56 19 nebraska appellate reports
anew with an evidentiary trial before the district court would
be tantamount to encouraging grievants to simply go through
the motions of the grievance process and then seek to litigate
employee disciplinary matters in the district court. We conclude
not only that such action would ignore the intent of the griev-
ance process set forth in the collective bargaining agreement,
but also that it would endorse a legal course of action that does
not appear to have ever before been endorsed in our jurisdic-
tion. We have discovered no prior authority for litigating under
the guise of breach of contract an employee’s dissatisfaction
with his discipline, and Turnbull has pointed us to none. This
further reaffirms our conclusion that Turnbull’s action should
properly be considered as an appeal of the discipline imposed
and the denial of his grievance and not as an original breach of
contract action.
V. CONCLUSION
We conclude that Turnbull’s “breach of contract” action is
more properly characterized as an attempt to appeal the admin-
istrative denial of his grievance concerning discipline imposed
for his violation of safety policies. As a result, Turnbull was
obligated to satisfy statutory prerequisites for perfecting juris-
diction in the district court through petition in error proceed-
ings. He failed to do so, and the district court properly dis-
missed his action for want of jurisdiction. We affirm.
Affirmed.
Model Interiors, appellee and cross-appellant, v.
2566 Leavenworth, LLC, a corporation, and
Michael Mapes, an individual, appellants
and cross-appellees.
809 N.W.2d 775
Filed May 31, 2011. No. A-10-776.
1. Breach of Contract: Damages. A suit for damages arising from breach of a
contract presents an action at law.
2. Judgments: Appeal and Error. The trial court’s factual findings in a bench trial
of an action at law have the effect of a jury verdict and will not be set aside
unless clearly erroneous.
model interiors v. 2566 leavenworth, llc 57
Cite as 19 Neb. App. 56
3. ____: ____. In reviewing a judgment awarded in a bench trial of a law action, an
appellate court does not reweigh evidence, but considers the evidence in the light
most favorable to the successful party and resolves evidentiary conflicts in favor
of the successful party, who is entitled to every reasonable inference deducible
from the evidence.
4. Contracts: Appeal and Error. The construction of a contract is a matter of law,
and an appellate court has an obligation to reach an independent, correct conclu-
sion irrespective of the determinations made by the court below.
5. Attorney Fees: Appeal and Error. An appellate court will affirm a trial court’s
decision awarding or denying attorney fees absent an abuse of discretion.
6. Judges: Words and Phrases. A judicial abuse of discretion exists when reasons
or rulings of a trial judge are clearly untenable, unfairly depriving a litigant of a
substantial right and denying just results in matters submitted for disposition.
7. Breach of Contract: Pleadings: Proof. In order to recover in an action for
breach of contract, the plaintiff must plead and prove the existence of a promise,
its breach, damage, and compliance with any conditions precedent that activate
the defendant’s duty.
8. Breach of Contract: Words and Phrases. A breach is a nonperformance of
a duty.
9. Breach of Contract. Whether or not a breach is material and important is a
question of degree which must be answered by weighing the consequences of the
breach in light of the actual custom of persons in the performance of contracts
similar to the one involved in the specific case.
10. Contracts: Actions: Substantial Performance. To successfully bring an action
on a contract, a plaintiff must first establish that the plaintiff substantially per-
formed the plaintiff’s obligations under the contract.
11. Contracts: Substantial Performance. Substantial performance may be estab-
lished as long as any deviations from the contract are relatively minor and
unimportant.
12. ____: ____. Substantial performance is shown when the following circumstances
are established by the evidence: (1) The party made an honest endeavor in good
faith to perform its part of the contract, (2) the results of the endeavor are benefi-
cial to the other party, and (3) such benefits are retained by the other party. If any
one of the circumstances is not established, the performance is not substantial and
the party has no right to recover.
13. ____: ____. Substantial performance is a relative term and whether it exists is a
question to be determined in each case with reference to the existing facts and
circumstances.
14. Unjust Enrichment. The doctrine of unjust enrichment is recognized only in the
absence of an agreement between the parties.
15. Appeal and Error. An appellate court is not obligated to engage in an analysis
which is not needed to adjudicate the controversy before it.
16. Attorney Fees: Appeal and Error. A party may recover attorney fees and
expenses in a civil action only when a statute permits recovery or when the
Nebraska Supreme Court has recognized and accepted a uniform course of proce-
dure for allowing attorney fees.
58 19 nebraska appellate reports
17. Final Orders. Generally, when a trial court clearly intends its order to serve as a
final adjudication of the rights and liabilities of the parties, the order’s silence on
requests for relief can be construed as a denial of those requests.
Appeal from the District Court for Douglas County: John D.
Hartigan, Jr., Judge. Affirmed.
John P. Passarelli and Amy L. Van Horne, of Kutak Rock,
L.L.P., for appellants.
Anne Marie O’Brien and Angela J. Miller, of Lamson,
Dugan & Murray, L.L.P., for appellee.
Inbody, Chief Judge, and Irwin and Moore, Judges.
Moore, Judge.
INTRODUCTION
Model Interiors (Model) filed a complaint against Michael
Mapes (Michael) and 2566 Leavenworth, LLC (collectively
Mapes), in the district court for Douglas County, alleging
breach of an oral contract and unjust enrichment. Mapes filed
a counterclaim, also alleging breach of an oral contract and
unjust enrichment. Cross-claims for fraudulent misrepresenta-
tion were voluntarily dismissed by the parties on the second
day of trial, and we do not make further reference to these
claims. Model was given leave at the start of trial to amend
its complaint to include a construction lien foreclosure. The
court entered judgment in favor of Model on each of its claims
in the total amount of $77,183.62. Mapes has appealed, and
Model has cross-appealed. Because we find that the district
court was not clearly erroneous in determining Model sub-
stantially performed the contract and that the court did not
abuse its discretion in failing to award attorney fees to Model,
we affirm.
BACKGROUND
Mapes purchased real property located on Leavenworth
Street in Omaha, Nebraska, with an abandoned, roofless shell
of a building and began to plan a complete rehabilitation of
the site. In June 2008, John and Shelley Biever, the owners of
Model, entered into an oral contract with Mapes for interior
model interiors v. 2566 leavenworth, llc 59
Cite as 19 Neb. App. 56
design services at the site. Under the terms of this contract,
Model was to provide interior design services, materials, fur-
niture, and products to Mapes in exchange for a design fee of
$20,000 and a 20-percent markup on selected materials and
products. The parties understood this to be a “‘cost plus’”
contract for services and payment. Mapes paid the $20,000 fee.
The record shows that Model obtained approval from Michael
or his wife for all decisions prior to ordering materials or serv
ices and that Michael was actively involved in every decision
Model made on his behalf. After becoming dissatisfied with the
progress of the work, Michael ordered Model off the property,
leading to the present lawsuit.
Model filed a complaint in the district court, alleging that
Mapes had breached the terms of the parties’ oral contract and
had been unjustly enriched thereby. Model sought judgment for
$81,093.58, plus interest and attorney fees.
Mapes answered, generally denying the substantive asser-
tions of Model’s complaint, setting forth various affirmative
defenses, and setting forth counterclaims for breach of contract
and unjust enrichment. Mapes sought actual damages, as well
as consequential and incidental damages, to be determined
at trial, the return of all sums paid by Mapes to Model for
its “incompetent and defective services,” interest, and attor-
ney fees.
Trial was held before the district court on January 7 through
8 and March 31, 2010. At the start of trial, Model’s attorney
sought and obtained leave to amend the complaint to add a
claim under the construction lien statutes, Neb. Rev. Stat.
§§ 52-125 to 52-159 (Reissue 2010). The court heard testimony
from various witnesses and received numerous documentary
exhibits into evidence. In addition to the information set forth
above, the evidence at trial was as follows:
The record shows that Mapes hired an architect and an
onsite general contractor, Jesse Calabretto, to work on the
renovation project. There was conflicting evidence presented at
trial as to whether Model acted as a general contractor on the
aspects of the work with which Model became involved. There
was also conflicting evidence about whether a completion date
of December 1, 2008, was a material term of the oral contract,
60 19 nebraska appellate reports
whether payment of the contract was tied to any set deadline,
and who was responsible for any missed deadlines.
The building on Leavenworth Street required extensive ren-
ovation, including new windows, roof, and floors. The floor
of the building required major work, including grinding and
filling. Grinding is a process that smoothes rough patches
and grinds down raised portions of a floor. The filling proc
ess allows for the floor to be leveled by filling in those parts
of the floor to be raised to the correct height. The original
flooring contractor selected by Calabretto was unable to pro-
vide the grinding and filling service. Model contacted Alan’s
Carpeting (Alan’s) in early September 2008 to inquire as to
whether it did floor grinding and filling, and Mapes selected
Alan’s to prepare the building floor. The bid placed by Alan’s
was an estimate for only grinding work, as an estimate for
the fill work was dependent on the grinding. This was com-
municated to Mapes in writing on the bid form, which stated
that “once we do the grinding we are able to give you a more
accurate bid.”
Alan’s began the grinding work in mid-September, which
work was supervised by Calabretto. At least once a week,
Alan’s and Calabretto completed a walk-through of the work
then completed. Mapes also inspected the work almost daily,
as Mapes would visit the building to inspect the progress of the
project. During the day-to-day supervision and walk-throughs,
Alan’s communicated the extent of the work being done on the
floor and the extent of the work yet to be completed. Alan’s
expressly stated to Mapes and Calabretto that the preparation
work was much more extensive than originally estimated, and
Mapes agreed to do what was necessary to finish the job com-
pletely. Neither Mapes nor Calabretto ever requested Alan’s to
stop work or communicated any complaints about the work.
During the floor-grinding process, Model was not involved
in the day-to-day supervision or walk-through inspections of
the work completed by Alan’s. Alan’s obtained permission
and authorization for all of its onsite work from Mapes or
Calabretto and not from Model. After concluding the grind-
ing process, Alan’s began to work on the fill, and during this
time, supervision and walk-throughs by Calabretto continued.
model interiors v. 2566 leavenworth, llc 61
Cite as 19 Neb. App. 56
Mapes was also onsite during the fill work. The evidence at
trial shows that Alan’s completed the necessary work of grind-
ing and preparing the floor of the building, that the results of
the work completed by Alan’s remain in the building and are
used on a daily basis, and that the work completed by Alan’s
remains uncompensated in the amount of $20,431.52.
As part of its contract with Mapes, Model contracted to
obtain wood flooring materials for the building. On about
August 6, 2008, the Bievers and Mapes met to discuss select-
ing and purchasing the wood flooring. At the conclusion of the
meeting, Mapes selected flooring from Elmwood Reclaimed
Timber (Elmwood). During the meeting, Mapes was informed
that the selected reclaimed wood flooring would require a spe-
cial adhesive to install. Calabretto’s wood flooring installer did
not bid on the wood floor installation work, and as a result,
at the request of Mapes, Model presented five separate bids
to Mapes for the wood floor installation on about September
15. After reviewing the bids, Mapes selected Matthew Conn to
install the wood flooring.
Conn measured the areas of the building to determine the
proper amount of wood flooring and adhesive to order, con-
tacting Elmwood representatives in the process to learn more
about the adhesive. Model did not assume, control, or super-
vise Conn’s work. Based upon Conn’s measurements, Model
placed an order with Elmwood for the wood flooring and
adhesive selected by Mapes. Prior to ordering the wood floor-
ing, Model informed Mapes that Elmwood required 4 to 6
weeks from the date of ordering to receive the wood flooring.
The wood flooring and adhesive required a downpayment of
$30,000, which Mapes paid on about September 26, 2008.
Model mailed the downpayment to Elmwood on September
27, and Model also paid the remaining invoice amount of
$27,298.50 to Elmwood.
Conn began to install the wood floor in October 2008. Conn
waited until the other subcontractors had completed their work
for the day to install the wood flooring. Additionally, the floor-
ing installation required specific temperature and humidity
controls to prevent damage to the floor and allow the adhesive
to adhere properly. Both Mapes and Calabretto were aware
62 19 nebraska appellate reports
of Conn’s work schedule for installing the wood flooring. In
late November or early December, Michael ordered Conn off
the building premises because he felt that Conn was too slow
in his work of installing the wood floor. Mapes subsequently
contracted Elmwood to install the floor. The record shows that
Model designed and ordered materials for the floor in the build-
ing, that Mapes has not paid the remaining $27,298.50 owed to
Model for the wood flooring provided by Elmwood, and that
Mapes accepted and has not rejected the wood flooring. The
record revealed some unresolved problems with broken stair
nosing, but the cause of this problem was not conclusively
established at trial.
Mapes and Model also contracted for the purchase of carpet-
ing, lighting, plumbing, cabinetry, and tile in the building. To
determine the proper amount of tile, carpeting, and adhesive
to order, Model contracted the carpet and tile installers from
Alan’s to measure the areas of installation. Alan’s measured
these areas based upon the design specifications for the tile
and carpet. After receiving the measurements, Model ordered
the necessary tile, carpeting, and adhesive. The record shows
that Model ordered materials as directed by others for the tile,
carpeting, and other materials necessary for the installation of
such products and that $10,403.87 is owed for this work. A
representative of Alan’s testified that its work for carpet and
tile was substantially completed.
Mapes contracted for the purchase of lights throughout
the property. Model ordered light fixtures from Architectural
Lighting, after receiving approval from Mapes. The order
required a 50-percent downpayment, which Mapes paid. Model
then ordered the lighting as specified by Mapes. After instal-
lation of the light fixtures, a manufacturing defect was discov-
ered that was in the process of being resolved by the manufac-
turer at the time of trial. Because of this defect, Mapes refused
to pay the remaining 50-percent balance due to Architectural
Lighting. The record shows that Model ordered the lighting as
approved and specified by Mapes.
Expert testimony at trial established that the unpaid work
by Model was of reasonable quality and customary for the
services Model provided. Model transmitted bills from vendors
model interiors v. 2566 leavenworth, llc 63
Cite as 19 Neb. App. 56
and added a 20-percent markup as agreed upon by Mapes,
and expert testimony established that this was also reasonable
and customary. Lori Krecji, an architect and interior designer,
inspected the building and testified that she did not find any
shoddy work or materials. Krecji reviewed the invoices and
inspected the work and materials referenced in the invoices.
She found the outstanding unpaid charges to be fair and rea-
sonable for what Mapes received. She testified, based upon her
inspection as an architect and interior designer and her knowl-
edge of materials and workmanship in the Omaha area, that
Model should be paid.
Mapes testified that Model designed portions of a building
for Mapes that achieved what it had wanted at the inception of
the agreement between Mapes and Model, which was a beauti-
ful and unique interior with a “‘wow’ factor.”
In early December 2008, after becoming dissatisfied with
the progress of the work, Michael ordered Model off the
property and prevented Model from performing the remainder
of its agreement. Shelley Biever testified that the project was
“almost substantially completed” at that time. Model and vari-
ous subcontractors were not paid for their services, materials,
and products. The record shows that the total remaining due to
Model is $77,183.62.
To recover the amounts due and owing under the oral con-
tract, Model filed a construction lien on January 30, 2009, in
the amount of $81,093.58. After filing the lien, Model reduced
some amounts due and owing, making adjustments due to the
return of some items ordered but not used. Construction liens
were also filed by Alan’s for $29,131.41 and by Elmwood for
$11,184.85.
The district court entered judgment on July 12, 2010,
in favor of Model on each of its claims in the total sum of
$77,183.62 plus taxable costs. The court made no explicit
findings with respect to attorney fees. The court found that
Model met its burdens of proof on its claims and that Mapes
failed to meet the burdens of proof on the affirmative defenses
and counterclaims. The court found that Mapes failed to
establish by a preponderance of the evidence that Model acted
as a general contractor on the aspects of the work undertaken
64 19 nebraska appellate reports
by Model. The court concluded that while Mapes “did trim
Calabretto’s compensation,” the contract made with Model
did not include responsibility for the work and products of
others. The court further concluded that the contract between
Model and Mapes was for interior design services, materi-
als, furniture, and products; that Mapes failed to establish
that Model agreed to become the general contractor, or that
Model accepted the responsibilities of a general contractor;
and that Model did not warrant the work by vendors or the
products supplied for the building. The court concluded that
the outstanding sums due were all customary and reasonable
and that Model substantially performed its design work on
the project.
ASSIGNMENTS OF ERROR
Mapes asserts, consolidated and restated, that the district
court erred in (1) finding in favor of Model on its breach
of contract claim instead of finding in favor of Mapes on
Mapes’ claim and (2) finding in favor of Model on its unjust
enrichment claim instead of finding in favor of Mapes on
Mapes’ claim.
On cross-appeal, Model asserts that the district court erred
in ignoring § 52-157(3) in denying attorney fees and costs to
Model after having prevailed on its construction lien claim and
foreclosure against Mapes.
STANDARD OF REVIEW
[1-3] A suit for damages arising from breach of a contract
presents an action at law. Dutton-Lainson Co. v. Continental
Ins. Co., 279 Neb. 365, 778 N.W.2d 433 (2010). The trial
court’s factual findings in a bench trial of an action at law have
the effect of a jury verdict and will not be set aside unless
clearly erroneous. Hooper v. Freedom Fin. Group, 280 Neb.
111, 784 N.W.2d 437 (2010). In reviewing a judgment awarded
in a bench trial of a law action, an appellate court does not
reweigh evidence, but considers the evidence in the light most
favorable to the successful party and resolves evidentiary con-
flicts in favor of the successful party, who is entitled to every
reasonable inference deducible from the evidence. Id.
model interiors v. 2566 leavenworth, llc 65
Cite as 19 Neb. App. 56
[4] The construction of a contract is a matter of law, and an
appellate court has an obligation to reach an independent, cor-
rect conclusion irrespective of the determinations made by the
court below. Reichert v. Rubloff Hammond, L.L.C., 264 Neb.
16, 645 N.W.2d 519 (2002).
[5,6] An appellate court will affirm a trial court’s decision
awarding or denying attorney fees absent an abuse of discre-
tion. Evertson v. City of Kimball, 278 Neb. 1, 767 N.W.2d 751
(2009). A judicial abuse of discretion exists when reasons or
rulings of a trial judge are clearly untenable, unfairly depriving
a litigant of a substantial right and denying just results in mat-
ters submitted for disposition. Behrens v. Blunk, 280 Neb. 984,
792 N.W.2d 159 (2010).
ANALYSIS
Breach of Contract.
Mapes asserts, consolidated and restated, that the dis-
trict court erred in finding in favor of Model on its breach
of contract claim instead of finding in favor of Mapes on
Mapes’ claim. Mapes argues that a December 1, 2008, dead-
line was a material term of the oral contract, which term
was breached by Model, that Model failed to substantially
perform its obligations under the contract, and that Model’s
breaches of the contract excused Mapes from performance
under the contract.
[7-9] In order to recover in an action for breach of contract,
the plaintiff must plead and prove the existence of a promise,
its breach, damage, and compliance with any conditions prec-
edent that activate the defendant’s duty. Henriksen v. Gleason,
263 Neb. 840, 643 N.W.2d 652 (2002). A breach is a nonper-
formance of a duty. Phipps v. Skyview Farms, 259 Neb. 492,
610 N.W.2d 723 (2000). Whether or not a breach is material
and important is a question of degree which must be answered
by weighing the consequences of the breach in light of the
actual custom of persons in the performance of contracts simi-
lar to the one involved in the specific case. Id.
Viewing the evidence in the light most favorable to Model
and resolving evidentiary conflicts in its favor as we must,
the evidence shows that the terms of the contract provided
66 19 nebraska appellate reports
that Model would provide interior design services, material,
furniture, and products to Mapes in exchange for a design fee
of $20,000 and a 20-percent markup on selected materials and
products. There is evidence in the record that when Model and
Mapes entered into the contract in June or July 2008, Mapes
did not communicate any December 1 deadline. Shelley Biever
did not recall hearing about a December 1 deadline until
August or September. There is also evidence that Calabretto
was the general contractor and was responsible for maintaining
the schedule. The district court’s determination as to the terms
of the parties’ contract is not clearly erroneous.
[10-13] In arguing that Model failed to substantially per-
form its obligations under the contract, Mapes points to the
fact that other flooring contractors were hired to finish the
work, that there were problems with the stair nosing, that
certain fixtures had to be replaced, and that there were prob-
lems with the lighting. To successfully bring an action on
a contract, a plaintiff must first establish that the plaintiff
substantially performed the plaintiff’s obligations under the
contract. VRT, Inc. v. Dutton-Lainson Co., 247 Neb. 845,
530 N.W.2d 619 (1995). Substantial performance may be
established as long as any deviations from the contract are
relatively minor and unimportant. Phipps, supra. Substantial
performance is shown when the following circumstances are
established by the evidence: (1) The party made an honest
endeavor in good faith to perform its part of the contract, (2)
the results of the endeavor are beneficial to the other party,
and (3) such benefits are retained by the other party. If any
one of the circumstances is not established, the performance
is not substantial and the party has no right to recover. VRT,
Inc., supra. Substantial performance is a relative term and
whether it exists is a question to be determined in each case
with reference to the existing facts and circumstances. Id. The
district court found that Model substantially performed its
design work on the project; that the results were beneficial in
that Mapes received a beautiful, unique interior with a “‘wow’
factor”; and that the benefits of Model’s work were retained
by Mapes. With respect to problems with the stair nosing, the
record did not establish the cause of this problem. As to the
model interiors v. 2566 leavenworth, llc 67
Cite as 19 Neb. App. 56
lighting issues, the record shows that there was a manufac-
turing defect. The evidence viewed most favorably to Model
supports the court’s conclusion that Model substantially per-
formed its obligations. Mapes complains that Model relies on
self-serving testimony from the Bievers and Model’s expert
witness. The lower court clearly accepted Model’s version of
the facts, and it is not our task to reweigh evidence. Model
is entitled to every reasonable inference deducible from the
evidence. Our standard of review requires us to consider the
evidence in the light most favorable to Model and to resolve
evidentiary conflicts in its favor. The district court’s deter-
mination that Model substantially performed its obligations
under the contract is not clearly erroneous. Mapes’ assignment
of error is without merit.
Unjust Enrichment.
[14,15] Mapes asserts that the district court erred in finding
in favor of Model on its unjust enrichment claim instead of
finding in favor of Mapes on Mapes’ claim for unjust enrich-
ment. The doctrine of unjust enrichment is recognized only
in the absence of an agreement between the parties. Washa
v. Miller, 249 Neb. 941, 546 N.W.2d 813 (1996). The record
clearly shows an agreement between the parties. Accordingly,
we need not address this assignment of error further. An appel-
late court is not obligated to engage in an analysis which is
not needed to adjudicate the controversy before it. Conley v.
Brazer, 278 Neb. 508, 772 N.W.2d 545 (2009).
Attorney Fees.
[16] On cross-appeal, Model asserts that the district court
erred in ignoring § 52-157(3) in denying attorney fees and
costs to Model after having prevailed on its construction lien
claim and foreclosure against Mapes. A party may recover
attorney fees and expenses in a civil action only when a statute
permits recovery or when the Nebraska Supreme Court has
recognized and accepted a uniform course of procedure for
allowing attorney fees. Eikmeier v. City of Omaha, 280 Neb.
173, 783 N.W.2d 795 (2010). Section 52-157 provides:
(1) If a person is wrongfully deprived of benefits to
which he or she is entitled under sections 52-125 to
68 19 nebraska appellate reports
52-159 by conduct other than that described in section
52-156:
(a) He or she is entitled to damages; and
(b) The court may make orders restraining the owner or
other person, or ordering them to proceed on appropriate
terms and conditions.
(2) If in bad faith a claimant records a lien, overstates
the amount for which he or she is entitled to a lien, or
refuses to execute a release of a lien, the court may:
(a) Declare his or her lien void; and
(b) Award damages to the owner or any other person
injured thereby.
(3) Damages awarded under this section may include
the costs of correcting the record and reasonable attor-
ney’s fees.
[17] At trial, Shelley Biever testified that Model had paid
attorney fees in connection with this action and was asking the
district court for those fees as part of its damages. However,
there was no evidence presented at trial regarding the amount
of attorney fees incurred. At oral argument, Model’s attorney
suggested that Model asked the court to reserve the issue of
attorney fees for later determination; however, such discus-
sion does not appear in the bill of exceptions. Counsel also
indicated that a motion for reconsideration was filed with
respect to the failure to award attorney fees and that a journal
entry reflects the court’s denial of the motion; however, such
proceedings are also not contained in the record provided to us
on appeal. We deem the court’s silence on the issue of attorney
fees in its final order to be a denial of the request. Generally,
when a trial court clearly intends its order to serve as a final
adjudication of the rights and liabilities of the parties, the
order’s silence on requests for relief can be construed as a
denial of those requests. In re Estate of Hedke, 278 Neb. 727,
775 N.W.2d 13 (2009).
While the statute relied upon by Model states that damages
awarded under that section “may include . . . reasonable attor-
ney’s fees,” it does not mandate the award of such fees. See
§ 52-157 (emphasis supplied). An appellate court will affirm a
trial court’s decision awarding or denying attorney fees absent
state v. lowery 69
Cite as 19 Neb. App. 69
an abuse of discretion. Evertson v. City of Kimball, 278 Neb. 1,
767 N.W.2d 751 (2009). Due to the discretionary nature of the
statute and the failure to adduce evidence concerning the fees,
we find no abuse of discretion by the court in connection with
its failure to award attorney fees.
CONCLUSION
The district court did not err in entering judgment in favor
of Model on its breach of contract claim and did not abuse its
discretion in failing to award attorney fees.
Affirmed.
State of Nebraska, appellee, v. Joseph R. Lowery,
appellee, and Sterling T. Huff, appellant.
798 N.W.2d 626
Filed May 31, 2011. No. A-10-789.
1. Attorney Fees: Appeal and Error. When an attorney fee is authorized, the
amount of the fee is addressed to the discretion of the trial court, whose ruling
will not be disturbed on appeal absent an abuse of discretion.
2. Judges: Words and Phrases. An abuse of discretion occurs when the trial
judge’s reasons or rulings are clearly untenable, unfairly depriving a litigant of a
substantial right and denying just results in matters submitted for disposition.
3. Attorney Fees. Attorney fees and expenses may be recovered only where pro-
vided for by statute, or when a recognized and accepted uniform course of proce-
dure has been to allow recovery of an attorney fee.
4. ____. To determine proper and reasonable fees, it is necessary to consider the
nature of the litigation, the time and labor required, the novelty and difficulty of
the questions raised, the skill required to properly conduct the case, the respon-
sibility assumed, the care and diligence exhibited, the result of the suit, the
character and standing of the attorney, and the customary charges of the bar for
similar services.
5. Attorney Fees: Proof. While attorney fees and expenses are ordinarily left
to the trial court’s discretion, an application for attorney fees and expenses
must be granted where the record demonstrates that the amount requested was
reasonable and there is no evidence or indication otherwise that the amount is
unreasonable.
6. ____: ____. Where the evidence contained in the record supports the fact that
the moving party’s request for attorney fees and expenses is a reasonable request,
and no other contrary evidence exists or is offered into evidence disputing rea-
sonableness, the request for such reasonable attorney fees and expenses must
be granted.