Full Opinion

Case: 25-30201 Document: 53-1 Page: 1 Date Filed: 11/25/2026 United States Court of Appeals for the Fifth Circuit United States Court of Appeals ____________ Fifth Circuit FILED No. 25-30201 November 25, 2026 ____________ Thomas B. Plunkett, III Clerk Medco Energi US, L.L.C., Plaintiff—Appellant, versus Howard Cantor; Doug Burgum, Secretary, U.S. Department of the Interior, Defendants—Appellees. ______________________________ Appeal from the United States District Court for the Western District of Louisiana USDC No. 2:23-CV-1755 ______________________________ Before Richman, Higginson, and Oldham, Circuit Judges. Per Curiam: The Department of the Interior charged Medco Energi, LLC (“Medco”) $646,000 in fees to inspect an offshore oil rig. Medco challenged the fee assessment as unlawful. We agree in part, so we reverse the district court’s entry of summary judgment for the defendants and vacate the fee assessment. Case: 25-30201 Document: 53-1 Page: 2 Date Filed: 11/25/2026 No. 25-30201 I A The Outer Continental Shelf Lands Act (“OCSLA”) governs oil and gas leases operating in the Gulf of America. Under the Act, the Secretary of the Interior may “promulgate regulations to provide for” annual inspections of “each facility.” 43 U.S.C. § 1348(c)(1). The Department’s Bureau of Safety and Environmental Enforcement (“BSEE”) classifies the facilities and conducts the inspections. The Department and the BSEE do not inspect for free. While the OCSLA does not mention inspection fees, Congress provides in annual Appropriations Acts that “the Secretary shall collect a nonrefundable inspection fee . . . for facilities subject to inspection under” the OCSLA. See, e.g., Consolidated Appropriations Act, 2016, Pub. L. No. 114-113, 129 Stat. 2242, 2549; Consolidated Appropriations Act, 2017, Pub. L. No. 115- 31, 131 Stat. 135, 459 (same). In this way, Congress authorizes fees in year- by-year Appropriations Acts rather than on a permanent basis. The Department’s Office of Natural Resources Revenue (“ONRR”) calculates the amounts owed and sends demands to the inspected parties. B Medco operated the MP 64 unit, a federally managed oil and gas lease off the Louisiana coast.1 The MP 64 unit consists of a central processing facility connected by subsea pipes to a series of 19 “caissons,” which are smaller platforms that house well equipment. One of the caissons is attached _____________________ 1 After this litigation commenced, Medco transferred its interest in the MP 64 unit to a company called Sanare Energy Partners, LLC, and Sanare transferred the interest to a company called Greyhound Energy, LLC. While Medco no longer operates the wells at issue, it is still litigating the case pursuant to Federal Rule of Civil Procedure 25(c). 2 Case: 25-30201 Document: 53-1 Page: 3 Date Filed: 11/25/2026 No. 25-30201 to the central facility by a walkway, but the remaining eighteen can be reached only by boat. As relevant here, BSEE inspected Medco’s facility and its associated caissons on two occasions in 2016 and 2017. In January 2017 and 2018, ONRR sent Medco fee assessments for both inspections. Because BSEE classified the main facility and all associated caissons as individual facilities, each incurred a separate inspection fee of $17,000. While the timeline is a little hazy, the Department eventually decided that some defunct wells and the walkway-connected caisson did not qualify as separate facilities. But it maintained that the other eighteen caissons were separate facilities, resulting in a total fee of $646,000 for the 2017 and 2018 assessments of the MP 64 unit. Medco appealed the fee awards to the Department’s ONRR. Medco claimed that ONRR lacked authority to assess fees because of gaps between Appropriations Acts in January 2017 and 2018, and that BSEE wrongly classified the main facility and caissons as separate facilities. ONRR rejected both claims. Medco then appealed to the Interior Board of Land Appeals (“IBLA”). The IBLA reversed, agreeing with Medco that ONRR had lacked statutory authority to assess fees during the gap between Appropriation Acts. The IBLA rejected the Department’s argument that interim continuing resolutions had authorized either demand. The IBLA therefore vacated both the 2017 and 2018 Demands. Accordingly, the IBLA did not address the caisson classifications. Then the Solicitor of the Interior, who had litigated Medco’s case before the IBLA, released an opinion. The opinion overruled the IBLA, rejected IBLA’s reading of the appropriations acts and continuing resolutions, and forbade any Department employee (including the IBLA itself) from relying on the IBLA’s decision to the contrary. In response, the 3 Case: 25-30201 Document: 53-1 Page: 4 Date Filed: 11/25/2026 No. 25-30201 IBLA rescinded its prior opinion and stated that it would issue a new ruling on Medco’s appeal. But it never did so. Instead, after letting Medco’s appeal languish for over a year, the IBLA dismissed the appeal on the ground that a statutory deadline for deciding the appeal had passed. C Medco then sued the Department in federal court under the APA. Once again, Medco argued that ONRR lacked authority to assess fees in January 2017 and 2018, and that BSEE had erred in classifying Medco’s caissons as separate facilities. The district court granted summary judgment to the Department on both claims. Medco timely appealed. Our review is de novo. II Medco’s appeal raises two questions: (A) whether ONRR had statutory authority to demand fees from Medco in January 2017 and 2018, and (B) whether BSEE misclassified Medco’s caissons as separate facilities. We address each in turn. A Statutory authority first. We (1) discuss the appropriations process and (2) explain why Congress’s Continuing Resolutions gave ONRR authority to demand fees from Medco. Then we address (3) Medco’s counterarguments. 1 A brief primer on federal appropriations helps to explain Medco’s argument. Dating back to “the First Congress[,] the practice has been [for Congress] to enact appropriations . . . during a single fiscal year.” James V. Saturno, Megan S. Lynch, Cong. Rsch. Serv., R47106, The 4 Case: 25-30201 Document: 53-1 Page: 5 Date Filed: 11/25/2026 No. 25-30201 Appropriations Process: A Brief Overview 1 (2023). Congress, however, cannot always agree on appropriations during a fiscal year. When that occurs, the Government either shuts down or Congress provides stopgap funding. The acts that provide this interim funding are commonly known as “continuing appropriations acts” or “continuing resolutions,” since they “continue” the funds previously appropriated. See James V. Saturno, et al., Cong. Rsch. Serv., R46595, Continuing Resolutions: Overview of Components and Practices 1 (2025) (hereinafter “Continuing Resolutions”). Government agencies must use continued funds on existing programs and under existing limitations. See id. at 6. Agencies cannot use the “funds to initiate new programs or activities or to avoid limitations imposed on previously appropriated funds.” Ibid. Two different continuing resolutions are relevant here. In December 2015, Congress passed the Consolidated Appropriations Act of 2016, which funded the Government through September 2016. See 129 Stat. at 2244. Congress subsequently failed to agree on a new budget. So at the end of September 2016, it passed the Continuing Appropriations Act of 2017. See Continuing Appropriations and Military Construction, Veterans Affairs, and Related Agencies Appropriations Act, 2017, and Zika Response and Preparedness Act, Pub. L. No. 114-223, 130 Stat. 857. This sequence then repeated. In May 2017, Congress passed the Consolidated Appropriations Act of 2017, which authorized a full budget through September 2017. But Congress once again failed to agree to a budget before that date. So in September 2017, it passed the Continuing Appropriations Act of 2018, which allowed the Government to continue operating until another budget agreement could be reached. See Continuing Appropriations Act, 2018 and Supplemental Appropriations for Disaster Relief Requirements Act, 2017, Pub. L. No. 115-56, 131 Stat. 1129. 5 Case: 25-30201 Document: 53-1 Page: 6 Date Filed: 11/25/2026 No. 25-30201 The two pairs of acts and resolutions are materially identical in their treatment of OCSLA funding. So to avoid confusion, we refer to the 2016 and 2017 consolidated appropriations acts as the “Appropriations Acts.” And we refer to the 2017 and 2018 continuing appropriations acts as the “Continuing Resolutions.” 2 For purposes of this appeal, the parties agree that the Appropriation Acts authorized ONRR to assess fees for inspections; they only differ over whether the Continuing Resolutions incorporated that fee authority. “In matters of statutory interpretation, text is always the alpha.” Matter of DeBerry, 945 F.3d 943, 947 (5th Cir. 2019). The Continuing Resolutions appropriate “[s]uch amounts as may be necessary, at a rate for operations as provided in the applicable appropriations Acts for [the prior fiscal year] and under the authority and conditions provided in such Acts, for continuing projects or activities . . . that were conducted in [the prior fiscal year], and for which appropriations, funds, or other authority were made available” in prior Appropriation Acts. 130 Stat. at 908; see also 131 Stat. at 1139 (same). The Continuing Resolutions thus appropriate the amount of money necessary for “continuing projects or activities” from the prior year, and they do so “under the authority and conditions provided” in the prior year’s acts. Medco concedes that this language appropriates funds for inspections. But it contends the Continuing Resolutions did not authorize fee requests. We disagree, for three reasons. First, the plain text of both Continuing Resolutions granted the Department authority to assess fees. Both Acts appropriate funds “under the authority and conditions” of prior Appropriations Acts, state that the funds are for “continuing projects or activities,” and specify the “projects or 6 Case: 25-30201 Document: 53-1 Page: 7 Date Filed: 11/25/2026 No. 25-30201 activities” are those “for which appropriations, funds, or other authority were made available” in prior Acts. Ibid. A project is “[a] plan or design” or “[a] planned undertaking.” Project, Webster’s Second New International Dictionary 1978 (1934; 1950 ed.). And an activity is a “[n]atural or normal function or operation.” Activity, id. at 27. The relevant plan, function, or operation here is the inspection of oil and gas facilities. Fees are part and parcel of that plan, function, or operation because they are the method by which Congress has chosen to fund it. True, spending money is different from collecting fees. But Congress carried forward not just “appropriations” and “funds,” but also “projects and activities” for which “other authority” was “made available” in prior Appropriation Acts. 130 Stat. at 908. The term “projects and activities” includes the previously authorized inspection program in toto, and fee collection is a project or activity for which “other authority” was available. Thus, the text of the Continuing Resolutions authorized both inspections and fees. Second, context confirms our understanding of the text. As Medco concedes, inspections and fees generally go together in the OCSLA context. In every fiscal year since 2010, Congress has required inspections and authorized the Department to collect fees in Appropriations Acts. Medco frames the inquiry as a search within the Continuing Resolutions for language carrying forward authority to collect fees. But given the statutory scheme, the opposite framing is more intuitive—if Congress intended to permit one part of the inspection program while disallowing another part, it would have said so. Put differently, it makes little sense to say that Congress passed a “continuing resolution” to continue only some of the OCSLA scheme and not its fee structure. To the contrary, Congress set aside money necessary for “continuing projects or activities” and “under the authority and conditions provided” in the prior year’s acts. Nothing in the Continuing Resolutions or 7 Case: 25-30201 Document: 53-1 Page: 8 Date Filed: 11/25/2026 No. 25-30201 Appropriations Acts distinguishes between inspections and fees, let alone authorizing the former while disallowing the latter. The failure to mention any exclusion of fees is the proverbial “dog that didn’t bark.” Koons Buick Pontiac GMC, Inc. v. Nigh, 543 U.S. 50, 63 (2004) (quotation omitted). As the Office of Legal Counsel explained in a different context: [T]he suggestion is that there is a negative implication to this section that any program, project[,] or activity not affirmatively provided funding or authority by the Continuing Resolution is thereby denied appropriations and authority, notwithstanding any other provisions of law. . . . As we have indicated already, this reading would be inconsistent with the usual practice and understanding of Continuing Resolutions. Authorization of Immigration Emergency Fund Reimbursements, 19 Op. O.L.C. 278, 280 (1995). Third, longstanding congressional practice supports our reading of the Continuing Resolutions. Congress has used Continuing Resolutions in every fiscal year since 1977, except three. Continuing Resolutions, supra, at 1. Given the practice’s near-ubiquity, we would expect some authority for the proposition that any activity in an Appropriations Act not expressly mentioned in a Continuing Resolution is therefore forbidden. Yet Medco can point to no case, treatise, or other authority recognizing a name-it-and-claim- it requirement for continued agency action. Instead, given the long history of Continuing Resolutions in the OCSLA context, it appears far more likely that Congress passed the Continuing Resolutions to authorize both funds for inspections and the collection of offsetting fees. 3 Resisting this conclusion, Medco observes that nothing in the Continuing Resolutions expressly mentions fees or fee collection. That’s true. But Medco’s argument would prove too much: the Continuing 8 Case: 25-30201 Document: 53-1 Page: 9 Date Filed: 11/25/2026 No. 25-30201 Resolutions do not mention “inspections” either, yet all agree that the mention of “programs or activities” authorized inspections. So, if the failure to expressly mention fees were decisive, then that would invalidate the entire inspection program. But see Atl. Richfield Co. v. Christian, 590 U.S. 1, 15–16 (2020) (“We would not expect Congress to take such an extraordinary step by implication.”). * All told, the 2017 and 2018 Continuing Resolutions carried forward ONRR’s authority to charge inspection fees. Medco’s challenge to the fee demands therefore fails. B Next, the classification decision. Medco claims the Department erred in classifying MP 64’s caissons as separate “facilities” under the relevant regulations. Courts will hold unlawful and vacate agency action that “is in ‘excess of statutory jurisdiction, authority, or limitations,’ or is ‘arbitrary, capricious, an abuse of discretion, or otherwise not in accordance with law.’” Nat’l Ass’n of Priv. Fund Managers v. SEC, 151 F.4th 252, 260 (5th Cir. 2025) (quoting 5 U.S.C. § 706(2)(A), (C)). Agency action that fails to comply with the agency’s own regulation is arbitrary and capricious. Erie Boulevard Hydropower, LP v. FERC, 878 F.3d 258, 269 (D.C. Cir. 2017). After all, “[i]t is axiomatic . . . that an agency is bound by its own regulations.” Nat’l Envtl. Dev. Ass’n’s Clear Air Project v. EPA, 752 F.3d 999, 1009 (D.C. Cir. 2014) (quotation omitted). Finally, the court “must exercise independent judgment in determining the meaning of statutory provisions.” Loper Bright Enters. v. Raimondo, 603 U.S. 369, 394 (2024). 9 Case: 25-30201 Document: 53-1 Page: 10 Date Filed: 11/25/2026 No. 25-30201 A reviewing court is limited to the agency’s initial explanation for its action. See SEC v. Chenery Corp., 318 U.S. 80, 94 (1943). That is the explanation which the court must compare to the agency’s governing regulation. Post hoc reasoning that did not “underl[ie] the [agency] action under review,” whether offered in court or not, cannot save a legally erroneous decision. See ibid. Outside the “rare circumstance[]” where that original error is harmless, FDA v. Wages & White Lion Invs., L.L.C., 604 U.S. 542, 587–89 (2025), the reviewing court will reverse and remand. We (1) explain the agency’s classification decision conflicts with the agency’s own regulations. And we (2) reject the agency’s counterarguments. 1 The OCSLA does not define a “facility.” So the Department promulgated a regulation defining “facility” as “all installations permanently or temporarily attached to the seabed.” 30 C.F.R. § 250.105. The Department also explained how it would treat “interconnected” installations: Any group of OCS installations interconnected with walkways, or any group of installations that includes a central or primary installation with processing equipment and one or more satellite or secondary installations, is a single facility. The Regional Supervisor may decide that the complexity of the individual installations justifies their classification as separate facilities. Ibid. The regulation has two components: a default rule and an exception. We explain how these two parts fit together, and why the Department’s actions conflicted with the regulatory text. As to the default rule, there are two ways that “installations” may be arranged: (1) a “group of [] installations” “interconnected with walkways, 10 Case: 25-30201 Document: 53-1 Page: 11 Date Filed: 11/25/2026 No. 25-30201 or” (2) “any group of installations that includes a central or primary installation” and “one or more satellite or secondary installations.” Ibid. Both sets of arrangements are classified the same—i.e., as “a single facility.” Ibid. The regulation thus addresses the possibility of installations that are unconnected by walkways but nonetheless constitute “a single facility.” Ibid. Then there’s the exception: “The Regional Supervisor may decide that the complexity of the individual installations justifies their classification as separate facilities.” Ibid. In other words, the Department may deviate from the default rule and classify a group of installations as separate facilities depending on the complexity of “the individual installations.” Ibid. An “installation” is something “attached to the seabed” in the Outer Continental Shelf. See ibid. (describing several different types of installations). Putting the default rule and the exception together: The regulation presumes that a group of installations constitutes a single facility. The Regional Supervisor may deviate from that default and classify those installations as separate. But to do so, he must invoke the regulation’s exception and evaluate “the complexity of the individual installations.” Ibid. Here, the Department applied a different rule: It determined that MP 64’s above-sea caissons were not connected by a walkway and hence were separate facilities. Michael Saucier, the Regional Supervisor of BSEE, relied on a supposedly “longstanding practice” at BSEE: “[W]here secondary or satellite installations are attached to the primary facility via subsea tiebacks, but the installations rise above the waterline some distance from the primary facility without a walkway connection,” the secondary facilities are “separate facilities.” ROA.75–76 (quotation omitted). According to Saucier, this “arrangement results in more complex, and time- and resource-intensive inspections.” Ibid. Saucier’s declaration contained no description of these 11 Case: 25-30201 Document: 53-1 Page: 12 Date Filed: 11/25/2026 No. 25-30201 inspections, nor any other information to explain why Medco’s caissons were separate facilities. There is a problem with this approach. Section 250.105’s default rule expressly contemplates that “any group of installations” unconnected by walkways nonetheless constitutes a single facility. By specifying that walkway connections make no difference to classification, the regulation already makes clear that the absence of a walkway is insufficient to render Medco’s installations separate facilities. The Department therefore erred by treating “distance from the primary facility without a walkway connection” as sufficient grounds to separately classify those caissons. ROA.75. Our reading is confirmed by § 250.105’s exception. The exception clause turns on “the complexity of the individual installations,” not on the presence or absence of a walkway connection. And the Department concedes that it did not evaluate any of Medco’s “individual installations” here, anyway. Regional Supervisor Saucier testified that he did not evaluate any individual caissons on the MP 64 Unit. When Medco appealed his determination, the reasoning was the same: The Department doubled down on the geographical dispersion of the caissons and the lack of a walkway as the analytical touchstone. That physical connection ruled the day is confirmed by the fact that the Department did agree with Medco that one of the caissons was not a separate facility, but only because a walkway connected that caisson to the central platform. Yet § 250.105’s plain text forecloses that laser focus on walkway connections between installations, and it distinguishes complexity of individual installations (which may except installations from group classification) from walkway connections (which may not). We therefore must set aside the Department’s classification decision. 12 Case: 25-30201 Document: 53-1 Page: 13 Date Filed: 11/25/2026 No. 25-30201 2 The Department’s counterarguments are unpersuasive. First, the Department argues that installations are complex—and hence separate under § 250.105’s exception—if inspectors must travel between them. The district court accepted a version of this argument. See Medco Energi v. Burgum, No. 2:23-CV-01755, 2025 WL 622669, at *6 (W.D. La. Feb. 26, 2025). The court noted that § 250.105 uses the term “installations” in the plural form. From that the district court inferred the Department could consider the complexity of a group of installations as a whole. Ibid. And finally, the court accepted the Department’s argument that the complexity of travel among Medco’s eighteen caissons sufficiently justified their classification as separate facilities. The Department’s reading is unpersuasive. First, it would render surplusage the default rule that disconnected installations are a single facility. “Regulations, like statutes, must be construed so that effect is given to all their provisions, so that no part will be inoperative or superfluous, void or insignificant.” United States v. CITGO Petroleum Corp., 801 F.3d 477, 485 (5th Cir. 2015) (quotation omitted). Here, § 250.105 expressly contemplates that disconnected installations—that is, installations without walkways— constitute a single facility. If it were true that walkway-less installations were by definition complex and hence separate, the default rule would be inoperative or superfluous. Second, the Department’s reading would render surplusage the regulations use of “individual.” Recall that the supervisor “may decide that the complexity of the individual installations justifies their classification as separate facilities.” 30 C.F.R. § 250.105 (emphasis added). The ordinary meaning of “individual” is “[e]xisting as a separate and distinct entity; single or singular; particular, opposed to general and universal.” Individual, 13 Case: 25-30201 Document: 53-1 Page: 14 Date Filed: 11/25/2026 No. 25-30201 Webster’s Second, supra, at 1267 (emphasis added and other emphasis omitted). Medco strenuously argues that this means the Department must assess each individual caisson rather than the overall complexity of the MP 64 Unit as a whole. We need not decide if Medco is correct on this score, because whatever “the complexity of the individual installations” means, it cannot be reduced to the presence or absence of a walkway. By instead treating walkways and travel between installations as sufficient conditions for individual classification, the Department violated § 250.105’s plain text. Second, the Department claims its classification decision is consistent with its “longstanding practice.” It is well established, however, that a “longstanding” interpretation does not prevent a federal court from resolving whether the agency’s interpretation is consistent with statutory and regulatory text. See Envtl. Def. Fund v. EPA, 124 F.4th 1, 18 (D.C. Cir. 2024) (“[T]he fact that the practice is longstanding cannot render it lawful.”). An agency cannot acquire regulatory power through adverse possession. That rule applies here, where the Department’s focus on the lack of a walkway between the grouped installations is “inconsistent with the regulation.” Chase Bank USA, N.A. v. McCoy, 562 U.S. 195, 211 (2011) (quotation omitted). Third, and finally, the Department claims we must defer to BSEE’s classification decisions under Kisor v. Wilkie, 588 U.S. 558 (2019), and Auer v. Robbins, 519 U.S. 452 (1997). Following Kisor, deference to an agency interpretation of its regulation is appropriate only where (1) after applying all the ordinary tools of statutory construction, the regulation is “genuinely ambiguous,” (2) the agency’s offered reading is reasonable, (3) the agency has officially adopted the reading, (4) the agency’s reading implicates its expertise, and (5) the agency’s reading is the product of a “fair and considered judgment.” 588 U.S. at 573–80 (quotations omitted) 14 Case: 25-30201 Document: 53-1 Page: 15 Date Filed: 11/25/2026 No. 25-30201 (overviewing these non-exhaustive “markers” of when deference is appropriate). Deference is not warranted under this standard. Even spotting the Department that collectively classifying “individual installations” is reasonable, the other factors cut against deference: • The ordinary tools of statutory interpretation indicate that classification decisions cannot be reduced to the presence or absence of a walkway; • The Department has not officially adopted its walkway-focused classification practice. It has instead applied the rule case-by-case; • The distance of a possible boat trip for the inspectors does not implicate the Department’s expertise in well design, safety, or maintenance; • The Department points to no “fair and considered judgment” preceding its separate classification of disconnected installations. Accordingly, we do not believe that Kisor or Auer requires deferring to the Department’s classification decisions or its reading of § 250.105. * * * The Department erred in classifying Medco’s caissons as separate facilities, and the district court erred in granting summary judgment on this point. We REVERSE the district court’s judgment, VACATE the Department’s fee assessments against Medco, and REMAND to the district court. 15