Full Opinion

****************************************************** The ‘‘officially released’’ date that appears near the beginning of each opinion is the date the opinion will be published in the Connecticut Law Journal or the date it was released as a slip opinion. The operative date for the beginning of all time periods for filing postopinion motions and petitions for certification is the ‘‘officially released’’ date appearing in the opinion. In no event will any such motions be accepted before the ‘‘officially released’’ date. All opinions are subject to modification and technical correction prior to official publication in the Connecti- cut Reports and Connecticut Appellate Reports. In the event of discrepancies between the electronic version of an opinion and the print version appearing in the Connecticut Law Journal and subsequently in the Con- necticut Reports or Connecticut Appellate Reports, the latest print version is to be considered authoritative. The syllabus and procedural history accompanying the opinion as it appears on the Commission on Official Legal Publications Electronic Bulletin Board Service and in the Connecticut Law Journal and bound volumes of official reports are copyrighted by the Secretary of the State, State of Connecticut, and may not be repro- duced and distributed without the express written per- mission of the Commission on Official Legal Publications, Judicial Branch, State of Connecticut. ****************************************************** ELECTRICAL CONTRACTORS, INC., ET AL. v. DEPARTMENT OF EDUCATION ET AL. (SC 18525) Rogers, C. J., and Norcott, Palmer, Zarella, McLachlan, Eveleigh and Harper, Js. Argued September 6, 2011—officially released January 17, 2012 Steven B. Kaplan, with whom was Paul R. Fitzgerald, for the appellants (plaintiffs). Darren P. Cunningham, assistant attorney general, with whom, on the brief, was Richard Blumenthal, former attorney general, for the appellees (named defendant et al.). Frank G. Usseglio and John T. Fussell, with whom were Karen K. Clark and Glenn A. Duhl, and, on the brief, Robert M. Cheverie and Gary F. Sheldon, for the appellees (defendant city of Hartford et al.). Opinion ZARELLA, J. The principal issue in this appeal is whether the nonunion plaintiffs, Electrical Contractors, Inc. (ECI), and six of its individual employees,1 have standing to challenge prebid specifications requiring the successful bidder on two state financed school con- struction projects2 in the city of Hartford to perform all project work with union labor under the terms of a project labor agreement (PLA). The plaintiffs claim that the trial court incorrectly concluded that (1) ECI lacked standing, pursuant to this court’s decision in Connecti- cut Associated Builders & Contractors v. Hartford, 251 Conn. 169, 740 A.2d 813 (1999) (Associated Builders & Contractors), to challenge the PLA requirement and the rejection of its lowest, responsible, qualified bids on the two construction projects after ECI refused to sign and be bound by the mandatory PLA, (2) the PLA requirement did not violate the applicable competitive bidding laws, General Statutes §§ 4a-100, 4b-91, 4b-92 and 10-287, (3) the individual plaintiffs did not have standing under article first, §§ 1, 4, 5 and 20, of the Connecticut constitution to challenge the PLA require- ment, and (4) ECI did not have standing to prosecute its claim that the PLA requirement was in violation of the Connecticut Antitrust Act, General Statutes § 35- 24 et seq. The defendants, the city of Hartford (city), Morganti Group, Inc., Downes Construction Company, LLC, Custom Electric, Inc.,3 the state department of education (department), and Mark K. McQuillan, the commissioner of education,4 who allegedly approved the challenged contracts on behalf of the state,5 disagree with the plaintiffs and raise two alternative grounds for affirmance, namely, that the plaintiffs’ claims are (1) preempted by federal labor law, and (2) barred by the doctrine of sovereign immunity.6 We affirm in part and reverse in part the judgment of the trial court. I FACTS The following relevant facts are set forth in the trial court’s memorandum of decision. ‘‘A PLA is a prehire collective bargaining agreement which requires all con- tractors and subcontractors on a construction project to comply with the terms of all existing collective bar- gaining agreements with unions representing workers from the trades performing work on the project and requires all project workers to join the unions for their respective trades, to remain members in good standing of such unions, and not to strike while the project is under construction.7 The PLAs . . . at issue share these essential features, although they set aside 15 per- cent of all work on each project for minority-owned . . . and/or women-owned . . . business enterprises, which are not bound by the PLAs.8 . . . ‘‘In their complaint, the plaintiffs [sought] several types of declaratory, injunctive and other extraordinary relief9 in connection with the projects . . . at issue based upon the common underlying claim that the city’s imposition of mandatory PLAs upon successful bidders on those and similar state-financed construction proj- ects is illegal. . . . ‘‘After this case was filed in [the trial] court, the defendants successfully petitioned for its removal to the United States District Court [for the District of Con- necticut] so that [the] federal constitutional claims . . . could be adjudicated in a federal forum. Upon its removal, the case was assigned to [Judge] Stefan Underhill, before whom the parties presented oral argu- ments after submitting extensive briefs on comprehen- sive motions to dismiss10 all counts of the plaintiffs’ then operative first amended complaint.11 At the conclu- sion of oral argument, Judge Underhill dismissed all of the plaintiffs’ federal claims, declined to exercise jurisdiction over their pendent state claims, and ordered that the case be remanded to [the trial] court for further proceedings. Left undecided in this process, with the express intention that [the trial] court should decide them on remand, were the defendants’ jurisdictional challenges to the plaintiffs’ state law claims. ‘‘After the case was remanded, the [trial] court met with counsel to establish a procedure for identifying those jurisdictional challenges that remained to be adju- dicated, claiming such challenges for a hearing, and filing supplemental briefs thereon. Upon receipt of the parties’ claims for hearing and supplemental briefs, which incorporated by reference all relevant portions of the briefs they had previously filed in federal court, the [trial] court heard oral argument on all challenges claimed for hearing on July 3, 2009. For the purpose of that hearing, the parties agreed that all documents and materials submitted by any party could be considered parts of the evidentiary record upon which to decide the contested issues presented on the pending motions. ‘‘The defendants, in their motions [to dismiss] . . . challenged [the trial] court’s subject matter jurisdiction over the plaintiffs’ state law claims on three separate grounds. First, they claim[ed] that the plaintiffs lack[ed] standing to bring a bid protest under settled principles of Connecticut common law, as most recently applied . . . in [Associated Builders & Contractors] . . . . Second, the state defendants argue[d] that the plaintiffs’ claims against them [were] barred by the doctrine of sovereign immunity because such claims do not rest upon allegations which, if proved, would establish that their conduct in this case was clearly in excess of their statutory authority. Third, all defendants join[ed] in claiming that the plaintiffs’ general challenge to the use of PLAs in state funded municipal school construction projects [was] preempted by federal labor law, which has long approved of their use [in] public construc- tion projects.’’ Following the hearing, the trial court agreed with the defendants that the plaintiffs lacked standing and that the action should be dismissed for lack of subject matter jurisdiction. In its memorandum of decision, the court concluded that ECI had failed to make a colorable claim that the PLA requirement effectuated fraud, corruption, favoritism or otherwise undermined the objective or integrity of the competitive bidding process under the common-law principles articulated in Associated Build- ers & Contractors. The court also concluded that the individual plaintiffs did not have standing because they were not prequalified electrical contractors and had ‘‘neither bid on either project nor could have done so . . . .’’ Accordingly, the trial court granted the defen- dants’ motions to dismiss without reaching or deciding the alternative grounds advanced in support of their motions. Thereafter, the plaintiffs appealed to the Appellate Court from the trial court’s judgment, and the appeal was transferred to this court pursuant to General Statutes § 51-199 (c) and Practice Book § 65-2. II STANDARD OF REVIEW ‘‘Standing is the legal right to set judicial machinery in motion. One cannot rightfully invoke the jurisdiction of the court unless he [or she] has, in an individual or representative capacity, some real interest in the cause of action, or a legal or equitable right, title or interest in the subject matter of the controversy. . . . When standing is put in issue, the question is whether the person whose standing is challenged is a proper party to request an adjudication of the issue . . . . Standing requires no more than a colorable claim of injury; a [party] ordinarily establishes . . . standing by allega- tions of injury. Similarly, standing exists to attempt to vindicate arguably protected interests. . . . ‘‘Standing is established by showing that the party claiming it is authorized by statute to bring suit or is classically aggrieved. . . . The fundamental test for determining aggrievement encompasses a well-settled twofold determination: first, the party claiming aggrievement must successfully demonstrate a specific, personal and legal interest in [the subject matter of the challenged action], as distinguished from a general interest, such as is the concern of all members of the community as a whole. Second, the party claiming aggrievement must successfully establish that this spe- cific personal and legal interest has been specially and injuriously affected by the [challenged action]. . . . Aggrievement is established if there is a possibility, as distinguished from a certainty, that some legally pro- tected interest . . . has been adversely affected.’’ (Internal quotation marks omitted.) May v. Coffey, 291 Conn. 106, 112, 967 A.2d 495 (2009). In the context of competitive bidding, it is well estab- lished that an unsuccessful bidder on a state or munici- pal contract has no contractual right under the common law that would afford standing to challenge the award of a contract. Connecticut Associated Builders & Con- tractors v. Hartford, supra, 251 Conn. 178. ‘‘[A] bid, even the lowest responsible one, submitted in response to an invitation for bids is only an offer which, until accepted by the municipality, does not give rise to a contract between the parties. . . . An unsuccessful bidder, therefore, has no legal or equitable right in the contract. Not unlike any other person whose offer has been rejected, the disappointed bidder has no right to judicial intervention. . . . ‘‘Moreover, no statute grants unsuccessful bidders standing to challenge the award of a state contract. . . . In particular, state and local competitive bidding laws have not been enacted in order to protect bidders. These laws serve to guard against abuses in the award of contracts such as favoritism, fraud or corruption and are enacted solely for the benefit of the public and in no sense create any rights in those who submit bids. . . . ‘‘Despite these substantial constraints, we have rec- ognized a limited exception to the rules of standing in order to provide a means of protecting the public’s interest in properly implemented competitive bidding processes. . . . Under this exception, unsuccessful bidders have standing to challenge the award of a public contract where fraud, corruption or acts undermining the objective and integrity of the bidding process existed . . . . [S]uch a suit is brought by one who suf- fers injury as a result of the illegal activity, but the suit itself is brought in the public interest by one acting essentially as a private attorney general.’’ (Citations omitted; internal quotation marks omitted.) Id., 178–80. ‘‘Our policy to limit standing so as to deny some claims brought by unsuccessful and precluded bidders is designed to protect twin goals that serve the public interest in various, sometimes conflicting, ways. The standing rules aim to strike the proper balance between fulfilling the purposes of the competitive bidding stat- utes and preventing frequent litigation that might result in extensive delay in the commencement and comple- tion of government projects to the detriment of the public.’’ (Internal quotation marks omitted.) Id., 180. Finally, because the issue of standing implicates sub- ject matter jurisdiction, it may be a proper basis for granting a motion to dismiss. E.g., May v. Coffey, supra, 291 Conn. 113; see Practice Book § 10-31 (a) (1). ‘‘The standard of review for a court’s decision on a motion to dismiss is well settled. A motion to dismiss tests, inter alia, whether, on the face of the record, the court is without jurisdiction. . . . [O]ur review of the court’s ultimate legal conclusion and resulting [determination] of the motion to dismiss will be de novo. . . . When a . . . court decides a jurisdictional question raised by a pretrial motion to dismiss, it must consider the allegations of the complaint in their most favorable light. . . . In this regard, a court must take the facts to be those alleged in the complaint, including those facts necessarily implied from the allegations, constru- ing them in a manner most favorable to the pleader. . . . The motion to dismiss . . . admits all facts which are well pleaded, invokes the existing record and must be decided upon that alone.’’ (Internal quotation marks omitted.) Gold v. Rowland, 296 Conn. 186, 200–201, 994 A.2d 106 (2010). ‘‘[I]t is the burden of the party who seeks the exercise of jurisdiction in his favor . . . clearly to allege facts demonstrating that he is a proper party to invoke judicial resolution of the dispute.’’12 (Internal quotation marks omitted.) May v. Coffey, supra, 113. Mindful of these principles, we address each of the plaintiffs’ claims in turn. III ANALYSIS A Standing of ECI ECI first claims that the trial court incorrectly con- cluded that it lacked standing to challenge the imposi- tion of the PLA requirement and the rejection of its lowest, responsible, qualified bids for the school con- struction projects. ECI specifically claims that the trial court misapplied this court’s narrow holding in Associ- ated Builders & Contractors that the plaintiffs did not have standing because they had not bid on the project, as ECI had done in the present case. In addition, ECI claims that the court in Associated Builders & Contrac- tors never considered the cost effects on the public bidding process of disqualifying nonunion contractors and workers, who constitute 90 percent of the local electrical workforce and 80 percent of the overall con- struction workforce, and never ruled on the discrimina- tory effects of the plaintiffs’ challenge to the PLA requirement. ECI further claims that the trial court in the present case disregarded the extensive factual record before it, including ‘‘overwhelming evidence’’ that the effect of the PLA requirement was to exclude nonunion contractors and employees from working on the projects, and did not properly consider that ECI was the lowest, responsible qualified bidder. In this regard, ECI maintains that the complaint and accompa- nying affidavits set forth numerous ways in which the PLA requirement discriminated against ECI and other nonunion contractors and caused them to suffer spe- cific, actionable harm by effectively barring them from working on the projects. The nonstate defendants respond13 that ECI’s claim as to the validity of the PLA requirement is virtually identical to the claim that was unsuccessfully raised by the plaintiffs in Associated Builders & Contractors and that ECI’s attempt to distinguish the present case from that and other Connecticut precedent is without merit. In particular, the nonstate defendants argue that Associ- ated Builders & Contractors determined that cost is not a factor to be considered in deciding whether the competitive bidding laws are undermined. They further argue that neither ECI nor other nonunion contractors presented evidence that the PLA requirement prevented nonunion contractors from bidding or working on the projects by making it economically unfeasible for them to do so. The nonstate defendants thus contend that ECI has failed to prove that it has standing because it did not establish that the PLA requirement was used to perpetuate fraud, corruption, favoritism or conduct that undermines the objective and integrity of the com- petitive bidding process. We agree with ECI that the trial court incorrectly concluded that it did not have standing. Because our analysis of this claim requires us to consider how the trial court interpreted and applied Associated Builders & Contractors, we divide the fol- lowing discussion into three parts. In the first part, we review the reasoning in Associated Builders & Contrac- tors. We next consider how the trial court applied Asso- ciated Builders & Contractors in the present case and explain why we disagree with the trial court’s conclu- sions. We finally examine the sufficiency of the plain- tiffs’ allegations that the PLA requirement was used to perpetuate fraud, corruption, favoritism or other con- duct that undermined the objective and integrity of the competitive bidding process. 1 Associated Builders & Contractors We begin with the reasoning in Associated Builders & Contractors. The trial court’s decision was based almost entirely on its interpretation of that case, in which this court concluded that the plaintiffs did not have standing. The plaintiffs were a trade association of contractors and subcontractors (association) and two individual subcontractors who sought to enjoin the defendant, the city of Hartford, from awarding a contract for the construction of a municipal parking garage. Connecticut Associated Builders & Contrac- tors v. Hartford, supra, 251 Conn. 171. The association claimed that, but for a PLA requirement in the bid speci- fications, some of its contractor members would have submitted bids on the project. Id., 177. The defendant subsequently sought to dismiss the complaint on juris- dictional grounds, alleging that the plaintiffs lacked standing. Id., 174. At the outset of its decision, the court described the principal issue as ‘‘whether nonbidding contractors and subcontractors14 ha[d] standing to challenge a bid speci- fication for a municipal project that require[d] the suc- cessful bidder to agree to abide by a [PLA].’’ Id., 170–71. It then determined that the nonbidding general contrac- tors, who were represented by the association, did not have standing to file the complaint. Id., 185, 186. The court explained: ‘‘In order to have standing, a general contractor member would have had to establish a color- able claim that: (1) either it bid on the project, or it would have submitted an equivalent bid, but for the [PLA] requirement; and (2) inclusion of the [PLA] requirement effectuated fraud, corruption, favoritism or other acts undermining the objective and integrity of the bidding process.’’ Id., 186. The court stated that the plaintiffs had not established that the general con- tractor members of the association had met either part of the test because, ‘‘[w]ith respect to the first part, the association did not show that any of its general contractor members had bid on the project or would have bid on the project. . . . The association cannot, therefore, invoke the standing of its general contractor members as a basis for its own standing to pursue its challenge to the validity of the [PLA] requirement.’’ Id. After concluding that the association had not satisfied this foundational, or threshold, element, the court deter- mined that, ‘‘[e]ven if this foundational element had been met by testimony of the association’s general con- tractor members that they would have bid, but for the [PLA] specification, the association still cannot prevail under the second part of the standing test.’’ Id., 186–87. With respect to the second part of the test, the associ- ation had claimed that the PLA requirement ‘‘arbitrarily and anticompetitively limit[ed] access to the bidding process’’ because it ‘‘imposed costs [on] nonunion gen- eral contracts that made it economically unfeasible for them to bid,’’ and, therefore, it violated ‘‘the integrity of competitive bidding . . . [and] injur[ed] the general public by driving up the cost of government funded projects.’’ Id., 187. The court disagreed, explaining that, ‘‘[e]ven assuming that the [PLA] requirement might increase the project’s cost, we know of no requirement in the competitive bidding statutes that propels cost considerations to the top of the list of appropriate con- siderations for public contract specifications. If cost alone were the determinative factor of appropriate bid criteria, disappointed bidders or nonbidders would have virtually unlimited opportunities to litigate project specifications on the ground of alternate designs, mate- rials, safety requirements and so on. Such litigation would involve courts in comparative cost assessments that would severely impair the discretion of governmen- tal bodies entrusted with the responsibility for govern- mental construction projects. It is neither unusual nor unfair for project specifications to give some potential bidders an economic advantage over others because of factors such as the bidder’s expertise, specialization and reliability.’’ Id., 187–88. The court elaborated that the record failed to show that cost considerations had precluded nonunion gen- eral contractors from participating in the bidding pro- cess, stating in a footnote that ‘‘the plaintiffs ha[d] provided no explanation as to how the alleged increased expense to some potential bidders would raise the costs of the overall project. An increase in costs in one aspect of a project can equally well result in overall cost sav- ings for the project. By avoiding labor disruption and maintaining a supply of skilled workers, as the project construction manager testified the [PLA] was designed to do, the [PLA] could reduce overall costs. The record . . . does not, in fact, support the association’s claim that cost considerations precluded nonunion general contractors from participating in the bidding process. Two of the five bidders were nonunion contractors. The association presented no testimony to support its claim that government projects using [PLAs] had higher total costs than other similar projects without [a PLA].’’ Id., 187 n.12. The court thus concluded that the associa- tion had failed to make ‘‘a colorable factual showing’’ to support its claim of economic disadvantage. Id., 187. The court stated that the ‘‘the record . . . demon- strates a nondiscriminatory decision by the [defendant] to use a [PLA]’’; id., 188; and that the ‘‘determinative factor’’ in a bidding challenge was ‘‘whether the require- ments in that process had been applied consistently and in good faith.’’ Id., 189. 2 Trial Court’s Application of Associated Builders & Contractors In relying on Associated Builders & Contractors when granting the defendants’ motions to dismiss ECI’s claim with respect to the competitive bidding statutes, the trial court initially acknowledged that none of the plaintiffs in that case had satisfied the threshold require- ment of demonstrating that they had bid on the project or would have bid on the project but for the PLA require- ment. The trial court then concluded that the court in Associated Builders & Contractors had reached the merits of the plaintiffs’ claim by considering whether inclusion of the PLA requirement in the prebid specifica- tions had ‘‘ ‘effectuated fraud, corruption, favoritism or other acts undermining the objective and integrity of the bidding process’ ’’ through the imposition of costs on nonunion contractors that made it economically unfeasible for them to bid. Referring to the statements in Associated Builders & Contractors that cost consid- erations were not ‘‘ ‘[at] the top of the list of appropriate considerations for public contract specifications’ ’’ and that the defendant’s decision to use a PLA was nondis- criminatory and within its discretion, the trial court determined that, because ECI had raised a ‘‘virtually identical’’ claim, the analysis of the claim on the merits in Associated Builders & Contractors was applicable and dispositive of the nonstate defendants’ motions to dismiss in the present case.15 We disagree with the trial court’s interpretation of Associated Builders & Con- tractors and the nonstate defendants’ claim that the holding in that case is dispositive of their motions to dismiss. As previously discussed, the principal issue in Associ- ated Builders & Contractors was ‘‘whether nonbidding contractors and subcontractors ha[d] standing to chal- lenge a bid specification for a municipal project that require[d] the successful bidder to agree to abide by a [PLA].’’ (Emphasis added.) Connecticut Associated Builders & Contractors v. Hartford, supra, 251 Conn. 170–71. The court ultimately determined that the plain- tiffs had not shown that any of the association’s general contractor members had bid on the project or would have bid on the project under the first part of the test, and, therefore, it could not ‘‘invoke the standing of its general contractor members as a basis for its own standing to pursue its challenge to the validity of the [PLA] requirement.’’ Id., 186. The court nonetheless pro- ceeded to consider whether the plaintiffs could have prevailed under the second part of the test. See id., 186–87. It is that portion of the analysis on which the trial court in the present case relied to resolve the standing issue. Its reliance, however, was misplaced for the following reasons. First, any consideration of the second part of the test in Associated Builders & Contractors was unnecessary following the court’s dispositive holding that the associ- ation lacked standing under the first part of the test. Accordingly, the court’s conclusion in Connecticut Associated Builders & Contractors v. Hartford, supra, 251 Conn. 186–87, that the plaintiffs could not prevail under the second part of the test and the reasoning on which its conclusion was based were nothing more than dicta.16 See, e.g., Statewide Grievance Committee v. Rozbicki, 211 Conn. 232, 246, 558 A.2d 986 (1989) (‘‘Once it becomes clear that the trial court lacked sub- ject matter jurisdiction to hear the plaintiffs’ complaint, any further discussion of the merits is pure dict[um]. . . . When the trial court concluded . . . that subject matter jurisdiction was missing, the remainder of its [ruling was] merely advisory . . . .’’ [Citation omitted; internal quotation marks omitted.]). Second, we disagree with the trial court and the non- state defendants that the court in Associated Builders & Contractors considered the merits of the plaintiffs’ com- plaint or ruled that the plaintiffs had failed to establish that the PLA requirement had a potentially discrimina- tory effect on nonunion contractors due to increased costs. Although the court’s reference to whether the plaintiffs had produced sufficient evidence of fraud, corruption or favoritism may have suggested that it was considering the merits of the defendant’s decision to impose a PLA requirement, the court itself rejected such a notion when it stated that ‘‘[t]he general rule of standing . . . is not inconsistent with the particular standard applicable to disappointed and would-be bid- ders: By requiring [the plaintiffs] to produce evidence that the bidding process was undermined by fraud, cor- ruption or favoritism, the court is simply forcing the party challenging the competitive bidding process to make a colorable claim of injury that it is within the zone of interests protected by the competitive bidding laws . . . . Although the plaintiffs were not required to prove the merits of their claim, they did have the lesser burden of establishing a colorable claim.’’17 (Emphasis altered; internal quotation marks omitted.) Connecticut Associated Builders & Contractors v. Hartford, supra, 251 Conn. 181–82. Consistent with this view, the dissent in Associated Builders & Contractors observed multiple times that the majority had not reached the merits, stating that ‘‘[t]he court, in a hyper- technical ruling on standing, avoids a substantive issue that . . . we should review’’; id., 193 (Berdon, J., dis- senting); ‘‘[t]he public interest should compel this court to address this issue’’; id. (Berdon, J., dissenting); ‘‘[t]he majority avoids [the plaintiffs’] substantive claims by narrowly ruling that the plaintiffs have no standing’’; id., 194 (Berdon, J., dissenting); and that, ‘‘[b]y declining to afford the plaintiffs standing, the majority . . . sim- ply ducks the issue of whether [PLA] requirements for a public construction contract violate state and local competitive bidding statutes.’’ Id., 201 (Berdon, J., dis- senting). In addition, the court stated on several occa- sions that its conclusion that the association lacked standing was based on deficiencies in the record; see id., 187 n.12, 188, 189; and that the plaintiffs had failed to make ‘‘a colorable factual showing’’ in support of their claim. Id., 187. Thus, neither the majority nor the dissent in Associated Builders & Contractors believed that the plaintiffs’ claim had been decided on its merits, and the trial court in the present case should not have applied the so-called holding in Associated Builders & Contractors under the second part of the test to decide the issues in the present case. Third, to the extent the trial court and the nonstate defendants regard the court’s discussion of cost in Asso- ciated Builders & Contractors as resolving the issue of whether a PLA requirement is discriminatory, and thus dispositive of the standing issue in the present case, they misconstrue the court’s analysis and fail to consider the subsequent evolution of Connecticut’s competitive bidding laws. Associated Builders & Con- tractors did not conclude that cost was not a factor to be considered in deciding whether the competitive bidding laws were undermined, nor did it evaluate or reach any conclusions regarding the broader question of whether the PLA requirement in that case contra- vened the competitive bidding laws. The court merely stated that it ‘‘[knew] of no requirement in the competi- tive bidding statutes that propels cost considerations to the top of the list of appropriate considerations for public contract specifications’’ and that ‘‘cost alone’’ should not be ‘‘the determinative factor’’; (emphasis added) id., 187–88; a statement with which ECI’s attor- ney in the present case agreed during oral argument before this court. The court also noted that ‘‘[a]n increase in costs in one aspect of a project can equally well result in overall cost savings for the project. By avoiding labor disruption and maintaining a supply of skilled workers, as the project construction manager testified the [PLA] was designed to do, the requirement could reduce overall costs. The record . . . does not, in fact, support the association’s claim that cost consid- erations precluded nonunion general contractors from participating in the bidding process.’’ Id., 187 n.12. Accordingly, the court in Associated Builders & Con- tractors did not conclude, as the trial court concluded and the nonstate defendants claim, that a PLA require- ment has no effect on competitive bidding because of increased costs to nonunion contractors and workers. It merely concluded that the ‘‘determinative factor’’ is whether the requirements of the bidding process have been applied consistently and in good faith, and that the plaintiffs had not made a ‘‘colorable factual show- ing’’ that the integrity of the bidding process had been affected by the additional costs allegedly imposed on nonunion contractors and workers by the PLA require- ment. Id., 187–89. Moreover, following the decision in Associated Builders & Contractors, the legislature enacted General Statutes § 4a-100, also known as the ‘‘prequalification statute,’’ which requires all bidders on public construc- tion projects to satisfy certain minimum standards in order to bid or perform work on such projects.18 Thus, given that the competitive bidding laws provide that a contract shall be awarded to the ‘‘lowest responsible qualified bidder’’; General Statutes § 10-287 (b) (1); the prequalification statute ensures that bidders are both responsible and qualified, and cost necessarily rises to the ‘‘top of the list’’19 of appropriate considerations for public contract specifications.20 Connecticut Associ- ated Builders & Contractors v. Hartford, supra, 251 Conn. 187. Finally, the statement in Associated Builders & Con- tractors that ‘‘[t]he trial court’s determination that the decision to adhere to a [PLA] was within the defendant’s discretion and the bounds of the competitive bidding statutes [and], therefore, did not exceed the limits of our case law’’; id., 182; did not mean that a PLA require- ment may never affect the integrity of the competitive bidding process. The court made the foregoing com- ment in response to the plaintiffs’ claim that the trial court improperly had reached the merits of whether the defendant’s decision to use a PLA was a proper exercise of its discretion. See id., 181–82. In that con- text, the court merely was observing that the defen- dant’s decision to use a PLA was discretionary and that the trial court had consulted our case law and properly determined that, in order to challenge the PLA require- ment, the plaintiffs were required to make a colorable claim of injury by producing evidence that the bidding process had been undermined by fraud, favoritism or corruption.21 See id., 182. The court made a similar observation in Connecticut Associated Builders & Con- tractors v. Anson, 251 Conn. 202, 213–14, 740 A.2d 804 (1999),22 a companion case released on the same day as Associated Builders & Contractors. In other words, the court in both Associated Builders & Contractors and Anson was referring to the fact that a public agency’s discretion to require a PLA in any given circum- stance is not unfettered. A balance must be struck between the potentially desirable effects of a PLA, such as the completion of a public project within time and financial constraints, and the public’s interest in the fairness and economy associated with the competitive bidding process. Viewed through this lens, the court in Associated Builders & Contractors was attempting to determine whether the plaintiffs’ allegations and other evidence in the record were sufficient to support a colorable claim that the integrity of the competitive bidding process would be seriously undermined by the imposition of the PLA requirement. See Connecticut Associated Builders & Contractors v. Hartford, supra, 251 Conn. 187–89 and n.12; see also footnote 17 of this opinion. Similarly, the court in Anson was attempting to determine whether the allegations and other evidence in the record concerning deprivation of the plaintiffs’ rights of free speech and association were sufficient to support a colorable claim that the integrity of the competitive bidding process would be seriously under- mined by the imposition of the PLA requirement. See Connecticut Associated Builders & Contractors v. Anson, supra, 251 Conn. 213–14. In neither case was the court considering the claims on their merits. Conse- quently, for all of the foregoing reasons, we conclude that, to the extent the trial court in the present case treated the analysis of the PLA requirement in Associ- ated Builders & Contractors under the second part of the standing test as a decision on the merits, it misun- derstood and misapplied that decision. 3 Sufficiency of the Allegations We also agree with ECI that the trial court failed to conduct an in-depth examination of the plaintiffs’ allegations to determine whether they were sufficient to support a colorable claim of injury. See footnote 23 of this opinion. As previously noted, ‘‘[w]hen a . . . court decides a jurisdictional question raised by a pre- trial motion to dismiss, it must consider the allegations of the complaint in their most favorable light. . . . In this regard, a court must take the facts to be those alleged in the complaint, including those facts necessar- ily implied from the allegations, construing them in a manner most favorable to the pleader. . . . The motion to dismiss . . . admits all facts which are well pleaded, invokes the existing record and must be decided upon that alone.’’ (Internal quotation marks omitted.) Gold v. Rowland, supra, 296 Conn. 200–201. The record includes ‘‘supporting affidavits that contain undisputed facts.’’ (Internal quotation marks omitted.) May v. Cof- fey, supra, 291 Conn. 108. In the present case, we con- clude, upon an examination of the allegations in the underlying complaint,23 together with the affidavits and stipulations of fact provided in support thereof, that ECI made the colorable factual showing that was missing in Associated Builders & Contractors. See footnote 17 of this opinion. It is undisputed that ECI submitted a bid on both construction projects, thus satisfying the first part of the standing test. ECI also sustained its burden under the second part of the test because the complaint, the supporting affidavits and other evidence, considered in their most favorable light, contained detailed allega- tions as to the discriminatory effect of the PLA require- ment on ECI and other nonunion contractors. Specifically, paragraph thirty-seven of the complaint alleges twelve ways in which the PLA requirement would ‘‘severely impair’’ ECI’s ability as a nonunion contractor to successfully perform work on the projects and place ECI at a competitive disadvantage relative to union contractors bidding on the same projects. Simi- larly, in his affidavit dated March 25, 2009, William J. Flynn, Jr., ECI’s vice president for nearly fifteen years, describes how the PLA requirement would penalize ECI, or any other nonunion contractor, their field employees and taxpayers by significantly increasing labor costs and how the alleged harm would be ongoing. Finally, in their joint affidavit dated March 23, 2009, which draws on four studies conducted by the Beacon Hill Institute at Suffolk University in Boston, Massachu- setts, concerning PLAs and the cost of public school construction in Connecticut, Massachusetts and New York, David G. Tuerck24 and Paul