These are consolidated appeals from two cases in which plaintiffs are residents of the Van Lopik and Limberlost subdivisions in Robinson Township who assert tort claims and constitutional violations against the township, the members of its board of trustees (Bernice Berens, Jackie Frye, Cheryl Clark, John Kuyers, Tracy Mulligan, Jacob Korving, Chris Kuncaitis, Ray Masko, Earl Rayla, Donna Stille, and Larry Harmon), its building officials (William Easterling and Phillip Forner), and others, after the Grand River flooded in the area of their homes in May 2004 and January 2005. The trial court granted in part and denied in part defendantsâ motions for summary disposition in each case. In Docket No. 279020, defendants appeal and cross-appeal. In Docket Nos. 279064 and 279088, defendants appeal by leave granted. We reverse and remand for entry of summary disposition in favor of all defendants on all of plaintiffsâ claims.
The underlying dispute in these cases involves the application of the Single State Construction Code Act (SSCCA), MCL 125.1501 et seq. At the times pertinent to these actions (2004 and 2005), the applicable building code in Michigan was, with certain exceptions, the International Building Code (2003). The 2003 International Building Code was adopted by reference effective February 29, 2004. See 2004 AACS, R 408.30401. Specifically, the defendant building officials determined the cost of repairing plaintiffsâ flood-damaged homes would exceed 50 percent of the fair market value of plaintiffsâ homes before the flooding, thus triggering the application of flood-resistant building code requirements. 2003 Michigan Residential Code R105.3.1.1. The Cumminses, in Docket No. 279020, were the only parties who suffered damage in the 2004 flood and borrowed in *685 excess of their homeâs value to rebuild it under the flood-resistant building code requirements before the 2005 flood. Almost all plaintiffs in Docket Nos. 279064 and 279088 appealed to the Construction Board of Appeals (CBA) on the basis that the 50 percent threshold had not been reached. By December 1, 2005, the CBA had granted relief to all plaintiffs who appealed. All plaintiffs were reissued occupancy permits by October 2005, regardless of whether their homes complied with building code or health department regulations.
In Docket No. 279020, the Cumminses filed their complaint in July 2006, alleging 13 separate counts: (1) conspiracy to violate plaintiffsâ constitutional, statutory, and common-law rights, (2) concert of action to commit one or more tortious acts, (3) unlawful and unconstitutional extrajudicial taking, (4) deliberate and purposeful violation of state statutes governing the exercise of eminent domain, (5) fraud, (6) extortion, (7) trespass, (8) intentional infliction of emotional distress, (9) gross negligence, (10) substantive due process violation, (11) procedural due process violation, (12) denial of equal protection, and (13) punitive damages against the individual township trustees and building officials Easterling and Forner. The trial court granted Easter-ling and Fornerâs motion for summary disposition pursuant to MCR 2.116(C)(4), (7), (8), and (10) with regard to all counts except counts (5) fraud, (9) gross negligence, and (10) substantive due process violation.
The trial court ruled that the Cumminsesâ fraud claim against Easterling and Forner presented material issues of fact for trial. The court reasoned âthat there is a genuine issue of material fact as to whether or not defendants made false material representations of facts to plaintiffs which plaintiffs relied upon.â On this basis, the trial court ruled that defendantsâ motion for sum *686 mary disposition regarding count (5) fraud failed pursuant to MCR 2.116(C)(10).
Regarding the Cumminsesâ gross negligence claim against Easterling and Forner, the trial court also determined that a material question of fact existed over whether defendantsâ conduct constituted gross negligence under MCL 691.1407. Specifically, the court ruled that a question of fact existed concerning whether defendantsâ imposition of building code requirements after the 2004 and 2005 floods rose to the level of gross negligence and was the proximate cause of plaintiffsâ injuries.
The trial court also ruled that plaintiffsâ substantive due process claim survived defendants Easterling and Fornerâs motion for summary disposition. Specifically, the court determined that a genuine issue of material fact existed regarding whether defendants acted arbitrarily and capriciously by imposing new building code requirements on plaintiffs in an effort to convince the Federal Emergency Management Agency (FEMA) to provide the township with grant funds to buy plaintiffsâ property. Easterling and Forner appeal by right.
Regarding the Cumminsesâ claims against the township and its trustees, the trial court did not dismiss count (3) unlawful and unconstitutional extrajudicial taking, and count (10) substantive due process violation. The trial court ruled that plaintiffsâ taking claim was not barred by the doctrine of ripeness, reasoning that the CBA was not the initial decision maker and that an appeal by the Cumminses to the CBA would have been futile because the CBA could not award money damages. Further, the court determined that the Cumminsesâ allegations that defendants engaged in a deliberate and aggressive course of action against plaintiffs to force them to sell their property without pay *687 ment of just compensation and that defendantsâ actions caused plaintiffs to expend thousands of dollars in unnecessary repairs, stated a claim for a de facto or regulatory taking for which issues of material fact remained.
The trial court, however, dismissed the Cumminsesâ taking claims against the individual township trustees because the Cumminses produced no legal authority to establish that individuals â as opposed to the townshipâ could take property for public use. The court also dismissed plaintiffsâ tort claims against the township and its trustees on the basis of governmental immunity.
The trial court granted defendantsâ motion for summary disposition regarding plaintiffsâ procedural due process claim, but the court ruled that genuine issues of material fact remained with regard to the Cumminsesâ substantive due process claim. As with this claim against Easterling and Forner, the trial court ruled that there was a genuine issue of material fact concerning whether defendants acted arbitrarily and capriciously when they imposed new building code requirements on plaintiffs in an alleged attempt to convince FEMA to provide the township with funds necessary to induce the Cumminses and other plaintiffs to sell their properties. Defendant Robinson Township and its trustees cross-appeal the various rulings of the trial court denying summary disposition with regard to plaintiffsâ taking and substantive due process claims.
In Docket No. 279064, defendants Easterling and Forner appeal by leave granted the trial courtâs order that denied their motion for summary disposition, in part, with regard to plaintiffsâ claims for violations of their rights to substantive due process. In Docket No. 279088, the township appeals by leave granted the trial courtâs order that denied its motion for summary dis *688 position, in part, with regard to plaintiffsâ taking and substantive due process claims. Both of these appeals arise from the same lower court case.
Plaintiffsâ complaint set forth four unlabeled counts. The first count cited the Fifth Amendment of the United States Constitution and Const 1963, art 10, § 2, and alleged that defendants violated plaintiffs rights by
[fliling [a] false application for a FEMA grant, including the intent and plan to take Plaintiffsâ properties without just compensation; [and]
Imposing unwarranted re-build and renovation requirements that were not required to avoid the effects of periodic floods in the general area.
The trial court granted defendants Easterling and Fornerâs motion for summary disposition regarding count I because the Taking Clause implicates only governmental, not individual liability. Plaintiffs apparently voluntarily dismissed both their taking and due process claims against the township trustees. As for plaintiffsâ taking claim against the township, the trial court ruled as it did in Docket No. 279020. It found that plaintiffsâ complaint pleaded facts that, if proved, would state a temporary taking claim and that genuine issues of material fact remained and precluded summary disposition.
Plaintiffs alleged in count II of their complaint that defendants violated plaintiffsâ rights under the Fifth Amendment and the Fourteenth Amendment of the United States Constitution and Const 1963, art 1, § 17. The trial court viewed this count as stating a claim based on both procedural and substantive due process. The trial court ruled that the procedural due process claim failed as a matter of law. But the trial court denied defendantsâ motion with respect to plaintiffsâ substantive due process claim against the township and defen *689 dants Easterling and Forner for the same reasons it denied summary disposition regarding similar claims by the Cumminses in Docket No. 279020.
The trial court granted defendants summary disposition of plaintiffsâ claims in count III (fraudulent misrepresentation) and in count IV (breach of duties âto fairly and responsibly enforce state and local lawsâ).
This Court granted defendantsâ application for leave to appeal in Docket Nos. 279064 and 279088, in part, because nearly identical issues were already before the Court as an appeal by right in Docket No. 279020, arising out of same factual circumstances. The Court also consolidated all three appeals to advance the efficient administration of the appellate process.
This Court reviews de novo a trial courtâs decision regarding a motion for summary disposition. Maiden v Rozwood, 461 Mich 109, 118; 597 NW2d 817 (1999). A trial court properly grants the motion when the proffered evidence fails to establish any genuine issue of material fact and the moving party is entitled to judgment as a matter of law. West v Gen Motors Corp, 469 Mich 177, 183; 665 NW2d 468 (2003). âA genuine issue of material fact exists when the record, giving the benefit of reasonable doubt to the opposing party, leaves open an issue upon which reasonable minds might differ.â Id.
âMCR 2.116(C)(8) tests the legal sufficiency of the claim on the pleadings alone to determine whether the plaintiff has stated a claim on which relief may be granted.â Spiek v Depât of Transportation, 456 Mich 331, 337; 572 NW2d 201 (1998). The trial court and this Court must accept all well-pleaded factual allegations as true, construing them in a light most favorable to the nonmoving party. Maiden, supra at 119. The motion may be granted only âwhere the claims are so clearly *690 unenforceable as a matter of law that no factual development could possibly justify recovery.â Wade v Depât of Corrections, 439 Mich 158, 163; 483 NW2d 26 (1992).
We also review de novo constitutional issues and any other questions of law that are raised on appeal. Forge v Smith, 458 Mich 198, 204; 580 NW2d 876 (1998); Hinojosa v Depât of Natural Resources, 263 Mich App 537, 541; 688 NW2d 550 (2004).
I. DOCKET NO. 279020
Easterling and Forner first argue that, in essence, plaintiffsâ claims against them are that they misinterpreted or misapplied the building code, which ultimately led to plaintiffsâ damages. Consequently, they argue, because plaintiffs failed to exhaust their administrative remedies, the trial court lacked subject-matter jurisdiction and plaintiffsâ complaint should have been dismissed in its entirety under MCR 2.116(C)(4). Plaintiffs argue that they are not required to exhaust their administrative remedies to bring a substantive due process claim under 42 USC 1983. Further, plaintiffs contend that they are excused from any requirement of exhaustion of administrative remedies because to do so would have been futile. The CBA would not have been able to award plaintiffs the relief they sought, which was money damages.
We agree with plaintiffs that failing to exhaust administrative remedies does not bar their constitutional substantive due process claim brought pursuant to 42 USC 1983. It may, however, bar a claim for a regulatory taking. See Electro-Tech, Inc v H F Campbell Co, 433 Mich 57, 79-83; 445 NW2d 61 (1989), discussing Patsy v Florida Bd of Regents, 457 US 496; 102 S Ct 2557; 73 L Ed 2d 172 (1982), and Williamson Co Regional Planning Comm v Hamilton Bank of Johnson City, 473 US *691 172; 105 S Ct 3108; 87 L Ed 2d 126 (1985). Also, we conclude that the doctrine of exhaustion of administrative remedies would not deprive the trial court of its jurisdiction with respect to properly filed, viable common-law tort claims, such as fraud or gross negligence. The doctrine of exhaustion of administrative remedies requires that where an administrative agency provides a remedy, a party must seek such relief before petitioning the court. Trever v Sterling Hts, 37 Mich App 594, 596; 195 NW2d 91 (1972). The converse, however, is that where the administrative appellate body cannot provide the relief sought, the doctrine does not apply. Id. at 596-597. Here, plaintiffs assert tort claims against defendants alleging that defendants fraudulently induced plaintiffs to incur unnecessary expenses and that defendants were grossly negligent. Thus, plaintiffsâ argument that the CBA would not have jurisdiction to grant the relief they requested (money damages) has merit.
Easterling and Forner next argue that the trial court erred when it failed to dismiss plaintiffsâ gross negligence claim. They assert entitlement to immunity from tort liability pursuant to MCL 691.1407(2) (c) because their conduct did not amount to gross negligence, and even if it did, it was not the proximate cause of plaintiffsâ damages. Plaintiffs argue they are not required to plead specific facts in avoidance of government immunity because that requirement applies only to claims against governmental bodies, not governmental employees. Plaintiffs assert that the trial court correctly ruled that genuine issues of material fact remain for trial regarding whether Easterling and Forner were grossly negligent by imposing allegedly unwarranted rebuilding requirements after the floods in 2004 and 2005 and whether this gross negligence was the proximate cause of plaintiffsâ injuries.
*692 We conclude that the trial court erred by not granting defendants summary disposition with regard to plaintiffsâ gross negligence claim. Even if Easterlingâs and Fornerâs interpretation of the building code were grossly negligent, it would not have been âtheâ proximate cause of plaintiffsâ claimed injuries, i.e., the one most immediate, efficient, and direct cause preceding the injury. MCL 691.1407(2) (c); Robinson v Detroit, 462 Mich 439, 446; 613 NW2d 307 (2000).
Here, plaintiffs have not stated, nor have they argued on appeal, the nature and extent of the alleged duty that Easterling and Forner might have breached so as to render them liable for gross negligence. The governmental immunity statute does not itself create a cause of action called âgross negligence.â Rakowski v Sarb, 269 Mich App 619, 627; 713 NW2d 787 (2006). It is axiomatic that the tort of negligence consists of four elements: (1) a duty owed by the defendant to the plaintiff, (2) a breach of that duty, (3) causation, and (4) damages. Henry v Dow Chemical Co, 473 Mich 63, 71-72; 701 NW2d 684 (2005). âDutyâ is a legally recognized obligation to conform to a particular standard of conduct toward another so as to avoid unreasonable risk of harm. Maiden, supra at 131. And, if defendants owed no duty to plaintiffs, plaintiffsâ gross negligence claim is unenforceable as a matter of law. Id. at 135.
âWhether a defendant owes a plaintiff a duty of care is a question of law for the court.â Beaudrie v Henderson, 465 Mich 124, 130; 631 NW2d 308 (2001). A duty of care may arise from a statute, a contractual relationship, or by operation of the common law, which imposes an obligation to use due care or to act so as not to unreasonably endanger other persons or their property. Riddle v McLouth Steel Products Corp, 440 Mich 85, 95; 485 NW2d 676 (1992); Clark v Dalman, 379 Mich 251, *693 261; 150 NW2d 755 (1967). This Court in Rakowski, supra at 629, listed a number of factors pertinent to determining whether to impose a common-law duty:
(1) the relationship of the parties, (2) the foreseeability of the harm, (3) the degree of certainty of injury, (4) the closeness of connection between the conduct and injury, (5) the moral blame attached to the conduct, (6) the policy of preventing future harm, and, (7) finally, the burdens and consequences of imposing a duty and the resulting liability for breach. The inquiry is ultimately a question of fairness involving a weighing of the relationship of the parties, the nature of the risk, and the public interest in the proposed solution. [Citations and punctuation omitted.]
The Rakowski Court weighed these factors to conclude that a building inspector did not owe a duty of care to a third party injured by faulty construction the inspector had approved. Id. at 630-635. Here, plaintiffs assume, but do not support with citation of legal authority or argument, that defendants owed them a duty to interpret and apply the building code to impose as little economic effect as possible. But the SSCCA requires that this stateâs various building codes balance several factors, including ensuring adequate maintenance of buildings and structures while still adequately protecting the health, safety, and welfare of the people. MCL 125.1504(3) (e). The SSCCA also has the goal of eliminating ârestrictive, obsolete, conflicting, and unnecessary construction regulations that tend to increase construction costs unnecessarily . . . .â MCL 125.1504(3)(d). Nothing in the SSCCA, however, suggests that a front-line building official should face future tort liability for not approving building plans that are the least costly to the applicant. Rather, the SSCCA requires that building officials make prompt building code decisions and provide the opportunity for a prompt appeal of a building officialâs decision. MCL *694 125.1511(1) provides: âFailure by an enforcing agency to grant, in whole or in part, or deny an application within [10 or 15 business days] shall be deemed a denial of the application for purposes of authorizing the institution of an appeal to the appropriate board of appeals.â Further, a local building official could face misdemeanor criminal charges if the official â[k]nowingly issues, fails to issue, causes to be issued, or assists in the issuance of a certificate, permit, or license in violation of [the SSCCA] or a rule promulgated under this act or other applicable laws.â MCL 125.1523(l)(g). In light of this statutory scheme, we conclude that fairness is not offended by placing the burden on plaintiffs to appeal perceived economically impracticable and unnecessary building requirements rather than proceed to incur the expenses and later seek redress through costly tort litigation. Recognizing the duty that plaintiffs assume exists would not advance the public interest.
Moreover, even if Easterlingâs and Fornerâs conduct breached a duty to plaintiffs and the conduct is âgross negligenceâ as defined by MCL 691.1407(7)(a), plaintiffs cannot establish that such conduct was âtheâ proximate cause of plaintiffsâ claimed injuries. Simply stated, plaintiffs cannot establish that defendantsâ conduct caused them to undertake economically impracticable and unnecessary rebuilding when plaintiffs had alternative courses of action, including (1) choosing not to rebuild (selling their property âas is,â just as they did when the Cumminses purchased the property in a flood-damaged state in 1994), or (2) exercising their right to appeal building code determinations they deemed impracticable or unnecessary. In addition, plaintiffs acknowledge in their complaint that other actors and causes contributed to their financial losses, including a decline in market values. Plaintiffs chose to incur debt far in excess of their propertyâs preflood *695 value. Further, other factors played a part in plaintiffsâ financial problems and stress, including âlost business revenue ... mortgage costs ... [and] facing foreclosure.â Because other homeowners successfully pursued administrative appeals, plaintiffs cannot establish that Easterlingâs and Fornerâs interpretation and application of the building code, even if âgrossly negligent,â were âthe proximate cause,â i.e., âthe one most immediate, efficient, and direct cause preceding [their] injury . .. .â Robinson, supra at 446.
Easterling and Forner next argue that the trial court erred when it failed to grant summary disposition with regard to plaintiffsâ fraud claim. We agree. Plaintiffs have failed to plead with particularity the false representations of material fact that either Easterling or Forner made that form the basis of a claim for fraud. MCR 2.112(B)(1); Cooper v Auto Club Ins Assân, 481 Mich 399, 414; 751 NW2d 443 (2008). Further, a viable fraud claim may not be inferred, even viewing plaintiffsâ complaint in the light most favorable to them. At most, plaintiffs allege that defendants made intentional, inaccurate statements regarding the law or stated opinions about future events (repair costs), which were not misrepresentations of existing or past facts necessary to support a claim of fraud. So plaintiffsâ complaint fails to state a claim for which relief can be granted. MCR 2.116(C)(8).
Actionable common-law fraud requires proof that â ÂŁ(1) the defendant made a material representation; (2) the representation was false; (3) when the defendant made the representation, the defendant knew that it was false, or made it recklessly, without knowledge of its truth as a positive assertion; (4) the defendant made the representation with the intention that the plaintiff would act upon it; (5) the plaintiff acted in reliance *696 upon it; and (6) the plaintiff suffered damage.â â M&D, Inc v McConkey, 231 Mich App 22, 27; 585 NW2d 33 (1998) (citations omitted). Further, an action for fraud must be predicated upon a false statement relating to a past or existing fact; promises regarding the future are contractual and will not support a claim of fraud. Hi-Way Motor Co v Intâl Harvester Co, 398 Mich 330, 336; 247 NW2d 813 (1976). Further, to establish a claim of fraudulent misrepresentation, the plaintiff must have reasonably relied on the false representation. Nieves v Bell Industries, Inc, 204 Mich App 459, 464; 517 NW2d 235 (1994). âThere can be no fraud where a person has the means to determine that a representation is not true.â Id.
Plaintiffs argue that the gist of their fraud claim is that defendants imposed unrealistic and unwarranted requirements on them when seeking building and occupancy permits after floods damaged their home in 2004 and 2005. Plaintiffs allege that all named defendants âindividually, collectively, or with one or more actors, made one or more material representationsâ as follows:
a. Misrepresented the law insofar as such law pertained to effecting repair on the homeownersâ properties, and Plaintiffsâ in particular,
b. Misrepresented the facts pertaining to the nature and extent of damages to homeownersâ properties, and Plaintiffsâ in particular, as caused by the 2004 and 2005 Floods, and
c. Misrepresented the law and the necessity of taking action to evict homeowners and Plaintiffs in particular and the shutting off of their utilities.
Plaintiffs do not allege with particularity the statements each defendant made that support these conclusory allegations. MCR 2.112(B)(1). Plaintiffs merely refer to unspecified allegations throughout their com *697 plaint. Assuming that the three stated allegations above can be inferred from the whole of plaintiffsâ complaint, it is clear that allegations a and c relate to opinions regarding the applicability of the building code or other legal requirements pertaining to plaintiffsâ flood-damaged property. Allegation c apparently relates to a determination whether the cost of repairing plaintiffsâ home would exceed 50 percent of its fair market value before the flood damage, which would involve the application of flood-resistant building code requirements. See 2003 Michigan Residential Code R105.3.1.1. Thus, viewing plaintiffsâ allegations in the light most favorable to them, we conclude that the alleged false statements are actually legal opinions and statements regarding actions necessary in the future to comply with legal requirements. So, the alleged statements are not false representations concerning an existing or past fact and cannot constitute fraud. Hi-Way Motor Co, supra at 336; see also Michaels v Amway Corp, 206 Mich App 644, 652; 522 NW2d 703 (1994) (alleged misrepresentation of the meaning of a contract term could not constitute fraud because not predicated on a statement of past or existing fact), and Kamalnath v Mercy Mem Hosp Corp, 194 Mich App 543, 554; 487 NW2d 499 (1992) (statements related to future action and to opinion were not actionable as fraud because not predicated on a statement relating to a past or an existing fact).
We acknowledge that some caselaw indicates that â âthe mere fact that statements relate to the future will not preclude liability for fraud if the statements were intended to be, and were accepted as, representations of fact, and involved matters peculiarly within the knowledge of the speaker.â â Foreman v Foreman, 266 Mich App 132, 143; 701 NW2d 167 (2005), quoting Crook v Ford, 249 Mich 500, 504-505; 229 NW 587 (1930). *698 Both Foreman and Crook are factually distinguishable from the present case. In Crook, the alleged false statements related to the past fact of whether a home had been constructed in a workmanlike manner. Crook, supra at 502. In Foreman, the false statements were made in a divorce case regarding the value of a major marital asset (a car dealership), and the other spouse was not permitted full access to make her own valuation. Foreman, supra at 143-144. The Foreman case also involved the wifeâs claim that she was fraudulently induced to enter a property settlement on the basis of the husbandâs false statement that he would continue operating the car dealership rather than sell it. 1 Id. at 143-148. There is no claim in the present case that defendants made false promises of future conduct with fraudulent intent upon which plaintiffs detrimentally relied.
Even assuming that defendants either knowingly or recklessly imposed âfalseâ building code requirements, i.e., ones that were not legally required, plaintiffsâ fraud theory still fails because plaintiffs cannot establish reasonable reliance on defendantsâ statements. Nieves, supra at 464. Thus, alleged misrepresentations regarding the terms of written documents that are available to the plaintiff cannot support the element of reasonable reliance. Id. at 464-465; Cooper, supra at 414-415. Here, the building code would have been readily available to plaintiffs. âPeople are presumed to know the law.â Adams Outdoor Advertising v East Lansing (After Remand), 463 Mich 17, 27 n 7; 614 NW2d 634 (2000), citing Mudge v Macomb Co, 458 Mich 87, 109 n 22; 580 NW2d 845 (1998). Likewise, the value of plaintiffsâ *699 home before the flood and the cost of any necessary repairs would be matters at least equally within plaintiffsâ knowledge or their ability to determine. Plaintiffs had equal access to information by which they were âbound to inform themselves of their rights before acting, and, if they fail[ed] to do so, they themselves are responsible for the loss.â Cooper, supra at 415.
Additionally, the element of reasonable reliance is further negated because plaintiffs had ample opportunity to appeal any of Easterlingâs and Fornerâs building code determinations. The SSCCA provides ample opportunity to an aggrieved party to promptly appeal an adverse decision by a local building code official. MCL 125.1514 requires the creation of a construction board of appeals for each governmental subdivision enforcing the code. When necessary documents are provided to building officials, they must render a decision regarding permit applications within 10 or 15 business days. MCL 125.1511(1). âFailure by an enforcing agency to grant, in whole or in part, or deny an application within these periods of time shall be deemed a denial of the application for purposes of authorizing the institution of an appeal to the appropriate board of appeals.â Id. âIf an enforcing agency refuses to grant an application for a building permit, or if the enforcing agency makes any other decision pursuant or related to this act, or the code, an interested person, or the personâs authorized agent, may appeal in writing to the board of appeals.â MCL 125.1514(1). In addition to having the authority to correct any erroneous determination by building officials, the construction board of appeals also has the authority to grant âa specific variance to a substantive requirement of the code if the literal application of the substantive requirement would result in an exceptional, practical difficulty to the applicant,â provided certain conditions are satisfied. MCL 125.1515. Fur *700 ther, an aggrieved party may appeal an adverse decision of the construction board of appeals to the State Construction Code Commission. MCL 125.1516. Beyond administrative appeals, further appeal to the circuit court and to this Court are available. See MCL 125.1517; MCL 125.1518; MCL 24.301. Consequently, plaintiffs cannot establish reasonable reliance on any incorrect building code decision defendants made that would constitute a viable claim for fraud. The trial court erred by not granting defendantsâ motion for summary disposition with regard to plaintiffsâ fraud claim.
All defendants argue that the trial court erred by not granting them summary disposition of plaintiffsâ substantive due process claim. We agree. Accepting plaintiffsâ factual allegations as true and construing them in the light most favorable to plaintiffs, we conclude that plaintiffsâ substantive due process claim against all defendants fails as a matter of law. The trial court erred by not granting defendants summary disposition of this claim. MCR 2.116(C)(8).
Both the Fourteenth Amendment of the United States Constitution and Const 1963, art 1, § 17, guarantee that no state shall deprive any person of âlife, liberty or property, without due process of law.â People v Sierb, 456 Mich 519, 522; 581 NW2d 219 (1998). These constitutional provisions guarantee more than procedural fairness and have a substantive component that protects individual liberty and property interests âagainst â âcertain government actions regardless of the fairness of the procedures used to implement them.â â â Id. at 523, quoting Collins v Harker Hts, 503 US 115, 125; 112 S Ct 1061; 117 L Ed 2d 261 (1992), quoting Daniels v Williams, 474 US 327, 331; 106 S Ct 662; 88 L Ed 2d 662 (1986). This stateâs constitutional provi *701 sion is coextensive with its federal counterpart. Sierb, supra at 523. âThe underlying purpose of substantive due process is to secure the individual from the arbitrary exercise of governmental power.â Id.
In general, the test to determine whether a law or its enforcement violates substantive due process is âwhether the law is rationally related to a legitimate governmental purpose.â Electronic Data Systems Corp v Flint Twp, 253 Mich App 538, 549; 656 NW2d 215 (2002); see also Syntex Laboratories v Depât of Treasury, 233 Mich App 286, 292; 590 NW2d 612 (1998) (applying the same test to the departmentâs enforcement decision). In the context of individual governmental actions or actors, however, to establish a substantive due process violation, âthe governmental conduct must be so arbitrary and capricious as to shock the conscience.â Mettler Walloon, LLC v Melrose Twp, 281 Mich App 184, 198; 761 NW2d 293 (2008). In disputes over municipal actions, including the issuance of building permits, only the most egregious official conduct can be considered arbitrary in the constitutional sense. Id. at 197, quoting City of Cuyahoga Falls v Buckeye Community Hope Foundation, 538 US 188, 198-199; 123 S Ct 1389; 155 L Ed 2d 349 (2003), and Sacramento Co v Lewis, 523 US 833, 846; 118 S Ct 1708; 140 L Ed 2d 1043 (1998).
This Court in Mettler Walloon surveyed numerous federal decisions that addressed substantive due process claims in the context of enforcement of land use regulations and concluded, âunder federal law, even a violation of state law in the land use planning process does not amount to a federal substantive due process violation.â Mettler Walloon, supra at 203. One of the federal cases the Mettler Walloon Court reviewed was Mongeau v City of Marlborough, 492 F3d 14, 20 (CA 1, *702 2007), in which the plaintiff, Eugene Mongeau, asserted that city building official Stephen Reid had violated Mongeauâs substantive due process rights in part by â âwrongly charging] or demanding] too much for his building permitThe federal court noted, in essence, that even if this were true, â â[Mongeau] may find recourse in other laws, but not in the substantive component of the Due Process Clause of the Fourteenth Amendment.â â Mettler Walloon, supra at 201, quoting Mongeau, supra at 20. Similarly, this Court quoted Koscielski v City of Minneapolis, 435 F3d 898 (CA 8, 2006), in turn quoting Anderson v Douglas Co, 4 F3d 574, 577 (CA 8, 1993), opining that â â[d]ue process claims involving local land use decisions must demonstrate the âgovernment action complained of is truly irrational, that is something more than ... arbitrary, capricious, or in violation of state law.â â â Mettler Walloon, supra at 204. In sum, the â âDue Process Clause âis not a guarantee against incorrect or ill-advised [governmental] decisions.â â â Id. at 206, quoting Collins, supra at 129 (citation omitted).
Here, plaintiffsâ primary allegation against defendants is the strict enforcement of building code provisions requiring flood-resistant construction when plaintiffs claim they should have been allowed to utilize cheaper (and less flood-resistant) rebuilding methods and materials. But even if defendantsâ application of the building code to plaintiffsâ circumstance were erroneous, their enforcement of flood-resistant building code requirements still advanced legitimate state interests in protecting the health, safety, and welfare of the public and protected property located in flood-prone areas. Plaintiffs also do not dispute that if the township planned to acquire private property in the flood plain where their home was located for a park and as a flood buffer zone, this *703 too would further a public use that would serve similar legitimate state interests. Indeed, plaintiffs do not contend that the township could not condemn their property for this public use; rather, plaintiffs allege only that the township, through Easterling, Forner, and others, attempted to acquire their property at less than its fair market value, that is, without constitutionally required âjust compensation.â
These allegations do not state conscience-shocking conduct. â âTo state a cognizable substantive due process claim, the plaintiff must allege âconduct intended to injure in some way unjustifiable by any government interestâ and that is âconscience-shockingâ in nature.â â Mettler Walloon, supra at 201-202, quoting Mitchell v McNeil, 487 F3d 374, 377 (CA 6, 2007), quoting Lewis, supra at 849 (emphasis added). Consequently, even if defendantsâ application of the flood-resistant building code requirements to plaintiffsâ situation were erroneous, it still furthered legitimate state interests and, therefore, could not be characterized as conscience-shocking. Plaintiffsâ remedy for an erroneous building code decision is to perfect an administrative appeal or pursue other available legal remedies; plaintiffsâ claim is not one of substantive due process. Mongeau, supra at 20. Even assuming that defendants were motivated to further a township flood-mitigation plan, their subjective motivation does not alter the legal conclusion that applying flood-resistant building code provisions to property situated in a flood plain, which had suffered repeated flood damage over the years, furthered legitimate state interests and therefore is not egregious, conscience-shocking conduct. Mettler Walloon, supra.
Plaintiffsâ allegation that defendants attempted to take private property without just compensation also *704 fails to support their substantive due process claim. First, as the trial court correctly ruled, only a governmental entity may take private property for public use. Second, the township did not, in fact, purchase plaintiffsâ property for less than fair market value. Plaintiffs were not forced âto surrender their property for pennies on the dollar or nothing.â If the township had acquired plaintiffsâ property at less than fair market value other than through a voluntary sale, plaintiffsâ remedy would have arisen under the Fifth Amendment, not the substantive due process component of the Fourteenth Amendment of the United States Constitution, and Const 1963, art 1, § 17. In Lewis, the Supreme Court noted its reluctance â âto expand the concept of substantive due processâ â so that â â[w]here a particular Amendment provides an explicit textual source of constitutional protection against a particular sort of government behavior, that Amendment, not the more generalized notion of substantive due process, must be the guide for analyzing these claims.â â Id. at 842, quoting Albright v Oliver, 510 US 266, 273; 114 S Ct 807; 127 L Ed 2d 114 (1994) (plurality opinion of Rehnquist, C.J.), quoting Graham v Connor, 490 US 386, 395; 109 S Ct 1865; 104 L Ed 2d 443 (1989) (citation omitted). Because claims of permanent or temporary regulatory taking of private property for public use without just compensation come within the protection of the Fifth Amendment, see First English Evangelical Lutheran Church v Los Angeles Co, 482 US 304; 107 S Ct 2378; 96 L Ed 2d 250 (1987) (First English I) (involving the allegation that a flood-plain ordinance denied all use of property near a riverbed), this part of plaintiffsâ claim cannot invoke the Due Process Clause. Lewis, supra at 842.
*705 Plaintiffs have not alleged that defendants conducted themselves so outrageously or arbitrarily as to shock the conscience. Mettler Walloon, supra at 197-213. Rather, plaintiffs allege conduct that furthers legitimate state interests â enforcing the state building code by requiring flood-resistant construction for property situated in a flood-prone area. To the extent plaintiffs allege that defendants erred in their application of the building code, plaintiffsâ remedy was to perfect an appeal or pursue other state remedies. Mongeau, supra at 20. And, to the extent plaintiffsâ complaint alleges an unconstitutional taking, their remedy is not under the substantive due process component of the Fourteenth Amendment; their remedy is under the Taking Clause of the Fifth Amendment. Lewis, supra at 842; First English I, supra. Because plaintiffs have not alleged facts to sustain their substantive due process claim, the trial court erred by not granting defendants summary disposition. MCR 2.116(C)(8).
Finally, we address plaintiffsâ taking claim. Defendant Robinson Township argues that plaintiffsâ taking claim fails because plaintiffs did not exhaust their administrative remedies, the permit process did not entail unreasonable delay, and fluctuations in market value do not constitute a taking of property. Plaintiffs argue that the townshipâs deliberate course of conduct that reduced the value of their property constituted a de facto taking. Plaintiffs also assert that a regulatory taking occurred under the balancing test of Penn Central Transportation Co v New York City, 438 US 104; 98 S Ct 2646; 57 L Ed 2d 631 (1978). Plaintiffs assert that the increase of their debt on their home (which exceeded their equity) to meet building code requirements, the decline in market value of their home, and the townshipâs improper motivation to acquire their *706 property at less than fair market value establish that a taking occurred. We disagree.
Both the Fifth Amendment of the United States Constitution and Const 1963, art 10, § 2, prohibit the taking of private property for public use without just compensation. 2 Dorman v Clinton Twp, 269 Mich App 638, 645; 714 NW2d 350 (2006). The Taking Clause of the Fifth Amendment âprovides in relevant part that âprivate property [shall not] be taken for public use, without just compensation.â â First English I, supra at 314. The Taking Clause âis designed not to limit the governmental interference with property rights per se, but rather to secure compensation in the event of otherwise proper interference amounting to a taking.â Id. at 315 (emphasis added). Thus, the government is not constitutionally prohibited from taking private property for public use but is only required to pay property owners just compensation when it does so. The government normally âtakesâ private property through the power of eminent domain and formal condemnation proceedings. See Dorman, supra at 645. But a âtakingâ of private property may occur without formal condemnation proceedings when the government overburdens the property with regulations. Id. In general, â âwhile property may be regulated to a certain extent, if regulation goes too far it will be recognized as a taking.â â K & K Constr, Inc v Depât of Natural Resources, 456 Mich 570, 576; 575 NW2d 531 (1998) (K & K Constr I), quoting Pennsylvania Coal Co v Mahon, 260 US 393, 415; 43 S Ct 158; 67 L Ed 322 (1922).
*707 The United States Supreme Court recognizes two types of âcategorical takingsâ regarding âregulatory action that generally will be deemed per se takings for Fifth Amendment purposes.â Lingle v Chevron USA Inc, 544 US 528, 538; 125 S Ct 2074; 161 L Ed 2d 876 (2005). âFirst, where government requires an owner to suffer a permanent physical invasion of her propertyâ however minor â it must provide just compensation.â Id. âA second categorical rule applies to regulations that completely deprive an owner of âall economically beneficial us[e]â of her property.â Id., quoting Lucas v South Carolina Coastal Council, 505 US 1003, 1019; 112 S Ct 2886; 120 L Ed 2d 798 (1992) (emphasis in Lucas). Apart from âthese two relatively narrow categories . . . regulatory takings challenges are governed by the standards set forth in Penn Central Transp. Co. v. New York City, 438 U.S. 104 [98 S Ct 2646; 57 L Ed 2d 631] (1978).â Lingle, supra at 538. 3 The Court in Penn Central established a balancing test that requires âa reviewing court [to] engage in an âad hoc, factual inquir[y],â centering on three factors: (1) the character of the governmentâs action, (2) the economic effect of the regulation on the property, and (3) the extent by which the regulation has interfered with distinct, investment-backed expectations.â K & K Constr I, supra at 577, quoting Penn Central, supra at 124. The âcommon touchstoneâ of all taking analyses is âto identify regulatory actions that are functionally equivalent to the classic taking in which government directly *708 appropriates private property or ousts the owner from his domain.â Lingle, supra at 539.
Plaintiffs argue that they have alleged and presented evidence to support a cause of action for a de facto taking. Michigan ârecognizes a cause of action, often referred to as an inverse or reverse condemnation suit, for a de facto taking when the state fails to utilize the appropriate legal mechanisms to condemn property for public use.â Peterman v Depât of Natural Resources, 446 Mich 177, 187-188; 521 NW2d 499 (1994). A de facto taking âcan occur without a physical taking of the property; a diminution in the value of the property or a partial destruction can constitute a âtaking.â â Merkur Steel Supply, Inc v Detroit, 261 Mich App 116, 125; 680 NW2d 485 (2004). No exact formula exists to determine when a de facto taking occurs, but there must be some action by the government expressly directed toward the plaintiffs property that effectively limits the use of the property. Dorman, supra at 645.
Plaintiffsâ de facto taking theory fails because they have neither alleged nor produced any evidence of a causal connection between any deliberate actions of defendants and the decline in the market value of their property. Thus, âa plaintiff alleging inverse condemnation must prove a causal connection between the governmentâs action and the alleged damages.â Hinojosa, supra at 548. Not only do plaintiffs bear the burden of proving causation in an inverse condemnation action, plaintiffs must also âsatisfy this burden by proving that the governmentâs actions were a substantial cause of the decline of its property.â Merkur, supra at 130. Here, back-to-back devastating floods in 2004 and 2005 damaged plaintiffsâ property. Although the townshipâs building officials enforced the state building code when plaintiffs decided to rebuild their home following each *709 flood, there is no logical causal relationship between compliance with flood-resistant building requirements and any decline in the fair market value that plaintiffsâ home may have experienced. The mere reduction in the value of regulated property is insufficient by itself to establish that a compensable taking has occurred. Penn Central, supra at 131; Dorman, supra at 647.
Likewise, plaintiffsâ theory that the township and its trustees possessed the subjective intent to acquire plaintiffsâ property for the publicâs use as a park and as a flood-buffer zone fails to establish a taking because there is no causal nexus to the market value decline of plaintiffsâ property. The townshipâs obtaining a FEMA grant after the 2005 flood to provide a mostly federally funded buyout option to flood victims (at 75 percent of preflood damage fair market value) cannot establish a taking because it did not oust plaintiffs from their property or diminish the propertyâs value. The FEMA grant that was never utilized with respect to plaintiffsâ property simply was not the functional âequivalent to the classic taking in which government directly appropriates private property or ousts the owner from his domain.â Lingle, supra at 539. Plaintiffsâ property must in fact be taken to invoke constitutional just compensation.
Plaintiffs also claim that they suffered a âcategoricalâ taking per se, i.e., that defendantsâ actions âcompletely destroyedâ their property. Plaintiffs argue that they were required to either abandon their home or rebuild it at costs far exceeding its value, which essentially deprived them of all its economically beneficial use. Quite the contrary, the undisputed facts establish that plaintiffs twice chose to rebuild their home after it was severely damaged by flooding. Because plaintiffs chose to rebuild their home, the township was required *710 to enforce the state building code. This Court has held that a municipality may not be found liable for a taking of private property when it is merely enforcing the requirements of state law. âIn order to impose liability on the township, city, or county, the [plaintiffs] must establish that [the] defendantsâ regulation caused the taking.â Frenchtown Charter Twp v City of Monroe, 275 Mich App 1, 5-6; 737 NW2d 328 (2007) (emphasis in original).
Further, the fact that plaintiffs incurred debt in excess of their equity to rebuild their home does not establish that the townshipâs enforcing the state building code was âfunctionally equivalent to the classic taking in which government directly appropriates private property or ousts the owner from his domain.â Lingle, supra at 539. Other than the relatively brief periods that plaintiffsâ home was uninhabitable because it required structural repair or did not meet minimal health and sanitation requirements, defendants never prohibited plaintiffs from using their property for the beneficial residential use plaintiffs desired. For those periods when plaintiffs were unable to occupy their property as a residence, they dispute that a âtemporaryâ taking occurred. Rather, plaintiffs argue that the mere fact that complying with building code requirements resulted in a negative equity denied them all economically beneficial use. This claim is without merit because even with a negative equity, plaintiffs are still able to use their property as a residence, and the property still retains some value even if its market value has declined. The fact that using their property as a residence is more costly in the face of the necessity to repair repeated flood damage does not establish a taking. âThe Taking Clause does not guarantee property owners an economic profit from the use of their land.â Paragon Properties Co v City of Novi, 452 Mich *711 568, 579 n 13; 550 NW2d 772 (1996), citing Sun Oil Co v Madison Hts, 41 Mich App 47, 56; 199 NW2d 525 (1972).
Next, plaintiffs argue that genuine issues of material fact exist regarding their regulatory taking claim. They contend that the township was improperly motivated to apply more costly flood-resistant building code requirements. Defendants argue that because plaintiffs failed to pursue available administrative remedies, their taking claim was not ripe for adjudication, and, therefore, the trial court erred by not granting defendants summary disposition on this claim. We agree.
â[A] claim that the application of government regulations effects a taking of a property interest is not ripe until the government entity charged with implementing the regulations has reached a final decision regarding the application of the regulations to the property at issue.â Williamson, supra at 186. The rule of finality applies to all constitutional âas appliedâ challenges to land use regulations and ensures that a plaintiff has suffered an â âactual, concrete injuryâ â Braun v Ann Arbor Charter Twp, 262 Mich App 154, 160-161; 683 NW2d 755 (2004) (citation omitted). Contrary to plaintiffsâ argument, the rule of finality applies even when a plaintiffs constitutional claim is premised under 42 USC 1983. Paragon Properties, supra at 576.
The Williamson Court discussed whether the Courtâs decision in Patsy v Florida Bd of Regents, 457 US 496; 102 S Ct 2557; 73 L Ed 2d 172 (1982), holding âthere is no requirement that a plaintiff exhaust administrative remedies before bringing a § 1983 action,â affected the rule of finality when asserting a regulatory taking claim. Williamson, supra at 192. The Court observed, âwhether administrative remedies must be exhausted is conceptually distinct... from the question whether an *712 administrative action must be final before it is judicially reviewable.â Id. When an administrative appeal would review whether the governmentâs initial decision was âunlawful or otherwise inappropriate,â the failure to exhaust administrative remedies would not preclude a § 1983 action under Patsy. Id at 193. But where the administrative body is empowered to review the initial agency decision by participating in the decision making regarding the regulation at issue and grant a variance from the regulationâs requirements, the initial decision âis not a final, reviewable decision.â Id. at 194. Thus, Williamson requires that before a claim that the imposition of a regulation to a parcel of property has effected a taking is ripe for adjudication, the claimant must have sought âalternative relief, in the form of variances ....â Paragon Properties, supra at 577.
This Court in Braun, supra at 159, and more recently in Frenchtown Charter Twp, supra at 7, adopted the rule of finality in Palazzolo v Rhode Island, 533 US 606, 620-621; 121 S Ct 2448; 150 L Ed 2d 592 (2001):
Under our ripeness rules a takings claim based on a law or regulation which is alleged to go too far in burdening property depends upon the landownerâs first having followed reasonable and necessary steps to allow regulatory agencies to exercise their full discretion in considering development plans for the property, including the opportunity to grant any variances or waivers allowed by law. As a general rule, until these ordinary processes have been followed the extent of the restriction on property is not known and a regulatory taking has not yet been established.
We conclude that the trial court erred by distinguishing Williamson and its progeny and ruling that the CBA could only review âwhether or not the regulations were indeed proper.â The trial court erred because the CBA *713 could not only review and determine whether the township building officials were properly applying the building code, it could also grant variances. MCL 125.1515(1) authorizes the CBA to grant variances from a âsubstantive requirement of the code if the literal application of the substantive requirement would result in an exceptional, practical difficulty to the applicant,â provided the conditions of that section are complied with. Moreover, the 2003 Michigan Residential Code severely restricts the discretion of building officials with respect to the application of the code to structures in areas prone to flooding âwithout the granting of a variance ... by the board of appeals.â R104.10.1. The same code also provides criteria for the CBA when considering granting variances in areas prone to flooding. R112.2.2. In sum, while the CBA could review and grant relief if building officials improperly or erroneously applied the codeâs requirements, it could also grant variances from the codeâs requirements. Thus, under Williamson and its progeny, because plaintiffs failed to âseek alternative relief, in the form of variances,â their taking claim was not ripe for adjudication. Paragon Properties, supra at 577.
We also reject the trial courtâs alternative reasoning for not applying the finality doctrine. The trial court reasoned that because the CBA could not award plaintiffs money damages, the plaintiffsâ appeal to the CBA would have been futile. A plaintiff may be excused from the rule of finality if further administrative appeal would be futile. Palazzolo, supra at 625-626; L & L Wine & Liquor Corp v Liquor Control Comm, 274 Mich App 354, 358; 733 NW2d 107 (2007). Plaintiffs, however, made no showing that an appeal to the CBA would have been futile, i.e., that plaintiffs would not have been able to obtain relief from building code requirements they deemed economically impracticable. âFutility will not *714 be presumed; courts assume that the administrative process will properly correct alleged errors.â Id.
The trial courtâs reasoning âputs the cart before the horse.â Plaintiffs cannot bring an action for money damages for a taking of property without just compensation until they have obtained a final regulatory decision, including pursuing available remedies for a variance from the regulations they assert caused them harm. Until the government has rendered a final decision regarding the application of a regulation to a particular property, including whether a variance may be granted, it is impossible to determine if a taking has occurred. Paragon Properties, supra at 576-577; Braun, supra at 158-159. The Supreme Court explained in Williamson-.
[A]mong the factors of particular significance in [applying the Penn Central balancing test] Eire the economic impact of the challenged action and the extent to which it interferes with reasonable investment-backed expectations. Those factors simply cannot be evaluated until the administrative agency has arrived at a final, definitive position regarding how it will apply the regulations at issue to the particular land in question. [Williamson, supra at 191.]
In sum, under Williamson and its progeny, plaintiffsâ regulatory taking claim was not ripe for adjudication because plaintiffs failed to seek alternative relief from the CBA in the form of variances regarding the alleged economically impracticable building code provisions requiring flood-resistant repair and reconstruction. Paragon Properties, supra at 577. Plaintiffs are not excused from the rule of finality because they have not demonstrated that an appeal to the CBA would have been futile. L & L Wine & Liquor Corp, supra at 358. Consequently, the trial court erred by not granting defendants summaiy disposition on plaintiffsâ taking claim, which was not ripe for judicial review. Frenchtown Charter Twp, supra at 7; Braun, supra at 161.
*715 We reverse and remand in Docket No. 279020 for the entry of an order of summary disposition in favor of all defendants on all of plaintiffsâ claims. Because defendants prevail, they may tax costs pursuant to MCR 7.219.
II. DOCKET NOS. 279064 AND 279088
Plaintiffs in this case assert the same substantive due process claims as the Cumminses did in Docket No. 279020. For the reasons discussed in that case, the trial court erred by not granting all defendants summary disposition on these claims.
Plaintiffs failed to allege or produce any evidence of conduct on the part of defendants that was so outrageous as to be arbitrary, capricious, and so lacking in rational relationship to a legitimate governmental purpose as to shock the conscious. Defendants did not enact ânew regulations,â they only interpreted and applied preexisting state building code requirements rationally related to the publicâs health, safety, and welfare with respect to structures situated in flood-prone areas. At most, defendants erred in their interpretations of the building code, for which plaintiffs had an administrative remedy.
To the extent plaintiffs claim defendantsâ actions âforcedâ them to sell their property to Robinson Township at below fair market value, plaintiffsâ remedy, if any, is under the Taking Clause of the Fifth Amendment, not the Due Process Clause. But plaintiffsâ taking claim also fails for reasons already discussed. We note that those few plaintiffs that voluntarily sold their flood-damaged properties under the FEMA grant program have waived a just compensation claim. 4
*716 Plaintiffs in this case, however, also assert that the facts and circumstances establish a compensable temporary taking. See First English I, supra. We conclude that plaintiffsâ temporary regulatory taking claim lacks merit because plaintiffs have neither alleged facts nor produced evidence supporting a claim that extraordinary delay in the permit review process resulted in a temporary taking that required just compensation under the Penn Central balancing test. Indeed, plaintiffs concede that it was not the timeliness of defendantâs decisions but the expense of complying with flood-resistant building code requirements and plaintiffsâ own delay in pursuing hardship appeals that delayed the repair and reoccupation of their homes.
In the seminal case recognizing the concept of a temporary taking, First English I, supra, the Court accepted as true the plaintiffs allegation that a temporary flood-plain ordinance enacted after devastating flooding denied it all use of its camp property near a river. First English I, supra at 313, 321. The flood destroyed all the plaintiffs buildings situated in the flood plain and the county of Los Angeles adopted an interim ordinance barring the construction or reconstruction of any buildings or structures in a designated flood-protection area, which included the plaintiffs property. Id. at 307. The California courts rejected the plaintiffs taking claim on the ground that just compensation could be obtained only prospectively after a *717 judicial determination that the ordinance violated the plaintiffs constitutional rights. Id. at 312. The United States Supreme Court held that once a court has determined that a âtakingâ has occurred, the Fifth Amendment commands just compensation even though the taking was only temporary. Id. at 316, 321. The Courtâs holding was limited: âWe merely hold that where the governmentâs activities have already worked a taking of all use of property, no subsequent action by the government can relieve it of the duty to provide compensation for the period during which the taking was effective.â Id. at 321. The Court further limited its holding by specifically noting that its analysis did not address âthe quite different questions that would arise in the case of normal delays in obtaining building permits, changes in zoning ordinances, variances, and the like which are not before us.â Id. (emphasis added). On remand, the California Court of Appeal held that the plaintiffs taking claim was properly dismissed because, among other reasons, the county ordinance had not deprived the plaintiff of all use of its property and because the 22-month total moratorium was a reasonable period to permit the county to study the problems associated with development in the flood-prone area and devise âa permanent ordinance which would allow only safe uses and the construction of safe structures in and near the river bed.â First English Evangelical Lutheran Church v Los Angeles Co, 210 Cal App 3d 1353, 1373; 258 Cal Rptr 893 (1989) (First English II).
The Supreme Court rejected a âtemporary takingâ claim involving a categorical ban on all residential development for a period of 32 months in Tahoe-Sierra Preservation Council, Inc v Tahoe Regional Planning Agency, 535 US 302; 122 S Ct 1465; 152 L Ed 2d 517 (2002). The United States Court of Appeals for the *718 Ninth Circuit had âheld that because the regulations had only a temporary impact on [the] petitionersâ fee interest in the properties, no categorical taking had occurred.â Id. at 318. The Supreme Court rejected arguments for a bright-line rule when considering claims of regulatory takings, noting that determining whether a âregulatory takingâ has occurred requires the âad hocâ factual inquiry of the Penn Central balancing test. Id. at 325-327. In doing so, courts must focus not only on â âthe parcel as a whole,â â id. at 327, quoting Penn Central, supra at 130-131, but also on the temporal dimensions of the ownerâs interest. Tahoe-Sierra, supra at 331-332. With respect to the temporal aspects of governmental regulation and property interests, the Court opined:
Logically, a fee simple estate cannot be rendered valueless by a temporary prohibition on economic use, because the property will recover value as soon as the prohibition is lifted. Cf. Agins v. City of Tiburon, 447 U.S. [255,] 263, n. 9 [100 S Ct 2138; 65 L Ed 2d 106 (1980)] (âEven if the appellantsâ ability to sell their property was limited during the pendency of the condemnation proceeding, the appellants were free to sell or develop their property when the proceedings ended. Mere fluctuations in value during the process of governmental decisionmaking, absent extraordinary delay, are âincidents of ownership. They cannot be considered as a âtakingâ in the constitutional senseâ â (quoting Danforth v. United States, 308 US 271, 285 [60 S Ct 231; 84 L Ed 240] (1939))). [Id. at 332 (emphasis added).]
The Tahoe-Sierra Court also observed that to require just compensation for â ânormal delays in obtaining building permits, changes in zoning ordinances, variances, and the like,â â id. at 335, quoting First English I, supra at 321, would affect other temporary regulations âthat have long been considered permissible exercises of the police power.â Tahoe-Sierra, supra at 335. *719 âA rule that required compensation for every delay in the use of property would render routine government processes prohibitively expensive or encourage hasty decisionmaking.â Id. Tahoe-Sierra teaches âthat requiring a governmental agency to compensate a property owner for the loss of value while considering applications for permits and variances under a land-use regulatory scheme would either become cost-prohibitive or lead to governmental agencies making hasty, presumably haphazard, decisions.â K & K Constr, Inc v Depât of Environmental Quality, 267 Mich App 523, 536 n 17; 705 NW2d 365 (2005) (K & K Constr II).
Comparing the length of total moratoriums held not to constitute temporary regulatory takings in First English and Tahoe-Sierra, we conclude no extraordinary delay occurred in the permit review process here. Further, requiring plaintiffs to obtain building and occupancy permits cannot itself constitute a taking of property. Bond v Depât of Natural Resources, 183 Mich App 225, 231; 454 NW2d 395 (1989), citing United States v Riverside Bayview Homes, Inc, 474 US 121, 126-127; 106 S Ct 455; 88 L Ed 2d 419 (1985). â[T]he very existence of a permit system implies that permission may be granted, leaving the landowner free to use the property as desired.â Id. at 127. Indeed, the essence of plaintiffsâ claim is not that they would not be allowed to use their property for residential purposes but that they had to comply with flood-resistant building code requirements that imposed financial hardship. This claim does not establish a temporary regulatory taking under the Penn Central balancing test.
The Penn Central balancing test requires examining (1) the character of the governmentâs action, (2) the economic effect of the regulation on the property, and (3) the extent by which the regulation has interfered *720 with distinct, investment-backed expectations. The relevant inquiries regarding the character of the governmentâs action is whether it singles plaintiffs out to bear the burden for the public good and whether the regulation being challenged âis a comprehensive, broadly based regulatory scheme that burdens and benefits all citizens relatively equally.â K & K Const II, supra at 559. Here, the township enforced the statewide building code and its provisions regarding flood-plain construction that apply equally to all landowners with property similarly situated in flood-prone areas. Thus, plaintiffs are both benefited and burdened like other similarly situated property owners; âthis factor weighs heavily against finding that a compensable regulatory taking has occurred here.â Id. at 563.
The economic effect of enforcing the building code requirements for flood-resistant construction also precludes a conclusion that a temporary taking occurred. Plaintiffsâ only claim is that such construction is more costly than construction that is not flood-resistant. But, as noted already, â[t]he Taking Clause does not guarantee property owners an economic profit from the use of their land.â Paragon Properties, supra at 579 n 13. Applying this principle to the present case means that the Taking Clause does not guarantee that a property owner may choose the least costly building materials or methods to repair or rebuild property that has been damaged in a flood. Moreover, plaintiffs who appealed to the CBA obtained relief from the economic hardship the regulations might impose within a reasonable period. This factor does not support finding a temporary taking occurred in this case.
The last Penn Central balancing-test factor examines the extent to which the governmental regulation has interfered with plaintiffsâ distinct, investment-backed *721 expectations. Here, plaintiffs do not assert that their property is used to make a profit; rather, they use their property for residential purposes. Because their homes are situated in a flood plain that experiences frequent flooding, plaintiffs could have no reasonable expectation that their property would not periodically experience flood damage necessitating costly repairs. See Dorman, supra at 648-649 (holding that the plaintiff could not establish that a zoning regulation interfered with âdistinct, investment-backed expectationsâ when the zoning regulation was consistent with the neighborhood and â[a] simple visual inspection of the area would have placed plaintiff on notice that his proposed development was inconsistent with the character of the neighborhoodâ); see, also, K & K Constr II, supra at 558 (the plaintiffs knowingly purchased regulated wetlands so âit [was] clear that there [had] not been a significant negative effect on [the] plaintiffsâ reasonable investment-backed expectationsâ) (emphasis in original). Similarly, the application of flood-resistant building code requirements to property situated in a flood-prone area cannot have interfered with plaintiffsâ reasonable âdistinct, investment-backed expectations. â
In sum, plaintiffsâ temporary regulatory taking claim fails as a matter of law because plaintiffs have neither alleged nor produced any evidence that the government extraordinarily delayed its responses and decisions following the flooding that damaged plaintiffsâ homes and rendered them temporarily uninhabitable. Plaintiffs simply have not created a question of fact under the Penn Central balancing test that a temporary taking requiring just compensation occurred. Consequently, the trial court erred by not granting defendant township summary disposition.
*722 We reverse and remand in Docket Nos. 279064 and 279088 for the entry of an order of summary disposition in favor of all defendants on all of plaintiffsâ claims. Because defendants prevail, they may tax costs pursuant to MCR 7.219. We do not retain jurisdiction.
âFraud in the inducement occurs where a party materially misrepresents future conduct under circumstances in which the assertions may reasonably be expected to be relied upon and are relied upon.â Samuel D Begola Services, Inc v Wild Bros, 210 Mich App 636, 639; 534 NW2d 217 (1995).
Michiganâs Constitution provides: âPrivate property shall not be taken for public use without just compensation therefor being first made or secured in a manner prescribed by law. Compensation shall be determined in proceedings in a court of record.â Const 1963, art 10, § 2.
The Lingle Court also discussed another type of taking case, not pertinent here, involving the doctrine of unconstitutional conditionsâ when the government requires a party to give up the constitutional right to receive just compensation for property taken for a public use in exchange for a discretionary benefit that has little or no relationship to the property. Nollan v California Coastal Comm, 483 US 825; 107 S Ct 3141; 97 L Ed 2d 677 (1987); Dolan v City of Tigard, 512 US 374; 114 S Ct 2309; 129 L Ed 2d 304 (1994).
Plaintiffs do not specifically argue or present evidence that those plaintiffs who participated in the FEMA grant program actually received *716 less than fair market value for their property. Fair market value must be determined as of the date the taking occurs. In re Urban Renewal, Elmwood Park Project, 376 Mich 311, 318; 136 NW2d 896 (1965). A taking through the FEMA grant could not have occurred until after the 2005 flood. But, under the grant program, compensation was based on a percentage of fair market value of the property before the flood damaged it. Moreover, plaintiffs could contractually waive their constitutional right to just compensation. See Stone v Michigan, 467 Mich 288, 292; 651 NW2d 64 (2002).