d 751, 761 (Tex. App.–Eastland 2024, no pet.). In this case, based on the underlying arguments in the parties’ briefs, their statements to the trial court at the hearing, 8 and the trial court’s broad ruling excluding any evidence of ACV or RCV damages, we conclude that the trial court’s ruling included a reconsideration of its order granting traditional, partial summary judgment for the Fund. See Carrillo, 848 S.W.2d at 84. Discussion To preserve error concerning the exclusion of evidence, the complaining party must actually offer the evidence and secure an adverse ruling from the court. Bobbora v. Unitrin Ins. Services, 255 S.W.3d 331, 334 (Tex. App.–Dallas 2008, no pet.); see Fletcher v. Minn. Min. & Mfg. Co., 57 S.W.3d 602, 607 (Tex. App.-Houston [1st Dist.] 2001, pet. denied). While the reviewing court may be able to discern from the record the nature of the evidence and the propriety of the trial court’s ruling, without an offer of proof, we never can determine whether exclusion of the evidence was harmful. Bobbora, 255 S.W.3d at 335. Thus, when evidence is excluded by the trial court, whether as the result of a pre-trial motion or during the course of trial, the proponent of the evidence must preserve the evidence in the record in order to complain of the exclusion on appeal. See id. (requiring offer of proof or bill of exception to preserve evidence following trial court’s pre-trial exclusion of expert testimony). An offer of proof preserves error for appeal if: (1) it is made before the court, the court reporter, and opposing counsel, outside the presence of the jury; (2) it is preserved in the reporter’s record; and (3) it is made before the charge is read to 8 When the trial court asked the District what damages evidence it wanted admitted, the District specifically stated it wanted ACV and RCV damages “for all of the schools, [including ]L.P. Waters and the high school.” RCV damages for these two schools were the subject of the trial court’s partial, summary-judgment order. 9 the jury. Id. When no offer of proof is made before the trial court, the party must introduce the excluded testimony into the record by a formal bill of exception. Id. (citing Sw. Country Enters., Inc. v. Lucky Lady Oil Co., 991 S.W.2d 490, 494–95 (Tex. App.–Fort Worth 1999, pet. denied)). A formal bill of exception must be presented to the trial court for its approval, and, if the parties agree to the contents of the bill, the trial court must sign the bill and file it with the trial court clerk. Bobbora, 255 S.W.3d at 335; Bryan v. Watumull, 230 S.W.3d 503, 516 (Tex. App.–Dallas 2007, pet. denied). Failure to demonstrate the substance of the excluded evidence results in waiver. Bobbora, 255 S.W.3d at 335; Self v. W. Cedar Creek Mun. Util. Dist., No. 12-20-00082-CV, 2021 WL 56213, at *2 (Tex. App.–Tyler Jan. 6, 2021, no pet.) (mem. op.). In the instant case, the District did not make an offer of proof or a formal bill of exception related to the trial court’s exclusion of its ACV and RCV damages evidence. And despite the fact that such evidence was filed with the trial court and referenced in pretrial motions, “filing a document with the trial court is not a sufficient offer of proof.” 9 Bobbora, 255 S.W.3d at 335. Therefore, we hold that without an offer of proof, the District failed to preserve error for review. See TEX. R. EVID. 103; TEX. R. APP. P. 33.1(a)(1)(B); Bobbora, 255 S.W.3d at 335. The District’s first issue is overruled. PARTIAL SUMMARY JUDGMENT 10 In its second issue, the District argues that the trial court erred in granting partial summary judgment in the Fund’s favor. Standard of Review We review the trial court’s summary-judgment ruling de novo. See Zive v. Sandberg, 644 S.W.3d 169, 173 (Tex. 2022); Joe v. Two Thirty Nine Joint Venture, 145 S.W.3d 150, 156 (Tex. 9 Indeed, it is axiomatic that the fact that a party has evidence does not ultimately require that party to seek to introduce such evidence. Here, the trial court specifically asked the District what evidence it wanted to admit, and the District responded it wanted to submit the damages as of February 2025 on an RCV and an ACV basis. It did not suggest, as a fallback position, that it also wanted to submit evidence of 2019 ACV valuation, even though that was part of the evidence previously filed with the trial court. Because the contract states that “ACV is computed by subtracting the depreciation of the Covered Property subjected to Loss from the actual replacement cost, using material of like kind and quality, of the Covered Property at the time of Loss,” it is reasonable to conclude that only the 2019 valuation is relevant to that calculation. This underscores the critical importance that an offer of proof or formal bill of exception plays in facilitating appellate review, and an appellate court should not have to resort to supposition in the performance of its analysis. 10 Although we concluded that the trial court’s partial summary judgment order was reconsidered in the trial court’s ruling excluding all ACV and RCV damages evidence, we address the District’s second issue out of an abundance of caution. 10 2004). Under this standard, we view “the evidence in the light most favorable to the non-movant, crediting evidence favorable to the non-movant if reasonable jurors could, and disregarding contrary evidence unless reasonable jurors could not.” Zive, 644 S.W.3d at 173. “A party moving for traditional summary judgment must prove that no genuine issue of material fact exists and it is entitled to judgment as a matter of law.” Wal-Mart Stores, Inc. v. Xerox State & Loc. Sols., Inc., 663 S.W.3d 569, 576 (Tex. 2023); see TEX. R. CIV. P. 166a(c). 11 We are not required to ascertain the credibility of affiants or to determine the weight of evidence in the affidavits, depositions, exhibits, and other summary judgment proof. See Gulbenkian v. Penn, 252 S.W.2d 929, 932 (Tex. 1952); Palestine Herald-Press Co. v. Zimmer, 257 S.W.3d 504, 508 (Tex. App.–Tyler 2008, pet. denied). Further, all theories in support of or in opposition to a motion for summary judgment must be presented in writing to the trial court. See TEX. R. CIV. P. 166a(c). If the trial court’s order granting summary judgment does not specify the grounds relied on for its ruling, we will affirm it if any of the theories advanced are meritorious. State Farm Fire & Cas. Co. v. S.S., 858 S.W.2d 374, 380 (Tex. 1993). Governing Law In construing a written contract, the primary concern of the court is to ascertain the true intentions of the parties as expressed in the instrument. Coker v. Coker, 650 S.W.2d 391, 393 (Tex. 1983); see also Nat’l Union Fire Ins. Co. of Pittsburgh, PA v. CBI Indus., Inc., 907 S.W.2d 517, 520 (Tex. 1995). To achieve this objective, we must examine and consider the entire writing in an effort to harmonize and give effect to all the provisions of the contract so that none will be rendered meaningless. See Coker, 650 S.W.2d at 393; CBI Indus., 907 S.W.2d at 520. No single provision taken alone will be given controlling effect; rather, all the provisions must be considered with reference to the whole instrument. See Coker, 650 S.W.2d at 393; CBI Indus., 907 S.W.2d at 520; Myers v. Gulf Coast Minerals Mgmt. Corp., 361 S.W.2d 193, 196 (Tex. 1962). If the written instrument is so worded that it can be given a certain or definite legal meaning or interpretation, then it is not ambiguous, and the court will construe the contract as a matter of 11 The Texas Supreme Court recently amended Texas Rule of Civil Procedure 166a, but “[o]ther than the deadline changes, Rule 166a’s rewrite is not intended to substantively change the law.” TEX. R. CIV. P. 166a cmt. to 2026 change. The amendments renumbered the rule’s provisions. See 89 Tex. B.J. 286, 289–92 (2026). Because the amendments apply only to summary-judgment motions filed on or after March 1, 2026, and the filing of the Fund’s partial summary-judgment motion preceded the amendments, we refer to the provisions of Rule 166a in effect at the time of filing. See id. at 286. 11 law. Coker, 361 S.W.2d at 393. The interpretation of an unambiguous contract is a question of law, which we review de novo. See MCI Telecomm. Corp. v. Tex. Utils. Elec. Co., 995 S.W.2d 647, 650 (Tex. 1999). Ambiguity does not arise simply because the parties advance conflicting interpretations of the contract; rather, for an ambiguity to exist, both interpretations must be reasonable. Lopez v. Munoz, Hockema & Reed, L.L.P., 22 S.W.3d 857, 861 (Tex. 2000). In interpreting a contract, we must presume that the parties thereto intended every clause to have some effect; therefore, we consider each part of the document with every other part of the document so that the effect and meaning of one part on any other part may be determined. See Birnbaum v. SWEPI LP, 48 S.W.3d 254, 257 (Tex. App.–San Antonio 2001, pet. denied). Moreover, we give terms their plain, ordinary, and generally accepted meaning unless the instrument shows that the parties used such terms in a technical or different sense. Id. Finally, we enforce an unambiguous agreement as written. Id. We are not permitted to rewrite an agreement to mean something it did not. Id. We cannot change the contract simply because we or one of the parties comes to dislike its provisions or thinks that something else is needed in it. Id. Parties to a contract are masters of their own choices and are entitled to select what terms and provisions to include in or omit from a contract. Id. Discussion Our determination of the District’s second issue relates to the following provisions of the contract: The Fund will pay only the Actual Cash Value (ACV) for the Covered Property subjected to Loss until repair or replacement is completed. ACV is computed by subtracting the depreciation of the Covered Property subjected to Loss from the actual replacement cost, using material of like kind and quality, of the Covered Property at the time of Loss. Repair or replacement must be completed within 365 days after the date the Loss was reported to the Fund, unless an extension is requested in writing by the Fund Member and granted by the Fund. The written request must be made within 365 days of the date the Loss was reported to the Fund. If repairs are not made within 365 days, or an extension is not granted, the ACV payment will be the full and final payment for the Loss . . . . In its partial motion for summary judgment, the Fund argued, in pertinent part, that the District was not entitled to recover RCV damages related to Greenville High School or L.P. Waters school because the repairs to these campuses were not completed timely under the terms of the contract. In response, the District argued that, under the terms of the agreement, the timeline to make repairs did not commence until the Fund made the initial ACV payment. 12 While neither party argues that the agreement is ambiguous, each interprets the applicable language differently, and neither concedes that its interpretation is any less reasonable than the other party’s interpretation of the same. Based on our reading of the agreement, we conclude that the language in the aforementioned section is not ambiguous. See Coker, 361 S.W.2d at 393. The contract sets forth, in no uncertain terms, that repairs must be completed within 365 days after the date the loss was reported to the Fund, unless an extension is requested in writing by the Fund Member and granted by the Fund, and if repairs are not made within 365 days, or an extension is not granted, the ACV payment will be the full and final payment for the loss. In other words, if repairs are not completed timely, the District is not entitled to payment of RCV damages. Despite the District’s contention, no language in this agreement reasonably can be interpreted as the 365- day timeline’s being triggered by the payment of ACV damages. The occurrence at issue took place on June 19, 2019. Since there is no evidence that an extension was requested, under the express terms of the contract, the latest date the District could give notice of damages under the contract would be June 19, 2020, and, thus, the latest date by which repairs could be completed thereunder would be June 19, 2021. Since there is no dispute that the repairs on the two campuses at issue were not completed by this date, we conclude that the District was not entitled to recover RCV damages under the terms of the contract. Nonetheless, the District argued in its response to the Fund’s motion that by its failure to adjust the claim properly, which resulted in the claim’s being undervalued, the Fund committed a prior, material breach, which relieved the District of its obligation to perform. When one party to a contract commits a material breach of that contract, the other party is discharged or excused from any obligation to perform. Compass Bank v. MFP Fin. Services, Inc., 152 S.W.3d 844, 852 (Tex. App.–Dallas 2005, pet. denied); see Mustang Pipeline Co. v. Driver Pipeline Co., 134 S.W.3d 195, 196 (Tex. 2004) (per curiam). But even assuming arguendo that the Fund breached its obligation to the District in the manner in which it assessed the amount owed on the claim, the outcome would not differ. Here, such breach, if any, did not affect the enforceability of the provision that required the District to complete repairs timely. See, e.g., James Constr. Grp., LLC v. Westlake Chem. Corp., 650 S.W.3d 392, 415 (Tex. 2022). Indeed, based upon our review of the contract as a whole, the parties’ unambiguous intent was that the District was under no obligation to repair the property under the terms of the agreement. Instead, its decision to do so merely was a condition precedent 13 to its entitlement to RCV damages. 12 See Criswell v. European Crossroads Shopping Ctr., Ltd., 792 S.W.2d 945, 948 (Tex. 1990) (whether contractual provision is covenant or condition precedent resolved by examining entire contract to determine parties’ intent). Accordingly, we conclude that any prior material breach by the Fund did not excuse the District’s failure to complete its repairs timely. Therefore, we hold that the trial court did not err in granting partial summary judgment against the District with regard to its recovery of RCV damages related to Greenville High School and L.P. Waters school because no genuine issue of material fact exists as to the District’s failure to complete repairs to these properties timely under the unambiguous language of the contract. The District’s second issue is overruled. DISPOSITION Having overruled the District’s first and second issues, we affirm the trial court’s judgment. BRIAN HOYLE Justice Opinion delivered November 10, 2026. Panel consisted of Worthen, C.J., Hoyle, J., and Davis, J. 12 While we recognize that conditions are disfavored under Texas law and the traditional, “conditional language” is not present, the unambiguous language of the contract simply does not obligate the D