Momentus Space, LLC. v. United States
CourtUnited States Court of Federal Claims
Date FiledNovember 23, 2026
Docket26-911
JudgeRobin Meriweather
StatusPublished
📰 News Coverage: Read the LAWS.com news report on this case
Full Opinion
In the United States Court of Federal Claims
MOMENTUS SPACE, LLC.,
Plaintiff,
No. 26-cv-0911
v.
(Filed: November 23, 2026) 1
THE UNITED STATES,
Defendant,
and
CAPELLA SPACE CORPORATION,
Defendant-Intervenor.
William M. Weisberg, Law Offices of William Weisberg PLLC, McLean, VA, for Momentus
Space, LLC.
Joshua A. Mandlebaum, Civil Division, United States Department of Justice, Washington, D.C.,
for the United States. With him on the briefs were Brett A. Shumate, Assistant Attorney
General, Patricia M. McCarthy, Director, Corinne A. Niosi, Assistant Director, Lt. Colonel
Jeffrey J. Hannon, Space Development Agency General Counsel, and Isabelle P. Cutting, Trial
Attorney, U.S. Air Force.
Michael Danton McGill, Arnold & Porter Kaye Scholer, LLP, Washington, D.C., for Capella
Space Corporation.
MEMORANDUM OPINION
This case arises from a United States Space Development Agency (“SDA”) solicitation
issued pursuant to what is commonly referred to as its “Other Transaction” (“OT”) authority.
The pertinent portion of the solicitation sought proposals to develop two prototype space
vehicles that would test radio frequency communications technology while orbiting the Earth.
Plaintiff, Momentus Space, LLC (“Momentus”), submitted an unsuccessful proposal. It then
1
The Court issued this decision under seal on October 26, 2026, and invited the parties to
submit proposed redactions on or before November 9, 2026. The redactions are indicated in the
decision by brackets and three asterisks, [* * *].
filed a bid protest with the Court, alleging that SDA erred in awarding an Other Transaction
agreement (“OT agreement”) to Defendant-Intervenor Capella Space Corporation (“Capella”).
The parties dispute whether this Court has jurisdiction to review the bid protest and whether
Momentus is entitled to the preliminary injunctive relief that it seeks.
Four motions are pending before the Court. Momentus has filed a Motion for a
Temporary Restraining Order and Preliminary Injunction and a Motion to Supplement or
Complete the Administrative Record. In response, the United States and Capella each filed a
Motion to Dismiss and opposed the motion to supplement the administrative record. Having
heard oral argument and reviewed the parties’ briefs, 2 the relevant law, and the Administrative
Record, the Court concludes that it lacks subject matter jurisdiction over Momentus’s claims.
Accordingly, the Court GRANTS the United States’ and Capella’s Motions to Dismiss,
DENIES Momentus’s Motion for Preliminary Injunction, DENIES AS MOOT the Motion to
Supplement or Complete the Administrative Record, and DISMISSES the Complaint.
BACKGROUND
I. The Defense Department’s “Other Transaction” Authority
Congress has authorized the Defense Department to conduct research and development
projects through several different means. The Secretary of Defense and the secretaries of
military departments may perform research and development projects:
(1) by contract, cooperative agreement, or grant, in accordance
with chapter 63 of title 31;
(2) through one or more military departments;
(3) by using employees and consultants of the Department of
Defense;
(4) by mutual agreement with the head of any other department or
agency of the Federal Government;
(5) by transactions (other than contracts, cooperative agreements,
and grants) entered into pursuant to section 4021 or 4022 of this
2
The following filings are relevant to this Order: Compl., ECF No. 1; Mem. in Supp. of
Pl.’s Mot. for a TRO and Prelim. Inj., ECF No. 4-1 (“Mot. for Prelim. Inj.”); Suppl. Mem. in
Supp. of Pl.’s Mot. for TRO and Prelim. Inj., ECF No. 20-1 (“Suppl. Mot. for Prelim. Inj.”); Pl.’s
Mot. to Suppl. or Complete the Administrative Record, ECF No. 20-2 (“Pl.’s Mot. to Suppl.
AR”); Def.’s Mot. to Dismiss, and Resp. to Pl.’s Mots. For Prelim. Inj. Relief, and for Deps.,
ECF No. 22 (“Def.’s Mot. to Dismiss”); Sandhoo Decl., ECF No. 22-1; Mot. to Dismiss Pl.’s
Bid Protest Compl., ECF No. 23-1 (“Capella’s Mot. to Dismiss”); Resp. to Pl.’s Mot. for a TRO
and Prelim. Inj. and Resp. to Pl.’s Suppl. Mot. for TRO and Prelim. Inj., ECF No. 24 (“Capella’s
Resp.”); Pl.’s Resp. to Def. and Def.-Intervenor’s Mot. to Dismiss and Opp’n to Suppl. of the
Administrative Record, ECF No. 25 (“Pl.’s Reply”); Def.’s Reply in Supp. of its Mot. to
Dismiss, ECF No. 26 (“Def.’s Reply”); Def.-Intervenor’s Reply to Pl.’s Resp. to Mot. to
Dismiss, ECF No. 27 (“Capella’s Reply”). Throughout, page citations to documents in the
record refer to the document’s original pagination.
2
title; or
(6) by purchases through procurement for experimental purposes
pursuant to section 4023 of this title.
10 U.S.C. § 4001(b).
This case involves SDA’s exercise of the authority, pursuant to section 4001(b)(5), to
conduct research and development projects by “transactions (other than contracts, cooperative
agreements, and grants).” That is commonly known as the Defense Department’s “Other
Transaction” authority. See, e.g., Tab 3.0, AR 87. The Defense Department often refers to
transactions conducted under this authority as “OTs” and calls the agreements governing those
transactions “OT agreements.” Id.; Tab 1.3, AR 16.
Additional statutory provisions governing OTs can be found in 10 U.S. Code sections
4021 and 4022. Section 4021 provides that “[t]he Secretary of Defense and the Secretary of each
military department may enter into transactions (other than contracts, cooperative agreements,
and grants) under the authority of this subsection in carrying out basic, applied, and advanced
research projects.” 10 U.S.C. § 4021(a). Section 4022 further specifies that certain Defense
Department officials “may, under the authority of section 4021 of this title, carry out prototype
projects that are directly relevant to enhancing the mission effectiveness of personnel of the
Department of Defense or improving platforms, systems, components, or materials proposed to
be acquired or developed by the Department of Defense, or to improvement of platforms,
systems, components, or materials in use by the armed forces.” Id. § 4022(a). The section
prohibits agency officials from entering into OTs for prototype projects unless one of the
following four conditions is met:
(A) There is at least one nontraditional defense contractor or
nonprofit research institution participating to a significant extent in
the prototype project.
(B) All significant participants in the transaction other than the
Federal Government are small businesses (including small
businesses participating in a program described under section 9 of
the Small Business Act (15 U.S.C. 638)) or nontraditional defense
contractors.
(C) At least one third of the total cost of the prototype project is to
be paid out of funds provided by sources other than the Federal
Government.
(D) The senior procurement executive for the agency determines in
writing that exceptional circumstances justify the use of a
transaction that provides for innovative business arrangements or
structures that would not be feasible or appropriate under a
contract, or would provide an opportunity to expand the defense
supply base in a manner that would not be practical or feasible
under a contract.
Id. § 4022(d)(1)(A)–(D).
3
Section 4022 also allows for “follow-on production contracts or transactions.”
Specifically, “[a] transaction entered into under this section for a prototype project may provide
for the award of a follow-on production contract or transaction to the participants in the
transaction. . . . A follow-on production award may be provided for in a transaction entered into
under this section for a prototype project, awarded with respect to such a transaction as one or
more separate awards, or a combination thereof.” Id. § 4022(f)(1). Such a follow-on production
contract “may be awarded to the participants in the transaction without the use of competitive
procedures . . . even if explicit notification was not listed within the request for proposal for the
transaction if-- (A) competitive procedures were used for the selection of parties for participation
in the transaction; and (B) the participants in the transaction successfully completed the
prototype project provided for in the transaction.” Id. § 4022(f)(2). An agency official may
award a follow-on production contract or transaction “when the Department determines that an
individual prototype or prototype subproject as part of a consortium is successfully completed by
the participants.” Id. § 4022(f)(3). OT agreements negotiated pursuant to section 4022 are
treated as “Federal agency procurement[s]” for the purposes of the procurement ethics
requirements set forth in chapter 21 of U.S. Code title 41. Id. § 4022(h).
II. The HALO Acquisition Vehicle and Europa Program Solicitation
A. The HALO Program
SDA created the Hybrid Acquisition for Proliferated Low-earth Orbit (“HALO”) program
through its OT authority in May 2024. Tab 3.0, AR 87. HALO is a contract vehicle through
which SDA can “solicit rapid and affordable mission feasibility demonstrations.” Tab 5.0, AR
98. It provides “a novel opportunity for non-traditional defense contractors to work directly with
SDA for rapid on-orbit mission feasibility prototypes,” 3 and functions as an acquisition vehicle
through which eligible participants can compete for future projects. Tab 5.1, AR 110.
Specifically, “HALO consists of other transaction (OT) for prototype agreements but is novel in
that it is a staged acquisition consisting of a competition to establish a pool of offerors who could
then compete for specific demonstration efforts, or ‘Prototype Orders (PO).’” Id.
3
According to 10 U.S. Code section 4022(e)(2), the term “nontraditional defense
contractor” is defined by 10 U.S. Code section 3014. Section 3014 states that:
the term ‘nontraditional defense contractor,’ with respect to a procurement or with
respect to a transaction authorized under section 4021(a) or 4022 of this title,
means an entity that is not currently performing and has not performed, for at
least the one-year period preceding the solicitation of sources by the Department
of Defense for the procurement or transaction, any contract or subcontract for the
Department of Defense that is subject to full coverage under the cost accounting
standards prescribed pursuant to section 1502 of title 41 and the regulations
implementing such section.
10 U.S.C. § 3014.
4
SDA issued a solicitation on May 31, 2024, for vendors interested in participating in
HALO, and amended it June 25, 2024; the winners of the solicitation would be eligible to
compete for future SDA prototype orders. SPACE DEVELOPMENT AGENCY, HYBRID ACQUISITION
FOR PROLIFERATED LEO (HALO) PROGRAM SOLICITATION (2024), https://sam.gov/opp/ff4a
47267ef04fe5af611e73444597da/view; Tab 5.1, AR 109–110. The competition was open to all
non-traditional defense contractors (“NDCs”), but not traditional defense contractors. Tab 3.0,
AR 87. SDA limited HALO in this way because “an important goal of the HALO acquisition is
to increase the supply of vendors that are able to offer competitive bids on future Space
Development Agency (SDA) spiral development Tranche competitions.” Id. HALO claims to
promote that goal by providing smaller, less risky demonstration missions to NDCs where they
can gain experience working with SDA while increasing the technical maturity of their
capabilities. Id. SDA reasoned that limiting HALO and the prototype orders associated with it
to NDCs would “develop the industrial base” and that the limit that SDA was imposing was
“similar to a limited competition justification to establish or maintain essential capabilities,
which is authorized by the Federal Acquisition Regulations.” Id. SDA also analogized it to
“small business set asides, a very common procurement practice.” Id.
Momentus and Capella are both NDCs and prime contractors participating in the HALO
program. See generally Tab 1.3 (Capella’s HALO OT agreement); Tab 2 (Momentus’s HALO
OT agreement). Consequently, they are both eligible to compete for OT awards issued through
the HALO acquisition vehicle.
B. Europa Solicitation
On July 1, 2025, 4 the SDA issued the Solicitation at issue in this case, Solicitation SDA-
PS-25-04 (“the Solicitation” or “Europa Solicitation”), thereby establishing the “Tranche 2
Demonstration and Experimentation System (T2DES) Europa program” (“Europa” or “the
Europa Program”). Tab 5.0, AR 98. The Europa Program was intended to facilitate
improvements and technological advancements in radio frequency communications that could be
leveraged in future SDA acquisitions of space vehicles. Tab 4.1, AR 92; Tab 5.0. AR 98
(“Future SDA constellations will leverage technologies and methods matured on the Europa
[space vehicles].”); Tab 7.0, AR 186 (discussing issues with existing radio frequency
communications systems and SDA’s desired improvements to those systems). In layman’s
terms, SDA sought to improve the technological capacity to send and receive satellite
communications despite radio frequency jamming. Tab 19.1, AR 871. The Solicitation sought
contractor proposals for OT prototype orders to demonstrate those advancements. Tab 5.0, AR
98.
The Europa Solicitation was issued through the HALO acquisition vehicle pursuant to
SDA’s OT authority. Consequently, only HALO prime contractors, like Momentus and Capella,
were eligible to submit proposals and compete for the OT award. Id.; Tab 4.1, AR 92. At oral
argument, the parties represented that any future solicitations to procure space vehicles or other
4
Although the solicitation was dated June 23, 2025, it was issued publicly on July 1,
2025. See Def.’s Mot. to Dismiss at 3 n.2 (explaining that SDA issued the Solicitation publicly
on July 1, 2025, despite dating the Solicitation June 23, 2025).
5
items using the Europa Program’s technological developments would not necessarily contain the
same eligibility limitations.
The Europa Solicitation called for two separate competitions described as separate
“tracks”—Track 1 and Track 2—and instructed offerors to submit proposals for only one of the
tracks. Tab 5.0, AR 98–99. Momentus and Capella submitted proposals for Track 1, titled
“Advanced Tactical Waveforms.” See generally Tab 12.0 (Capella Track 1 executive summary
submission); Tab 13.0 (Momentus Track 1 executive summary submission). Under Track 1, the
SDA sought proposals for two contractor owned, contractor operated space vehicles. Tab 5.0,
AR 98. The Solicitation also instructed offerors to provide options pricing for a second and third
year of on-orbit operations and testing. Id. The awardee was expected to spend twelve to
eighteen months developing and testing vehicles with the desired radio frequency
communications technology and then launch the vehicles into space for at least one year of on-
orbit testing of the technology. Id.; Tab 7.0, AR 186–88 (SDA’s concept of operations for
testing).
SDA represented that it would make the Track 1 award using a two-phased “down select”
approach. Tab 5.0, AR 98. The Solicitation instructed offerors to first submit executive
summary documents describing their proposed solutions. Id. Based on the executive summary
documents received, SDA would select a subset of offerors to provide a full proposal. Id. If
selected, an offeror would negotiate with SDA to establish a final agreement and submit a
Statement of Work and Milestone Plan. Id.
III. Evaluation of Proposals Submitted for Europa OT Awards
A. Executive Summaries
As noted, interested contractors first submitted an executive summary. The executive
summary had to address the spacecraft bus, payload, and ground system. Id., AR 100. It also
had to propose a schedule, discuss program management, and explain how the offeror’s proposal
could scale to support large, operational constellations of space vehicles. Id. Finally, the
executive summary had to include a “not to exceed” price—including charges for the optional
second and third years of on-orbit operations. Id.
SDA received executive summaries from ten offerors, including Momentus and Capella,
by July 28, 2025. Tab 14.0 (summary tab); Tab 12.0; Tab 13.0. A Source Selection Evaluation
Team (“SSET”) evaluated the executive summaries. Tab 14.0, AR 682. On August 11, 2025,
the SSET briefed the Source Selection Advisory Council (“SSAC”) on its findings and
recommendations. Tab 14.1, AR 683. Later the same day, the SSAC briefed the Selection
Official (“SO”), Dr. Sandhoo, on the SSET’s results. Tab 14.2, AR 736, 739. On August 12,
2025, the SO decided that Momentus, Capella, [***], and [***] would advance to the next phase
and provide full proposals. Tab 14.3, AR 790–93. On August 15, 2025, SDA informed
Momentus and Capella of this decision and gave both offerors feedback on their executive
summaries. Tab 14.4, AR 794–96; Tab 14.5, AR 797–99.
6
B. Full Proposals
Momentus and Capella were two of the four contractors that submitted full proposals to
SDA. Full proposals were to include presentation slides and a written addendum addressing the
CUI-level (“controlled unclassified information”) portion of the Solicitation (a “written CUI
addendum”). Tab 5.0, AR 104; Tab 7.2, AR 190–92. The presentation was to address the
offeror’s plan for program management, technical solution, schedule, price, past performance,
and ground rules or assumptions. Tab 5.0, AR 102–04. Written CUI addenda had to include
design descriptions for the antenna and radio frequency component, additional design
descriptions for the radio and digital component, and other technical information. Tab 7.2, AR
190–92. Momentus and Capella gave presentations and submitted written CUI addenda on
August 29, 2025. Tab 12.1, AR 306; Tab 12.4, AR 476; Tab 13.1, AR 509; Tab 13.4, AR 667.
The Solicitation required SDA to select a full proposal based on the proposals’ “totality,”
including technical factors and price. Tab 5.0, AR 106–07. SDA would weigh, in descending
order of importance, technical realism, technical solution, and vendor diversity. Id., AR 106. It
would then compare and equally weigh that evaluation with price. Id., AR 106–07.
Capella offered a base price of $[***] and a not to exceed price (including all options) of
$48,9[***]. Tab 12.1, AR 354. Momentus offered a base price of $[***] and a not to exceed
price (including all options) of $[***]. Tab 13.1, AR 563. Capella’s and Momentus’s technical
factors were evaluated as follows:
Factor 1 Technical Factor 2 Technical Factor 3 Vendor
Realism Solution Diversity
Capella Excellent Good Good
Momentus Acceptable Acceptable Acceptable
Tab 15.0 (summary tab). 5 On September 19, 2025, the SSAC briefed the SO on the
technical evaluation and recommended Capella for the Track 1 award. Tab 16.0, AR 801, 808,
817.
IV. Award Decision
On September 24, 2025, the SO determined that “Capella’s better non-price factors overcome
the differences in price” and authorized SDA to enter negotiations with Capella for a Track 1
award. Tab 16.1, AR 846–49. On October 2, 2025, SDA notified Momentus that its proposal
was not selected to move forward to negotiations. Tab 16.3, AR 851.
5
SDA’s ratings of Capella’s and Momentus’s full proposals differed from its ratings of
their executive summaries. At the executive summary stage, SDA rated Capella’s Technical
Realism, Technical Solution, and Vendor Diversity as “Good.” Tab 14.0 (summary tab); Tab
14.3, AR 791. It rated Momentus’s Technical Realism, Technical Solution, and Vendor
Diversity as “Acceptable,” “Good,” and “Good,” respectively. Id.
7
After negotiations with Capella regarding the specific statement of work and schedule,
see Sandhoo Decl., ¶ 24, SDA awarded Agreement FA24012490081-P0001 to Capella for
$39,116,090 on April 1, 2026. Tab 19.0, AR 863. On April 8, 2026, SDA notified Momentus
that an agreement had been awarded and that Momentus could request feedback on its proposal.
Tab 17.0, AR 852. Momentus requested feedback and received an outbrief on April 17, 2026.
Tabs 17.1–17.2, AR 853–56. That outbrief provided the adjectival ratings assigned to
Momentus’s executive summary. See id.; cf. Tab 14.0 (summary tab); Tab 14.1, AR 693; Tab
14.2, AR 743. On May 8, 2026, Momentus received a second outbrief. Tab 17.3, AR 857–59.
The second outbrief explained how Momentus’s and Capella’s adjectival ratings changed from
their July 2025 executive summaries to their August 2025 full proposals. Id.
On June 1, 2026, in response to Momentus’s concerns about the fairness and propriety of
the SDA’s decision, the SO issued a memorandum further explaining his rationale for his
decision to pursue negotiations with Capella. Tab 18.0, AR 860–62. Among other things, the
SO explained that, in his judgment, Capella’s superior bus flight heritage placed it in a “different
league of technical merit” than Momentus, and that that feature alone was worth paying
Capella’s higher price. Id., AR 862.
V. Procedural Background
Momentus filed its Complaint and motion for preliminary injunctive relief on June 24,
2026. See Compl.; Mot. for Prelim. Inj. Momentus later supplemented its request for injunctive
relief and filed a motion to supplement the administrative record with deposition testimony. See
Suppl. Mot. for Prelim. Inj.; Pl.’s Mot. to Suppl. AR. SDA filed a response opposing
Momentus’s preliminary injunction motion and moved to dismiss the Complaint for lack of
subject matter jurisdiction. See Def.’s Mot. to Dismiss.
Capella intervened in the case on July 2, 2026. See Order, ECF No. 14. Subsequently,
Capella moved to dismiss the Complaint for lack of subject matter jurisdiction and opposed
Momentus’s request for injunctive relief. See Capella’s Mot. to Dismiss; Capella’s Resp.
SDA’s and Capella’s motions to dismiss, Momentus’s motion for injunctive relief, and
Momentus’s motion to supplement the administrative record with deposition testimony are all
fully briefed and ripe for resolution. The Court also heard oral argument on the pending
motions.
LEGAL STANDARDS
I. Motion to Dismiss for Lack of Subject Matter Jurisdiction
United States Court of Federal Claims Rule (“RCFC”) 12(b)(1) governs motions to
dismiss an action based on lack of subject matter jurisdiction. When resolving such a motion,
the Court must accept as true all undisputed facts asserted in the plaintiff's complaint and draw
all reasonable inferences in the plaintiff’s favor. Trusted Integration, Inc. v. United States, 659
F.3d 1159, 1163 (Fed. Cir. 2011). But if jurisdictional facts are disputed, the Court may consider
8
other relevant evidence. Reynolds v. Army & Air Force Exch. Serv., 846 F.2d 746, 747 (Fed. Cir.
1988). Ultimately, plaintiffs bear the burden of establishing subject matter jurisdiction by a
preponderance of the evidence. Id. at 748. If the Court determines that it lacks subject matter
jurisdiction, it must dismiss the action. RCFC 12(h)(3).
II. Motion for Preliminary Injunction
Preliminary injunctive relief is an “extraordinary remedy.” Associated Energy Gp., LLC
v. United States, 172 Fed. Cl. 799, 812 (2024) (quoting Winter v. Nat. Res. Def. Council, 555
U.S. 7, 24 (2008)). To obtain that remedy, the moving party must establish: a likelihood of
success on the merits, that irreparable harm would ensue absent relief, that the balance of
hardships favors relief, and that relief supports the public interest. Id. (citing PGBA, LLC v.
United States, 389 F.3d 1219, 1228–29 (Fed. Cir. 2004)). Courts may not grant injunctive relief
in cases where they lack jurisdiction. See Celgard, LLC v. LG Chem, Ltd., 624 F. App’x 748,
751 (Fed. Cir. 2015). Accordingly, before reaching the merits of the preliminary injunction
analysis, the Court must “[a]t a minimum, … determine that there is a ‘substantial probability’
that it has jurisdiction over the [underlying] claim[.]” Id.
DISCUSSION
Before reaching the merits of Momentus’s preliminary injunction motion, the Court must
determine whether it has jurisdiction to review Momentus’s claims. See id. The parties dispute
whether the Tucker Act, 28 U.S.C. § 1491, gives this Court jurisdiction to review the OT
agreement between SDA and Capella. That turns on whether the underlying Solicitation and
award constitute or are connected to a “procurement” or “proposed procurement.” The United
States and Capella contend that the Europa Solicitation and award are neither a procurement nor
connected to one, and thus urge the Court to dismiss the Complaint. Momentus counters that the
Europa Solicitation and award are merely interim steps on a path toward a procurement contract
to acquire space vehicles with new communications technology, and therefore its claims are
within the Court’s bid protest jurisdiction. For the reasons discussed below, the Court finds that
it lacks subject matter jurisdiction and must dismiss Momentus’s Complaint.
I. Overview of Statutory Provisions and Caselaw Regarding Whether OT
Agreements Fall Within this Court’s Tucker Act Jurisdiction
The Tucker Act authorizes the Court of Federal Claims to render judgment “on an action
by an interested party objecting to a solicitation by a Federal agency for bids or proposals for a
proposed contract or to a proposed award or the award of a contract or any alleged violation of
statute or regulation in connection with a procurement or a proposed procurement.” 28 U.S.C §
1491(b)(1). “The concluding phrase ‘in connection with a procurement or proposed
procurement’ applies to each jurisdictional prong, giving this Court ‘broad’ authority ‘over
objections to a solicitation, objections to a proposed award, objections to an award, and
objections related to a statutory or regulatory violation so long as these objections are in
connection with a procurement or proposed procurement.’” Raytheon Co. v. United States, 175
Fed. Cl. 281, 288 (2025). Put simply, the Tucker Act is “in its entirety . . . exclusively concerned
9
with procurement solicitations and contracts.” Res. Conservation Grp., LLC v. United States,
597 F.3d 1238, 1245 (Fed. Cir. 2010).
The Tucker Act does not define procurement, thereby leaving room for disagreement
about which solicitations and transactions are within its scope. The Federal Circuit has adopted
the definition of procurement codified at 41 U.S.C. § 111 to determine whether a “procurement”
or “proposed procurement” has occurred. See Distributed Sols., Inc. v. United States, 539 F.3d
1340, 1345 (Fed. Cir. 2008) (citing 41 U.S.C. § 403(2) (currently codified at 41 U.S.C. § 111)).
That statutory provision defines “procurement” to “include[] all stages of the process of
acquiring property or services, beginning with the process for determining a need for property or
services and ending with contract completion and closeout.” 41 U.S.C. § 111 (emphasis added).
The Federal Circuit also examined the meaning of “procurement” in Hymas v. United
States, 810 F.3d 1312 (Fed. Cir. 2016). There, the Federal Circuit declined to rely solely on 41
U.S.C. § 111 when deciding whether Fish and Wildlife Service (“FWS”) cooperative farming
agreements (“CFAs”) were procurement contracts subject to the Court’s jurisdiction or
cooperative agreements exempted from it. Id. at 1324–25. Instead, it reviewed the definitions of
“cooperative agreement” and “procurement contract” set forth in the Federal Grant and
Cooperative Agreement Act (“FGCAA”). Id. Under the FGCAA, an instrument is a
procurement contract if “the principal purpose of the instrument is to acquire (by purchase, lease,
or barter) property or services for the direct benefit or use of the United States Government.” Id.
at 1325 (quoting 31 U.S.C. § 6303(1)). Instruments are cooperative agreements if the agency
“principally intended to ‘transfer a thing of value’ to the private [party] ‘to carry out a public
purpose of support or stimulation authorized by a law of the United States instead of acquiring
(by purchase, lease, or barter) property or services for the direct benefit of or use of the United
States Government.’” Id. at 1327 (quoting 31 U.S.C. § 6305(1)). The Federal Circuit reasoned
that the CFAs were not procurement contracts because FWS had not intended to acquire farming
services for the United States Government’s direct benefit or use. Id. at 1328. Rather, FWS had
principally intended to conserve wildlife in refuges—carrying out a public purpose authorized by
law—by allowing farmers to grow food for animals on refuge lands. Id. at 1327–29. The fact
that the CFAs would indirectly benefit FWS did not convert them into procurement agreements.
See id. at 1328–29.
Neither Hymas nor Distributed Solutions directly addresses whether and under what
circumstances solicitations and agreements issued under the Defense Department’s OT authority
qualify as procurements or are connected to an actual or proposed procurement. Thus, the Court
must look to nonbinding rulings from other Court of Federal Claims judges to ascertain whether
it has jurisdiction over Momentus’s bid protest.
Given the absence of binding Federal Circuit precedent, Court of Federal Claims judges
have grappled with whether Tucker Act jurisdiction extends to solicitations of proposals under
OT authority; 6 the approaches and outcomes vary given the unique fact patterns of each case.
6
Raytheon Co. v. United States, 175 Fed. Cl. 281, 291–93 (2025), provides a
comprehensive review of the cases in which the Court of Federal Claims has considered its
jurisdiction over OT agreements. Telesto Grp., LLC v. United States, 176 Fed. Cl. 711, 727–36
10
Compare Space Expl. Techs. Corp. v. United States, 144 Fed. Cl. 433, 441–45 (2019) (finding no
subject matter jurisdiction) with Raytheon Co., 175 Fed. Cl. at 291–94 (finding subject matter
jurisdiction) and Indep. Rough Terrain Ctr., LLC v. United States (“IRTC”), 172 Fed. Cl. 250,
256–60 (2024) (finding subject matter jurisdiction). Raytheon formulated a jurisdictional
standard that focuses on the “federal agency’s immediate endgame” and concludes that this
Court’s bid protest jurisdiction encompasses OT agreements that are “intended to provide the
government with a direct benefit in the form of products or services.” 175 Fed. Cl. at 293–94.
Ultimately, Judge Bonilla concluded that the challenged OT award was intended to facilitate the
development, production, and government’s acquisition of a missile defense system, and
therefore was within the Court’s jurisdiction. Id. at 294. Judge Davis applied a similar standard
in IRTC, reasoning that “the relevant inquiry requires the Court to look at what the Government
is seeking through the solicitation of proposals.” 172 Fed. Cl. at 258. The solicitation at issue in
IRTC was issued after prototypes had been made (i.e. a “follow-on production contract”) and was
designed to “acquire for the benefit of the Army the goods and services proposed . . . as part of
the prototype phase.” Id. Accordingly, it was within this Court’s bid protest jurisdiction. See id.
In Telesto, Judge Hertling observed that the jurisdictional analysis must begin with determining
the “‘principal purpose of the relationship’ between prototype program participants and the
[government agency].” 176 Fed. Cl. at 731; see also id. at 732 (“Examining an OT’s principal
purpose determines whether the OT can effectively itself be or include a proposed
procurement.”). He concluded that the OT award before him was “in connection with” a
procurement because the Army had decided to acquire a successful prototype with a follow-on
production contract; at that stage, acquisition was the principal purpose. Id. at 732.
Although most judges examining the Court’s jurisdiction over OT agreements invoke the
Hymas “principal purpose” test, their opinions diverge regarding the degree to which the intent
to acquire a good or service must be actualized (if at all). As mentioned above, one of the
statutory provisions authorizing OT agreements allows for “follow-on production contracts or
transactions.” 10 U.S.C. § 4022(f)(1). Relying on this authority, Defense Department officials
sometimes plan research and development projects with one stage where they solicit
experimental prototype projects and another stage where they purchase the outcomes of those
projects from offerors through a follow-on production contract; OT agreements govern the
arrangements at each stage. See id. § 4022(f)(3) (authorizing a follow-on production contract or
transaction when the Defense Department determines that a prototype project is successful). In
Telesto, Judge Hertling concluded that the acquisition of goods or services becomes the
“principal purpose” of an OT solicitation of prototypes only after “the prototype process is
completed successfully, and the agency decides to move forward to procure the prototype.” 176
Fed. Cl. at 732–33. Before that point, during the prototyping stage, the agency’s principal
purpose may be promoting research and development. See id. at 732. Raytheon, in contrast,
held that the lack of a formal commitment to purchase the prototype is not dispositive of the
jurisdictional issue. 175 Fed. Cl. at 294. Judge Bonilla deemed this principle particularly true
when the prototypes are “ill-suited for acquisition and use by the general public,” and further
observed that the record in Raytheon demonstrated that the agency “ha[d] every intention of
awarding a follow-on production contract to [the selected contractor] in the event the defense
(2025), contains a similarly robust analysis and is the most recent opinion addressing the Court’s
OT agreement jurisdiction.
11
contractor’s proposed solution [was] proven.” Id. Similarly, in a case where a contractor’s lack
of success in the OT solicitation could exclude it from participating in a follow-on contract,
Judge Holte found that an OT agreement initiated the procurement process and was connected to
the proposed procurement even before the follow-on contract had been awarded. See Hydraulics
Int’l, Inc. v. United States, 161 Fed. Cl. 167, 176–79 (2022).
II. Whether this Court Has Jurisdiction to Review Momentus’s Challenge to the
SDA OT Award
The parties advance competing approaches to determine whether the Tucker Act gives
this Court jurisdiction to review the SDA’s OT award. The United States contends that OT
solicitations, by definition, can never be procurements, and, alternatively, that this specific OT
award is not a procurement. See Def.’s Mot. to Dismiss at 16–22; Def.’s Reply at 2–8. The
United States also urges the Court not to apply the intent-based jurisdictional test articulated in
Raytheon. See Def.’s Reply at 8–10. Capella acknowledges that the Court may have jurisdiction
over OT awards if they relate to a procurement contract but asserts that no such link exists here.
See Capella Mot. to Dismiss at 8–13. Capella further argues that even if the Europa Solicitation
were connected to a procurement, the Court would lack jurisdiction because Momentus has not
alleged a violation of a procurement statute or regulation. See id. at 14. Momentus contends that
SDA “repeatedly indicated to offerors that this OTA was in a more or less direct throughline to
follow-on procurement contracts for upcoming SDA payloads,” and that the Court therefore has
jurisdiction under Raytheon and Telesto. Pl.’s Reply at 6.
The Court rejects the Government’s contention that all OT solicitations and awards are
outside this Court’s Tucker Act jurisdiction. The United States posits that OT agreements cannot
be procurements because OT transactions are statutorily defined as something “other than
contracts, cooperative agreements, and grants.” See Def.’s Mot. to Dismiss at 18–20 (citing 31
U.S.C. § 6303); see also 18 U.S.C. § 4021(a); 10 U.S.C. § 4001(b)(5). It notes that section
4001(b)(1) allows the Secretary of Defense to perform research and development projects “by
contract, cooperative agreement, or grant, in accordance with chapter 63 of title 31,” i.e., 31
U.S.C. § 6303 of the FGCAA. See Def.’s Mot. to Dismiss at 18 (quoting 10 U.S.C. §
4001(b)(1)). FGCAA section 6303 directs executive agencies to use “procurement contracts”
when the “principal purpose of the instrument is to acquire . . . property or services for the direct
benefit or use of the United States” or if “the agency decides in a specific instance that the use of
a procurement contract is appropriate.” 31 U.S.C. § 6303. The United States asserts that section
4001(b)(1)’s reference to “contract” must therefore be construed to refer to a “procurement
contract,” so that “contract” has the same meaning under both provisions. See Def.’s Mot. to
Dismiss at 19. It concludes that OT agreements are something “other than procurement
contracts,” and consequently, not covered by the Tucker Act. See id. at 19–20 (emphasis added).
None of the relevant precedent adopts the United States’ proposed statutory
interpretation, and for good reason. Section 4001(b)(1)’s reference to the FGCAA provision
discussing “procurement contracts” does not support reading the word “procurement” into
section 4001(b)(5)’s definition of OT agreements as something “other than contracts.” Indeed, if
Congress wanted to make “contract” and “procurement contract” coterminous, it could have said
that “contract” should be defined “in accordance with chapter 63 of title 31.” It is more logical
12
to read the reference to the FGCAA to mean that if research and development projects are
entered into “by contract, cooperative agreement, or grant,” they should comply with the
FGCAA, which provides guidance for executive agencies acquiring property and services from
contractors through those legal instruments. See 31 U.S.C. § 6301 (defining purpose of
FGCAA); see also id. §§ 6302–6309. The fact that section 4001(b)(