Sweet Star
CourtArmed Services Board of Contract Appeals
Date FiledOctober 23, 2026
Docket64505
JudgeEyester
StatusPublished
📰 News Coverage: Read the LAWS.com news report on this case
Full Opinion
ARMED SERVICES BOARD OF CONTRACT APPEALS
Appeal of - )
)
Sweet Star ) ASBCA No. 64505
)
Under Contract No. W91B4N-18-P-5056 )
APPEARANCE FOR THE APPELLANT: Sweeta Rahimi
President & Chief Executive Officer
Kabul, Afghanistan
APPEARANCES FOR THE GOVERNMENT: Dana J. Chase, Esq.
Army Chief Trial Attorney
MAJ Joseph A. Seaton, JA
Trial Attorney
OPINION BY ADMINISTRATIVE JUDGE EYESTER ON THE
GOVERNMENT’S MOTION FOR SUMMARY JUDGMENT
The Department of the Army (Army) moved for summary judgment arguing
Sweet Star failed to submit its claim within six years of accrual pursuant to 41 U.S.C.
§ 7103(a)(4)(1). In response, Sweet Star argued there was an ongoing dispute with the
Army which affected the claim accrual date, or in the alternative, there were factors
beyond its control which caused it to file the appeal after the six-year statute of
limitations. The Army contends that equitable tolling does not apply here because
Sweet Star did not diligently pursue its rights and there were no extraordinary
circumstances which prevented it from filing within the time limits. For the reasons
set forth below, we grant the Army’s motion for summary judgment.
STATEMENT OF FACTS (SOF) FOR PURPOSES OF THE MOTION
1. On September 4, 2018, the United States Army (Army) awarded contract
No. W91B4N-18-P-5056 to Sweet Star (Sweet Star) for the delivery of information
technology equipment and cable supplies for a fixed price of 14,051,489.13 AFN 1
($203,644.77) (R4, tab 1 at 1, 3). Sweet Star was to deliver the equipment to Bagram
Airfield (id. at 1). The contract incorporated by reference Federal Acquisition
Regulation (FAR) 52.233-1, DISPUTES (MAY 2014) (id. at 19).
1
Afghani (AFN) refers to the local currency in Afghanistan (see R4, tab 1 at 20
incorporating by reference Defense Federal Acquisition Regulation Supplement
252.232.7014, NOTIFICATION OF PAYMENT IN LOCAL CURRENCY
(AFGHANISTAN) (SEP 2014)).
2. Sweet Star emailed the Army contracting team on October 22, 2018, stating
it successfully delivered the items to Bagram Airfield and requesting payment (R4,
tab 6 at 1). Sweet Star attached a “Delivery Ticket,” which was the list of items for
which it sought payment (R4, tab 7). Upon inspection on October 23, 2018, the Army
found the majority of the items listed on the “Delivery Ticket” were either incorrect;
incorrect and not a suitable substitution; an incorrect quantity; not compatible; or
missing (R4, tab 9, tab 10 at 1, tab 15).
3. Sweet Star emailed the Army several times seeking payment (see e.g., R4,
tab 8 at 1, tab 10 at 1). On October 24, 2018, the contracting officer informed Sweet
Star that the person who signed for the delivery was not authorized to accept the items.
Further, the contracting officer explained there were some issues with the items so the
customer “wouldn’t be able to accept the invoice . . . until those issues [were]
rectified.” (R4, tab 10 at 1)
4. On October 31, 2018, the Army again notified Sweet Star that some of the
items were missing, damaged, or non-conforming. The Army asked Sweet Star about
a process for returning the unsuitable items. (R4, tab 16 at 2)
5. On November 6, 2018, Sweet Star emailed the Army about the return of the
items and delivery of missing items (R4, tab 16 at 1-2). On November 17, 2018, the
contracting officer sent Sweet Star a cure notice (R4, tabs 17-18). According to the
notice, Sweet Star delivered the items almost a month late and numerous items were
incorrect, damaged, or missing. The contracting officer gave Sweet Star 10 days to
correct all the deficiencies and retrieve the rejected shipment or the Army would
terminate the contract for cause. (R4, tab 18 at 1)
6. On December 7, 2018, the contracting officer told Sweet Star that the Army
would not keep unsuitable items or unsuitable substitutes. However, the contracting
officer stated that Sweet Star was not responsible for any missing items because a
government representative attested that all items were accounted for upon delivery.
The contracting officer asked for an address in which it could ship the items back to
Sweet Star. The contracting officer instructed Sweet Star to adjust its invoice to
5,795,103.69 AFN. Sweet Star provided an address on December 8, 2018. (R4, tab 33
at 1)
7. On December 10, 2018, the Army issued a modification (which noted it
required Sweet Star’s signature but the file contains no signed modification). The
modification decreased the total price for contract line item number 0001 from
12,985,439.13 AFN ($188,194.77) to 5,795,103.69 AFN ($83,987.01) (a decrease of
7,190,335.44 AFN ($104,207.76)). The purpose of the modification was to
“deobligate the funding that represent[ed] the total for the items that were returned to
2
the customer.” (R4, tab 35 at 1) In December 2018, the Army approved some
payment be made to Sweet Star (R4, tab 38).
8. On January 8, 2019, the Army asked Sweet Star how it wanted to retrieve
the rejected items. Sweet Start stated it would not take the items because it had tried to
retrieve them previously but now it was too late to dispose of them. (R4, tab 43 at 1)
9. By email dated January 11, 2019, the contracting officer notified Sweet Star
it had until January 24, 2019 to collect all non-conforming contract items as the Army
would not deliver them to Sweet Star. After January 24, 2019, any non-conforming
items that Sweet Star had not collected would be considered “abandoned,” leaving the
government to dispose of the items per agency procedures. (R4, tab 45 at 1) Sweet
Star failed to collect its non-conforming contract items by January 24, 2019, but
blamed the Army for failure to coordinate (see R4, tab 49 at 1).
10. On March 25, 2019, Sweet Star emailed the Army, including the
contracting officer, stating that it received only 45 percent payment on the contract and
seeking payment for the remaining materials for which it had not been paid and were
still in the Army’s possession. Sweet Star further stated it was its “Final Notice,” and
asked the Army to finalize its decision concerning the materials for which it had not
been paid or it would appeal to the Board. The request for payment did not include a
sum certain, nor did the request contain the claim certification set forth at 41 U.S.C.
§ 7103(b)(1). (R4, tab 57 at 1)
11. The Army considered Sweet Star’s March 25, 2019 email to be a claim for
over $100,000. On May 16, 2019, the Army contracting officer instructed Sweet Star
to certify its purported claim. The Army specifically told Sweet Star it must certify the
following: the claim is made in good faith; the support data are accurate and complete
to the best of the contractor’s knowledge and belief; the amount requested accurately
reflects the contract adjustment for which the contractor believes the government is
liable; and the certifier is authorized to certify on behalf of the contractor. (R4, tab 59)
12. On May 18, 2019, the contracting officer issued a final decision (COFD)
denying Sweet Star’s claim, in part (R4, tab 60, tab 61 at 1, 3). The contracting officer
stated the Army paid Sweet Star for all items it accepted and any missing items. The
Army did not pay Sweet Star 7,190,335.44 AFN ($104,207.76), which was the amount
by which the Army had decreased the contract via a modification. (R4, tab 61 at 2)
Further, according to the contracting officer, Sweet Star never arranged to retrieve the
nonconforming items in the Army’s possession and the Army had no evidence that
Sweet Star attempted to coordinate retrieval. The contracting officer concluded that
Sweet Star’s request for payment was for the $104,207.76, but that the Army only
owed 29,849.40 AFN ($432.60) for certain items and denied the remaining balance of
7,160,486.04 AFN ($103,775.16). (Id. at 2-3) The contracting officer also explained
3
that since Sweet Star’s claim was over $100,000, it had been instructed to certify the
claim “but failed to do so” (id. at 3).
13. The next day, Sweet Star emailed the contracting officer stating it never
filed a claim and asked questions about how to pick up the materials. The contracting
officer explained that no one can enter Bagram Airfield without an escort and that all
Sweet Star had to do was contact the designated individual (not the customer) as
instructed and that person could have coordinated pick-up. (R4, tab 62 at 1)
14. On May 20, 2019, Sweet Star complained about not being paid for the
material still in the Army’s possession. Sweet Star asked how to file a claim. In
response, the contracting officer directed Sweet Star to the ASBCA’s website. (R4,
tab 63 at 1)
15. By email dated May 23, 2019, Sweet Star filed a notice of appeal to the
Board, which the Board docketed as ASBCA No. 62082. Ultimately, on
September 30, 2020, the Board dismissed the appeal for lack of jurisdiction, holding
there was an inadequate notice of the basis of the claim and amount in Sweet Star’s
request, and thus there was no claim. Sweet Star Logistic Serv., ASBCA No. 62082,
20-1 BCA ¶ 37,704 at 183,046. In a footnote, the Board explained that if Sweet Star
resubmits its claim, it should ensure there is a sum certain and certification (if the
amount requested exceeded $100,000) which the Board included in the decision. Id.
at 183,046 n.2.
16. Soon thereafter, on October 2, 2020, Sweet Star filed a document with the
Board, which the Board treated as a motion for reconsideration. Sweet Star Logistic
Serv., ASBCA No. 62082, 21-1 BCA ¶ 37,773 at 183,343. The Board noted that
“[r]ather than submitting a new claim to the contracting officer (CO), with a sum
certain, certified if over $100,000 as also required by the [Contract Disputes Act
(CDA)],” Sweet Star filed this document with the Board “complaining about the
dismissal of its claim, but not offering any additional information or demonstrating
that our decision was somehow improper.” Id. The Board affirmed its prior dismissal
of Sweet Star’s appeal for lack of jurisdiction. Id. The Board specifically provided
the following instruction: “Should appellant wish to pursue a claim, it must submit a
claim to the CO with a sum certain, and certified if it exceeds $100,000.” Id.
17. Sweet Star next filed two emails with the Board, on January 1 and
January 19, 2021, which the Board deemed to constitute a second motion for
reconsideration. Sweet Star, ASBCA No. 62082, 21-1 BCA ¶ 37,827 at 183,704. The
Board denied the motion as our rules do not allow for a second motion for
reconsideration. Id. Further, the Board instructed its Recorder’s Office to not accept
any other filings related to the appeal. Id.
4
18. In the January 1, 2021 email to the Board, Sweet Star requested a lawyer.
The Board explained it does not provide lawyers to parties. (App. br., tab 2 at 1-2)
19. On July 5, 2021, Sweet Star emailed several individuals at the Army (one
email address included the contracting officer’s name) asking for the materials to be
returned or to be paid for them (app. br., tab 3 at 1). Sweet Star attached its ASBCA
appeal to the email (id. at 1-3). On July 7, 2021, an individual from the Army emailed
Sweet Star and copied others from the Army asking if someone could look into the
matter, and noting the specific individual who was the contracting officer for this
contract (Ms. Mulvaney) (id. at 4). Over the next two weeks, Sweet Star and the
individual from the Army exchanged emails, with the Army stating the ASBCA
denied the appeal and that Sweet Star should talk to someone in Afghanistan about the
matter (id. at 5-11). Ms. Mulvaney was copied on the emails (id. at 4-11).
20. On September 3, 2022, Sweet Star contacted a private sector attorney
seeking representation for its claim (app. br., tab 4). Sweet Star also submitted a
petition for a special immigration visa to the Department of State on September 14,
2022 (app. br., tab 5 at 10-11).
21. Sweet Star submitted a renewed “claim” on July 8, 2025 seeking
$104,207.76, which included certification language. Sweet Star explained the “claim
pertains to a dispute arising from the reduction in payment for goods delivered under
the contract, specifically those items that were allegedly damaged, missing, or deemed
non-conforming.” Sweet Star submitted the claim to two different email addresses for
Ms. Mulvaney. (App. br., tab 6 at 1) There is nothing in the record showing the Army
or Ms. Mulvaney responded.
22. On January 3, 2026, Sweet Star filed a claim with the contracting officer,
which included certification language, seeking 7,198,691.37 AFN for materials
delivered (R4, tab 66 at 1, 3). On January 28, 2026, Sweet Star filed a corrected, claim
with certified language seeking $104,209.26, and arguing the government retained
goods after delivery and failed to pay for them (app. br., tab 9 at 2-3). On January 30,
2026, the contracting officer told Sweet Star that its legal staff was reviewing the
email and documents (id. at 7). On April 7, 2026, Sweet Star filed its appeal with the
Board on a deemed denial of its claim.
DECISION
The contract incorporated by reference the disputes clause, which explained the
contract was subject to the CDA (SOF ¶ 1; FAR 52.233-1(a)). As relevant here, the
CDA states that each contractor claim must be submitted within six years of claim
accrual. 41 U.S.C. § 7103(a)(4)(A); see also FAR 52.233-1(d)(1); FAR 33.206(a). A
claim accrues “when all events[] that fix the alleged liability of either the Government
5
or the contractor and permit assertion of the claim, were known or should have been
known.” FAR 33.201.
The Army moves for summary judgment arguing that there is no genuine issue
of material fact that Sweet Star submitted its January 28, 2026 claim more than six
years after it accrued (gov’t mot. at 1). 2 According to the Army, the claim accrued at
the latest on December 10, 2018 when the Army issued a modification decreasing the
total contract price and, as the Army states, establishing it would not pay Sweet Star
for the nonconforming supplies (id. at 11; see SOF ¶ 7). The Army also contends the
claim actually accrued as early as October 24, 2018, when the contracting officer told
Sweet Star there were issues with the delivered items and the Army would not pay for
the full shipment (gov’t mot. at 12).
In its initial brief, Sweet Star stated this appeal (and thus the underlying claim)
“concerns the same underlying contractual dispute that has existed since 2018” (app.
br. at 15). In its reply brief, it argues the claim did not accrue in December 2018
because the government did not establish Sweet Star received the modification (app.
reply at 4; app. sur-reply at 1). Sweet Star also argues that the claim did not accrue in
December 2018 because the parties were engaged in an ongoing dispute and the Army
controlled the disposition of the material (app. sur-reply at 1-2).
The facts show that on October 24, 2018, the contracting officer told Sweet Star
there were issues with the items delivered and the customer would not accept Sweet
Star’s invoice until it rectified those issues (SOF ¶ 3). Then, on December 7, 2018, the
contracting officer told Sweet Star that the Army would not keep unsuitable items or
unsuitable substitutes and instructed Sweet Star to adjust its invoice to 5,795,103.68
AFN (SOF ¶ 6). This adjusted amount is equal to the adjusted amount on the
modification (see SOF ¶¶ 6-7). Thus, even if Sweet Star did not receive a copy of the
modification, it knew the issues and an amount in dispute. In fact, with this
information, Sweet Star was able to complain to the contracting officer about
nonpayment and file an appeal with the Board (SOF ¶¶ 10, 15-16). Ultimately, the
contracting officer issued a final decision (SOF ¶ 12), and there were ongoing
exchanges with Army personnel on the matter (see SOF ¶¶ 19, 21); however, the
Army’s position regarding nonpayment did not change.
We will grant summary judgment only if “there is no genuine issue as to any
material fact and the moving party is entitled to judgment as a matter of law.” Celotex
Corp. v. Catrett, 477 U.S. 317, 322 (1986) (citation omitted). As even Sweet Star
admits, by 2018, Sweet Star knew the facts underlying the dispute. We conclude the
2
The Board also sua sponte raised the issue of whether, pursuant to 41 U.S.C.
§ 7103(a)(4)(A), Sweet Star submitted its claim within six years of claim
accrual. Bd. Order dtd. Jul 29, 2026.
6
claim accrued by October 24, 2018 when Sweet Star knew the Army would not pay for
nonconforming goods and knew the unpaid amount (even if later it changed slightly).
Sweet Star therefore was to have filed its claim by October 24, 2024. See Afghan
Premier Logistics, ASBCA No. 62938 et al., 23-1 BCA ¶ 38,373 at 186,404 (denying
motion for reconsideration and explaining that “for the claim to accrue it is sufficient
for the claimant to know it was wronged and has a cause of action against the
government, not necessarily having all the details nailed down”); Watts Constructors,
LLC, ASBCA No. 63753, 25-1 BCA ¶ 38,938 at 189,514-15, mot. recons. den., 26-1
BCA ¶ 38,981 (explaining that a contractor knew or should have known it suffered
some injury at the time a modification was issued but the claim could have accrued
earlier).
By its own admission, Sweet Start did not file a certified claim that included a
sum certain with the contracting officer until January 2026 (SOF ¶ 22; see also app. br.
at 5). Thus, it filed its claim over six years (and more than seven years) after it
accrued. 3
The CDA’s statute of limitations is not jurisdictional, and is subject to equitable
tolling. Sikorsky Aircraft Corp. v. United States, 773 F.3d 1315, 1322 (Fed. Cir.
2014). The Board has held that the CDA’s six-year statute of limitations “may be
equitably tolled when a litigant has (1) been pursuing his rights diligently, and
(2) some extraordinary circumstance ‘stood in his way and prevented timely filing.”’
The Adamant Grp. for Contracting and Gen. Trading, ASBCA No. 60316, 16-1 BCA
¶ 36,577 at 178,136 (quoting Menominee Indian Tribe of Wis. v. United States, 577
U.S. 250, 255 (2016)); see also Kamaludin Slyman CSC, ASBCA No. 62006 et al.,
21-1 BCA ¶ 37,849 at 183,794). For the first prong, the Board will determine whether
there was “‘reasonable diligence,’ not ‘maximum feasible diligence.’” Kamaludin
Slyman CSC, 21-1 BCA ¶ 37,849 at 183,794 (quoting Holland v. Florida, 560 U.S.
631, 653 (2010)). For the second prong, the Board will look at whether the litigant’s
delay was both extraordinary (i.e., whether critical information was undiscoverable)
and beyond the litigant’s control. Id. at 183,794-95 (citations omitted).
Sweet Star claims it was diligent in its pursuit regarding the filing of its claim
because it continued to seek administrative relief through the Board; worked with the
3
Sweet Star submitted a “claim” on July 8, 2025 seeking $104,207.76, which included
certification language (SOF ¶ 21). Even if we considered this to be a claim
(despite Sweet Star not arguing this fact and never appealing it), this “claim”
was still submitted more than six years after it accrued. Further, even if we
concluded the claim accrued on December 7, 2018, when the contracting officer
told Sweet Star that the Army would not keep unsuitable items/substitutes and
instructed Sweet Star to adjust its invoice (SOF ¶ 6), Sweet Star still filed the
claim late.
7
United States special immigrant visa program, and submitted an application to
relocate, dated September 14, 2022; attempted to retain legal counsel in September
2022 to prepare the claim; and continued (starting in 2021) searching for the
responsible contracting officer (noting that many government email addresses became
inactive) (app. br. at 3-5, 11, tab 3-5). Sweet Star explains that it used SAM.gov to
locate the contracting officer (app. br. at 14). Finally, in January 2026, Sweet Star
states it was able to transmit its claim to several contracting officials and one of them
forwarded the claim to the responsible contracting officer (id.).
Sweet Star also argues it faced extraordinary circumstances beyond its control
which caused the delay. First, Sweet Star explains it is not an attorney and was not
represented by counsel when it filed the initial claim and English is not the owner’s
first language (app. br. at 9, 12). Second, Sweet Star argues that the withdrawal of the
United States from Afghanistan in August 2021 caused disruptions to its business (id.
br. at 3). Specifically, Sweet Star explains that as an Afghan contractor that had
supported the United States military, it was forced to leave the company’s office (after
company records were lost) and family residence (where private property was taken)
due to security threats (id. at 3, 5).
In response, the Army argues there was nothing preventing Sweet Star from
filing a certified claim on time. Specifically, the Army argues that Sweet Star retained
access to its business email accounts and used those accounts to repeatedly send
communications to the Army, Department of State and one attorney after the Taliban’s
takeover of Afghanistan; and had almost three years to submit its claim before the
Taliban’s takeover (gov’t mot. at 11-12, 15, 19-20). Further, as the Army notes, Sweet
Star was able to submit a “claim” in March 2019, and then appeal to the Board (id.
at 16). At that point, both the Army and Board provided specific instructions on
certain key ingredients to a claim (certification and sum certain) (id.). Instead, Sweet
Star filed additional emails with the Board and then did not attempt to file another
claim until too late (id. at 16-17).
As noted, the contract included the disputes clause, which defines a claim and
sets forth the exact certification required if the amount requested is over $100,000
(SOF ¶ 1; FAR 52.233-1(c), (d)). The clause also explains that claims must be
submitted in writing to a contracting officer within six years of accrual.
FAR 52.233-1(d)(1). The record shows that on March 25, 2019, Sweet Star emailed
the contracting officer complaining it did not receive the entire contract amount and
that the remaining materials for which it had not been paid were still in the Army’s
possession (SOF ¶ 10).
The Army considered Sweet Star’s March 25, 2019 email to be a claim for over
$100,000 and thus on May 16, 2019, the Army contracting officer instructed Sweet
Star to certify its purported claim and provided it the exact certification language to
8
use (SOF ¶ 11). Later, Sweet Star appealed to the Board, and on September 30, 2020,
the Board dismissed the appeal for lack of jurisdiction, holding there was an
inadequate notice of the basis of the claim and amount in Sweet Star’s request, and
thus there was no claim. Sweet Star, ASBCA No. 62082, 20-1 BCA ¶ 37,704
at 183,046. The Board specifically explained that if Sweet Star resubmitted its claim,
it should ensure there is a sum certain and certification (if the amount requested
exceeded $100,000). Id. at 183,046 n.2.
Rather than heed either the Board’s or contracting officer’s guidance and
submit a claim with a certification and sum certain, Sweet Star decided to email the
Board requests for reconsideration (SOF ¶¶ 16-17). See also Sweet Star, ASBCA
No. 62082, 21-1 BCA ¶ 37,773. Again, the Board provided specific instructions that if
Sweet Star wished to pursue a claim, it must submit it to the contracting officer with a
sum certain, and certification if it exceeded $100,000 (SOF ¶ 16). See Sweet Star,
ASBCA No. 62082, 21-1 BCA ¶ 37,773.
In addition, rather than file a claim per the Board’s or contracting officer’s
instructions, on July 5, 2021 Sweet Star emailed the Army asking for the materials to
be returned or for the Army to pay for them (SOF ¶ 19). Over the next two weeks,
Sweet Star and the Army exchanged emails, with the Army stating the ASBCA denied
the appeal and that Sweet Star should talk to someone in Afghanistan about the matter
(id.). Much later, on September 3, 2022, Sweet Star contacted an attorney about its
claim and also submitted a petition for special immigration classification to the
Department of State on September 14, 2022 (SOF ¶ 20).
Thus, before the withdrawal of the United States from Afghanistan in
August 2021 caused disruptions to its business, Sweet Star was able to file a purported
claim; file an appeal with the Board; email the Army, Army contracting officer, and
Board; and seek counsel about its claim; but somehow, Sweet Star was unable to file a
claim (see SOF ¶¶ 15-20). Sweet Star was also able to apply for a special visa to the
Department of State (SOF ¶ 20). Sweet Star did not pursue its rights diligently and
nothing stood in its way or prevented timely filing. Sweet Star knew the issues and
how much it sought, and was instructed several times on how to file a claim. See
Platinum Servs., Inc., ASBCA Nos. 62199, 62200, 24-1 BCA ¶ 38,643 at 187,859
(finding no equitable tolling of the six-year limitations period where contracts set forth
what appellant must do to preserve its claims, and appellant failed to do it). Ignoring
such instruction is not diligent pursuit.
Sweet Star then waited over four years to attempt contact with the Army again
(SOF ¶ 21) and file a claim (SOF ¶ 22). As Sweet Star admits, even now with the
Taliban in Afghanistan, it was able to file a claim and this appeal. Sweet Star’s actions
do not evidence reasonable diligence. Furthermore, all information regarding the
claim was readily available to Sweet Star (the claim information, email addresses,
9
SAM.gov, etc.), and there is no evidence the delay was beyond Sweet Star’s control.
Sweet Star cannot demonstrate either element of equitable tolling.
Finally, Sweet Star makes several pleas regarding the fact it is pro se and has
limited English (app. br. at 9, 12). As the Board has stated before, “[a]lthough pro se
litigants are generally afforded a degree of leniency with regard to administrative
matters and pleadings, they are not exempt from otherwise complying with legal
requirements.” CLC Constr. Co., ASBCA No. 59110, 20-1 BCA ¶ 37,584 at 182,497
n.8 (citations omitted); see also Elham Ahmadi Constr. Co., ASBCA No. 61031, 17-1
BCA ¶ 36,861 at 179,604 (“The fact that appellant is a pro se, non-United States
contractor, whose personnel are likely to be unfamiliar with government contract law
and have limited English speaking and writing abilities does not excuse the failure to
comply with jurisdictional prerequisites.”). Sweet Star has shown that even though it
is pro se, it was able to file more than one claim with the contracting officer, appeal to
the Board, contact an attorney for assistance, apply for a special U.S. visa, and, as it
admits, use SAM.gov to find contracting personnel.
CONCLUSION
We grant the Army’s motion for summary judgment.
Dated: October 23, 2026
LAURA EYESTER
Administrative Judge
Armed Services Board
of Contract Appeals
I concur I concur
J. REID PROUTY MICHAEL N. O’CONNELL
Administrative Judge Administrative Judge
Acting Chairman Vice Chairman
Armed Services Board Armed Services Board
of Contract Appeals of Contract Appeals
10
I certify that the foregoing is a true copy of the Opinion and Decision of the
Armed Services Board of Contract Appeals in ASBCA No. 64505, Appeal of Sweet Star,
rendered in conformance with the Board’s Charter.
Dated: October 23, 2026
PAULLA K. GATES-LEWIS
Recorder, Armed Services
Board of Contract Appeals