Aset Partners Corp. v. United States
CourtUnited States Court of Federal Claims
Date FiledJuly 29, 2026
Docket25-2033
JudgeEric G. Bruggink
StatusPublished
📰 News Coverage: Read the LAWS.com news report on this case
Full Opinion
.In the United States Court of Federal Claims
No. 25–2033C
(Filed: May 29, 2026)
(Re-issued: July 29, 2026)1
**************************
ASET PARTNERS CORP.,
Plaintiff,
v.
THE UNITED STATES,
Defendant,
and
CFOCUS SOFTWARE INCORPORATED,
Intervenor.
**************************
Daniel J. Strouse, Arlington, VA, for plaintiff.
Rebecca T. Mitchell, Trial Attorney, United States Department of
Justice, Civil Division, Commercial Litigation Branch, Washington, DC,
with whom were Brett A. Shumate, Assistant Attorney General, Patricia
McCarthy, Director, Douglas K. Mickle, Acting Deputy Director. Victoria R.
Roth, Senior Attorney for Acquisition and Procurement Law, Department of
Homeland Security, of counsel.
John R. Tolle, McLean, VA, for intervenor.
1
Pursuant to the Protective Order entered in this case, this opinion was
originally filed under seal to afford the parties an opportunity to propose any
appropriate redactions. They have done so. See ECF No. 54. Redactions
are indicated by asterisks.
OPINION
Bruggink, Judge
Plaintiff ASET Partners Corp. (“ASET”) brought this bid protest
challenging defendant’s decision, acting through the Department of
Homeland Security (“DHS”), to award a contract to intervenor cFocus
Software Incorporated (“CSI” or “cFocus”). All parties filed motions for
judgment on the administrative record, and oral argument was held on April
10, 2026. Shortly after oral argument, plaintiff’s motion for judgment on the
administrative record was denied; defendant and intervenor’s respective
motions were granted. Order of April 10, 2026 (ECF No. 50). We more
thoroughly explain our reasons below.
BACKGROUND2
I. The Solicitation
On July 11, 2025, DHS’s Geospatial Management Office DHS issued
Solicitation 70RTACQ00000044, a request for quote (“RFQ”).
Administrative Record (“AR”) Tab 18, 302–07. The successful bidder was
to provide critical support to DHS through enterprise geospatial capabilities;
it would ensure public safety and national security through incident
monitoring, resource deployment tracking, and emerging threat assessment.
AR Tab 8, 275; Tab 33, 717–18. This work is termed Geospatial Capabilities
and Infrastructure Support 3.0. AR Tab 18, 302–07. The proposed contract
was to be for one year (finishing in September 2026) with two option years
thereafter. AR Tab 20b, 436.
The RFQ included a Statement of Work (“SOW”) and Instructions to
Quoters. AR Tabs 18a, 19b, 20b (SOW); Tabs 18b, 19c, 20c (Instructions to
Quoters). The SOW laid out four task areas germane to our discussion: (1)
Enterprise and Technical Architecture Support; (2) Geospatial Information
Technology Management and Support; (3) Project Management and Agile
Methodologies; and (4) Surge Support (optional). AR Tab 20 407–08. The
SOW also included staffing requirements. It listed four key positions: (1)
Project Manager; (2) Scrum Master; (3) System Architect; and (4)
Information System Security Officer (“ISSO”). AR Tab 20b 439–41. The
Solicitation suggested hourly rates for different labor categories, AR Tab
2
These facts are drawn from the Administrative Record.
2
19e, 406, and each quoter could “determine the appropriate personnel mix to
accomplish the outlined tasks in the SOW,” AR Tab 20a, 409.
The Instructions to Quoters required that a Technical Quote be
included in each submission. The Technical Quote (also referred to as
Volume 1), outlines three factors for review: Factor 1 – Technical Approach;
Factor 2 – Management Approach; and Factor 3 – Experience and
Qualifications of Key Personnel (Resumes). AR Tab 20c, 445–48.3 These
three factors were equal in importance and in aggregate were weightier than
price. Id. at 449–50. Each of the three Factors have constituent sub-factors.
Three sub-factors of Factor 1 are relevant. Quotes were required to
address:
1.1 A technical approach that demonstrates experience with
architecting and implementing custom applications.
1.2 Demonstrated experience in implementing geospatial
solutions in an [Amazon Web Services (“AWS”)] cloud
environment including development and blue-green
environments.
1.6 Demonstrated ability to use agile methodologies for
multiple teams including utilization of collaboration tools
such as JIRA, Confluence, Microsoft Teams, SharePoint,
and Service Now.
AR Tab 20c, 446–47.
Sub-factors 1.2 and 1.6 include technical terms that require further
explanation. In sub-factor 1.2, the word ‘environment’ refers to the behind-
the-scenes portion of a webpage. A blue-green environment permits software
developers to gradually implement changes without shutting down a website
or service through parallel virtual systems. AR Tab 22a, 502. At any given
moment, only the “blue” or “green” environment handles user requests,
while the other version undergoes development updates. Id. Traffic is
switched seamlessly (in theory) between the two, allowing incremental
changes without interruption. Id. Sub-factor 1.6’s reference to Agile
3
The Instructions for Quoters also required a Price (Volume 2). AR 20c,
445–48.
3
methodologies alludes to methods of working. Agile methods include stand-
up meetings, intense but short timelines (referred to as “sprints”), and user-
story based design. AR Tab 21a, 472; see also AR Tab 22a, 507.
The relevant sub-factor for Factor 2 tasked bidders to demonstrate
their management approach. Quoters needed to show an “ability to resource
all positions at the time of contract award through (a) current employment of
the proposed staff, (b) submission of Letters of Commitment for contingency
hires . . . and/or (c) has comparable commitments in place with
subcontractors.” AR Tab 20c, 447.
Factor 3 (Experience and Qualifications of Key Personnel) had three
sub-factors, all of which are relevant here.
3.1 The Government will evaluate confidence in the
Offeror’s qualifications and labor categories for each task
in the SOW. The quoter shall identify the role for which
the personnel are proposed. The quoter shall include the
resume of each Key Personnel member proposed (only
resumes for Key Personnel will be accepted).
3.2 The Government will evaluate confidence in the
Offerors’ proposed Staffing Plan and if the proposed staff
has sufficient skill sets and relevant experience to
successfully complete each task in the SOW with the
number of hours by labor category. The Staffing Plan
shall identify and describe all staffing resources and roles
required to support the DHS geospatial capabilities and
GII platform. This plan shall be informed by knowledge
transfer and handoff of current DHS GII operations and
maintenance provided by the legacy contractor teams as
referenced in this SOW. This plan shall be delivered to
the Government thirty (30) days after award.
3.3 The Government will evaluate confidence in the
Offeror’s proposed key personnel staff and if they have
sufficient skill sets, based on provided resumes, to
successfully complete the tasks in the SOW.
Id. at 447–48.
4
Of note, there are two staffing plans referred to in the Solicitation: a
bidding staffing plan (referenced in sub-factor 3.2 above) and the awardee
staffing plan (described below as a SOW deliverable). The bidding staffing
plan submitted with each quote needed to include the number of staff,
grouped by labor category. AR Tab 19a, 360 (questions 3 and 12). On the
other hand, the awardee staffing plan required the name of each person
performing work. Id.
The Solicitation contemplated an award based upon value rather than
lowest price. The bidder who “provides the best value to the Government,
considering technical evaluation factors and price” would win. AR Tab 20c,
450. DHS could select a more expensive bid if the quote provided a “superior
technical solution, or [a] solution indicating a reduced performance risk,
warrant[ing] a price premium.” Id. Once a bidder was deemed “best suited
(i.e., the apparent successful awardee), the government reserve[d] the right
to communicate with only that quoter to address any remaining issues, if
necessary, and finalize the resultant award.” Id. DHS could communicate
with the presumptive awardee regarding “technical and price” issues. Id.
Discussions with offerors were not otherwise contemplated.
The bids were evaluated by two teams—the technical evaluation team
(“TET”) and the business evaluation team (“BET”). AR Tab 25, 669 (TET);
AR Tab 20c, 448–49 (BET). The TET was to review the technical volume of
each quote, pen a report, and rate every bid on each of the three factors. AR
Tab 25, 670. The three possible ratings were “high confidence,” “some
confidence,” and “low confidence.” AR Tab 27, 685. Based upon the sub-
factors, the TET would list elements of each bid that increased or decreased
confidence in the bidder’s ability to perform. AR Tab 27, 677. The BET,
composed of the Contracting Officer (“CO”) and a contract specialist, were
to evaluate if the total price was fair and reasonable. AR Tab 20c, 446–49.
Quotes were required by August 4, 2025. After the TET and BET
concluded their respective analyses, the best value contract could be
determined. DHS was required to issue an award before the expiration of
funds at the end of the Fiscal year on September 30, 2025. Once an awardee
was chosen, DHS was required to gain Secretary approval.
5
II. The Bids
On August 4, 2025, DHS received proposals from three bidders: CSI,
ASET, and *********, a non-party. Although an awardee had not yet been
selected, on August 11, 2025, DHS prophylactically requested Secretary
approval because of the relatively short time between quote submission and
the decision deadline. AR Tab 33, 717. The acting undersecretary requested
approval for $11,955,555.74 (the highest price of the three quoters). Id.
Because this occurred before the end of the evaluation process, the agency
left the awardee name “[t]o be determined.” Id. at 719. On September 15,
2025, the Secretary of DHS approved the amount requested. Id.
While waiting for the Secretary’s approval, the bid evaluations
continued. The TET concluded its review and submitted its report to the CO
on September 9, 2025. AR Tab 27, 686. It rated ********* with “some
confidence” for Factors 1 and 2, but with “low confidence” for Factor 3. Id.
at 682–84. CSI received “high confidence” ratings for all three factors. Id. at
676–78. ASET received a “high confidence” rating only for Factor 1. For
Factors 2 and 3, the TET gave CSI “some confidence.” Id. at 679–82. As a
result, the TET recommended CSI for the award. Id. at 676. After examining
the price volumes, and finding them to be fair and reasonable, the BET
determined that CSI’s quote provided the best value, AR Tab 28, 699. The
agency thus selected CSI because it concluded that CSI’s technical
superiority warranted a price premium. AR Tab 30, 712–14.
Prior to making that award, on September 25, 2025, the CO had
received suggested changes from agency staff with respect to her source
selection, pricing evaluation, and best value memoranda, but was unable to
finish revisions to those memoranda incorporating those suggestions before
the September 30th deadline. See, e.g. AR Tab 59, 902; AR Tab 62, 912. The
CO, therefore, officially awarded CSI the contract on September 29, 2025,
and the company immediately began performance. AR Tab 35, 723–24.
On September 30, 2025, ASET gave the government a notice of intent
to file a bid protest before this court. The following day, appropriations for
the Federal Government lapsed, but work continued on the contract because
DHS deemed the work “essential.” AR Tab 8, 275. In addition, the CO
revised the source selection, pricing evaluation, and best value memoranda,
AR Tab 59, 90, “[a]s part of the quality control process that often occurs once
the fiscal year ends.” AR Tab 60, 903–08; AR Tab 62, 912–13. This process
concluded on October 31, 2025, with a memo detailing the revisions made
6
post-award. AR Tab 62, 914. Despite these revisions, see, e.g., AR Tabs 54–
56, she concluded that they did not call for a different award decision. AR
Tab 59, 902.
III. Key Personnel Changes
The SOW contains a table of required deliverables including a staffing
plan. AR Tab 20b, 433. The eventual awardee was required to submit this
plan thirty days after award. Id. The contract stipulated that, if the contractor
wished to substitute any key personnel, the contractor had to give fifteen
business days’ advance notice to DHS. Id. at 439. The SOW incorporates
Homeland Security Acquisition Regulation 3052.215-70. AR Tab 19d, 404.
Under that regulation, the request needed to include a justification, names of
the personnel involved, qualifications for proposed replacements, and had to
be in writing. AR Tab 20b, 439. Contractors could only substitute with
approval from the CO and proposed personnel had to “possess qualifications
equal to or superior to those of the key person being replaced, unless
otherwise approved by the [CO].” Id.
After award, but during the previously described “quality control”
process, CSI submitted two sets of requests to substitute certain of its key
personnel. AR Tab 49, 820–27. CSI sought approval to bring in
************ as Scrum Master. A Scrum Master is responsible for leading
daily “stand-up meetings and coordinat[ing] Agile ceremonies including
sprint planning, reviews and retrospectives.” AR Tab 22a, 509; see also AR
Tab 21a, 476. ******** had originally been included by ASET for the same
role in its proposal. Compare AR Tab 49, 820, 826–27, with AR Tab 21a,
477, 480–81. CSI also sought to substitute the persons it had initially
proposed for the ISSO, Project Manager, and Systems Architect positions.
The CO approved the changes on December 16, 2025. AR Tab 53, 851.
Before the conclusion of the “quality control” process, on October
22, 2025, ASET filed a second Pre-Filing Notification of its intent to file a
protest. At defendant’s request, plaintiff provided the government with a
draft complaint of its prospective bid protest on October 27, 2025. This
prompted DHS to reevaluate the award, which kept plaintiff from filing its
complaint until after that process concluded. Work was not halted during this
process, however, and CSI continued performance of the contract. See, e.g.,
AR Tab 8, 275; AR Tab 33, 717–18. The reevaluation ended November 5,
7
2025, and concluded with a reaffirmance of the award to CSI.4 AR Tab 69,
969–70.
On November 28, 2025, ASET filed the pending bid protest.
Complaint 1 (ECF No. 1). In Counts I and V, plaintiff alleges that DHS
arbitrarily and capriciously evaluated the credentials of ASET and CSI’s
proposed staff under Factor 3. Id. at 6, 17. In Counts II and IV, ASET argues
that DHS’ evaluation under Factor 2 was arbitrary and capricious because it
evaluated CSI’s and ASET’s staffing plans under different standards. Id. at
12, 16. In Count III, plaintiff contends DHS arbitrarily and capriciously
overlooked CSI’s inexperience, contrary to the Solicitations’ requirements.
Id. at 15. Plaintiff seeks an injunction against continued performance and a
new evaluation and award decision. On February 3, 2026, ASET moved for
judgment on the administrative record. Defendant and intervenor cross-
moved on February 24, 2026.
DISCUSSION
We evaluate bid protests under the standards set forth in the
Administrative Procedure Act (“APA”). 28 U.S.C. § 1491(b)(4). An
agency’s decision will be set aside if its actions are arbitrary, capricious, an
abuse of discretion, or otherwise contrary to law. See 5 U.S.C. § 706;
Banknote Corp. of Am. v. United States, 365 F.3d 1345, 1350–51 (Fed. Cir.
2004). An action is arbitrary, capricious, contrary to law, or an abuse of
discretion if “the agency ‘entirely failed to consider an important aspect of
the problem, offered an explanation for its decision that runs counter to the
evidence before the agency, or [the action] is so implausible that it could not
be ascribed to a difference in view or the product of agency expertise.’” Ala.
Aircraft Indus., Inc.–Birmingham v. United States, 586 F.3d 1372, 1375
(Fed. Cir. 2009) (quoting Motor Vehicle Mfrs. Ass’n of the United States, Inc.
v. State Farm Mut. Auto. Ins. Co., 463 U.S. 29, 43 (1983)). “In applying the
APA standard of review, this Court affords considerable deference to an
agency’s procurement decisions.” Ekagra Partners, LLC v. United States,
163 Fed. Cl. 189 (2022) (quotations omitted). “[I]n the post-award context,
the protester must show that there was a substantial chance it would have
received the contract award but for that error.” Statistica, Inc. v. Christopher,
102 F.3d 1577, 1582 (Fed. Cir. 1996).
4
We use the term “reevaluation” advisedly. The CO used the term “new
award decision,” but the original award was never vacated.
8
Under Rule 52.1 of this court, we make “factual findings . . . from the
record evidence as if [we] were conducting a trial on the record.” Bannum,
Inc. v. United States, 404 F.3d 1346, 1356 (Fed. Cir. 2005). When
determining a motion on the administrative record, “the Court must make
fact findings where necessary.” Baird v. United States, 77 Fed. Cl. 114, 116
(2007). We consider four factors when deciding whether to issue an
injunction: “(1) whether plaintiff has succeeded on the merits of the case; (2)
whether plaintiff will suffer irreparable harm if the court withholds injunctive
relief; (3) whether the balance of hardships to the respective parties favors
the grant of injunctive relief; and (4) whether it is in the public interest to
grant injunctive relief.” KGJJ Eng’g Solutions, LLC, v. United States, 161
Fed. Cl. 556, 569 (2022).
I. Did DHS Err In Evaluating CSI’s Technical Approach?
Plaintiff contends that DHS improperly evaluated the experience and
qualifications of CSI’s key personnel. ASET argues that CSI failed to
demonstrate experience in three of the six sub-factors for Factor 1, Technical
Approach.
Under sub-factor 1.1, bidders had to propose a technical approach
demonstrating “experience with architecting and implementing custom
applications and configuring geospatial, solutions, including automation
testing.” AR Tab 20c, 446. Plaintiff argues that CSI did not show any
experience in software architecture or automation testing. ASET points to
language from CSI’s proposal in which the company only presented a plan
of what it would do prospectively, not what its prior experience had been.
See AR Tab 22a. We disagree.
CSI addressed sub-factor 1.1 with over a page of its proposal. While
its proposal spends only one paragraph explicitly describing experience
under the sub-factor,5 the entire proposal is written in the present tense in
terms of what it currently does: “we develop,” “[w]e emphasize,” “[w]e
implement,” “our team has deep expertise,” “[w]e perform,” “we conduct
load and performance testing . . . to determine,” “[w]e simulate real-world
5
CSI explained that its experience “developing a custom situational
awareness GIS application for U.S Army North (ARNORTH) taught [it] how
to rapidly deliver new geospatial capabilities under tight timelines without
compromising quality.” AR Tab 22a, 501.
9
demand . . . and tune our applications,” “[w]e track . . . .” AR Tab 22a, 502.
Sub-factor 1.1 does not preclude the agency from inferring experience via a
bidder’s detailed, task-oriented approach to what it currently does as well as
what it proposes to continue to do. When technical proposals are evaluated,
we give “greater deference than usual” to an agency. Red Cedar Harmonia,
LLC v. United States, 176 Fed. Cl. 409, 422 (2025) (quoting E. W. Bliss Co.,
77 F.3d at 449). We find no irrationality in the inferences drawn by the
agency in CSI’s favor in this regard.6
Plaintiff’s second issue under Factor 1 revolves around blue-green
environments. The Solicitation instructs bidders to “[d]emonstrate[]
experience in implementing” these environments AR Tab 20c, 446. CSI
outlined its proposed approach to blue-green environments in some detail,
stating that it
appl[ies] this approach to geospatial systems, for instance by
staging updates of an ArcGIS Enterprise stack on a parallel [or
blue-green] environment. When a new version or configuration
is ready and tested, we cut over the traffic via AWS
Application Load Balancers or Route 53 DNS switching, with
no perceptible downtime to users. AWS’s on-demand
provisioning makes blue-green feasible even for complex
systems, as we can script the instantiation of the full stack, run
automated tests, and then tear down the old stack, paying only
for the transition period.
AR Tab 22a, 502. As with its attempt to satisfy the requirement of sub-factor
1.1, CSI responded to sub-factor 1.2 by describing its current practices: “[w]e
design,” “we use,” “we provide,” “we implement blue-green deployment
strategies,” “we apply this approach to geospatial systems,” “we utilize,” etc.
Id. As to its experience in the blue-green environment, CSI explained that:
[a]t the EPA, cFocus implemented a cloud-based ArcGIS
infrastructure emphasizing automation and repeatability. Our
team leveraged Infrastructure as Code (IaC) scripts to
provision development and test environments in AWS on
6
Plaintiff allows that CSI demonstrates experience in software development,
but argues that “architecting” is distinct from “development” citing AR Tab
20c, 446. The record does not definitively show that the two terms have no
overlap. Id.
10
demand, enabling EPA geospatial teams to rapidly prototype
new capabilities, test updates, and validate configurations
without risk to production systems. For instance, during EPA’s
rollout of a national environmental monitoring application, our
IaC-driven AWS sandbox environments allowed rapid testing
and validation of new ArcGIS features and AWS services,
significantly reducing deployment timelines.
Id. at 502–03.
Plaintiff argues that CSI did not demonstrate experience with blue-
green environments. A review of the excerpt above, however, shows that this
was not the case. Indeed, the agency considered this element a strength of
CSI’s proposal. In addition, while plaintiff also believes that the agency
failed to credit ASET’s proposal more highly than it should, that sort of
weighing of the agency’s review of technical strengths and weaknesses is the
prototypical “minutia of the procurement process,” which the court will not
second guess. E.W. Bliss Co., 77 F.3d at 449. We may “not second guess”
DHS’ weighting of CSI and ASET’s relative ability to provide blue-green
environments. Id.
Plaintiff’s last contention under Factor 1 relates to sub-factor 1.6. It
argues that CSI did not show any experience using Agile methodologies.
That sub-factor required CSI’s quote to “[d]emonstrate[] ability to use agile
methodologies for multiple teams.” AR Tab 20c, 447. Plaintiff argues that
CSI again only offers a proposal for what it would do in the future with regard
to Agile methods. See AR Tab 22a, 508. ASET contends that the use of the
present and future tense in CSI’s proposal does not describe experience.
Thus, plaintiff asserts CSI has not demonstrated experience under sub-factor
1.6.
Here too ASET unnecessarily narrows CSI’s quote—cFocus did cite
an instance of prior performance. The quote outlines services provided to the
Defense Intelligence Agency where CSI “adopted Agile for application
development and integrated it with that agency’s stage gate reviews.” AR
Tab 22a, 508. While ASET may disagree with DHS’ assessment of CSI’s
experience with Agile methodologies, we may not disturb the agency’s
decision on those grounds. See E.W. Bliss Co., 77 F.3d at 449. In sum, for all
three sub-factors plaintiff takes issue with under Factor 1, we find no error.
DHS’s conclusions about DCS’s demonstrated experience.
11
II. Did DHS Properly Evaluate CSI’s Management Approach?
Plaintiff next contends that DHS treated ASET unequally compared
to CSI when evaluating their respective staffing levels under Factor 2:
Management Approach. Plaintiff argues that CSI made an important mistake
when it initially promised to provide names for twenty-three vetted
employees, AR Tab 22a, 504, but produced nineteen at most, id. at 514–15.7
Despite this, DHS had “increased confidence” in CSI’s staffing plan. See AR
Tab 27, 678. DHS justified its rating in the face of the discrepancy stating,
“[w]hile this appears to be a minor inaccuracy, it does not materially affect
the ability to meet the SOW requirements.” AR Tab 56, 875. Plaintiff
contends this was not a small error but a 22% deviation from what CSI
promised to provide. Pl. Reply, 23 (ECF No. 37). Plaintiff argues that CSI,
therefore, failed demonstrate the “full staffing approach” required by the
RFQ. AR Tab 20c, 447.
This is an incorrect conception of the task before the TET. Its task was
to judge whether a quoter could “resource all positions at the time of contract
award.” AR Tab 20c, 447. The RFQ notably did not require a minimum
number of staff. Id. at 446–48. The agency was aware of the discrepancy in
naming 19 of 23 individuals and judged it to be a minor inaccuracy. This was
not arbitrary. The four individuals not named were optional for the project.
CSI initially promised four people to work on the “Surge Support” task—a
possible project that was optional. AR Tab 22a, 515. Those four people were
not included in its eventual staffing plan deliverable, drawing down the total
number of named individuals to nineteen. Id. Plaintiff concedes as much. Pl.
Reply, 25–26 (ECF No. 37). Thus, DHS’ decision to overlook this “minor
inaccuracy” was not contrary to the RFQ and was not capricious. DHS did
not “entirely fail[] to consider an important aspect of the problem, offer[] an
explanation for its decision that runs counter to the evidence before the
agency,” and the action is not so “implausible that it could not be ascribed to
a difference in view or the product of agency expertise.” State Farm Mut.
Auto. Ins. Co., 463 U.S. at 43. DHS properly evaluated CSI under Factor 2
as well.
Under Count IV, ASET argues DHS should have treated plaintiff
similarly to CSI when it assigned “increased confidence” to CSI for
7
Plaintiff alleges it may be as few as eighteen names because the last
individual was not fully vetted. Pl. Reply, 22 (ECF No. 37) (citing AR Tab
22a, 515).
12
submitting nineteen named staff but did not do the same for ASET which had
identified fifteen employees. AR Tab 21a, 474–76. There were material
differences, however. Unlike CSI’s proposal, AR Tab 22a, 514–515, ASET’s
quote did not connect the individuals it submitted to specific labor categories,
compare AR Tab 21a, 474, with AR Tab 2d, 101 (native) (listing labor
categories). Thus, ASET’s proposal is not “substantively indistinguishable
[from] or nearly identical” to CSI’s quote. Off. Design Grp. v. United States,
951 F.3d 1366, 1372 (Fed. Cir. 2020) (quotation omitted). Plaintiff’s
argument under Count IV fails.
III. Did DHS Err By Keeping CSI’s “High Confidence” Rating for Factor
Three Despite CSI Proposing Changes in Key Personnel?
Plaintiff’s final contention revolves around CSI’s proposed changes
to key personnel after the initial award on September 29, 2025.8 ASET argues
that, in light of CSI’s request to substitute personnel during the reevaluation
period, DHS only had two options: (1) evaluate the proposal without the
benefit of the personnel basis and reject it as technically unacceptable; or (2)
open discussions for all offerors and permit the replacement of the not
previously named key personnel, citing Chenega Healthcare Servs., LLC v.
United Staes, 138 Fed. Cl. 644, 652 (2018). See also PAE Applied Techs.,
LLC v. United States, 153 Fed. Cl. 573, 578–79 (2021). Here, plaintiff
contends that the key personnel CSI proposed in August were no longer valid
because CSI asked to replace them. Because the RFQ did not permit
discussions with all offerors, plaintiff contends the only alternative left for
DHS would be to reject CSI’s application. Because Aset was runner-up in
the agency’s evaluation, Aset argues it had a substantial chance at being
awarded the business had DHS followed the Chenega rule.
This challenge’s difficulty is that it targets events after contract award,
which occurred on September 29, 2025. This argument turns on whether or
not CSI was the awardee in October 2025 when it requested to substitute key
personnel. We may only render judgment in bid protests on three distinct
grounds: (1) pre-award protests; (2) post-award protests; or (3) any “alleged
violation of statute or regulation in connection with a procurement or a
proposed procurement.” 28 U.S.C. § 1491(b)(1). Claims associated with “the
adjustment or interpretation of contract terms, or other relief relating to the
contract” are governed by the Contract Disputes Act. Todd Constr. L.P. v.
8
ASET withdrew its argument in Count V that DHS erred in evaluating
ASET’s personnel under Factor 3. Pl. Reply, 1 n.1 (ECF No. 37).
13
United States, 656 F.3d 1306, 1311 (Fed. Cir. 2011) (quoting 48 C.F.R.
§ 2.101).
Here, the SOW permitted the awardee to request changes to key
personnel. AR Tab 36, 759–61. On October 16th and 17th, 2025, CSI
requested substitutions and in December 2025, the CO approved the requests.
AR Tab 53, 851. At all relevant points during this reevaluation period, CSI
was the awardee, and, for aught that appears, was performing. It was
admittedly confusing for the CO to reconfirm the award after her internal
reevaluation, but the fact remains that the award took place prior to the
requested personnel changes. Requesting personnel changes after
performance begins is not a problem. Thus, because CSI’s request and DHS’
subsequent approval were merely matters of contract administration, CSI’s
requests to substitute personnel fall outside our “bid protest jurisdiction.”
MSC Indus. Direct Co. v. United States, 140 Fed. Cl. 632, 651 (2018).
Even if the requested substitutions were not matters of contract
administration, DHS did not act arbitrarily by using CSI’s initial key
personnel during reevaluation. For that review, the RFQ did not require DHS
to consider information outside of the initial quotes—information such as the
requests for substitution. See generally AR Tab 20c. Moreover, plaintiff has
not shown that CSI’s initial key personnel were unavailable. “[K]ey
personnel are unavailable when they are, in fact, no longer working with their
employer.” KPMG LLP v. United States, 166 Fed. Cl. 588, 597 (2023) (citing
Orion Int'l Techs. v. United States, 66 Fed. Cl. 569, 575 (2005) (explaining
that a key staff member was unavailable because he was hired by the
government), aff'd, 185 F. App'x 966 (Fed. Cir. 2006). There was no
indication that CSI’s substitutions were caused by unavailability. See
generally AR Tabs 49–52. Chenga and its progeny only apply if “an offeror
is obliged to make a change in the key personnel included in its proposal,”
138 Fed. Cl. at 652 (emphasis added), not if a substitution is made because
of convenience or to improve contract performance.9 Therefore, plaintiff
cannot clear the high bar of irrationality as to Factor 3 because it has not
demonstrated DHS’ exceeded its “broad discretion.” Tyler Constr. Grp. v.
United States, 570 F.3d 1329, 1334 (Fed. Cir. 2009).
9
Intervenor cFocus asserts that the Chenga rule was invalidated recently.
Golden v. United States, 157 Fed. Cl. 680 (2022). We need not reach this
contention because this argument is deposed of on other grounds.
14
CONCLUSION
Plaintiff has not shown that the agency violated a regulation,
procurement statute, or acted arbitrarily in awarding intervenor the subject
contract. The government’s evaluation of the technical and management
elements of intervenor’s and plaintiff’s proposals were rational. Plaintiff’s
arguments represent mere disagreements as to the relative merits of
proposals, something that is beyond our purview. Nor was the agency under
a legal duty to inquire further regarding the availability of intervenor’s key
personnel at the time of award or during its “reevaluation” because there was
no demonstrated unavailability. Accordingly, the Clerk of Court is directed
to enter judgment for defendant. No costs.
s/Eric G. Bruggink
ERIC G. BRUGGINK