Full Opinion

United States Tax Court T.C. Memo. 2026-118 INTERMOUNTAIN ELECTRONICS, INC., Petitioner v. COMMISSIONER OF INTERNAL REVENUE, Respondent __________ Docket No. 11019-19. Filed November 17, 2026. __________ Matthew S. Reddington, Robert G. Wonish II, Coby R. Leslie, John H. Dies, Jr., Janine M. Campanaro, and Jefferson H. Read, for petitioner. Christopher J. Richmond, Jonathan D. Walker, Bryant W. Smith, Daniel J. Kleid, and Inga C. Plucinski-Holbrook, for respondent. MEMORANDUM FINDINGS OF FACT AND OPINION BUCH, Judge: This case involves section 41 1 research credits claimed by Intermountain Electronics, Inc. (Intermountain), a corporation principally engaged in the business of manufacturing custom mining equipment. The Commissioner disallowed research credits claimed for 2012 through 2015 (years in issue). The disallowed credits relate to thousands of projects; however, we instructed the parties to present evidence with respect to a representative sample of those projects. The issue for decision is 1 Unless otherwise indicated, statutory references are to the Internal Revenue Code, Title 26 U.S.C. (I.R.C.), in effect at all relevant times, regulation references are to the Code of Federal Regulations, Title 26 (Treas. Reg.), in effect at all relevant times, and Rule references are to the Tax Court Rules of Practice and Procedure. All monetary amounts are shown in U.S. dollars and rounded to the nearest dollar. Served 11/17/26 2 [*2] whether these projects (and by extrapolation, the thousands of projects) qualify for section 41 credits. The parties put on evidence with respect to twelve of those projects. Most of those projects related to products designed and manufactured for delivery to Intermountain’s customers. As to those projects, the attempt to allocate costs between routine manufacturing and research was conducted retrospectively, and the attempted allocation proved unreliable. Two projects, however, were designs of new products, and the parties agree that they constitute qualified research. Thus, of the twelve projects presented at trial, petitioner met its burden to establish that two of its projects qualified for the research credit. Regarding those two projects, petitioner provided credible substantiation of the amount to be taken into account to calculate the credit. FINDINGS OF FACT I. Background Intermountain is a corporation with its principal place of business in Price, Utah. Intermountain is principally a manufacturer of custom electrical distribution and control equipment for underground and surface mining, among other applications. Intermountain’s story begins with a tragedy. John Houston received a degree in electrical automation technology in the early 1970s. He put his degree to use working as an electrician on both surface and underground mining equipment. A decade into his career, he found himself working for Emery Mining Co. Shortly before Christmas in 1984, 27 people died as a result of a mine fire at the mine where Mr. Houston worked. The following month, Mr. Houston founded Intermountain in Price, Utah, which initially focused on repairing and modifying electrical components used in the mining industry. Intermountain started out repairing electrical equipment for mining operations. Tom Akers joined the company in the late nineties as a partial owner, leading Intermountain to focus on developing the business. Because of its growth in the mining industry, Intermountain established new facilities in Ohio and Illinois, near the Ohio Valley and the Illinois River Basin coal regions. Over time, Intermountain began performing more complex services and designing custom products to meet the demands of the 3 [*3] mining industry. However, because of the cyclical nature of the coal mining industry, Intermountain needed to diversify. Intermountain opened its Denver, Colorado location to expand into the oil and gas industry. By the early 2000s, Intermountain expanded into design and manufacturing control systems and mine-related power distribution equipment. Intermountain created custom electrical equipment, including control buildings, switchgears, transformers, variable frequency drive packages or controller packages, and skids. A transformer, also called a power center or load center, transforms voltage and provides circuits to operate individual pieces of underground equipment. A variable frequency drive (VFD) changes the frequency of the power signal of an AC motor to change the speed at which it operates. A skid is the structure at the bottom of a product on which an enclosure, outdoor equipment, or pumps rest. Intermountain also performed design and manufacturing work for electrical systems. To this day, Intermountain focuses on creating equipment that distributes power. II. Intermountain’s Project Design Process for Custom Electrical Equipment and Custom Transformers A. Phase 1 – Initial Design For custom electrical equipment and transformers, Intermountain’s work begins with a customer need or request. Intermountain’s business comes from its existing customer base, word of mouth referrals, and competitive bidding. Customers choose Intermountain for its technical expertise and ability to craft custom solutions for customer problems. For Intermountain’s custom electrical equipment manufacturing, the customer typically comes to Intermountain with a problem, and Intermountain develops a product to solve it. Intermountain’s customers make requests of varying levels of complexity. Some customers provide drawings to Intermountain with the expectation that it would build their designs. Other customers provide a list of needs or specifications from which Intermountain can design and build a product. Intermountain declines projects when it is not confident that it can design and build a product that meets the customer’s needs. 4 [*4] Intermountain works with its customers to create a list of specifications. To develop project specifications, Intermountain must consider many technical and environmental complications. Electrical installations in an underground mine present vastly different environmental challenges when compared to more typical above-ground electrical installations. Intermountain distinguishes itself from its competition by placing engineering staff, as opposed to salespeople, as the first point of contact for its customers. The engineering staff have the necessary expertise to identify the customer’s concerns and technical requirements and to propose a design to address those concerns and requirements. Scheduling considerations are at the forefront during the initial design stage. If Intermountain cannot meet a customer’s deadline, they let the customer know ahead of time. Intermountain has an incentive to schedule things accurately because missing a deadline can cause residual delays for other projects. Intermountain enters into fixed-fee contracts with its customers. Intermountain provides a preliminary design as part of its quote to a customer for a contract. This preliminary design shows the customer the major components of the product and explains their functions. Intermountain discusses the design with its customer to ensure the project meets the customer’s needs and specifications. On the basis of this design, Intermountain provides a quote to the customer. After receiving the quote, a customer may issue a purchase order. Intermountain then typically issues a sales order acknowledgment, which includes an estimated date of completion for the product in that document. Of course, Intermountain prices projects so as to profit from them. Intermountain seeks to accurately price projects to ensure the costs of labor and materials do not exceed the quoted price. To do this, Intermountain relies on specialized staff members who understand the engineering involved. If a design must change after the initial quote, the party that precipitated the change bears the cost. B. Phases 2 and 3: Mechanical and Electrical Design and Layout From the original designs, Intermountain creates the mechanical and electrical designs. These designs serve as instructions for the 5 [*5] production team. The processes for designing the mechanical and electrical layouts occur simultaneously. After receiving the order, the assigned electrical engineer begins identifying the relevant parts to create the design. The electrical engineer prepares a series of electrical drawings and a list of necessary components. The electrical engineer determines whether certain products would function as intended and, if not, finds a suitable alternative. After the design is complete and a bill of materials is created, the project proceeds to a mechanical engineer under the direction of the project manager. Mechanical engineering consists of drawing the product in 3–D and ensuring it complies with various requirements such as the relevant codes. Intermountain will often include in its designs equipment that it obtains from third parties. Intermountain relies on drawings from manufacturers or vendors to determine necessary information for the equipment. This information includes the equipment’s weight, dimensions, how certain parts are mounted, its center of gravity, and how power goes either into or out of the equipment. The mechanical engineer uses this information along with the information from the electrical engineer. The mechanical engineer runs calculations on components such as the structural members of the project base frame to determine dead loads, live loads, and cable tray loads. 2 Creating the 3–D drawing involves sizing the structural members and locating and placing those members based on where the loads exist within the structure. When creating the drawing, the mechanical engineers also factor in information collected from weather and seismic data. This information assists Intermountain in calculating the appropriate building supportive structures. Intermountain faces unique challenges in creating the electrical designs for applications in mines. Electricity travelling through mines may be subject to voltage drops. Intermountain also needs to consider how power loads affect the system. Intermountain also encounters challenges in creating the mechanical design and layout. Intermountain needs to create products 2 Dead loads are the weight of the permanent elements of a building or structure. Live loads are the weight of intermittent variables occurring on the building or structure, including personnel walking across the floor or seasonal snow landing on top of a structure. And cable tray loads are the weight of the cable tray which is used to hold electrical cables inside equipment. 6 [*6] that withstand a variety of environmental factors, both above and below ground. Products situated above ground need to withstand weather conditions common to surface mines such as dusty river basins and deserts. Below ground, the products are placed in direct proximity with caustic materials such as soda ash, potash, and salts. Intermountain creates products that account for a variety of factors. One of those factors is the size constraints of an underground mine, which affect the entire product, including ventilation, cooling, and airflow. To address these constraints, Intermountain conducts computational fluid dynamics to ensure proper ventilation and circulation. Intermountain also needs to create equipment that can enter different kinds of mines through either tunnels or shafts. Occasionally, the equipment a customer requires has dimensions that, when the equipment is upright, exceed the length or width of the tunnel or shaft. Thus, installing the equipment requires that it be tilted in such a way that it will pass through the tunnel or shaft before reaching its ultimate installation destination. This requires special engineering to allow equipment that is intended to be installed upright to be tilted and rotated during the installation process. Intermountain also needs to ensure that equipment can withstand delivery across dirt roads and into mines. This requires mechanical specifications that can withstand a high degree of abuse. Finally, Intermountain needs to build equipment that can operate safely around hazardous or explosive gases. The equipment must be designed and built to contain any sparks within the equipment so as to avoid possible explosions. For example, equipment for use in the extraction of oil and gas contains systems to monitor levels of methane, propane, and other potentially dangerous gases. Despite these challenges, Intermountain is well equipped to face them. Intermountain maintains a standard parts library to use in designing its projects. Intermountain ensures that its projects are designed and built by experts who understand the products and applications. Intermountain assigns projects according to each project manager’s particular expertise. Intermountain uses specialized software to design its projects to meet the structural stresses to which they will be exposed. An engineer enters project information into the application, which calculates the amounts of bending stress, deflection, and shear stress a part will encounter. This permits engineers to determine whether a selected part 7 [*7] can withstand the anticipated stress. Engineers also need to calculate the centers of gravity of projects to determine pick points and determine the load and stress. To calculate heat loss, Intermountain’s engineers take information provided by vendors of various components and input them into a program to calculate heat loss. To ensure compliance with various code requirements, an Intermountain engineer inputs information into a computer program that will confirm whether a proposed design is in compliance. If possible, Intermountain relies on past designs to form the basis for new ones. Intermountain’s staff discusses all revisions to designs. Sometimes revisions are necessary because a vendor makes a change to a part used in a project. Some of Intermountain’s customers require Intermountain to seek its approval before revising a drawing, while others do not. Intermountain models its projects using 3–D drawing software. The software enables the engineers to rotate the model and review it from different angles and elevations. Intermountain’s engineers use the software to visualize the assembly of parts to see whether parts overlap or collide, to line up parts, and to check clearances. The software calculates an object’s center of gravity and accounts for the weight of the components. C. Phase 4: Pre-Production Review Before fabrication, every project undergoes an electrical review and a mechanical review. The electrical pre-production review consists of confirming the appropriateness of building materials and the electrical components. The mechanical pre-production review sometimes requires reworking a design. The manufacturing team works with the mechanical design team to identify any barriers to manufacturing the final product. At times, reworking a design takes anywhere from one day to two months, and Intermountain may have to rework significant portions of a design. Once the internal reviews and the reviews by the client are complete, Intermountain prepares construction drawings. D. Phase 5: Laser Cutting and Bending Intermountain works with heavy 10-gauge steel to create custom parts for its projects. It laser cuts steel to meet precise specifications. 8 [*8] Intermountain cannot buy precut steel that meets its needs and tolerances. E. Phase 6: Fabrication and Final Assembly The fabrication process includes construction, painting, piping, and skid construction. Individuals involved in the manufacturing process sometimes encounter issues and provide feedback or ideas on how to resolve an uncertainty in the project design. ā€œPaintingā€ is more than mere painting; the paint department ensures that the products have the necessary protective coatings to meet project requirements of the environment where the product will be installed. The piping department is responsible for custom welding. F. Phase 7: Testing and Quality Control Testing and quality control are separate departments. The testing department conducts functional testing to check for engineering or design flaws and to ensure the product functions as designed. Quality control evaluates the product to ensure that the already-functioning product meets Intermountain’s quality standards. Intermountain measures the functionality of the product using its Transformer Test Report. The results of the testing undertaken for custom transformers are published in the report. These tests check the resistance, termination, and density of transformer coils, the core steel, the system voltage, the functionality of the design, and Occupational Safety and Health Administration sound requirements. Although necessary and helpful, the testing does not allow Intermountain to simulate the environmental conditions at the ultimate installation site. A transformer consists of four components that are designed and fabricated in parallel: the insulation system, the coil winding, the core steel, and the clamping system. Most of the testing is done before the entire product is dipped in resin and baked. After the resin is applied, alterations to the transformer are impossible without breaking the steel and coils. Intermountain submerges coils in resin and puts them under pressure for several hours and bakes them before testing them again. After testing, the entire assembly is dipped in resin. A failed transformer can overheat, which can lead to catastrophic fires, injuries, and even death. 9 [*9] III. Intermountain’s Project Process for Proprietary Product Development In addition to building custom electrical equipment, Intermountain also develops specialized proprietary products. A. Phase 1: Product Development/Product Architecture The first phase of Intermountain’s proprietary product development is the development phase or project architecture phase. In the development phase Intermountain conceptualizes the product it intends to design and fabricate. At the outset of the project, Intermountain evaluates one or more alternatives regarding the appropriate design and architecture of the product. Intermountain undertakes a design process that involves forming hypotheses, testing them, and adjusting them as necessary. Intermountain also creates simulations to evaluate the feasibility of a conceptual design. After the completion of the initial concept design, the project manager sends a product specification sheet to Intermountain’s stakeholders. The sheet contains more detail regarding the proposed design and initial diagramming. B. Phase 2: First-Level Prototype Design The second phase of Intermountain’s product development process is to create a first-level prototype. To be able to review and test a first-level prototype, Intermountain uses software that tests all the inputs and outputs in the electronics and makes sure that all the electronics function properly. Once Intermountain has an initial design, it creates a schematic design for its first-level prototype. The 3–D modeling is completed by a mechanical engineer or draftsman with computer-aided design and drafting (CADD) software. Once completed, the drawing goes to an Intermountain employee, Dale Curtis, who oversees Intermountain’s internal research and development department. He works on all of Intermountain’s proprietary products. The design is then input into a circuit board design program to graphically design the circuit board. The 3–D modeling software resolves some but not all uncertainties surrounding product feasibility. The software does not tell 10 [*10] the designer whether the electrical componentry is going to interact appropriately or whether its initial electrical design is functional. Although Intermountain creates 3–D models for all the important components in a product, other elements of the product (such as wiring) are often excluded from the model. Mechanical design has a direct effect on the electrical design of a product. If spaces are too narrow, electrical components can create an electric arc. The Mine Safety and Health Administration (MSHA) of the U.S. Department of Labor has strict safety standards regarding the level at which electric currents may leak into one another, to avoid the creation of hazardous conditions. Once the 3–D model is approved, Intermountain converts that model from a 3–D perspective to a 2–D drawing. The 2–D drawings are then prepared for approval and phase two prototype fabrication. C. Phase 3: Second-Level Prototype Fabrication The next phase is what Intermountain refers to as the ā€œP2 Development Phase.ā€ In the development of the second-level prototype, Intermountain evaluates all the data that it gathered from the design and review of the first-level prototype to make all the necessary design modifications. Before Intermountain begins fabrication of the second- level prototype, they run calculations and use computer simulations on the circuits to test the engineering. Intermountain tests the second-level prototype using an ā€œalpha release code,ā€ which is testing software with all relevant functions and features built into it. Throughout this phase, Intermountain thoroughly evaluates and tests the second-level prototype while also making improvements. Intermountain then fabricates the second-level prototypes, assembles them, tests them, and finds any mistakes in its design. The team sometimes repeats the process until the second-level prototype passes its final functional review and the team is ready to obtain approvals. D. Phase 4: Pre-Production Review The fourth phase of Intermountain’s product development design process is the Pre-Production and Approvals phase. This phase involves preparing the product for release. A product can take years to go from phase 1 to the pre-production phase. It is not uncommon for Intermountain to discover additional material failures in the product at 11 [*11] this phase, which would then require returning to the proverbial drawing board to improve the design. E. Final MSHA Approval Requirements Before Intermountain can introduce a newly designed product into the stream of commerce, MSHA must approve it. To meet MSHA requirements, Intermountain relies on simulations and its familiarity with MSHA requirements. IV. Financial Data Tracking During the years in issue, Intermountain used Enterprise Resource Planning (ERP) to track financial data by using a single system to account for every project, order, quote, and invoice that was generated. ERP maintained both contractor costs and supply expenditures. The system allowed Intermountain to track costs from when a product, component, or material was either purchased, received, or added to a job. Intermountain used an ERP system called Epicor to track and generate every project, order, quote, and invoice. Hourly employees did not enter time into Epicor before a project was released to the production floor. Engineers typically did not log their time in Epicor. Salaried employees did not have any time tracking requirements. V. alliantgroup Study For the years in issue, Intermountain hired alliantgroup, LP (alliantgroup), a tax consulting firm, to conduct a section 41 research credit study. Intermountain provided financial records and documentation to alliantgroup to substantiate and quantify the amounts of qualified research expenditures incurred for 2010 through 2015, inclusive. These financial records included the gross salaries of its employees. Intermountain provided alliantgroup with explanations for multiple projects. After reviewing the provided records, alliantgroup used a statistical sampling method to determine the amounts of Intermountain’s activities that might count as qualified research during the years in issue. Once the sample was drawn, alliantgroup conducted interviews with representatives of Intermountain. The people who were interviewed had experience overseeing a particular project or historical knowledge of a project. After estimating the amount of qualified research, alliantgroup quantified its findings in a calculation summary. 12 [*12] This summary included a chart summarizing the gross salaries of Intermountain’s employees and the qualifying research expenditures. The record does not contain a study for 2015; however, the corporate representative for alliantgroup testified that alliantgroup performed a study for that year. VI. Amended Returns and Audit Relying on the alliantgroup reports, Intermountain amended its 2012 through 2015 tax returns to claim research credits. Intermountain claimed the following credits or carryforwards for each year: Tax Year Research Credit Claimed 2012 $1,458,436 2013 1,526,866 2014 1,559,625 2015 1,118,811 The Commissioner selected Intermountain’s tax returns for 2012 through 2015 for examination. On April 19, 2019, the Commissioner issued a notice of deficiency to Intermountain, disallowing research credits and credit carryforwards, and determined the following deficiencies: Tax Year Deficiency 2012 $880,433 2013 1,051,499 2014 498,847 2015 873,332 Intermountain timely filed a Petition with this Court for redetermination of the deficiencies. 13 [*13] VII. Trial Projects During the years in issue, Intermountain generated expenses for thousands of projects for which they claimed research credits. Given the number of projects for which petitioner claimed research credits, the parties agreed to present at trial a sample of twelve research projects (trial projects). Our conclusions with respect to these trial projects are not binding as to the remaining research projects. Rather, it is the Court’s expectation that this Opinion will enable the parties to mutually resolve the credits for the remaining projects. See Phx. Design Grp., Inc. v. Commissioner, T.C. Memo. 2024-113, at *10–11. The parties each selected six projects for a total of twelve projects. These projects are individually labeled by Intermountain’s internal reference numbers: 20047X, 205662, 209564-1-1, 209873-1-1, 210464-1- 1, 210554-1-1, 208277-2-1, 024649-1-1, 206901-1-1, 69545, RD-0000, and RD-0009. In a stipulation of settled issues, the Commissioner noted that he does not stipulate the extrapolation of the results of the trial projects to all of petitioner’s projects during the years in issue. A. Project 20047X: Hillsboro Longwall Project 1. Longwall Mining In general, there are two kinds of underground mining: continuous and longwall mining. Continuous mining systems mine coal or other minerals by drilling straight into the rock with small machines. Conversely, longwall mining systems mine seams of coal or other minerals with a machine that passes in front of the coal and shaves it away layer by layer. The seam of coal a longwall system mines is called a longwall face. Longwall faces are generally the length of a city block and can range from 1,000 feet to a mile wide. A longwall mining system is highly mechanized. At the cutting edge is a ā€œshearer,ā€ which can include either one or two cutting heads studded with pegs, spikes, or blades, referred to as ā€œbits.ā€ Beneath the entire path of the shearer is a ā€œface conveyor,ā€ a conveyor belt that catches the coal that is sheared off the wall. The face conveyor transports the mined materials to a ā€œhead gateā€ where it falls onto a ā€œstage loader.ā€ A stage loader is another conveyor that is at 90 degrees to the face conveyor. A crushing device on the stage loader pulverizes the coal before it continues to the main line conveyor up to the surface. 14 [*14] Above the track of the shearer and conveyor belt are ceiling shields controlled by hydraulic power. The shields are numerous and set side by side along the coal block. The shields use large hydraulic rams to support the roof and prevent the roof from collapsing into the mining area. As the shearer passes the shield, it creates a void of unsupported ceiling. The shields must then reposition themselves to the newly exposed coal face. 2. Intermountain’s Experience with Longwall Mining Project 20047X, the Hillsboro Longwall project, was the first longwall mining system Intermountain produced. It was completed in 2012. The Hillsboro Longwall project included various subprojects. Although this was the first longwall mining system produced by Intermountain, it had experience working on longwall mining equipment before undertaking the Hillsboro Longwall Project. Between 2009 and 2012, Intermountain was exposed to longwall mining projects through repair and rebuilding projects for a variety of clients. Since as early as 1985, Intermountain has maintained electrical components for longwall systems. Additionally, it had been rebuilding components for longwalls since at least 1997. Intermountain’s prior custom electrical equipment works for longwall systems included bringing longwall machinery into its facilities to overhaul, update, or redesign its electrical systems. Intermountain also had experience rebuilding power centers, working on master controllers, and fixing or rebuilding several parts for longwall systems. 3. Hillsboro Longwall Mining Project Hillsboro Energy (Hillsboro) hired Intermountain to design and build a complete underground longwall system. Hillsboro wanted Intermountain to build an electrical system that powered the face conveyor, the stage loader, the crusher, and all the safety systems within those electrical systems. During the bidding process, Hillsboro Energy provided Intermountain with information about necessary features of the final product. Hillsboro and Intermountain worked together to develop ideas for new functions and features that could be used to create an improved longwall system. The design of the final product was not clear to Intermountain at the outset of the project. After the initial meetings, Intermountain presented a preliminary design to Hillsboro. Hillsboro provided Intermountain with basic product constraints but did not specify the design of the final 15 [*15] product. After Hillsboro transmitted these constraints, Intermountain began designing the final product. 4. Project Design Intermountain’s design needed to resolve a variety of problems Hillsboro was facing with its longwall mining operation. Solutions to one problem would sometimes yield new obstacles, which would require a design process to resolve. We will address each of the problems and its corresponding solution. a. CAT Tracks and Monorail System A longwall mining system requires equipment to deliver electricity to the system. This equipment is typically located at the mine headgate and includes several separate housing units for transformers and other electrical devices. As the shearer progresses, it travels further from the otherwise stationary electrifying equipment. Periodically, the electrifying equipment must move closer to the shearer. Before enlisting Intermountain, Hillsboro’s process to move this electrifying equipment was labor intensive. Hillsboro attached steel beams to the bottom of the housing units, and laborers would haul the units in what amounted to a ā€œgame of leapfrog.ā€ Additionally, Hillsboro’s system attached cables or hydraulic lines to a monorail on the ceiling, which operated as a festoon system. Moving the cables and hydraulic equipment was a labor-intensive operation that required workers to pull down cables weighing twenty-five pounds per foot and rehang them. To solve this issue, Intermountain proposed self-propelling electrical housing units. The design would add continuous tracks of interconnected metal plates that wrap around wheels, referred to as CAT tracks, to the bottom of the housing units of the longwall train. The tracks would propel the equipment alongside the shearing mechanism without the need for additional intervention. The train would have five cars: a 3-megavolt power center, a 9- megavolt power center, a starter car, a variable frequency drive car, and a production car. Intermountain affixed CAT tracks to only some cars, while the others just had wheels. After calculating the weight of the train, Intermountain determined the longwall train would also need another engine. The train moved at 4 to 5 miles per hour and could be steered via remote control. Intermountain designed the CAT tracks and wheels to function even given the unlevel nature of a mine floor and the 16 [*16] presence of debris. The design included heavy duty connecting devices to attach each of the cars to one another. Intermountain first planned the electrical details, such as the number of cars needed in the train and what equipment could be fit into each car. After the initial electrical layout began, Intermountain involved the mechanical engineering design team to incorporate automation into the design. The monorail system was designed to be mounted to the ceiling, from which equipment would hang from rollers overhead. The system was made of a six-inch steel I-beam that runs for miles down the entryway of the longwall system to the mouth of the mining section. The stage loader, the transformer, and variable frequency drive sections were hooked to the monorail system by cables and moved with the monorail system. The whole train of cars moved in unison with the monorail. This alleviated the need for workers to physically move the festooned cables, because the cables are attached to the longwall train. This project represented Intermountain’s first design integrating CAT tracks into a longwall system. Pat Lemmon, Intermountain’s project manager for this project, had experience with CAT tracks in other contexts. b. Hydraulic Pressure Hillsboro’s prior system did not deliver constant pressure to its shields when moving. To solve this problem, Hillsboro and Intermountain discussed the possibility of adding a variable frequency drive to control the longwall pump. Integrating a variable frequency drive into the pump system was a challenge for Intermountain. A variable frequency drive takes input voltage, converts it, and puts out a variable voltage and frequency to control a motor at a desired speed. This process generates a significant amount of heat. The variable frequency drive systems Intermountain used in the Hillsboro project were relatively large at six feet tall. The mining conditions placed sizing constraints on the design, which required Intermountain to design the variable frequency drive to be horizontal, creating additional heat. Intermountain’s design had to account for that additional heat. 17 [*17] c. Coal Spillover Another problem was that the main line conveyors would often become overloaded with mining materials. Overloaded conveyor systems lead to spillage, which creates excess waste, inefficiency, and MSHA violations. Coal was overflowing because Hillsboro could not control the rate at which the conveyor system transported the coal coming off the rock face. To solve the spillover issue, Intermountain introduced a variable frequency drive into the system. By delivering power to the stage loader at any desired frequency, Hillsboro could control the rate of the stage loader and, thus, control the flow of coal to the mainline conveyor. d. Custom Transformers and Safety Intermountain custom designed a 9,000 kilovolt transformer, which was integrated into the 9 megavolt power center. Because of size constraints, Intermountain designed the 9,000 kilovolt transformer to be split across three parts, each containing 3,000 kilovolt transformers. The core assemblies were then interconnected to act as one 9 megavolt transformer. The electrical design of the 9 megavolt power center went through a minimum of 10 revisions. The mechanical design of the 9 megavolt power center went through twice as many design drawing revisions because the mechanical design changes when the electrical design changes. The design of the 9 megavolt power center also depended on the design of the starter car. Intermountain also designed the controller, the ā€œbrains of the system.ā€ The controller is located at the head gate and acts as an interface between the operators and the equipment. The controller provides vital readings on pump pressure, which equipment was on or off, and the current on the tail drive. Most of the safety components are in the controller. If there were any changes to the mechanical or electrical design of other longwall components, it would affect the design of the controller. Intermountain included an additional custom feature in the variable frequency drive power cars and the starter car to permit maintenance without interrupting mining. Intermountain developed an innovative design for what it called ā€œdraw-out drawers.ā€ Draw-out drawers included controls on a panel that would swing out and allow 18 [*18] access to the back of the cabinet. Intermountain built spare circuits so that workers could access the drawers without interrupting the longwall operation. As the electrical design was developed, Intermountain had several requirements to monitor. It had to ensure compliance with MSHA standards, make preliminary calculations, and determine how the components would work together electrically and mechanically. Intermountain would enlist an employee who was unfamiliar with the electrical design to conduct an independent review comparing the original bill of materials to the electrical schematics to determine discrepancies. 5. Project Testing Intermountain ran a series of simulations to check for failures in the system. In