Strategi Consulting, LLC v. United States
CourtUnited States Court of Federal Claims
Date FiledJuly 24, 2026
Docket26-450
JudgeCarolyn N. Lerner
StatusPublished
📰 News Coverage: Read the LAWS.com news report on this case
Full Opinion
In the United States Court of Federal Claims
STRATEGI CONSULTING, LLC,
Plaintiff,
v. No. 26-450 1
(Filed: July 24, 2026)
THE UNITED STATES,
Defendant.
Nicholas T. Solosky, Spencer Fane LLP, Washington, D.C., for Plaintiff.
Collin T. Mathias, Civil Division, U.S. Department of Justice, Washington, D.C.
OPINION AND ORDER
LERNER, Judge.
In this bid protest action, Plaintiff Strategi Consulting, LLC (“Strategi”) completed a
previous Phase II contract to develop Tactical Surveillance, Reconnaissance, and Tracking
(“TacSRT”) software for the U.S. Air Force (“Air Force”) and U.S. Space Force (“Space Force”)
through the Small Business Innovation Research Program (“SBIR”). Strategi brings this action
to protest the Government’s failure to award it a follow-on Phase III SBIR contract despite a
continuing need. Compl. ¶ 5, ECF No. 1. Plaintiff further alleges the Government has assigned
de facto Phase III work to the quasi-government, quasi-private organization Dragon Army.
Id. ¶¶ 6, 10. Plaintiff argues this assignment amounts to a violation of the SBIR statutory
preference to award Phase III contracts to the previous contractor. Id. ¶ 13. Defendant
characterizes the Government’s actions as permissible internal development of the Government’s
own technology. Def.’s Mot. to Dismiss at 15, ECF No. 29 (“Mot.”).
The Government moves to dismiss under Rule of the Court of Federal Claims (“RCFC”)
12(b)(1) on grounds that there is no “procurement” and thus this Court lacks jurisdiction, or in
the alternative, that this protest is precluded by the Task Order Bar in the Federal Acquisition
and Streamlining Act of 1994 (“FASA”). Mot. at 1–2, 18. However, the Court’s broad
jurisdiction over actions in connection with a procurement encompasses the claims as alleged in
Plaintiff’s Complaint. Also, the Task Order Bar does not preclude Plaintiff’s claim that
1
This Opinion was filed under seal on July 9, 2026. ECF No. 40. The parties jointly notified the
Court that they will not propose redactions. ECF No. 42. Accordingly, the Court reissues this
Opinion publicly without redactions.
Defendant has assigned de facto Phase III work outside the scope of previous task orders.
Defendant’s argument that Plaintiff’s allegations lack redressability also fails because the bid
protest statutes contemplate the declaratory and injunctive relief Plaintiff requests.
Accordingly, Defendant’s Motion is DENIED.
I. Background
A. Factual Background
Strategi protests the Government’s actions as violations of the SBIR program. The SBIR
program is codified in the Small Business Innovation Development Act of 1982, Section 9 of the
Small Business Act, 15 U.S.C. § 638. Compl. ¶ 27. SBIR requires certain federal agencies to
reserve a portion of their research and development funds for small businesses. Id. SBIR has a
uniform process for projects solicited under its statutes, including a three-phase award process.
Id. ¶ 28; 15 U.S.C. § 638(e)(4). Phase I determines “the scientific and technical merit and
feasibility of ideas that appear to have commercial potential.” 15 U.S.C. § 638(e)(4)(A). Phase
II projects “further develop proposals which meet particular program needs.” Id. § 638(e)(4)(B).
“[W]here appropriate,” agencies can solicit Phase III SBIR projects “for work that derives from,
extends, or completes efforts made under prior funding agreements under the SBIR program.”
Id. § 638(e)(4)(C). The SBIR statute requires federal agencies to issue Phase III awards (if
awarded at all) to the SBIR recipients who created the technology “[to] the greatest extent
practicable.” Id. § 638(r)(4)(C) (emphasis added).
Strategi was awarded a Phase II SBIR contract from Space Systems Command (“SSC”)
Systems Delta 10, a group in the Space Force, on August 14, 2024. Compl. ¶ 41. Under the
contract, Strategi built the TacSRT automation platform, Voltron. Id. Strategi’s contract closed
on November 14, 2025, “with all deliverables accepted.” Id. ¶ 44. The Government validated
Voltron’s capabilities when it awarded Strategi the Beowulf Certificate to Field (Authorization to
Operate equivalent) and Strategi passed Iterative Capability Testing (“ICT”). Id. ¶ 43. In its
Motion to Dismiss, the Government admits Voltron received its certifications; but it asserts
several unresolved technical comments remained and Voltron did not proceed to the second
round of testing under the onboarding process. Mot. at 6 n.5.
According to the Complaint, Plaintiff alleges the Air Force “identified a continuing
requirement for TacSRT development through Voltron” before the Phase II contract closed.
Compl. ¶ 45. On July 31, 2024, Plaintiff gave government representatives a presentation titled,
“How to Issue a SBIR Phase 3,” detailing broader work in relation to TacSRT development.
Id. ¶ 48. Plaintiff alleges Patrick Kitchens, a Government civilian within the Air Force Research
Lab (“AFRL”), indicated the intent to pursue work proposed by Strategi, and Strategi prepared a
solicitation package proposal in response. Id. ¶¶ 48–49, 135. However, Strategi alleges the
Agency then pursued its proposed Phase III work with another contractor. Id. ¶ 50.
Strategi alleges in September 2024, shortly after their Phase II award, the AFRL’s
subsidiary organization, DRAGON (“Defense Readiness Agile Gaming Online Network”) Army
(“Dragon Army”), began work on Vigil, a TacSRT platform that was duplicative of Voltron.
2
Id. ¶¶ 6, 55. Plaintiff claims “Dragon Army operates as a pooled, badge-less, multi-contractor
environment in which the program lead ([Patrick] Kitchens as Government Product Owner)
directed personnel across multiple contract vehicles and labor streams as though they were one
team. This structure enabled the Government to continue TacSRT/Voltron-derived work without
a clean, transparent, single procurement path.” Id. ¶ 58. According to the Government, Dragon
Army “employs multiple service support contractors to support its software development and
maintenance missions” along with its government employees. Mot. at 5 (citing Compl. ¶ 6).
Defendant does not state whether Dragon Army should be considered a private contractor or an
internal government organization. See generally Mot. However, Defendant’s Motion argues
Strategi is contesting “a decision by the Government to internally develop software . . . using
existing contractors.” Id. at 13.
According to Plaintiff, Dragon Army created and developed “competing TacSRT tools,
including Vigil, OPP Microservice, and TacSRT Core Tasking” using a “multi-contractor /
multi-contract effort.” Compl. ¶ 55. Strategi claims Dragon Army uses existing contract
vehicles, including task orders, to assign “de facto” Phase III development of Voltron-derived
capabilities. Id. ¶¶ 71–73. Plaintiff identifies four private entities with task orders or prior
contracts with Dragon Army—Tech7, KBR, Parsons, and DFNN—and alleges they have been
assigned “Voltron-derived” work. Id. ¶ 73.
Plaintiff claims Vigil and related TacSRT work generated by Dragon Army are identical
to the Voltron platform and that Dragon Army began replicating Voltron in September 2024.
Id. ¶¶ 60, 69. Plaintiff states, “[t]he challenged Vigil/TacSRT work is not merely in the same
mission area as Voltron – it is the same workflow stack, rebuilt on substitute performers, using
the same operational concepts and feature architecture that Voltron delivered or planned.”
Id. ¶ 69. Strategi identified several backlog items on Jira (a project management software) for
Vigil work and produced charts indicating how the Jira items replicated Voltron capabilities and
Strategi ideas for Phase III work. Id. ¶ 70.
Plaintiff additionally alleges the decision not to award Strategi Phase III work was a
biased, intentional act, citing statements by Mr. Kitchens: “(i) On December 15, 2024, Kitchens
explicitly declared his intent to bring TacSRT back to Dragon Army and his personal dislike of
Strategi team members and (ii) On February 12, 2025, Kitchens stated: ‘Barb[ara Golf (the
Contracting Officer)] is going to take the funding and when we do, we won’t keep your team.’”
Id. ¶ 52.
On December 16, 2025, the Agency requested Strategi turn over the Voltron codebase to
“support critical TacSRT program execution and ongoing sustainment activities.” Id. ¶ 62. On
December 23, 2025, Strategi stated it had provided the codebase, and asserted “all Government
use of the VOLTRON codebase and associated technical data remains subject to Strategi’s SBIR
data rights.” Id. ¶¶ 63–64. Plaintiff further responded that it should be “afforded the opportunity
to fulfill the requirement for any work deriving from or extending the prior SBIR work.”
Id. ¶ 65. Strategi alleges the Government did not respond to its request. Id. ¶ 66.
3
According to Plaintiff, the Agency directed Dragon Army to rebuild Voltron through
Vigil, and Dragon Army has since extended and further developed the project, which in fact,
constitutes Phase III work under the SBIR. Pl.’s Resp. (“Resp.”) at 16, ECF No. 36.
B. Procedural History
Plaintiff filed suit on March 20, 2026. Compl. Plaintiff also moved for a temporary
restraining order (“TRO”) the same day, which the Court denied at a March 24, 2026 Joint
Preliminary Status Conference. Mot. for TRO, ECF No. 2; Order, Strategi Consulting, LLC v.
United States, No. 26-450 (Fed. Cl. March 24, 2026). The Court adopted the Parties’ jointly
proposed schedule for a motion to dismiss, cross-motions for judgment on the administrative
record (“AR”), and a potential motion to supplement the AR on March 26, 2026. Mots.
Scheduling Order, ECF No. 14.
After the Government submitted the AR, Plaintiff filed a Motion to Supplement to admit
additional documents to the record, including correspondence between the protester and Dragon
Army companies, records of discussions between the agency and the protester, and documents
related to proposals for a Phase III project. Exhibit 1, Mem. in Supp. of Mot. to Suppl., ECF No.
23-1; Mot. to Suppl. the AR at 2, ECF No. 22. Strategi also petitioned the Court to instruct the
Government to produce development records for “Vigil . . . and other TacSRT tools.” Mot. to
Suppl. the AR at 2. Plaintiff further moved to permit Strategi to conduct depositions of agency
personnel, including the Contracting Officer, to “probe the factual bases of her assertions” in her
Declaration. Id.
On May 4, 2026, the Government filed a Motion to Amend Schedule and Stay Briefing
on Plaintiff’s Motion to Supplement the AR. Mot. to Amend, ECF No. 24. It requested the
Court resolve jurisdictional questions first and amend the schedule to delay further action until
Defendant’s Motion to Dismiss was resolved. Id. at 9. Plaintiff filed a response in opposition on
May 8, 2026. ECF No. 25. The Court granted Defendant’s Motion and stayed briefing on
Plaintiff’s Motion to Supplement on May 12, 2026. ECF No. 28.
Strategi’s Complaint alleges the Government (1) violated SBIR’s Procurement
Preference by using existing contracts to procure work that extends Strategi’s Phase II contract;
(2) violated the SBIR’s Procurement Preference and acted arbitrarily and capriciously by not
awarding it a Phase III contract; and (3) violated SBIR’s Policy Directive’s requirement to
negotiate with the Phase II contractor, document impracticalities, and provide notice to the SBA.
Compl. ¶¶ 96–129. Finally, Plaintiff seeks a declaratory judgment that the Agency has engaged
and continues to engage in bad faith. Compl. ¶¶ 130–42.
The Government moves to dismiss because there is no “procurement or proposed
procurement” in dispute and therefore, this Court’s procurement bid protest jurisdiction is
inapplicable. Mot. at 10–17. Defendant maintains that any agency work in dispute is too
informal to amount to a “procurement.” Def.’s Reply (“Reply”) at 1–11, ECF No. 37. In the
alternative, the Government alleges that Plaintiff’s Complaint relates to task orders, which are
barred from review by the FASA. Mot. at 18–21. The Government also argues that there is no
Article III standing because Plaintiff’s claims lack redressability under bid protest statutory
4
provisions. Id. at 21–27. Lastly, Defendant posits dismissal is required because amendment of
the Complaint would be futile. Id. at 27–28.
Strategi maintains its suit falls properly under this Court’s bid protest jurisdiction because
Strategi contests the Government’s decision to assign work to a third party and requests
injunctive and declaratory relief available in bid protests. Resp. at 12–15, 26–27. Plaintiff also
asserts its Complaint discusses task orders only tangentially, and therefore, its suit is not
precluded by FASA Task Order Bar. Id. at 20––-26.
II. Legal Standards
A. Motion to Dismiss Standard
Defendant moves to dismiss Plaintiff’s claims under RCFC 12(b)(1) for lack of subject-
matter jurisdiction and failure to establish standing under Article III of the Constitution, U.S.
Const. art. III. See generally Mot. If the Court determines at any time that it lacks subject-
matter jurisdiction, the Court must dismiss the action. RCFC 12(h)(3).
When reviewing a motion to dismiss for a lack of jurisdiction, “the court is generally
‘obligated to assume all factual allegations to be true and to draw all reasonable inferences in
plaintiff’s favor.’” FFTF Restoration Co., LLC v. United States, 86 Fed. Cl. 226, 235 (2009)
(quoting Henke v. United States, 60 F.3d 795, 797 (Fed. Cir. 1995)). However, “the court ‘may
find it necessary to inquire into jurisdictional facts that are disputed.’” Id. (quoting Rocovich v.
United States, 933 F.2d 991, 993 (Fed. Cir. 1991)). “In establishing the predicate jurisdictional
facts, a court is not restricted to the face of the pleadings, but may review evidence extrinsic to
the pleadings ….” Omran Holding Grp. v. United States, 128 Fed. Cl. 273, 280 (2016) (quoting
Cedars–Sinai Med. Ctr. v. Watkins, 11 F.3d 1573, 1584 (Fed. Cir. 1993)).
If jurisdictional facts are in dispute, the Plaintiff bears the burden to prove its
jurisdictional allegations. Advanced Simulation Tech. Inc. v. United States, 173 Fed. Cl. 587,
596 (2024) (“ASTi”), appeal dismissed, No. 2025-1089, 2025 WL 593520 (Fed. Cir. Feb. 24,
2025) (citing Thomson v. Gaskill, 315 U.S. 442, 446 (1942)) (“[I]f a plaintiff’s allegations of
jurisdictional facts are challenged by the defendant, the plaintiff bears the burden of supporting
the allegations by competent proof.”); Def. Tech., Inc. v. United States, 99 Fed. Cl. 103, 113
(2011) (citing Reynolds v. Army & Air Force Exch. Serv., 846 F.2d 746, 748 (Fed. Cir. 1988)
(“[O]nce the . . . court’s subject matter jurisdiction [is] put in question it [is] incumbent upon [the
plaintiff] to come forward with evidence establishing the court’s jurisdiction.”). The Federal
Circuit has established that the plaintiff must demonstrate subject matter jurisdiction by a
preponderance of the evidence. Reynolds, 846 F.2d at 748; Brandt v. United States, 710 F.3d
1369, 1373 (Fed. Cir. 2013).
B. Bid Protest Jurisdiction Standard
The Tucker Act “confers jurisdiction upon the Court of Federal Claims over the specified
categories of actions brought against the United States” and “waives the Government’s sovereign
5
immunity for those actions.” Fisher v. United States, 402 F.3d 1167, 1172 (Fed. Cir. 2005).
Plaintiff filed suit in this Court under this Court’s bid protest jurisdiction. Compl. ¶ 17.
“Bid protests are heard by this Court under the Tucker Act . . . .” MORI Assocs., Inc. v.
United States, 102 Fed. Cl. 503, 517 (2011); 28 U.S.C. § 1491. The Tucker Act provides,
[the Court of Federal Claims] shall have jurisdiction to render judgment on an action by
an interested party objecting to a solicitation by a Federal agency for bids or proposals for
a proposed contract or to a proposed award or the award of a contract or any alleged
violation of statute or regulation in connection with a procurement or a proposed
procurement.
28 U.S.C. § 1491(b)(1) (emphasis added).
This dispute centers on the last clause, granting jurisdiction over “any alleged violation of statute
or regulation in connection with a procurement or a proposed procurement.” Resp. at 13–14.
The Federal Circuit has broadly interpreted the term “procurement” in 28 U.S.C. §
1491(b)(1). Sys. Application & Techs., Inc. v. United States, 691 F.3d 1374, 1381 (Fed. Cir.
2012) (“[A] narrow application of section 1491(b)(1) does not comport with the statute’s broad
grant of jurisdiction over objections to the procurement process.”); see also Distributed Sols.,
Inc. v. United States, 539 F.3d 1340, 1346 (Fed. Cir. 2008) (finding the statute includes
allegations in “connection with any stage of the federal contracting acquisition process, including
‘the process for determining a need for property or services’” (quoting 41 U.S.C. § 111)). “To
establish jurisdiction pursuant to this definition, [a contractor] must demonstrate that the
government at least initiated a procurement, or initiated ‘the process for determining a need’ for
acquisition.” Distributed Sols., 539 F.3d at 1346.
This broad interpretation of procurement provides this Court jurisdiction to review
certain agency denials of unsolicited proposals, as well as an agency’s decision to insource work
to government agencies instead of pursuing competitive private procurement. See Diaz v. United
States, 853 F.3d 1355, 1357–58 (Fed. Cir. 2017) (holding subject-matter jurisdiction existed for
claim that the government improperly denied unsolicited procurement proposal); Santa Barbara
Applied Research, Inc. v. United States, 98 Fed. Cl. 536, 542–43 (2011) (finding the
government’s decision to insource amounted to a procurement decision under the Tucker Act);
see Loomacres, Inc. v. United States, 134 Fed. Cl. 779, 783 (2017) (finding bid protest standing
for plaintiff challenging government insourcing decision); see also Fisher-Cal Indus., Inc. v.
United States, 839 F. Supp. 2d 218, 222 (D.D.C. 2012) (“As numerous other courts, including
the Fifth, Eleventh, and Federal Circuits, have noted, insourcing necessarily involves
‘determining a need for property or services’ and whether there was a need to perform such
functions through private contractors.”), aff’d, 747 F.3d 899 (D.C. Cir. 2014).
6
C. Article III Standing Redressability Provisions
Defendant additionally moves to dismiss Plaintiff’s suit for lack of standing under Article
III of the Constitution. Mot. at 21–27. 2 The Government posits Plaintiff’s claims are not
redressable under this Court’s bid protest jurisdiction. Id.
As a threshold jurisdictional matter, a plaintiff must show that it suffered an injury that
would likely be redressed by judicial relief. CSI Aviation, Inc. v. United States, 181 Fed. Cl.
143, 170 (2026) (quoting Lujan v. Defs. of Wildlife, 504 U.S. 555, 560–61 (1992)). “Each
element must be supported in the same way as any other matter on which the plaintiff bears the
burden of proof, i.e., with the manner and degree of evidence required at the successive stages of
the litigation.” Id. at 170–71 (quoting Lujan, 504 U.S. at 561). “An alleged injury to a legally
protected interest is considered redressable, if it is ‘likely, as opposed to merely speculative, that
the injury will be redressed by a favorable decision.’” Maryland Enter., L.L.C. v. United States,
91 Fed. Cl. 511, 524 (2010) (quoting Lujan, 504 U.S. at 561). “In a bid protest case, like any
other, ‘the party invoking federal jurisdiction bears the burden of establishing standing.’” CSI
Aviation, Inc., 181 Fed. Cl. at 172 (quoting CliniComp Int’l, Inc. v. United States, 904 F.3d 1353,
1358 (Fed. Cir. 2018)).
Defendant argues Plaintiff’s claims are not redressable as a bid protest. And if Plaintiff’s
claims can be directly redressed by other statutes, then the Court is precluded from bid protest
review. Mot. at 21–22. “[S]tatutory schemes with their own remedial framework exclude
alternative relief under the general terms of the Tucker Act.” United States v. Bormes, 568 U.S.
6, 13 (2012).
D. SBIR Jurisprudence
Finally, SBIR mandates federal agencies issue any Phase III awards to the prior awardee
that created the technology “to the greatest extent practicable.” 15 U.S.C. § 638(r)(4). While
SBIR does not require agencies to pursue a Phase III award, it does require a preference for the
prior awardee if one is made. Lite Machines Corp. v. United States, 143 Fed. Cl. 267, 284
(2019).
The Federal Circuit has addressed how to apply SBIR’s statutory preference in at least
two instances. In Arlton v. Aerovironment, Inc., the Federal Circuit affirmed summary judgment
for a company using a patent produced under SBIR because the company’s usage fell under
affirmative defenses under 28 U.S.C. § 1498. No. 21-2049, 2026 WL 294827, at *4 (Fed. Cir.
Feb. 4, 2026). The Federal Circuit noted, in dicta, that if SBIR obligated the government to
2
To prevail in a procurement action, Plaintiff must also show statutory standing to state a bid
protest claim under RCFC 12(b)(6). Weeks Marine, Inc. v. United States, 575 F.3d 1352, 1363
(Fed. Cir. 2009); CACI, Inc.-Fed. v. United States, 67 F.4th 1145, 1151 (Fed. Cir. 2023).
Defendant does not bring a motion to dismiss for a failure to state a claim nor mention statutory
standing, and it is, therefore, waived. See Mot. However, Plaintiff would need to show
pre-award bid protest statutory standing to prevail on a motion for judgment on the
administrative record. Weeks Marine, 575 F.3d at 1363.
7
award a Phase III contract to a disappointed bidder, the appropriate remedy would be to pursue a
bid protest action in the Court of Federal Claims. Id. In Night Vision Corp. v. United States, the
Federal Circuit asserted that although SBIR prioritizes awarding Phase III work to the earlier
Phase II contractor, this does not create a contractual commitment for an award. 469 F.3d 1369,
1374–75 (Fed. Cir. 2006). The Federal Circuit affirmed the Court of Federal Claims’ dismissal
for failure to state a claim under RCFC 12(b)(6). Id.
This Federal Circuit jurisprudence does not directly address whether this Court possesses
pre-award bid protest jurisdiction over a failure to award an SBIR Phase III claim. However, this
Court has applied the Federal Circuit’s past broad interpretation of a claim “in connection with a
procurement” to find that a protest invoking SBIR’s preference was properly brought under the
Tucker Act. Squire Solutions, Inc. v. United States, 156 Fed. Cl. 249, 264–65 (2021) (citing Sys.
Application & Techs., Inc., 691 F.3d at 1381).
III. Discussion
A. Plaintiff has Sufficiently Alleged Claims Connected to a Procurement or
Proposed Procurement.
1. Plaintiff’s Allegations Fall under the Umbrella of Actions Related to a
Procurement.
This Court has bid protest jurisdiction over actions by “an interested party objecting to
. . . any alleged violation of statute or regulation in connection with a procurement or a proposed
procurement.” 28 U.S.C. § 1491(b)(1). The factual allegations here are sufficient to defeat the
Motion to Dismiss and show by a preponderance of the evidence that the agency’s actions relate
to a procurement.
Numerous key facts are in dispute. For example, after the Government failed to respond
to its proposals for a Phase III project, Plaintiff alleges the Government replicated the work it
produced for Voltron to prepare for a private contractor takeover through Vigil. Compl. ¶¶ 6–7.
The Government denies this and argues Vigil is simply another TacSRT software with
similarities to Voltron and is more compatible with the AFRL’s infrastructure. Mot. at 7.
In Plaintiff’s view, Vigil “derives from, extends, or completes” Voltron and is de facto
Phase III work. Compl. ¶ 125. The Government maintains the work is simply continued
development and operationalizing, not additional services. Mot. at 7. In Contracting Officer
Barbara Golf’s Declaration, she states that the Government chose not to onboard Voltron and
directed her team to “extend [the] existing software baseline to manage the [TacSRT] mission
set.” Tab 168 at Admin. R. (“AR”) AR1909. Plaintiff alleges one of the decision-makers
demonstrated a bias against awarding future work to Strategi. Compl. ¶¶ 50, 52, 140. Defendant
does not address this allegation. Plaintiff further asserts the Air Force has assigned de facto
Phase III work to substitute performers in Dragon Army through the vehicle of existing Task
Orders. Compl. ¶¶ 73–74. Plaintiff maintains this action is akin to awarding a contract to a
competing private company. Resp. at 15–20. Defendant denies this and describes Dragon Army
8
as a government organization that “employs multiple service support contractors to support its
software development and maintenance missions” along with its government employees. Mot.
at 5. Plaintiff claims the Government’s denials serve to “evade procurement law by rebranding
funded contract vehicles as ‘internal resources.’” Resp. at 16.
Thus, numerous factual disputes persist. At this stage, Plaintiff need only prove its
jurisdictional factual allegations by a preponderance of the evidence. See Reynolds, 846 F.2d
at 748. “Showing something by a preponderance of the evidence simply requires the trier of fact
to believe that the existence of a fact is more probable than its nonexistence before it may find in
favor of the party who has the burden to persuade the Court of the fact’s existence.” Concrete
Pipe & Prods. of California, Inc. v. Constr. Laborers Pension Tr. for S. California, 508 U.S.
602, 622 (1993) (citation modified).
Here, evidence demonstrates the following is more likely than not: the Government
reviewed Strategi’s Phase III proposals; the Agency declined to award Strategi a Phase III
contract; the Government requested Strategi’s codebase for the Voltron software; the
Government continues development on a TacSRT software similar to Voltron; and private
contractors have likely been assigned this work, at least to some extent. At this stage, Plaintiff’s
allegations amount to a reviewable procurement claim.
“‘Procurement’ includes all stages of the process of acquiring property or services,
beginning with the process for determining a need for property or services and ending with
contract completion and closeout.” 41 U.S.C. § 111. This Court follows the Federal Circuit’s
repeated broad interpretation of what constitutes a procurement. Distributed Sols., 539 F.3d
at 1346 (“A proposed procurement, like a procurement, begins with the process for determining a
need for property or services.”); Cleveland Assets, LLC v. United States, 883 F.3d 1378, 1381
(Fed. Cir. 2018) (finding bid protest jurisdiction extends only “to actions in which the
government at least initiated a procurement, or initiated the process for determining a need for
acquisition” (citation omitted)).
The Government identifies several cases finding internal agency decisions to use “in-
house” resources should not be considered connected to “procurements,” even under the Federal
Circuit’s broad scope of procurement jurisdiction. Mot. at 12–14; see ASTi,, 173 Fed. Cl. 587.
ASTi focused on a dispute where the government originally awarded a contract to develop Digital
Radio Management System training software to another contractor, and ASTi filed a protest.
ASTi, 173 Fed. Cl. at 589–90. Subsequently, the Government remedied its action by cancelling
the contract and developing the work internally. Id. at 590. ASTi argued the Court still had
jurisdiction to review the Government’s action. Id. However, the Court held there was not “a
sufficiently concrete government procurement action that would make ASTi’s bid protest ripe.”
Id.
Plaintiff persuasively distinguishes ASTi on multiple grounds. Resp. at 17. Strategi
argues that ASTi assessed a government action to internally develop its own product that it had
developed over twenty years ago, and there was “no reason to acquire anything new.” Id. (citing
ASTi, 173 Fed. Cl. at 590–92). Plaintiff also distinguishes ASTi, noting that here, the Agency
9
funded Strategi’s Voltron product, the Agency declined Plaintiff’s Phase III proposal, and the
Agency duplicated Voltron’s features to continue work with third-party contractors. Resp. at 17.
Plaintiff characterizes this as “acquisition by another name.” Id. Indeed, the Government’s
acknowledgement that Dragon Army “employs multiple service support contractors” in its
software development projects supports Plaintiff’s allegations, at least at this stage. Mot. at 5.
In ASTi, the plaintiff’s only evidence that a private contractor was engaged in follow-on
work was that an outside contractor had posted a job opening for similar work. 173 Fed. Cl.
at 590. Here, Plaintiff identifies robust evidence that the Government is likely assigning private
contractors the work in dispute. Resp. at 16. Barbara Golf’s declaration states that she decided
not to onboard Voltron and “extend[ed] existing software baseline to manage the [TacSRT]
mission set,” and assigned the further development to her team, Dragon Army. Tab 168
at AR1909. The Government’s acknowledgement that Dragon Army includes “service support
contractors” also bolsters the allegation that the Contracting Officer assigned Voltron-derived
work to a private entity. Mot. at 5.
Additionally, ASTi contemplates that even some government decisions to develop its own
product can amount to a procurement:
At some point, a government decision to develop a product can amount to having
determined a need under Distributed Solutions, and then the government needs to look at
possible outside suppliers. 10 U.S.C. § 3453. But when the government is working on
software that it developed long ago and has not issued any solicitations or requests for
information . . . the alleged procurement is simply too speculative to fall within the
court’s jurisdiction.
173 Fed. Cl. at 593.
Here, the alleged acquisition is more defined: Plaintiff proffers that the Government declined a
proposal for follow-on work in 2025 and simultaneously pursued similar work with private
contractors. Resp. at 9.
The Government also asks this Court to follow the holdings in VFA v. United States, 118
Fed. Cl. 735 (2014) and International Genomics v. United States, 104 Fed. Cl. 669 (2012). Mot.
at 14–16. Both cases noted that in Distributed Solutions, the company protested a decision in
connection with a formal Request for Information sent publicly. Int’l Genomics, 104 Fed. Cl. at
676; VFA, 118 Fed. Cl. at 741. The cases warned against opening a “Pandora’s box” and
expanding jurisdiction over informal government action. VFA, 118 Fed. Cl. at 743. Still,
Distributed Solutions noted “the statute does not require an actual procurement. The statute
explicitly contemplates the ability to protest these kinds of pre-procurement decisions.” 539
F.3d at 1346.
While Defendant is correct that the agency in Distributed Solutions sent formal Requests
for Information to potential contractors, the holding does not suggest that such formal requests
are required. Id. This was further clarified by the Federal Circuit in Diaz. 853 F.3d at 1358.
Diaz found bid protest subject-matter jurisdiction over a denial of an unsolicited proposal, and
10
the Court recognized informal emails and the contracting officer’s review as responses to the
“proposed procurement.” Diaz, 853 F.3d at 1358.
In addition, Defendant argues bid protest jurisdiction can only be applied to actions
contesting a “violation of a statute or regulation” related to a procurement. Mot. at 16–17
(“[C]autionary and informative regulations and directives provide only internal governmental
direction. . . . [Such] provisions supply no remedy for private parties in a judicial forum.”)
(quoting Am. Tel. & Tel. Co. v. United States, 307 F.3d 1374, 1380 (Fed. Cir. 2002)). Defendant
posits the SBIR Phase III preference statute is not a procurement regulation statute, but merely
an informal directive applying to contract formation. Id. at 17. SBIR states “Federal agencies
and Federal prime contractors shall . . . (B) issue, without further justification, Phase III awards
relating to technology . . . to the SBIR and STTR award recipients that developed the
technology.” 15 U.S.C. § 638(r)(4).
In contrast, Plaintiff reads the SBIR Phase III preference statute as mandating
procurement compliance and not akin to the “cautionary and informative” regulations Am. Tel. &
Tel. Co. prohibits. Resp. at 15. Plaintiff’s interpretation is consistent with Federal Circuit
precedent. Arlton, 2026 WL 294827, at *4 (holding protests of SBIR Phase III contract awards
belong in the Court of Federal Claims because of its “exclusive jurisdiction to review the full
range of procurement protest cases” (quoting Res. Conservation Grp., LLC v. United States, 597
F.3d 1238, 1243 (Fed. Cir. 2010)).
According to Defendant, “Strategi fails to identify a single procurement or proposed
procurement that Strategi was eligible to receive.” Mot. at 11. Defendant maintains that the
development of Vigil does not amount to an acquisition of services and thus does not amount to
a procurement. However, developing research or prototypes is considered a procurement.
Squire Solutions, Inc., 156 Fed. Cl. at 262–63 (“The fact that the Topic focuses on research and
development does not preclude it from being a procurement.”).
Ultimately, Plaintiff has met its burden to show its protest is in connection with a
procurement by a preponderance of the evidence. While this is sufficient to defeat a motion to
dismiss on subject-matter jurisdiction, Strategi’s burden of proof to survive a motion for
judgment on the administrative record will be much higher.
2. Undisputed Jurisdictional Facts Involve Government Insourcing and
Denials of Procurement Proposal Actions.
There is no dispute that Strategi presented an extensive SBIR Phase III project proposal
to the Agency, and the Agency declined to adopt it. See Mot. at 6; Resp. at 8–9. Count II of the
Complaint explicitly contests the decision to decline the proposal. Compl. ¶¶ 105–12. Review
of agency procurement proposal denials falls within this Court’s subject-matter jurisdiction.
Diaz, 853 F.3d at 1357–58.
Furthermore, if the government’s actions were considered only internal agency decisions
to pursue work in-house, see Reply at 2–3, the Court still possesses subject-matter jurisdiction to
review the action. “The Air Force’s decision to in-source . . . involved a process for determining
11
a need for property or services and was made in connection with a procurement or proposed
procurement.” Dellew Corp. v. United States, 108 Fed. Cl. 357, 370 (2012) (citation modified);
see also Loomacres, Inc., 134 Fed. Cl. at 783 (denying a motion to dismiss a former contractor’s
bid protest against the government’s decision to insource future work); MORI Assocs., Inc., 102
Fed. Cl. at 524–25 (finding the government’s cancellation of a solicitation alongside an alleged
violation of a statute falls within bid protest jurisdiction). Contra VFA, 118 Fed. Cl. at 743
(granting motion to dismiss protest of informal decision by agency to develop software in-
house); ASTi, 173 Fed. Cl. at 592–94 (finding the government’s insourcing decision not
sufficiently concrete to be considered a procurement).
B. The Task Order Bar Does Not Preclude Plaintiff’s Lawsuit.
The Government contends FASA Task Order Bar prevents Strategi from bringing a bid
protest. Mot. at 18–21; 41 U.S.C. § 4106(f). The statute stipulates a “protest is not authorized in
connection with the issuance or proposed issuance of a task or delivery order.” Id. The Agency
claims Plaintiff’s repeated references to “actions taken pursuant to issued task orders” equate to a
direct and casual connection to the issuance of their task orders, and accordingly, this protest is
precluded by the Task Order Bar. Reply at 8.
Plaintiff counters that the Task Order Bar does not prohibit the “protest[ ] of every
agency action that tangentially involves a task order.” Resp. at 20–21. “[A] challenge to
the selection (or planned selection) of a particular (task order) contracting vehicle does not
equate to the ‘proposed issuance’ of a task order.” Tolliver Group, Inc. v. United States, 151
Fed. Cl. 70, 101 (2020). FASA simply bars the challenge of agency decisions that are “‘directly
and causally connected’ to the issuance of a task order.” Id. at 103 (quoting SRA Int’l, Inc. v.
United States, 766 F.3d 1409, 1413 (Fed. Cir. 2014)). This Court has previously held that the
Task Order Bar did not prohibit claims against solicitations with peripheral references to task
orders. See Tolliver Group Inc., 151 Fed. Cl. at 93–106; BayFirst Sols., LLC v. United States,
104 Fed. Cl. 493, 507–08 (2012). The Task Order Bar requires a comprehensive review into the
“connectedness of each challenged procurement decision to the issuance or proposed issuance of
a task order.” BayFirst Sols., LLC, 104 Fed. Cl. at 503.
“Not every decision that precedes the selection of a task order vehicle is so bound up with
the proposed issuance of a task order that a protest of the decision would be prohibited by
FASA.” Mori Assocs., Inc. v. United States, 113 Fed. Cl. 33, 38 (2013). Furthermore,
“[p]rocurement decisions that are made after task orders have been issued are similarly not
affected by the FASA prohibition.” Id. at 38.
Here, Strategi’s protest is directed at the Agency’s violation of the SBIR
Statute’s Procurement Preference, not the task orders themselves. Resp. at 21. Specifically,
Strategi is challenging the Agency’s decision to use other contract vehicles, such as task orders,
instead of awarding it a Phase III. Compl. ¶ 126; contra DataMill, Inc. v. United States, 91 Fed.
Cl. 740, 756–57 (2010) (finding Task Order Bar applied to bid protest claim where the
government pursued contested work through a new task order). It alleges the Agency is
12
engaging in “improper de facto Phase III work” through the identified task orders. Resp. at 24
(citing Compl. ¶¶ 71–74).
The Government’s reliance on SRA Int’l is misplaced because “every allegation in SRA’s
complaint [was] connected to issuance of the task order.” Mot. at 19; SRA Int’l, Inc., 766 F.3d
at 1412–13. Here, Strategi’s allegations are not all directly related to the task orders.
Strategi’s core allegation is the Agency violated the SBIR Statute’s Procurement Preference by
not awarding it a Phase III contract. Compl. ¶¶ 71–74. In support, Plaintiff identifies three task
orders which it alleges wer