Janice Claborne and Sheryl Jones v. the Housing Authority of New Orleans
Date Filed2023-12-20
Docket2023-CA-0182
Cited0 times
StatusPublished
Full Opinion (html_with_citations)
JANICE CLABORNE AND * NO. 2023-CA-0182
SHERYL JONES
* COURT OF APPEAL
VERSUS
* FOURTH CIRCUIT
THE HOUSING AUTHORITY
OF NEW ORLEANS * STATE OF LOUISIANA
*
*
*******
JCL LOBRANO, J., CONCURS IN PART, DISSENTS IN PART, AND ASSIGNS
REASONS
I concur in part in that I would also affirm the district court’s denial of
HANO’s cross motion for partial summary judgment on the issue of liability. I
respectfully dissent in part in that I would reverse the district court’s granting of
Plaintiffs’ motion for partial summary judgment on the issue of liability and find
that the district court wrongly rendered Summary Judgment against HANO,
finding it liable as a matter of law.
This class action case involves not only lease agreements between the
Housing Authority of New Orleans (“HANO”) and Plaintiffs but also Resident
Management Agreements (“RMAs”) between HANO and Guste Homes Resident
Management Corporation and B.W. Cooper Residence Management Corporation
(collectively “the RMCs”) pertaining to their respective public housing
developments.
The lease agreements obligate HANO to “maintain the dwelling unit and the
project in a condition that is decent, safe, sanitary, and in good repair . . .
complying with the requirements of applicable building codes, housing codes,
Uniform Physical Condition Standards and other HUD regulations materially
affecting health and safety.” The RMAs obligate HANO to perform non-routine
and extraordinary repairs while the RMCs are obligated to perform routine
1
inspections and maintenance “repairing any damage to the Development to ensure
that the Development is kept in a decent, safe and sanitary condition” and “to
enforce all rules, regulations and procedures applicable to public housing”
including applicable “policies, and procedures promulgated by HUD or HANO . . .
in accordance with HQS/UPSI, PHAS or alternate policy and in accordance with
all local building and housing codes.” Plaintiffs allege that the RMCs assumed a
duty and/or were obligated to the tenants as third party beneficiaries under the
RMAs to maintain their apartments in a safe living condition, including a mold-
free environment.
While the district court found HANO was liable for class-wide breaches to
Plaintiffs on summary judgment, the Summary Judgment and the majority opinion
omit any discussion on the potential liability of the RMCs or address or make a
determination regarding the relationship between HANO and the RMCs or the
duties that HANO and the RMCs undertook in their respective capacities pursuant
to the RMAs. Neither the Summary Judgment nor the majority opinion examine
whether the conditions for which HANO was being held liable were the results of
actions or inactions by the RMCs in their respective capacities as managers under
the RMAs. These omissions by the district court and the majority opinion are
applicable to a determination of HANO’s liability and raise genuine issues of
material fact, which preclude a summary judgment.
To prevail on a breach of contract claim, the plaintiff must prove by a
preponderance of the evidence: 1) the defendant owed the plaintiff an obligation;
2) the defendant failed to perform the obligation; and 3) the defendant’s failure to
perform caused damage to the plaintiff. Favrot v. Favrot, 10-0986, pp. 14-15 (La.
App. 4 Cir. 2/9/11); 68 So.3d 1099, 1108-09. The record shows that mold growth
can be influenced by a variety of factors, including structural issues (poor
ventilation or water leaks) and lack of routine maintenance (minor leaks or
2
dampness). Both types of failures – extraordinary and routine maintenance – can
collectively contribute to a mold problem. For example, structural defects
(HANO’s alleged responsibility) may have created conditions conducive to mold
growth, while inadequate routine care (the RMCs’ alleged responsibility) may have
exacerbated or failed to mitigate the issue. This complexity, coupled with the
microscopic nature of mold, makes it challenging to pinpoint a single cause, which
creates genuine issues of material fact not conducive to a summary judgment
proceeding. The responsibilities of the tenants, HANO, and the RMCs overlap or
interact, further complicating a causation analysis in a motion for summary
judgment proceeding.
3