T-Mobile West v. Ramallo CA4/1
CourtCalifornia Court of Appeal
Date FiledOctober 27, 2026
DocketD086593
StatusUnpublished
📰 News Coverage: Read the LAWS.com news report on this case
Full Opinion
Filed 10/27/26 T-Mobile West v. Ramallo CA4/1
NOT TO BE PUBLISHED IN OFFICIAL REPORTS
California Rules of Court, rule 8.1115(a), prohibits courts and parties from citing or relying on opinions
not certified for publication or ordered published, except as specified by rule 8.1115(b). This opinion
has not been certified for publication or or dered published for purposes of rule 8.1115.
COURT OF APPEAL, FOURTH APPELLATE DISTRICT
DIVISION ONE
STATE OF CALIFORNIA
T-MOBILE WEST, LLC, D086593
Plaintiff and Respondent,
v. (Super. Ct. No. CIVSB2413693)
LUIS O. RAMALLO et al.,
Defendants and Appellants.
APPEAL from an order of the Superior Court of San Bernardino
County, Jay H. Robinson, Judge. Affirmed.
Law Office of Robert D. Conaway and Robert D. Conaway for
Defendants and Appellants.
Mintz Levin Cohn Ferris Glovsky & Popeo, Antony Nash, Nada I.
Shamonki, and Nadia A. Zivkov for Plaintiff and Respondent.
I. INTRODUCTION
Defendants1 are developing a UFO-themed hotel along the freeway in
Baker, between Southern California and Las Vegas. Plaintiff T-Mobile West,
LLC (T-Mobile) provides wireless telecommunication services and operates
antenna facilities on tower space it leases on property adjacent to
Defendants’ hotel project. T-Mobile alleges that when Defendants added
steel “ray gun” thematic features to the rooftop of their hotel, the decorative
pieces obstructed radio signals from T-Mobile’s neighboring antenna.
T-Mobile sued Defendants alleging that the rooftop features’ obstruction
violates an easement that entitles users of the T-Mobile site “to clear and
keep clear . . . obstructions as may . . . be necessary for the protection” of
communication facilities contemplated in the easement.
T-Mobile sought a preliminary injunction requiring Defendants to
remove the rooftop adornments. T-Mobile argued it was likely to prevail on
the merits because the publicly recorded easement encumbers Defendants’
property and entitles T-Mobile (as successor to the easement’s original
grantee) to clear the obstruction. T-Mobile argued the balance of interim
harms favored T-Mobile because the obstruction impacted seven critical
wireless facilities, and alternative workarounds were too time-consuming and
speculative to pursue.
Defendants countered that T-Mobile was unlikely to prevail on the
merits because no valid easement existed or encumbered Defendants’
property. They argued the balance of harms weighed against an injunction
1 The defendants are Luis O. Ramallo; Susana T. Ramallo; and The
Ramallos, Inc. doing business as Alien Fresh Jerky (together, Defendants).
2
because estimated construction and operating delays would cost Defendants
upwards of $50,000,000.
The trial court issued a preliminary injunction requiring removal of the
rooftop features. The court found the likelihood of success prong was “pretty
straightforward.” And although the court found the balancing of harms to be
“a very, very close question,” the court concluded it favored T-Mobile because
T-Mobile would face more contingencies in implementing a workaround than
Defendants would face in removing the rooftop appurtenances. The court
ordered T-Mobile to post a $750,000 undertaking, setting further proceedings
to reevaluate the amount of the undertaking and to determine the specific
work required to remove the rooftop features. After reviewing the parties’
supplemental submissions, the court left the injunction and undertaking
unchanged.
On appeal, Defendants argue that T-Mobile’s evidence regarding the
likelihood of prevailing, the balance of harms, and the proper undertaking
amount was unpersuasive and conflicted with Defendants’ evidence. They
maintain these conflicts precluded the trial court from issuing a preliminary
injunction and required resolution by jury trial. As we will explain,
Defendants’ arguments misunderstand well-established appellate principles
and the nature of provisional relief.
Accordingly, we affirm the preliminary injunction.
II. FACTUAL AND PROCEDURAL BACKGROUND
A. The Parties and Their Property Interests
1. Defendants
The Ramallos own property located at 72302 Baker Boulevard in
unincorporated Baker (the Ramallo Property). The Ramallos are officers of
3
The Ramallos, Inc. doing business as Alien Fresh Jerky, which operates a
successful jerky store on the Ramallo Property. Around 2014, the Ramallos
began developing a UFO-themed hotel (the UFO Hotel) on the Ramallo
Property to capitalize on tourist traffic to “Area 51” in Nevada. Construction
of the flying-saucer-shaped hotel structure was largely completed in 2024.
Steel and fiberglass “ray gun” thematic elements (the rooftop features) were
installed on the hotel rooftop in 2023.
2. Plaintiff
T-Mobile is a wireless telecommunications company with millions of
customers in the United States. To provide its service, T-Mobile secures
property rights to install, access, and maintain thousands of wireless
facilities. At issue here is a wireless facility located at 72316 Baker
Boulevard in Baker, which the parties sometimes refer to as the “AT&T
Property.” The AT&T Property is adjacent to the Ramallo Property and is
currently owned by Pacific Bell Telephone Company (Pacific Bell).
In 2005, Pacific Bell entered a license agreement with T-Mobile’s
predecessor-in-interest, Omnipoint Communications, Inc. (Omnipoint), to
grant Omnipoint and its successors and assigns use and rights to the AT&T
Property. Specifically, under the agreement, Pacific Bell licensed access to
T-Mobile’s attorney in fact, CCTMO LLC, which in turn leases property
access rights to T-Mobile.
B. The Easement
In December 1961, when the AT&T Property was owned by Pacific
Bell’s predecessor — Pacific Telephone and Telegraph Company (Pacific
Telephone) — the then-owner of the Ramallo Property, Jeanette M. Howard
Metheny, granted an easement to Pacific Telephone (the Easement). The
4
Easement was publicly recorded on February 20, 1962. The Easement
granted Pacific Telephone and “its successors and assigns” the right to install
telecommunications facilities and to keep them accessible and unobstructed.
With regard to facilities, the Easement grants “an exclusive easement
to construct, place, operate, maintain, repair, replace and remove such aerial
and underground telephone, telegraph and communication structures
consisting of a 10’ x 10’ x 40’ Central Office building, one existing 10’ x 10’ x 8’
concrete block building, surface testing terminals, poles, wires, cables,
conduits, manholes and necessary fixtures and appurtenances in, under and
upon real property” legally described in the Easement.
As to access and obstruction, the Easement grants “the right to clear
and keep cleared from said easement such brush or other obstructions as may
in the opinion of [the] Grantee [i.e., Pacific Telephone and its successors and
assigns] be necessary for the protection of said building or structures in the
use of said easement.”
C. The Complaint
In April 2024, T-Mobile filed a complaint against Defendants for breach
of easement, declaratory judgment, and private nuisance, stemming from the
UFO Hotel’s alleged interference with radio signals from T-Mobile’s wireless
facilities on the AT&T Property. The complaint refers to these as the
“Impacted Wireless Facilities.”
T-Mobile alleges it did not observe any obstruction of its wireless
facilities during initial stages of the hotel’s construction. However, T-Mobile
alleges, “recent construction” of “[s]teel beams and some architectural
features . . . directly in front of one of T-Mobile’s Impacted Wireless
Facilitates” was “obstructing radio frequency emissions to and from
5
T-Mobile’s Impacted Wireless Facilities and the services they provide.” The
complaint alleges the hotel’s interference with T-Mobile’s wireless facilities
violates the Easement provision giving the grantee the right to clear
obstructions as the grantee deems necessary.
The complaint prays for (among other things) “[a]n injunction requiring
Defendants to remove the steel beams, architectural features, or any other
objects on top of their UFO Hotel.”
D. Preliminary Injunction
1. T-Mobile’s Motion
In October 2024, about six months after filing its lawsuit, T-Mobile
moved for a preliminary injunction “prohibiting the placement of steel beams,
architectural features, or any other objects on top of Defendants’ UFO Hotel
that interfere with or reduce the full functionality of T-Mobile’s use of its
Impacted Wireless Facilities.” T-Mobile supported its motion with a
declaration from its Director of Network Engineering & Operations, Lowell
Handy.
Handy described the parties, their property interests, and the
Easement as summarized above.2 (See part II.A., ante.) He then addressed
the UFO Hotel’s interference with T-Mobile’s wireless facilities, its impact on
T-Mobile’s operations, and T-Mobile’s efforts to mitigate the interference.
Handy identified the UFO Hotel’s rooftop features as the source of
interference. He explained that “[b]efore construction of the decorative
features began, the Hotel structure was not causing interference and
2 Handy’s declaration attached as an exhibit an assessor’s parcel map
showing the Easement in relation to the Ramallo Property.
6
disruption to T-Mobile’s wireless facilities.” But the erection of “steel beams,
architectural features, and other objects on the rooftop . . . directly in front of
one of T-Mobile’s Impacted Wireless Facilities” began “significantly impacting
and disrupting T-Mobile’s . . . Impacted Wireless Facilities” by “obstruct[ing]
radio frequency emissions.”
Handy explained why the “full functionality of T-Mobile’s Impacted
Wireless Facilities in this location is essential.” “The Impacted Wireless
Facilities serve as a ‘donor’ to seven other facilities in the greater area. As a
‘donor’ site, the Impacted Wireless Facilities use point to point microwave
transmissions to send wireless signals to and from other T-Mobile wireless
sites, which then retransmit the signals to provide personal wireless service
in the areas surrounding those sites. T-Mobile’s microwave transmissions
require a clear, unimpeded path (or ‘line of sight’) between the sending and
receiving microwave facilities. Moreover, the Impacted Wireless Facilities
provide critical wireless services for T-Mobile’s customers and the
surrounding community.” Because of the integrated nature of these wireless
facilities, the hotel’s obstruction of the Impacted Wireless Facilities on the
AT&T Property was “causing significant connection issues that are affecting
T-Mobile’s wireless facilities and services even beyond the immediate vicinity
of the Impacted Wireless Facilities.” Handy asserted that this interference
“render[ed] T-Mobile’s ability to use the AT&T Property essentially useless”
and, therefore, “wasted the time, money, and other resources that T-Mobile
poured into negotiating and improving the AT&T Property.”
Handy described “several steps” T-Mobile took or considered “to
address Defendants’ interference with its Impacted Wireless Facilities. For
example, T-Mobile has sought potential relocation of the Impacted Wireless
Facilities on the AT&T Property . . . . If the Impacted Wireless Facilities on
7
the AT&T Property were raised, continued interference would be highly
likely to continue. In addition to relocating the Impacted Wireless Facilities
to a different property—which would render the Easement useless for its
intended use and to T-Mobile—relocating or constructing a temporary facility
on a different property would require substantial time, expense,
administrative processes with the County, and ultimately, there is no
certainty that a different location could be found, secured, or approved.”
Handy further explained that the interference financially impacted
T-Mobile by “diminish[ing] the value of the Easement,” “caus[ing] T-Mobile to
spend money and resources to find solutions to restore signal connectivity,”
and by “significantly damag[ing]” T-Mobile’s reputation for “quality of
service” in the “highly competitive” wireless telecommunications industry.
Handy reasoned that “[w]ithout an injunction, T-Mobile will continue to
suffer substantial harm to its reputation and goodwill with customers,” who
will “switch[] providers.”
Finally, Handy concluded that “[f]inding an alternate location” for the
Impacted Wireless Facilities was “simply not feasible” because “start[ing] all
over at a new site . . . generally takes years and millions of dollars to find the
appropriate site location (if even possible), negotiate a lease agreement, apply
for permits, design power supplies, construct and install the wireless
facilities, and integrate and activate them.”
T-Mobile’s attorney submitted a declaration explaining he had
researched a previous lawsuit involving an easement dispute between the
AT&T Property and the Ramallo Property. Records from the lawsuit showed
it involved a damaged underground cable. Resolution of that case did not
“waive[] or reduce[]” T-Mobile’s rights under the Easement.
8
Based on this evidence, T-Mobile argued it was likely to prevail on its
claims for breach of easement and private nuisance. Specifically, T-Mobile
cited its right under the Easement “to clear and keep cleared from said
easement such . . . obstructions as may in the opinion of the Grantee be
necessary.”
T-Mobile also argued it would “suffer far greater harm than Defendants
if it cannot restore its Impacted Wireless Facilities.” On one hand, T-Mobile
maintained that it would continue to suffer harm from the interference with
the Impacted Wireless Facilities, diminished value of the Easement and
property rights in the AT&T Property, and interference with customers’
“ability to use their contractual benefits with T-Mobile.” T-Mobile reasoned
“no amount of money” could compensate for these harms. “In contrast,”
T-Mobile argued, “the only harm conceivably faced by Defendants is loss of a
decorative element on top of the Hotel.”
2. Defendants’ Opposition
Defendants opposed T-Mobile’s motion and filed seven declarations and
a request for judicial notice.
Defendants argued T-Mobile was unlikely to prevail on the merits of its
claims for several reasons. Regarding standing, Defendants argued it was
“questionable” whether T-Mobile was the proper plaintiff because
government records attached to Defendants’ request for judicial notice
showed that the Federal Communications Commission (FCC) license for
T-Mobile’s Impacted Wireless Facilities were issued in the name of a different
T-Mobile entity that was not registered with the Secretary of State to do
business in California. Conversely, Defendants argued T-Mobile named the
9
wrong defendants because the UFO Hotel building was owned by The UFO
Hotel, Inc., which was not named in the lawsuit.
Defendants also challenged the validity of the Easement in several
ways. First, they argued they prevailed in previous litigation that
determined the Ramallo Property was not subject to an easement serving the
AT&T Property. Defendants supported this argument with Mr. Ramallo’s
declaration briefly describing the litigation, documents regarding the
judgment in that litigation, and a declaration filed in that litigation from a
Pacific Bell employee who determined no easement authorized Pacific Bell to
place underground wires on the Ramallo Property.
Second, Defendants argued the Easement was invalid because the
purported grantor (Ms. Matheny) no longer owned the Ramallo Property
when she ostensibly granted the Easement. Defendants supported this
assertion with the declaration from a licensed professional land surveyor,
Joseph Miller, who stated he determined Matheney “did not own or have any
rights to the property” when she granted the easement in 1962 because she
had already conveyed title to C.E. Huffman and Lena A. Huffman in 1961.
Miller also opined that the location of the Easement as shown on the
annotated assessor’s parcel map attached to Handy’s declaration in support
of T-Mobile’s motion was incorrect. Miller further asserted that the antenna
tower on which T-Mobile’s Impacted Wireless Facilities were installed was
outside the Easement area on the AT&T Property.
Third, Defendants disputed the scope of rights that the Easement
granted. Defendants argued it was limited to brush clearance, not
unobstructed radio waves.
Defendants also raised several challenges to T-Mobile’s claim that it
suffered irreparable injury. First, Defendants disputed that the Impacted
10
Wireless Facilities had, in fact, been affected by construction of the rooftop
features. Defendants asserted that a T-Mobile employee whom Defendants
deposed to prepare their opposition — Market Manager Muhammad
Ahmed — acknowledged that T-Mobile based its interference claim only on
photos and not network performance data. Defendants countered this claim
with photos of the Impacted Wireless Facilities purporting to show that they
were not obstructed. Mr. Ramallo also stated there had been “[n]o cell signal
degradation” at the Ramallo Property, though he did not specify whether he
had T-Mobile service.
Second, Defendants asserted T-Mobile had already implemented a
workaround for any signal interference. Defendants cited T-Mobile Market
Manager Ahmed’s deposition testimony that T-Mobile rerouted microwave
signal communication from a different location, which provided relief to four
of the seven interconnected wireless facilities. The witness added, however,
that the temporary solution was already at 99 percent capacity.
Defendants argued that the balance of harms weighed in their favor.
On one hand, Defendants asserted that T-Mobile could eliminate any
obstruction by simply repositioning the impacted microwave dish about
10 feet higher on the same tower. Defendants cited Ahmed’s testimony that
T-Mobile has done this at other locations in the past when “there is specific
distance available between the [wireless service] antennas and the
microwave.” Mr. Ramallo stated he received an estimate that repositioning
the microwave dish would cost less than $10,000.
On the other hand, Defendants maintained they would incur
substantial expense and delay if the court issued the requested injunction. A
civil engineer involved with the UFO Hotel project, Ricky Sarmiento,
submitted a one-page declaration with a one-page scope of work “explain[ing]
11
the significant amount of rework that would be created by granting the . . .
preliminary injunction.” Sarmiento opined the retrofitting would (1) involve
approximately 55,000 pounds of steelwork, including retrofitting other parts
of the building’s steel structure “due to the unbalanced loading condition as a
result of removing the roof theme elements”; (2) possibly require new
construction permitting that could take up to three years to process; and
(3) “require extensive engineering work” and “extensive shoring to stabilize
the whole structure.”
Dennis Santiago, a licensed contractor and the “project overseer and
superintendent” of the UFO Hotel project, submitted a declaration estimating
that the cost of retrofitting the hotel to remove the rooftop features “could
potentially exceed $30 million” because of “the hotel’s remote desert location”
and “the high liability associated with [its] unconventional structure.”
Santiago believed the work would require “removal of the upper steel
structure of the UFO Hotel.”3 Santiago’s declaration was about two pages
and attached no exhibits.
Business consultant Peter Mehit submitted a declaration attaching
portions of a business plan he prepared for the UFO Hotel. He estimated
projected hotel revenues would exceed $20 million during its first three years
of operation.
Defendants requested that, if the court were to issue a preliminary
injunction, the court require T-Mobile to post a $20 million undertaking.
3 Mr. Ramallo likewise stated in his declaration that the rooftop features
“are connected to structural steel” and “steel footings” that were “designed to
handle the load” of the rooftop features.
12
3. T-Mobile’s Reply
T-Mobile filed a reply brief addressing Defendants’ arguments.
Regarding its own standing, T-Mobile pointed out that Handy
explained in his declaration that the plaintiff entity is the operator of the
licensed frequencies for the wireless facilities on the AT&T Property.
Regarding Defendants’ argument that T-Mobile sued the wrong defendant,
T-Mobile submitted evidence that The UFO Hotel, Inc. was not in good
standing with the California Secretary of State records and, in any event, the
Ramallos (who are named defendants) are the entity’s only officers.
Responding to Defendants’ challenges to the Easement’s validity,
T-Mobile submitted a preliminary title report showing that the Easement
encumbers the Ramallo Property. T-Mobile also submitted a quitclaim deed
showing that the Easement’s original grantor did not convey the Ramallo
Property to the Huffmans until 1965 — over three years after she granted the
Easement. In contrast to these title records, T-Mobile observed that
Defendants offered no documentary evidence to support their surveyor’s
conclusory assertions regarding the Ramallo Property’s chain of title.
Further, T-Mobile explained that the previous easement litigation involved a
claimed prescriptive easement arising from a land patent and had no relation
to the Easement.
Regarding the Easement’s location, T-Mobile explained that even if
“the physical footprint of the Easement is solely within the AT&T
Property” — that is, that the Easement granted the right to construct
facilities only on that property — “it would have no impact on T-Mobile’s
rights . . . to protect the dominant estate [i.e., the AT&T Property] from
interference on the servient Ramallo Property.” T-Mobile also cited authority
supporting the proposition that the right to remove obstructions to buildings
13
and phone lines included the right to remove obstructions to radio waves
because radio waves are the natural evolution of the telecommunications
technology covered by the Easement. (Citing Salvaty v. Falcon Cable
Television (1985) 165 Cal.App.3d 798, 803 [holding that “the addition of cable
television equipment on surplus space on [a] telephone pole was within the
scope of [an] easement for” telephone and power lines because, “[a]lthough
the cable television industry did not exist at the time the easement was
granted, it is part of the natural evolution of communications technology”].)
T-Mobile also disputed Defendants’ claim that the rooftop features did
not obstruct the Impacted Wireless Facilities. T-Mobile submitted excerpts
of Market Manager Ahmed’s deposition testimony stating that he (1) “as
an engineer,” could “clearly tell” from photos “that the microwave dish
path . . . is obstructed, and it will be causing interference”; and (2) reviewed
“received[-]signal level” and “site[-]availability” data that confirmed the
obstruction, which at times involved “losing complete sites during the day.”
T-Mobile reiterated that its temporary workaround addressed only four of the
seven interconnected towers and was already at 99 percent capacity.
Ahmed submitted a declaration rebutting Defendants’ claim that
T-Mobile could eliminate the obstruction by repositioning the microwave dish
higher on the existing tower. First, doing so would not allow sufficient
separation between the microwave dish and the wireless service antennas
already at the top of the tower, “which would cause interference among the
14
radiofrequency signals.”4 Second, raising the microwave dish 10 feet “would
not provide sufficient clearance to resolve the interference” from the rooftop
features, but rather, would cause “an even more significant impact on the
microwave link.” Third, “the tower would need to be structurally capable of
handling the weight and loading factors of the dish at that point on the
tower.” Finally, because T-Mobile does not own the tower, T-Mobile would
need the owner’s permission to move the dish.
Regarding the balance of harms, T-Mobile attacked Defendants’
evidence as “speculative and unsubstantiated.” T-Mobile estimated the
removal “should realistically cost in the tens of thousands not tens of
millions” of dollars. Accordingly, T-Mobile stated it was “prepared to post a
$250,000 undertaking” if the court issued a preliminary injunction.
T-Mobile lodged evidentiary objections to much of Defendants’
supporting evidence.
4. Hearing and Trial Court’s Ruling
The trial court heard T-Mobile’s motion on February 4, 2025. The court
granted the parties’ requests for judicial notice and overruled T-Mobile’s
evidentiary objections. After hearing extensive argument from counsel, the
trial court granted T-Mobile’s motion.
Preliminarily, the court determined that because the nature of relief
T-Mobile sought was a mandatory injunction — “it requires affirmative acts
on behalf of the enjoined party” (i.e., “removal of at least one part of a
4 The tower is 60 feet tall. T-Mobile has wireless service antennas at the
very top of the tower, extending down to 57 feet above the ground. The
obstructed microwave dish is located on the tower at a centerline of 49 feet
above ground level.
15
structure”) — “[t]here is a stronger showing that is required.” The court
nevertheless concluded T-Mobile met this heightened threshold.
The court found that T-Mobile “sustained its burden on its likelihood to
prevail on the merits of each of its causes of action.” The court found the
evidence on this point “pretty straightforward.”
The court then turned to the “the second part of the analysis, which
is . . . the interim harm the plaintiff will suffer if the injunction is not issued
compared to the harm the defendant would suffer if it . . . is issued.” The
court deemed this “a very, very close question” that ultimately favored
T-Mobile. On one hand, the court was unpersuaded by Defendants’ projected
lost revenue because the hotel “business hasn’t opened yet.” On the other
hand, the court noted the importance of T-Mobile’s “telecommunications
service, including emergency services, in a very rural area of Southern
California.” This importance was heightened by the fact T-Mobile was
“already operating on an improvised solution” that left T-Mobile without “an
additional redundancy.”
The court also found that “the number of adjustments that would be
needed to T-Mobile’s communications network that would provide the same
level of service prior to the obstruction . . . is subject to far more contingencies
and far less certainty than the adjustment that the defense would need to
make.” The court reasoned that because “the county has already permitted
[the UFO Hotel] structure, it would stand to reason that the county would
also permit adjustments” to the hotel to facilitate emergency communication
services in the area. In contrast, “the number of contingencies and the
number of uncertainties that inure to T-Mobile’s detriment” — “potentially
separate litigation proceedings as to each one of their seven locations,”
16
followed by system testing and adjustments — “tilt[ed] the court’s analysis in
[T-Mobile’s] favor.”
The court ordered T-Mobile to post a $750,000 undertaking. Because of
the mandatory nature of the injunction, the court directed Defendants to
submit additional evidence describing “the exact actions” required to remove
the rooftop features and the “effect . . . that would have on the remaining
footprint of the hotel.” The court set a hearing on these issues for March 6,
2025, which the court later continued to April 1, 2025.
E. Motion for Reconsideration
In the meantime, in February 2025, Defendants moved the court to
reconsider or dissolve the preliminary injunction. (See Code Civ. Proc.,5
§§ 1008 [reconsideration], 533 [modification or dissolution of injunction
“when the ends of justice would be served”].) In addition to restating their
original opposition to T-Mobile’s motion, Defendants argued the court’s order
and request for additional information violated Defendants’ rights under the
Fourth, Fifth, and Fourteenth Amendments to the United States
Constitution. Defendants supported their motion with additional evidence
regarding FCC licensure of T-Mobile entities, county permit records from
1996 regarding installation of wireless facilities on the AT&T Property, and
an email showing that AT&T hired surveyor Miller in 2012 for easement
work (which Defendants argued shows that “Miller was considered by both
sides to be a go to guy”). Defendants’ attorney explained in a declaration that
he did not initially submit some of this additional evidence because he
5 Statutory references are to the Code of Civil Procedure unless
otherwise indicated.
17
“thought [Defendants’ original evidentiary showing] was sufficient to raise [a]
factual dispute and felt the additional paperwork might be . . . cumulative.”
In opposition, T-Mobile argued that (1) Defendants’ motion did “not
present any new facts, circumstances, or law,” but rather merely “rehash[ed]
or recharacterize[d] the very same arguments and ‘evidence’ Defendants
presented in their opposition”; and (2) “the motion fail[ed] to establish its
allegedly new facts and circumstances could not be presented at the
preliminary injunction hearing.”
In reply, Defendants reargued (1) the import of T-Mobile’s deponent’s
testimony given before the preliminary injunction hearing, (2) surveyor
Miller’s opinions regarding the existence and location of the Easement, and
(3) the previous easement litigation.
F. Submissions Regarding Removal of the Rooftop Features
1. Defendants’ Submission
On March 4, 2025, Defendants filed the supplemental material
requested by the trial court regarding the scope of work required to remove
the UFO Hotel’s rooftop features.
A supporting declaration from contractor Santiago described the work
required to remove the rooftop features and estimated it would cost more
than $28 million.
Defendants’ engineer, Sarmiento, stated in a declaration that the
removal work would take about 18 months and cost $28 million, “more or
less.”
Surveyor Miller submitted a declaration clarifying statements he made
in his earlier declaration and discussing the previous easement litigation. He
18
attached a preliminary title report for the Ramallo Property that showed the
property was not encumbered by the Easement.
The UFO Hotel project’s “architect of record,” Tom Steeno, submitted a
declaration asserting that the county’s approval of the hotel project specified
that revisions would require a new county review and approval process.
Steeno also discussed his views regarding the validity of the Easement.
Business consultant Mehit submitted a declaration elaborating on his
estimate of revenue Defendants would lose from removing the rooftop
features.
Mr. Ramallo submitted a declaration discussing (1) land surveys
conducted during previous development of the Ramallo Property that did not
reveal the Easement; (2) the previous easement litigation; (3) the preliminary
title report for the Ramallo Property that did not show it was encumbered by
the Easement; and (4) the fact that the UFO Hotel’s roof and structure are
complete and that changes will require new permits and engineering, which
will trigger delays.
2. T-Mobile’s Submission
T-Mobile filed a brief and declarations from its attorney and an
engineer. The attorney explained that Defendants refused to allow T-Mobile
to inspect the UFO Hotel’s rooftop or to access its latest construction plans.
The engineer, Kevin McCoy, stated he had “more than 30 years of
experience in the fields of civil and structural engineering, forensic
engineering, and civil and structural design and analysis.” After Defendants
refused to allow a site inspection or to provide construction plans, McCoy
visited the county’s development office and reviewed the plans there. Based
on his review of those plans and the supplemental declarations from
19
Sarmiento and Santiago, McCoy asserted that the representations in those
declarations were “not credible.”
Specifically, McCoy opined that, “[c]ontrary to insinuations in
Mr. Sarmiento’s and Mr. Santiago’s declarations” that the rooftop features
are fully integrated into the hotel structure, the rooftop features “are just
attached to the roof framing” and “can be pulled off and put back on.”
Moreover, removing the rooftop features “would ultimately make the UFO
Hotel lighter and more compact and would not require the significant
‘retrofitting’ and ‘additional support’ suggested by Mr. Sarmiento and
Mr. Santiago.” Accordingly, McCoy opined that T-Mobile’s $750,000
undertaking was “more than sufficient to cover” the removal, storage, and
reinstallation (if necessary) of the rooftop features.
T-Mobile objected generally to Defendants’ supplemental submissions
to the extent they sought to merely relitigate issuance of the preliminary
injunction. T-Mobile also asserted specific evidentiary objections to portions
of Defendants’ evidence.
G. Hearing and Trial Court’s Ruling
On April 1, 2025, the trial court heard Defendants’ motion for
reconsideration and considered the submissions regarding removal of the
rooftop features.
Regarding reconsideration, the court denied Defendants’ motion and
overruled T-Mobile’s evidentiary objections. To the extent Defendants
characterized their motion as one for reconsideration under section 1008, the
court denied it because, “[o]verall, there appear[ed] to be no new evidence as
required by the statute, meaning different facts, circumstances or law for the
court to consider that it had not already considered.” Additionally, “[t]o the
20
extent that any of the facts that were submitted in support of the motion
were new, there [was] insufficient justification proffered by the defense . . .
for not offering it at the time that the court granted the injunction.” The
court also found, “[a]t this preliminary stage, [that] there [was] insufficient
evidence for the court to grant the alternative relief under section 533 that
the ends of justice would be served by modifying or dissolving the injunction.”
Turning to removal of the rooftop features, the trial court deemed the
evidence from Defendants’ contractor and engineer conclusory and
unsupported. The court “didn’t see any supporting facts or documentation
about how a modification to a decorative aspect” of the hotel would cost
$28 million when construction of the entire UFO Hotel to date cost only
$27 million.
III. DISCUSSION
A. Preliminary Injunction Standards
“ ‘[T]rial courts should evaluate two interrelated factors when deciding
whether or not to issue a preliminary injunction. The first is the likelihood
that the plaintiff will prevail on the merits at trial. The second is the interim
harm that the plaintiff is likely to sustain if the injunction were denied
compared to the harm that the defendant is likely to suffer if the preliminary
injunction were issued.’ ” (White v. Davis (2003) 30 Cal.4th 528, 554; see
Midway Venture LLC v. County of San Diego (2021) 60 Cal.App.5th 58, 76
(Midway Venture).) “The trial court’s determination must be guided by a
‘mix’ of the potential-merit and interim-harm factors; the greater the
plaintiff’s showing on one, the less must be shown on the other to support an
injunction.” (Butt v. State of California (1992) 4 Cal.4th 668, 678 (Butt); see
Midway Venture, at p. 76.) “A trial court,” however, “may not grant a
21
preliminary injunction, regardless of the balance of interim harm, unless
there is some possibility that the plaintiff would ultimately prevail on the
merits of the claim.” (Butt, at p. 678.)
“Our review of a preliminary injunction ‘may trigger any or all of the
three standards of appellate review.’ ” (Anderson v. County of Santa Barbara
(2023) 94 Cal.App.5th 554, 568 (Anderson); accord, Midway Venture, supra,
60 Cal.App.5th at p. 76.)
First, “[w]e review de novo the trial court’s application of legal
principles.” (Anderson, supra, 94 Cal.App.5th at p. 568; accord, Midway
Venture, supra, 60 Cal.App.5th at p. 76.)
Second, “[t]he trial court’s evaluation and weighing of the parties’
likelihood of success on the merits and the balance of harm is reviewed for
abuse of discretion.” (Anderson, supra, 94 Cal.App.5th at p. 568, accord, Butt,
supra, 4 Cal.4th at p. 678.) “The appellate court will find an abuse of
‘discretion only when [the trial court] has exceeded the bounds of reason or
contravened uncontradicted evidence. [Citation.] The burden rests with the
party challenging the trial court’s ruling to make a clear showing of an abuse
of discretion.” (Santa Clara Valley Water Dist. v. Eisenberg (2025)
117 Cal.App.5th 714, 728 (Eisenberg).) “In reviewing the lower court’s ruling
for abuse of discretion, we do not reweigh the evidence or evaluate the
credibility of witnesses.” (Ryland Mews Homeowners Assn. v. Munoz (2015)
234 Cal.App.4th 705, 712 (Munoz).) “When ‘the preliminary injunction
mandates an affirmative act that changes the status quo, we scrutinize it
even more closely for abuse of discretion.’ ” (Eisenberg, at p. 728.)
Third, “the superior court’s express and implied findings of fact are
accepted by appellate courts if supported by substantial evidence.” (Midway
Venture, supra, 60 Cal.App.5th at p. 77; accord, Anderson, supra,
22
94 Cal.App.5th at p. 568.) “Where the evidence before the trial court was in
conflict, we do not reweigh it or determine the credibility of witnesses on
appeal. ‘[T]he trial court is the judge of the credibility of the affidavits filed
in support of the application for preliminary injunction and it is that court’s
province to resolve conflicts.’ [Citation.] Our task is to ensure that the trial
court’s factual determinations, whether express or implied, are supported by
substantial evidence. [Citation.] Thus, we interpret the facts in the light
most favorable to the prevailing party and indulge in all reasonable
inferences in support of the trial court’s order.” (Shoemaker v. County of Los
Angeles (1995) 37 Cal.App.4th 618, 625 (Shoemaker).) We review the trial
court’s ruling based on the record as it existed when the trial