Stevens Aerospace and Defense Systems, LLC v. United States
CourtUnited States Court of Federal Claims
Date FiledJune 1, 2026
Docket25-1659
JudgeDavid A. Tapp
StatusPublished
📰 News Coverage: Read the LAWS.com news report on this case
Full Opinion
In the United States Court of Federal Claims
Nos. 25-1659C, 25-1751C
Filed: May 14, 2026
Reissued: June 1, 2026 †
STEVENS AEROSPACE AND DEFENSE
SYSTEMS, LLC,
and
IACCESS TECHNOLOGIES, INC.,
Plaintiffs,
v.
THE UNITED STATES,
Defendant,
and
BORSIGHT INC.,
Intervenor-Defendant.
Stephanie M. Harden, with Robyn Burrows, Michael Slattery, and Samarth Barot, Blank Rome
LLP, Washington, D.C., for Plaintiff Stevens Aerospace and Defense Systems, LLC.
Paul F. Khoury, with George Petel, and Vaibhavi Patria, Of Counsel, Wiley Rein LLP,
Washington, D.C., for Plaintiff iAccess Technologies, Inc.
Antonia R. Soares, Senior Trial Counsel, Commercial Litigation Branch, Civil Division, with
Douglas K. Mickle, Acting Deputy Director, Patricia M. McCarthy, Director, and Brett A.
Schumate, Assistant Attorney General, U.S. Department of Justice, Washington, D.C., with
Major Princess Gaye and Gareth C. Hyndman, II, U.S. Air Force, Of Counsel, for Defendant.
Evan R. Sherwood, with Steven M. Masiello and Joshua B. Fix, Dentons US LLP, Washington,
D.C., for Intervenor-Defendant.
†
This Opinion was originally issued under seal, (ECF No. 78). The Court provided parties with
the opportunity to submit proposed redactions. The Court accepts all proposed redactions. (See
Joint Status Report, ECF No. 80). The sealed and public versions of this Opinion differ only to
the extent of those redactions, the publication date, and this footnote.
MEMORANDUM OPINION AND ORDER
TAPP, Judge.
In bid protests, the Court monitors the boundaries of agency discretion. It cannot redraw
them. Consolidated Plaintiffs, Stevens Aerospace and Defense Systems, LLC (“Stevens”), and
iAccess Technologies, Inc. (“iAccess”), urge otherwise. (See Order Granting Mot. to
Consolidate, ECF No. 37 in Case No. 25-1751). Plaintiffs challenge the Air Force’s re-award of
a contract to Intervenor-Defendant, Borsight, Inc. (“Borsight”) to update training aircraft and
simulators. 1 (Am. Compl. at ¶¶ 1, 9, ECF No. 49 in Case No. 25-1659 (“Stevens’s Am.
Compl.”); Compl. at ¶¶ 1–2, ECF No. 1 in Case No. 25-1751 (“iAccess’s Compl.”)). Plaintiffs
bring related claims, most turning on discretionary judgments beyond the Court’s purview.
Therefore, Stevens’s and iAccess’s Motions for Judgment on the Administrative Record
(“MJARs”), are DENIED. (Stevens’s MJAR, ECF No. 51; iAccess’s MJAR, ECF No. 52). The
United States’ and Borsight’s Cross-Motions for Judgment on the Administrative Record
(“Cross-MJARs”), are GRANTED. (Borsight’s Cross-MJAR, ECF No. 63; Def.’s Cross-MJAR,
ECF No. 64). The United States’ Motion to Amend/Correct the Administrative Record, (ECF
No. 41), is DENIED. Stevens’s Motion to Supplement the Administrative Record, (ECF No.
50), is DENIED as MOOT.
I. Background
The United States Department of the Air Force (“Air Force” or “Agency”) solicited bids
for updates to the avionics of approximately 442 T-6A trainer aircraft and ground based training
simulators. (Administrative Record (“AR”) 5182, ECF No. 28). The Solicitation established a
best-value trade-off source selection process structured around four primary factors: (1)
Technical; (2) Technical Risk; (3) Past Performance; and (4) Price. (AR 5185). Only those
proposals meeting the threshold requirements of Factor 1 (Technical) advanced to the best-value
analysis. (Id.). Stevens, iAccess, and Borsight were the most highly rated offerors included in the
competitive range for this procurement. (AR 29601, ECF No. 34). The Source Selection
Authority (“SSA”) summarized the ratings for each as follows:
1
This is Stevens’s second challenge to the Air Force’s award to Borsight—the first was
voluntarily dismissed following corrective action. Stevens Aerospace and Defense Systems, LLC
v. United States, Case No. 1:25-cv-01339-DAT, __ Fed. Cl. __ (2025).
2
(AR 52613, ECF No. 38). Ultimately, the SSA determined that Borsight “offer[ed] the best value
to include a superior technical proposal with greater benefits and advantages to the Government,
low risk, and satisfactory past performance for a slightly higher price[,]” and the Air Force
awarded the contract accordingly. (AR 52647). iAccess challenged this award at the Government
Accountability Office, (see iAccess’s Compl. at ¶ 48), and Stevens filed in this Court, (see
Stevens’s Am. Compl. at ¶ 28 (citing Stevens Aerospace and Defense Systems, LLC v. United
States, Case No. 1:25-cv-01339-DAT, __ Fed. Cl. __ (2025)). In response, the Air Force elected
to take corrective action. (iAccess’s Compl. at ¶ 55 (citing Compl. Ex. 9, Notice of Corrective
Action), ECF No. 1-10 in Case No. 25-1751). The Air Force awarded Borsight the contract once
again, and both Plaintiffs renewed their protests in this Court. (Stevens’s Am. Compl. at ¶¶ 35–
38; see iAccess’s Compl. at ¶ 1).
II. Analysis
iAccess brings four counts against the United States. (iAccess’s Compl. ¶¶ 68–143).
Stevens brings eighteen. (Stevens’s Am. Compl. ¶¶ 39–267). Broadly, Plaintiffs’ arguments fall
into three categories: (1) technical evaluation and compliance with the Solicitation; (2)
communication between the Agency and the offerors; and (3) the Agency’s analytical
methodology. Across all three, Plaintiffs ask the Court to do something it has no power to do—
divine the inner reasoning of the contracting officer and substitute its own.
A. Jurisdiction and Standard of Review
When the Court hears a bid protest, it “appl[ies] the appropriate [Administrative
Procedure Act] standard of review” in accordance with 5 U.S.C. § 706. Fla. Power & Light Co.
v. Lorion, 470 U.S. 729, 743–44 (1985). Under the Administrative Procedure Act (“APA”), “[i]n
a bid protest case, the inquiry is whether the agency’s action was arbitrary, capricious, an abuse
of discretion, or otherwise not in accordance with law and, if so, whether the error is prejudicial.”
Glenn Def. Marine (ASIA), PTE Ltd. v. United States, 720 F.3d 901, 907 (Fed. Cir. 2013).
Judicial review of agency action under the APA is a highly deferential inquiry in which the court
asks whether the agency’s decision lacked a rational basis, was unsupported by the
administrative record, was arbitrary and capricious, or violated a statute or regulation, and the
protester must also show prejudice resulting from any such error. Weeks Marine, Inc. v. United
States, 575 F.3d 1352, 1358 (Fed. Cir. 2009); Glenn Def. Marine, 720 F.3d at 907; CHE
Consulting, Inc. v. United States, 552 F.3d 1351, 1354 (Fed. Cir. 2008). “Under the ‘arbitrary
and capricious’ standard[,] the scope of review is a narrow one. A reviewing court must
‘consider whether the decision was based on a consideration of the relevant factors and whether
3
there has been a clear error of judgment.’” Bowman Transp., Inc. v. Arkansas-Best Freight Sys.,
Inc., 419 U.S. 281, 285 (1974) (quoting Citizens to Preserve Overton Park v. Volpe, 401 U.S.
402, 416 (1971)).
Critically, the Court is expected to apply a “presumption of regularity” and avoid
substituting its own judgment for that of the agency. Cleveland Assets, LLC v. United States, 883
F.3d 1378, 1382 (Fed. Cir. 2018); Bowman Transp., 419 U.S. at 285. Additionally, “[i]f the court
finds a reasonable basis for the agency’s action, the court should stay its hand even though it
might, as an original proposition, have reached a different conclusion as to the proper
administration and application of the procurement regulations.” Honeywell, Inc. v. United States,
870 F.2d 644, 648 (Fed. Cir. 1989) (quoting M. Steinthal & Co. v. Seamans, 455 F.2d 1289, 1301
(D.C. Cir. 1971) (citation modified)). “For that reason, procurement decisions ‘invoke[] highly
deferential rational basis review.’” Savantage Fin. Servs., Inc. v. United States, 595 F.3d 1282,
1286 (Fed. Cir. 2010) (quoting CHE Consulting, 552 F.3d at 1058) (citation modified)). But the
agency must articulate a “rational connection between the facts found and the choice made.”
Burlington Truck Lines, Inc. v. United States, 371 U.S. 156, 168 (1962). Even so, “a protestor’s
burden is particularly great in negotiated procurements because the contracting officer is
entrusted with a relatively high degree of discretion, and greater still, where . . . the procurement
is a ‘best-value’ procurement.” Banknote Corp. of Am., Inc. v. United States, 56 Fed. Cl. 377,
380 (2003), aff’d, 365 F.3d 1345 (Fed. Cir. 2004).
Here, all parties move for judgment on the Administrative Record. See RCFC 52.1.
Unlike the standard applied in summary judgment motions, “the existence of genuine issues of
material fact does not preclude judgment on the administrative record” under RCFC 52.1. Tech.
Sys., Inc. v. United States, 98 Fed. Cl. 228, 242 (2011). Rather, the Court’s inquiry focuses on
whether, “given all the disputed and undisputed facts, a party has met its burden of proof based
on the evidence in the record.” A&D Fire Protection, Inc. v. United States, 72 Fed. Cl. 126, 131
(2006) (citing Bannum, Inc. v. United States, 404 F.3d 1346, 1356 (Fed. Cir. 2005)).
B. Technical Compliance and Evaluation
Both Plaintiffs argue that Borsight was noncompliant with the Solicitation—failures that
should have technically excluded Borsight’s proposal from consideration. Specifically, Stevens
argues that Borsight was missing a software agreement for a subcontractor, and that Borsight
inconsistently committed to data rights. (Stevens’s Am. Compl. at ¶¶ 218–27). Stevens also
alleges that Borsight’s display system failed to comply with Solicitation requirements. (Id. at ¶¶
243–49). Both Plaintiffs argue that the record does not support Borsight’s “reliability” figures,
(id. at ¶¶ 174–92; see iAccess’s Compl. at ¶¶ 120–22), and that the Air Force improperly
assigned strengths to Borsight’s proposal, (Stevens’s Am. Compl. ¶¶ 108–21, 122–129, 130–46;
iAccess’s Compl. at ¶¶ 107–22). Finally, iAccess argues that the Air Force overlooked
discrepancies in Borsight’s Line Replaceable Unit (“LRU”) components and Mean Time
Between Failure (“MTBF”) calculations, and that the procurement officials evaluated Borsight’s
and iAccess’s LRU components disparately. (iAccess’s MJAR at 24–36).
Broadly, Plaintiffs ask to substitute the Court’s judgment for the technical evaluations
completed by procurement officials. It cannot. See Info. Sciences Corp. v. United States, 73 Fed.
Cl. 70, 104 (2006); see also Mortgage Contracting Servs. LLC v. United States, 153 Fed. Cl. 89,
4
126 (2021) (“The court must especially defer to the agency’s technical evaluations, past
performance ratings, and other ‘minutiae of the procurement process . . . which involve
discretionary determinations of procurement officials.’”) (quoting J.C.N. Constr., Inc. v. United
States, 107 Fed. Cl. 503, 510 (2012)). Alternatively, to the extent that Plaintiffs argue that the Air
Force has not substantiated its findings, the Court finds that it has.
First, Stevens argues that Borsight did not provide a requisite software agreement for its
subcontractor, . (Stevens’s MJAR at 2, 10–12). This, according to Stevens, was a
violation of the Software Licensing Requirement in Section H003 of the Request for Proposals
(“RFP”) and should have rendered Borsight’s proposal deficient. (Id.). Section H003 of the RFP
provides that: “License agreements shall be provided to the Government Contracting Officer
concurrent with proposal submission to ensure compliance with the terms and conditions shown
below . . . to the extent known at the time an offer is submitted to the Government.” (AR 5259,
ECF No. 29). Stevens’s reading of the section is too narrow. The critical language in Section
H003 is “to the extent known at the time an offer is submitted” because this language means
software agreements can be finalized post-award. (See Def.’s Cross-MJAR at 9). While Clause
H003’s use of the term “shall” does establish that providing license agreements is a
requirement, “to the extent known” plainly indicates flexibility. Each word of the clause has
meaning. See LS3, LLC v. United States, 168 Fed. Cl. 722, 727 (2023) (“Take the words for
what they are.”) (quoting T. Swift, Illicit Affairs (Folklore), (Republic, 2020)).
In the same breath, Stevens also argues that Borsight’s proposal to give the Air Force
unrestricted rights to commercial software is “unusual.” (Stevens’s Resp. at 6, ECF
No. 65). While the Air Force did specifically note the unrestricted rights, (AR 31558), there is
no discrepancy between what Borsight promised and what it delivered. (See Def.’s Cross-MJAR
at 9–10). The sufficiency of Borsight’s promised data rights—and the nuances of those rights
themselves—is a determination far better suited to the Air Force than a court. See Mortgage
Contracting Servs., 153 Fed. Cl. at 126; J.C.N. Constr., 107 Fed. Cl. at 510. If anything, the fact
that the Air Force specifically noted the unrestricted rights exemplifies the detailed nature of its
inquiry into Borsight’s proposal. There is nothing in the record to indicate that this decision was
arbitrary or capricious. A contracting officer’s decision is not arbitrary merely because a court
or a disappointed bidder might have reached a different conclusion. See Honeywell, 870 F.2d at
648.
Second, Stevens argues that Borsight’s display system is not compliant with the terms of
the Solicitation. (Stevens’s MJAR at 2–3, 12–13, 19–20, 25). According to Stevens, Borsight’s
two primary displays (“IDUs”) do not provide the required eighty square inches of alternate
display area. (Id. at 2–3). Stevens argues that the Air Force therefore improperly determined that
Borsight met all threshold requirements under Factor 1, Subfactor 1 (Threshold Compliance)
and the Section L EN Tables requiring that “displays shall be visible to the flight crew
throughout the entire range of operational lighting conditions, from direct sunlight to darkness.”
(Id. at 12–13 (citing AR 19088, ECF No. 32)). Stevens maintains that Borsight did not make
any representations concerning its Universal Management Unit’s (“UMU”) ability to meet this
threshold display requirement. (Id. at 13). In turn, the United States argues that the Air Force’s
evaluation of Factor 1, Subfactor 1 was based on each offeror’s technical approach for meeting
the requirements in Sections L and M, which stated: “for requirements marked as ‘Y’ in the Full
Compliance column, no further explanation or rationale is required.” (Def.’s Cross-MJAR at 11
5
(citing AR 18063–64, 18105, 18107)). Both Borsight and Stevens were marked “Y” in the Full
Compliance column, so they met the Factor 1, Subfactor 1 requirements. (AR 51726, 52121). In
its Final Proposed Revision (“FPR”), Borsight also discussed the properties of the “IDU-680
flight display supplemented with the Borsight UMU keyboard unit” in detail, stated that the
UMU met 100% of the testing requirement, and relayed the fact that the IDU-6802 exceeded the
testing requirements by 40%. (AR 24916 (Section L EN Tables, SF1 Threshold Compliance,
Cell B109), 41196, ECF No. 36).
The United States argues that Stevens is “creating a requirement that simply doesn’t
exist.” (Tr., 67:10–11, ECF No. 73). The Court agrees once again. Even if it could delve into the
mind of the Air Force testing and procurement officials, the plain language of the Solicitation
indicates that “no further explanation or rationale is required” for fully compliant proposals.
(AR 18107).
Stevens hurls a number of additional accusations at the Air Force’s technical evaluations
of Borsight. (Steven’s MJAR at 13–21 (arguments related to: Subfactor 2(a)(ii) of Factors 1 and
2 (Solar Hardiness); Subfactor 2(b)(iii) of Factor 1 (Display Configurability); and Subfactor
2(b)(iv) of Factors 1 and 2 (Sustainability)). The Court has reviewed the arguments and the
Administrative Record and finds that these determinations were squarely within the discretion
of the contracting officer. It is not the Court’s place to second-guess the Air Force’s findings.
Info. Sciences Corp., 73 Fed. Cl. at 104; see Mortgage Contracting Servs., 153 Fed. Cl. at 126.
Both Stevens and iAccess argue that the record does not support Borsight’s “reliability”
figures—referring to the MTBF figures reported by Borsight. (Stevens’s MJAR at 3, 21–26;
iAccess’s MJAR at 24–36). Specifically, Stevens contends that “Borsight’s calculated system-
level total MTBF of hours [in its FPR] is patently incorrect,” because Borsight updated
some of its MTBF figures during discussions with the Air Force. (Stevens’s MJAR at 22, 23
(citation modified)). In other words, there was a back-and-forth between the Air Force and
Borsight regarding the MTBF calculations for the inhabited and uninhabited portions of the
aircraft that resulted in Borsight’s MTBF rising by 16,000 hours. (Tr., iAccess, 31:21–32:10,
33:2–7). The Court does not get to opine on whether the Air Force properly evaluated the safety
of these aircraft. (Tr., 33:18–19); see COMINT Sys. Corp. v. United States, 700 F.3d 1377, 1384
(Fed. Cir. 2012) (noting that technical-scoring disputes concern procurement minutiae and
discretionary determinations insulated from judicial second-guessing). However, as iAccess
points out—the Air Force awarded Borsight an additional significant strength based on these
allegedly erroneous numbers. (Tr., 35:19–22). In response, the United States argues that the Air
Force is entitled to rely on Borsight’s MTBF figures absent “significant countervailing evidence
reasonably known to the agency evaluators that should create doubt” about the accuracy of
those values. (Def.’s Cross-MJAR at 17 (quoting Allied Tech. Grp., Inc. v. United States, 649
F.3d 1320, 1331 (Fed. Cir. 2011))). Similarly, Borsight attacks Plaintiffs’ arguments as
“rhetoric” and notes that “[t]he protestors’ arguments underscore why it is not appropriate to re-
evaluate the technical minutia of the procurement process through litigation.” (Borsight’s Cross-
MJAR at 17–18). In an ideal world, Borsight and the Air Force would have included more
explanation as to how and why Borsight’s MTBF numbers increased so dramatically during
discussions, but in the arcane world of government contracting—this does not rise to the level
of abuse of discretion or arbitrary or capricious action on the part of the Air Force. See Bowman
6
Transp., 419 U.S. at 286 (an agency decision of less‑than‑ideal clarity should be upheld if the
agency’s path is reasonably discernible). As the Court noted during the oral argument, “[it is]
not a physicist[,]” (Tr., 33:19), and lacks sufficient evidence to overturn the Air Force’s
decision making with regards to Borsight’s MTBF calculations.
iAccess also argues that the Air Force disregarded risks by overlooking discrepancies in
Borsight’s LRU components and improperly allowed Borsight to use only three LRU
components for its CFIT-P calculation, while requiring iAccess to revise its model to include
five LRU components. (iAccess’s MJAR at 25–27 (citing Subfactor 2(a)(i)), 31–34 (citing
Subfactor 2(b)(i))). However, iAccess fails to account for the fact that Borsight resolved its
issues related to subfactors 2(a)(i) and 2(b)(i). (See Def.’s Cross-MJAR at 42–43 (citing AR
30294–96 for the proposition that although the Air Force initially assigned Borsight a weakness
for using one part number in its proposal ( ) and a different part number in its L EN Table
(P/N ), Borsight resolved the issue during discussions)). Similarly, for Subfactor 2(b)(i),
the Air Force identified a weakness in Borsight’s approach because its “proposal appear[ed] to
not account for all the LRUs required for the TAWS/CFIT-P function[.]” (AR 30297). However,
Borsight recalculated the MTBF and accounted for the missing LRUs—which met the objective
requirement. (Def.’s Cross-MJAR at 42–44 (citing AR 30297–98); see also AR 51734 (the Air
Force finding that Borsight exceeded the MTBF requirements for Subfactor 2(b)(i))).
Nevertheless, iAccess argues that Borsight failed to account for all LRUs—the weakness was for
Borsight’s CFIT-P system which was missing several components “to include but not limited to
the Global Positioning System (GPS)/Satellite Base Augmentation System (SBAS) Receiver and
HUB45 LRU” yet Borsight provided MTBFs for only two of the “missing several components.”
(iAccess’s Resp. at 10, ECF No. 66 (citing AR 45866, AR 45871–72)). According to iAccess,
the Air Force’s reasoning is therefore circular—the flaws in Borsight’s revised calculations were
revealed after the weakness was assessed. (Id.).
The Court is not persuaded. The United States correctly observes that iAccess fails to
recognize that it agreed that its own proposal did not calculate the MTBF for the CFIT-P
function correctly, and that it was unable to resolve this issue. (Def.’s Cross-MJAR at 44; see AR
31829, 32938–39). The Air Force accepted Borsight’s revised assertion that its “CFIT-P system
had three subassemblies” and its “proposed system configuration for CFIT-P has a calculated
MTBF of 11,260 hours.” (AR 41520). It is not the Court’s role to second-guess the Air Force’s
analysis. See Off. Design Grp. v. United States, 951 F.3d 1366, 1373 (Fed. Cir. 2020) (rejecting
protestor argument that would “give a court free reign to second-guess the agency’s discretionary
determinations underlying its technical ratings.”). The Air Force did not ignore several higher
LRU component MTBFs from iAccess’s proposal, or fail to give iAccess credit for identifying
each component’s MTBFs. (iAccess’s MJAR at 35–36 (citing Subfactor 2(a)(iii))). The Air
Force found that “[Borsight]’s approach provided higher component MTBFs as compared to
iAccess’s approach” even though iAccess’s Keyboard’s MTBF was 148,302 and Borsight’s was
23,177. (AR 25506, 52363)). According to the United States, this was because the iAccess
Keyboard MTBF applies only to a keyboard, whereas the MTBF for Borsight reflects the
combination of the two components that make up the UMU—a UMU Display Control Module
and a UMU Remote Keyboard Module. (Def.’s Cross-MJAR at 46 (citing AR 41203)). This
distinction meant the Air Force was evaluating different assemblies rather than comparable
standalone components. Therefore, the Air Force’s conclusion that iAccess’s approach did not
provide higher component MTBFs was reasonable.
7
Finally, iAccess challenges the Air Force’s interpretation of language in its proposal
regarding testing of its temperature exceedance. (iAccess’s MJAR at 35). iAccess’s proposal
states: “[b]ased on analysis and the results from the previous testing, the iAccess Team has
assured the equipment selected will EXCEED the threshold requirement of SRD 3.5.6.3.2 when
tested for the ARP.” (AR 25507–08). iAccess’s proposal also contained a table noting that it
“will retest for exceedance.” (AR 25507). The Air Force took this to mean that iAccess had not
yet tested the equipment. (Def.’s Cross-MJAR at 45–46). iAccess argues that this was a
misreading of the plain language of its proposal—the Air Force ignored the phrase “[b]ased on
analysis and the results from the previous testing[,]” (AR 25507), and should have given iAccess
credit, (Tr., 38:3–39:2). However, Court finds it reasonable that the Air Force relied on the
language “will exceed . . . when tested for the ARP.” (AR 25507–08 (emphasis added)). iAccess
uses the future tense to describe testing, creating a logical assumption that testing had not yet
occurred. Tellingly, iAccess uses the past tense to describe testing for fuselage and cockpit zone
equipment in the same section of its proposal. (Compare AR 25507 (“the iAccess Team’s offer
EXCEEDS the threshold Temperature Qualification requirements of SRD 3.5.6.3.1 for Fuselage
Zone installed equipment . . .”) and AR 22508 (“the iAccess Team’s offer EXCEEDS the
threshold Temperature Qualification requirements of SRD 3.5.6.1 for Cockpit Zone installed
equipment . . .”) with AR 25507–08 (“the iAccess Team has assured the equipment selected will
EXCEED the threshold requirement of SRD 3.5.6.3.2 when tested for the ARP.”) (emphasis
added)). No contracting officer could reasonably be expected to read past the plain language of
iAccess’s proposal, especially given the surrounding context. See Warrior Focused Sols., LLC v.
United States, 175 Fed. Cl. 416, 429 (2025) (“Contracting officers and bidders share an equal
obligation to ensure clarity; agencies cannot be expected to read between the lines and make
sense of proposal terms.”). iAccess’s argument fails.
Neither Plaintiff has demonstrated that the Air Force acted arbitrarily or capriciously
when evaluating the technical components of the offerors’ proposals. See Weeks Marine, 575
F.3d at 1358. Nor have they shown any violation of statute. Id. Most of the protestors’ arguments
here run headlong into agency discretion. The contracting officer was squarely within his or her
authority to evaluate the software rights, display systems, reliability figures, and the capacity of
Borsight to deliver on its promises. The Air Force reasonably interpreted both proposals with
regard to the testing and performance of the equipment at issue—and the parties have provided
no basis for the Court to second-guess the Air Force’s decision.
C. Communications Between Offerors and the Air Force
Stevens argues that the Air Force conducted unequal discussions with Borsight regarding
a missing software license in its FPR. 2 (Stevens’s MJAR at 7–10). According to Stevens, the Air
Force notified Borsight multiple times that it was missing a license agreement for Red Hat Linux
(“Red Hat”) software. (Id. at 8–9; Tr., 13:17–20). Stevens argues that these notifications
amounted to an improper discussion, (Stevens’s MJAR at 9), and the missing license should have
immediately disqualified Borsight from consideration. (Stevens’s Resp. at 4–5). There is no
dispute that Borsight was required to include the Red Hat license in its contract volume, and it
2
Notably, iAccess does not raise this issue. (See iAccess’s MJAR, ECF No. 52).
8
did not. (See Tr., 51:22–23). On March 19, 2025, the Air Force emailed Borsight to notify it that
its FPR failed to include the Red Hat license. (AR 53277). That same day, the Air Force
extended the FPR deadline for all offerors in the competitive range to March 21, 2025. (AR
52389). This was due to technical computer issues due to “extremely high winds” on the original
FPR due date. (Id.; Tr., 68:13–69:14). Stevens insinuates that this extension was a surreptitious
decision by the Air Force in order to allow Borsight extra time to resubmit its FPR with the
missing license. (See Stevens’s MJAR at 8–9).
There is no merit to this argument. High winds affected the Air Force’s computer system
and so it reasonably extended the deadline for all offerors in the competitive range, including
Stevens. (AR 52389; see also Tr., 68:7–24 (elaborating on the impacts of wind on the Air
Force’s computer systems)). While the Red Hat license was “mistakenly omitted from
[Borsight’s] FPR[,]” (AR 42304, ECF No. 36), the Air Force already had the Red Hat license in
its possession—it was just not attached to the Contract Volume portion of Borsight’s proposal.
(AR 30753–54; Tr., 56:7–57:19). Borsight responded by attaching the license, still before the
deadline for final proposed submissions. (See AR 42303). Given that the Air Force already had
possession of the software license, and references to the software license existed throughout
Borsight’s proposal, (AR 41891), it would be too exacting for the Court to find that this omission
invalidated Borsight’s proposal. 3
Because Borsight’s omission did not withhold any information essential to the Agency’s
evaluation, it qualified as an obvious minor clerical mistake of the sort the FAR allows
contracting officers to resolve. See FAR § 15.306(a) (authorizing contracting officers to seek
clarifications to correct clerical or similarly minor errors). The Court concludes that the email
notifying Borsight of the missing software license does not rise to the level of a discussion. Dell
Fed. Systems, L.P. v. United States, 906 F.3d 982, 998 (Fed. Cir. 2018). FAR § 15.306(a)(1)
defines a clarification as a “limited exchange . . . that may occur when award without discussions
is contemplated.” Importantly, clarifications, as opposed to discussions, do not allow for
proposal revisions. Aspire Therapy Servs. & Consultants, Inc. v. United States, 166 Fed. Cl. 366,
377 (2023). The March 19, 2025 email to Borsight stated, “your company has the opportunity to
review your proposal and resubmit your FPR if you choose.” (AR 42304). Stevens argues that
this language “constituted a discussion because it was intended to allow Borsight to revise its
proposal.” (Stevens’s Resp. at 3). What the Air Force “intended to allow” is beyond the scope of
this Court’s jurisdiction—it does not have the power to divine meaning beyond the words on the
3
Stevens argues that without the license, the Air Force would not have “reasonable certainty as
to the contract’s material terms.” (Stevens’s Resp. at 5 (citing Bionetics Corp. v. United States,
159 Fed. Cl. 834, 842 (2022); APT Research, Inc. v. United States, 154 Fed. Cl. 526, 537 (2021)
(for the proposition that “missing copy of signed agreement was not a minor clerical error that
could be corrected through discussions[.]”), ECF No. 65). However, the issue in APT Research
was over a required employee agreement that was missing entirely—not a copy of an agreement
as Stevens suggests. 154 Fed. Cl. at 537. The Plaintiff in APT Research argued not only that the
missing employee agreement should not have invalidated their protest, but that the agreement
was not actually required at all. Id. The Court found for the United States. Id. Here, Borsight had
previously included the software agreement, and referred to it throughout its proposal.
9
page. The words “review” and “resubmit” do not mean the same thing as “revise” and, read in
context, the email conveyed nothing more than a notice that the license was missing. Either way,
Borsight made no substantive revisions to its proposal beyond attaching the missing license. (AR
42303; See Tr., 75:13–76:4).
Stevens asks the Court to draw a parallel between the Air Force’s email to Borsight about
the Red Hat license, and that the Air Force was unable to obtain past performance references for
a $666 million contract performed by one of Stevens’s subcontractors, CAE US, Inc. (“CAE”).
(Stevens’s MJAR at 29–31; see Stevens’s Am. Compl. at ¶¶ 49–59). This comparison is “apples
to oranges[.]” (Tr., 62:23–63:2). In discussions, the Air Force notified Stevens that it was unable
to contact CAE’s reference. (AR 34347 (the Air Force informed Stevens that “the POC and Key
Individuals provided lacked past performance quality information, resulting in ‘Unknown’
quality for each contract noted.”), ECF No. 35). Stevens responded by providing updated
references and contact information. (AR 34348–49). However, one of the references provided
“ha[d] no knowledge of performance on that contract[,]” and the other reference did not respond.
(AR 48082–84, ECF No. 37). Stevens also complains that the Air Force was not able to locate
Contractor Performance Assessment Reporting System reports (“CPARS”) for the CAE contract,
in violation of the “too close at hand” doctrine. (Stevens’s MJAR at 31). This refers to the
premise that “[i]t is well-established that ‘some information is simply too close at hand to require
offerors to shoulder the inequities that spring from an agency’s failure to obtain, and consider,
the information.’” Insight Public Sector, Inc. v. United States, 157 Fed. Cl. 398, 410 (2021)
(quoting Vanguard Recovery Assistance v. United States, 101 Fed. Cl. 765, 781 (2011)). There is
a limit, however: “[c]ourts typically limit the universe of information that it considers ‘too close
at hand’ to documents in the possession of the contracting agency or information that is
personally known to the contract evaluator.” Id.
Whether an apple or an orange, Stevens does not get unlimited bites. The Air Force
notified Stevens that it could not track down CAE’s past performance references, and ultimately
Stevens could not provide the information requested. (AR 34347). The Air Force could not have
done anything differently given the circumstances. This situation is nothing like the Air Force’s
email to Borsight—an obvious issue that Borsight promptly rectified prior to the RFP deadline.
Nor did the Air Force violate the “too close at hand” doctrine—the Air Force did not have the
Past Performance Questionnaires (“PPQ”) and CPARs for CAE in its possession. (AR 52213);
see Insight Public Sector, 157 Fed. Cl. at 410. The Air Force was justified in assigning Stevens
an “Unknown” when the information was indeed unknown. AccelGov, LLC v. United States, 164
Fed. Cl. 345, 360 (2023) (“[C]ourts have frequently recognized that a procuring agency is not
expected to hunt for potentially responsive information that is not included or not adequately
presented in the relevant section of an offeror's proposal.”). In sum, the Court finds that the
communications between Borsight and the Air Force did not rise to the level of discussions. Nor
is there a parallel between the Borsight email and the Air Force’s inability to obtain past
performance references for the CAE contract. Stevens’s arguments are unavailing.
D. The Agency’s Analytical Methodology
Plaintiffs’ remaining complaints are directed at the Air Force’s analytical methodology—
the way the Agency aggregated its evaluations and determined whether to consider certain
components of past performance, assigned ratings, and conducted its best-value and
10
responsibility determinations. (Stevens’s Am. Compl. at ¶¶ 70–97, 178–188, 228–242; iAccess’s
Compl. at ¶¶ 123–143). None of Plaintiffs’ arguments bear fruit.
First, Stevens argues that the Air Force’s responsibility determination for Borsight was
unreasonable because Borsight holds a “red” Supplier Risk Score in the Supplier Performance
Risk System (“SPRS”). (Stevens’s MJAR at 26–28). This, according to Stevens, should have
triggered the FAR § 9.104-3(b) presumption of non-responsibility because a “red” SPRS score is
the lowest possible rating. (Id. at 26). FAR § 9.104-3(b) states in part: “A prospective contractor
that is or recently has been seriously deficient in contract performance shall be presumed to be
nonresponsible, unless the contracting officer determines that the circumstances were properly
beyond the contractor’s control, or that the contractor has taken appropriate corrective action.”
Borsight’s poor rating stems largely from multiple Corrective Action Requests (“CARs”) issued
under a contract with the North Atlantic Treaty Organization (“NATO”). (AR 53875). The
United States argues that there is no evidence demonstrating that Borsight has been “seriously
deficient in contract performance[,]” and that there are “many other sources of information that
the contracting officer can consult in determining whether an offeror has a satisfactory past
performance record.” (Def.’s Cross-MJAR at 18–20). Section 209.105-1 of the Defense Federal
Acquisition Regulation Supplement (“DFARS”) states in part that “[c]ontracting officers shall
consider the supplier risk assessment available in the [SPRS] . . . when determining
responsibility.” DFARS § 209.105-1(2)(iii) (citing DFARS § 204.7603). However, the section
begins with: “[a] satisfactory performance record is a factor in determining contractor
responsibility[,]” and that CPARS are also “[o]ne source of information relating to contractor
performance . . . .” See DFARS § 209.105-1(2)(i). The United States argues that this language
does not automatically exclude offerors with red SPRS scores, (see Def.’s Cross-MJAR at 18-
21), and this Court agrees.
The plain language of DFARS § 209.105-1 makes it clear that the SPRS score is one of
many considerations the Agency must evaluate. And here, the Air Force did so. The record
reflects that “[t]he Government interviewed the program at NATO regarding the contractor’s
performance.” (Tr., 22:18–21; see AR 26996, 53872, ECF No. 59). This refers to a July 2023
email exchange with NATO about the contract at issue, which stated that Borsight “was/is
completing work in accordance with contract requirements.” (AR 26996). Stevens takes issue
with the timing of this exchange, because some of the CARs were issued afterward. (Stevens’s
MJAR at 27 (citing AR 53875)). However, a red SPRS score does not create a per se
presumption of non-responsibility, as Stevens suggests. “Contracting officers are generally given
wide discretion in making responsibility determinations and in determining the amount of
information that is required to make a responsibility determination.” Bender Shipbuilding &
Repair Co. v. United States, 297 F.3d 1358, 1362 (Fed. Cir. 2002) (citation modified). Even FAR
§ 9.105-1(c) states that contracting officers may also consider “any other relevant past
performance on the offeror[,]” thereby conferring a significant degree of discretion.
Even still, the contracting officer did consider Borsight’s risk assessment in the
Contractor Responsibility Determination and Findings document, and acknowledged that one of
the Somewhat Relevant contracts that the Air Force evaluated contained CARs in the SPRS
system. (AR 53872). As properly noted by the United States: “the presence of CARs on a
contract does not mean that a contractor has been seriously deficient in performance or require
the contracting officer to ignore the extensive past performance evaluation completed throughout
11
the source selection process.” (Def.’s Cross-MJAR at 21). In other words, Borsight’s CARs are
not the silver bullets Stevens wishes to cast them as. While more information about the
contracting officer’s analysis of Borsight’s red risk rating would have been welcome here, the
Court must make do. Thalle Constr. Co. v. United States, 169 Fed. Cl. 592, 642 (2024) (an
agency’s decision need not be “a model of clarity.”). The contracting officer considered Contract
No. 4600004024 when analyzing the full picture of Borsight’s past performance. Nothing more
is required. Motor Vehicle Manufacturers Ass'n of the United States, Inc. v. State Farm Mut.
Auto. Ins. Co., 463 U.S. 29, 30–31 (1983) (agency action is lawful if it rests “on a consideration
of the relevant factors . . . .”).
Second, Stevens argues that the Air Force should have assigned it a Significant Strength
(rather than a Strength), for RFP § M.2.2.2 Subfactor 2(a)(i), which required the agency to
evaluate whether threshold requirements for several environmental qualification categories had
been met or exceeded, including temperature qualifications for certain LRUs. (Stevens’s MJAR
at 28–29; see AR 18107–109, 44242 (Tab 122a1, LRU Sheet, Column K)). Specifically, Stevens