Coleman v. BP Expl & Prod
Citation19 F.4th 720
Date Filed2021-11-29
Docket20-40811
Cited19 times
StatusPublished
Full Opinion (html_with_citations)
Case: 20-40811 Document: 00516110190 Page: 1 Date Filed: 11/29/2021
United States Court of Appeals
for the Fifth Circuit United States Court of Appeals
Fifth Circuit
FILED
November 29, 2021
No. 20-40811 Lyle W. Cayce
Clerk
Ledell Coleman,
PlaintiffâAppellant,
versus
BP Exploration & Production, Incorporated; Grand
Isle Shipping, L.L.C.,
DefendantsâAppellees.
Appeal from the United States District Court
for the Southern District of Texas
USDC No. 3:19-CV-102
Before Higginbotham, Willett, and Duncan, Circuit Judges.
Don R. Willett, Circuit Judge:
High ocean winds caused an oil-platform worker to injure his back
while building scaffolding. He sued the companies managing both the day-to-
day construction and the overall construction project. Neither company was
his direct employer. Because a reasonable jury could not find either company
liable for the workerâs injury, we AFFIRM summary judgment for
Defendants.
Case: 20-40811 Document: 00516110190 Page: 2 Date Filed: 11/29/2021
No. 20-40811
I
Shell Pipeline Co. LP wanted to expand a fixed oil platform that it
operated out on the Outer Continental Shelf (âOCSâ), off Louisianaâs
coast. Not wanting to manage the expansion project itself, Shell engaged BP
Exploration & Production. BP then delegated the projectâs day-to-day
management to Grand Isle Shipping, LLC. From there, Grand Isle engaged
Brand Energy Services to build some scaffolding on the platform. One of
Brandâs scaffold builders was Ledell Coleman, the plaintiff appellant.
Safety out on the platform was paramount. BP made everyone adopt
and receive training on its safety rules; required Grand Isle to âtake full
responsibility for the . . . safety of all its operations and methodsâ; used on-
site safety supervisors; and delegated to everyone authority to âstop workâ
if conditions were unsafe. Grand Isle did similarly. It required Brand to
expressly warrant that its workers could perform the work âsafelyâ; also
used on-site safety supervisors; tightly controlled access to the tools that
Brand used to build the scaffolding; and issued applicable safety equipment
to Brandâs employees. Brand, in turn, retained autonomy over when it would
work. It completed a âJob Safety Environmental Assessmentâ before every
shift and, as part of that assessment, considered âweather conditionsâ when
deciding âthe right timeâ to work.
The right time to work was not when Coleman first arrived at the
platform. High winds kept Coleman on a housing vessel, located adjacent to
the platform, for five days after he arrived. On the fifth day, though, BP told
Brand that the wind had died down to âlike, 22â knots. Brand decided that
ânow [is] the right time to [do] the work.â BP then began to transport
Coleman and other Brand workers onto the platform.
Though the wind continued, Coleman arrived at the platform and
began to build the scaffolding. To build the scaffolding, Coleman had to carry
2
Case: 20-40811 Document: 00516110190 Page: 3 Date Filed: 11/29/2021
No. 20-40811
heavy, eight-foot-long scaffolding boards. At some point while he was
carrying a board, the wind gusted and âgot up under it.â Coleman tried to
âsnatch[] it to keep it from going overboard.â Something in his back
âpoppedâ and his back began to hurt. Coleman informed his supervisor and
returned to the housing vessel. He was evacuated the next day.
Coleman sued BP and Grand Isle in Texas state court for negligence.1
Grand Isle removed the case to federal district court. Following discovery,
each Defendant moved for summary judgment on Colemanâs remaining
claims. They argued that Louisianaâs independent-contractor rule barred
holding them liable for Brandâs negligence. They further argued that no
evidence supported that they committed independent negligent acts against
Coleman. The district court agreed, granted both motions, and then entered
a final judgment dismissing Colemanâs claims. Coleman appealed.
II
We review summary judgment de novo and apply the same standard
as the district court.2 We may affirm only if no genuine dispute of material
fact exists and Defendants were entitled to judgment as a matter of law.3
Defendants may satisfy their burden by demonstrating âa complete failure of
proofâ on an âessential elementâ of Colemanâs case.4 Still, we must view all
evidence and draw all justifiable inferences in favor of Coleman, the
1
Coleman brought other claims as well, but he agreed to dismiss them prior to
Defendantsâ motions for summary judgment.
2
Hall CA-NV, L.L.C. v. Old Republic Natâl Title Ins. Co., 990 F.3d 933, 936 (5th
Cir. 2021) (citation omitted).
3
Id.
4
Celotex Corp. v. Catrett, 477 U.S. 317, 323 (1986).
3
Case: 20-40811 Document: 00516110190 Page: 4 Date Filed: 11/29/2021
No. 20-40811
nonmovant.5 A âgenuineâ fact dispute exists only if a reasonable jury could
return a verdict for Coleman based on the evidence. 6 âConclusional
allegations and denials, speculation, improbable inferences, unsubstantiated
assertions, and legalistic argumentation do not adequately substitute for
specific facts showing a genuine issue for trial.â7
The parties agree that we should look to Louisiana law in evaluating
Colemanâs claims against the summary-judgment standard. We agree with a
caveat. The platform where Coleman was injured was located off Louisianaâs
coast and affixed to the OCS. Federal law exclusively governs out on the
OCS.8 Not the state of Louisianaâs. But given the platformâs location, we
will adopt Louisiana law âas surrogate federal lawâ when it is âapplicable and
not inconsistent with . . . other Federal laws.â9
Louisiana vicarious-liability and negligence law is applicable and not
inconsistent with other federal laws in this case. As the Supreme Court
recently explained, we adopt state law âonly where there is a gap in federal
lawâs coverage.â10 If âa federal law addresses the issue at hand,â then no gap
exists.11 The parties do not point us to any federal laws that address the merits
5
Old Republic, 990 F.3d at 936 (citation omitted).
6
TIG Ins. Co. v. Sedgwick James of Wash., 276 F.3d 754, 759 (5th Cir. 2002).
7
Id.
8
Rodrigue v. Aetna Cas. & Sur. Co., 395 U.S. 352, 357(1969) (holding that âfederal law is âexclusiveâ in its regulationâ of âartificial islands and fixed structures erectedâ out on the OCS (quoting Outer Continental Shelf Lands Act, ch. 345, sec. 4,67 Stat. 462
, 462 (1953) (codified as amended43 U.S.C. § 1333
) [hereinafter OCSLA])).
9
Id. (quoting OCSLA section 4).
10
Parker Drilling Mgmt. Svcs., Ltd. v. Newton, 139 S. Ct. 1881, 1892 (2019).
11
Id.
4
Case: 20-40811 Document: 00516110190 Page: 5 Date Filed: 11/29/2021
No. 20-40811
in this case. Therefore, we will adopt Louisiana lawâas surrogate federal
lawâin deciding it.
III
Coleman contends that a genuine dispute of material fact exists on
whether Defendants are vicariously liable for Brandâs negligence. He bases
his contention on three different theories: (A) that Brand was not an
independent contractor with respect to Defendants; (B) even if Brand was an
independent contractor, then Defendants exercised operational control over
it; and (C) even if Brand was an independent contractor, then Defendants are
vicariously liable for authorizing unsafe work practices. We are unpersuaded.
A
Colemanâs first vicarious-liability theory is that Brand was not
Defendantsâ independent contractor, but their employee. Adopting
Louisiana law, âa principal is not liable for the negligent acts of an
independent contractor acting pursuant to the contract.â12 The five
âHickmanâ factors govern deciding whether Brand qualified as an
independent contractor.13 On this evidence their balance weighs in
Defendantsâ favor.
12
E.g., Graham v. Amoco Oil Co., 21 F.3d 643, 645 (5th Cir. 1994) (citation omitted).
13
Hickman v. S. Pac. Transp. Co., 262 So. 2d 385, 390â91 (La. 1972); see also Tower Credit, Inc. v. Carpenter,825 So. 2d 1125, 1129
(La. 2002) (summarizing the Hickman
factors).
5
Case: 20-40811 Document: 00516110190 Page: 6 Date Filed: 11/29/2021
No. 20-40811
(1)
The first Hickman factor is whether âthere is a valid contract between
the parties.â14 The parties do not dispute the validity of the contracts in the
record between Brand and Grand Isle, and between Grand Isle and BP.
Therefore, the first Hickman factor weighs in Defendantsâ favor.
(2)
The second Hickman factor is whether âthe work being done is of an
independent nature such that the contractor may employ non-exclusive
means in accomplishing it.â15 At least one Louisiana court has held that this
factor weighs against independent-contractor status when a worker is
required to use specific tools.16
The second factor applies differently to each Defendant. No evidence
supports that BP interfered with the means that Brand chose for
constructing the scaffolding. Not so for Grand Isle. Grand Isle admitted in
deposition that it âown[ed]â the tools that Brand âutiliz[ed]â to complete
the scaffolding work: the âhammers,â âwrenches,â âsafety harnesses,â and
âthings like that.â Grand Isle also stored these tools for Brand in âtool
houses.â On this evidence a reasonable jury could find that Grand Isle
required Brand to use specific tools to complete the scaffolding work.
Therefore, this factor weighs in BPâs favor, but against Grand Isleâs.
14
Carpenter, 825 So. 2d at 1129.
15
Id.
16
See Kibodeaux v. Progressive Ins. Co., 4 So. 3d 222, 226 (La. Ct. App. 2009) (noting
that an inspector âwould most likely not have been allowed to substitute his own badge or
his own inspection cards, in place of those providedâ).
6
Case: 20-40811 Document: 00516110190 Page: 7 Date Filed: 11/29/2021
No. 20-40811
(3)
The third Hickman factor is whether âthe contract calls for specific
piecework as a unit to be done according to the independent contractorâs own
methods, without being subject to the control and direction of the principal,
except as to the result of the services to be rendered.â17 Still, principals may
exercise control and direction over the end result of the work without
creating an employer-employee relationship.18 Further, Louisiana courts are
reluctant to incentivize dangerous work practices by creating an employer-
employee relationship based merely on workplace-safety standards.19
The third factor weighs in BPâs favor. Coleman argues that BPâs
safety rules, on-the-platform supervision, and reporting requirements were
so pervasive that BP effectively specified Grand Isle and Brandâs work-
performance standards. We disagree. No evidence supports that BPâs
general safety rules prescribed how Brand needed to build scaffolding.20
17
Carpenter, 825 So. 2d at 1129. Louisiana courts have found that certain facts make this factor weigh against finding an independent-contractor relationshipâfor example, unilaterally specifying work-performance standards, work hours, and work location, Kibodeaux,4 So. 3d at 226
; Simon v. Farm Bureau Ins. Co.,297 So. 3d 147
, 152 (La. Ct. App.
2020), or causing workers to fear termination for non-compliance with any of these, Simon,
297 So. 3d at 152â53.
18
Carpenter, 825 So. 2d at 1129.
19
See Davenport v. Amax Nickel, Inc., 569 So. 2d 23, 28 (La. Ct. App. 1990)
(âImposing liability based on that theory could lead to the absurd result of encouraging
owners to ignore and condone safety violations by independent contractors in order to
avoid liability.â).
20
Even if they did, it would take an exceptional case before workplace-safety rules
could cause the third Hickman factor to weigh against an independent-contractor
relationship. The law encourages workplace safety out on the OCS. Not vice-versa. Id.; see
also LeJune v. Shell Oil Co., 950 F.2d 267, 270 (5th Cir. 1992) (commenting that, under
Louisiana law, â[t]he fact that a principal takes an active interest in the safety of the
employees of its independent contractor does not, in and of itself, constitute direct
7
Case: 20-40811 Document: 00516110190 Page: 8 Date Filed: 11/29/2021
No. 20-40811
Further, BP was entitled to exercise direction and control over the end result
of Brandâs services through reporting requirements. Coleman also equates
BPâs control over transportation to and from the platform with specifying
Brandâs work hours. But the record reflects that BP did not make
transportation decisions unilaterally. Brand decided when to work, and BP
decided when to transport. Without more, we can only speculate that BP
actually specified Brandâs work hours. Because speculation cannot support a
genuine fact dispute, this argument fails to persuade as well.21
The third factor also weighs in Grand Isleâs favor. Despite Coleman
pointing to Grand Isleâs routine supervision on the platform, no evidence
supports that Grand Isle ever prescribed how Brand needed to build
scaffolding.
(4)
The fourth Hickman factor is whether âthere is a specific price for the
overall undertaking agreed upon.â22 The record and partiesâ arguments are
unclear on how we should weigh this factor. We therefore hold that the fourth
factor is neutral.
(5)
The fifth Hickman factor is whether âthe duration of the work is for a
specific time and not subject to termination or discontinuance at the will of
either side without a corresponding liability for its breach[.]â23 This factor
operational control.â (quoting Duplantis v. Shell Offshore, Inc., 948 F.2d 187, 193 (5th Cir.
1991))).
21
TIG, 276 F.3d at 759.
22
Carpenter, 825 So. 2d at 1129.
23
Id. Here too, Louisiana courts have found that certain facts make this factor
weigh against finding an independent-contractor relationshipâfor instance, if one party
8
Case: 20-40811 Document: 00516110190 Page: 9 Date Filed: 11/29/2021
No. 20-40811
weighs in both Defendantsâ favor. No evidence supports and Coleman does
not argue that BP could unilaterally terminate Brand. Coleman does argue,
though, that Grand Isle could. He quotes the Grand IsleâBrand contract:
â[Grand Isle] may terminate any particular work or service being performed
under this contract at any time at its sole discretion.â Coleman contends that
this clause is an at-will-termination-without-liability provision. We disagree.
We construe contracts by reading them as a whole.24 The contractâs
preceding sentence expressly provides that âterminationâ would not relieve
either party âof its respective obligations and liabilities arising from or
incident to work performed or services rendered.â Simply put, Grand Isle
could terminate the contract at will, but Brand would still have a claim for
breach. Therefore, this clause is no evidence that Grand Isle could terminate
Brand at will without incurring liability for breach.
* * *
In sum, the Hickman factors weigh in favor of holding that Brand was
Grand Isle and BPâs independent contractor. For Grand Isle, the first, third,
and fifth factors weigh in favor of an independent-contractor relationship.
Only the second factor casts some doubt on that conclusion. But standing
alone, that one factor in this case is not enough for a reasonable jury to return
a verdict that Brand was Grand Isleâs employee. The answer is even clearer
for BP. No factor casts doubt on Brandâs status as BPâs independent
contractor. Therefore, a reasonable jury could not return a verdict that Brand
was BPâs employee either.
may unilaterally terminate the contract without liability for breach. Simon, 297 So. 3d at
155â56.
24
Ogea v. Loffland Bros. Co., 622 F.2d 186, 189 (5th Cir. 1980) (declining to adopt
a contractual interpretation that âwould ignore the well-recognized principle under
Louisiana law that [a] contract must be viewed as a wholeâ (citation omitted)).
9
Case: 20-40811 Document: 00516110190 Page: 10 Date Filed: 11/29/2021
No. 20-40811
B
Colemanâs second vicarious-liability theory is that even if Brand was
an independent contractor, Defendants are still vicariously liable because
they exercised operational control over Brand. Though the independent-
contractor rule generally bars vicarious liability, some exceptions apply. One
is the operational-control exception. As we have recognized before, when a
principal either âretainsâ25 or âexercisesâ operational control over the
independent contractorâs acts, then the principal remains vicariously liable.26
Retention and actual exercise of control do not weigh equally. We clarified in
Echeverry v. Jazz Casino Co. that contractual retention weighs heavier.27 The
district court found that the operational-control exception did not apply as to
either BP or Grand Isle. Coleman disputes this on two fronts. He attacks
both the standard that the district court used and its application. We agree
with the district court.
(1)
Coleman argues that the district court applied too-narrow a standard
in deciding operational control. Coleman argues that operational control
exists anytime a principal does not give an independent contractor
âcompleteâ or âabsolute freedom to perform work as [it] deem[s] fit.â
Colemanâs standard is much too broad. The district court faithfully
applied the operational-control standard that we have articulated before:
25
Graham, 21 F.3d at 645.
26
Bartholomew v. CNG Producing Co., 832 F.2d 326, 329 (5th Cir. 1987).
27
See 988 F.3d 221, 232(5th Cir. 2021) (âThe supervision and control that is actually exercised by the principal is less important than the right to control that is contractually reserved.â); see also Sandbom v. BASF Wyandotte, Corp.,674 So. 2d 349, 354
(La. Ct. App. 1996) (âThe decisive element is whether the principal has retained the right
of direct supervision of the step-by-step process of accomplishing the work.â).
10
Case: 20-40811 Document: 00516110190 Page: 11 Date Filed: 11/29/2021
No. 20-40811
Operational control requires evidence of âdirect supervisionâ by the
principal âover the step-by-step process of accomplishing the work.â28 That
standard is not met merely because the principal contractually retained
general rightsâfor example, the right to âorder the work stopped or
resumed,â âinspect its progress,â âreceive reports,â 29 or demand that an
independent contractor develop and implement safety procedures. 30 Neither
is that standard met merely because a principal keeps a representative
physically present at the jobsite to ensure compliance with the contract.31
Therefore, we disagree with Colemanâs operational-control-
exception formulation. The district court got the standard right.
(2)
Coleman further contends that he raised a fact dispute under the
operational-control standard. Applying the above standard, we disagree.
Coleman argues that Defendants exercised operational control by giving
Brand work priorities. But setting general work priorities does not prescribe
the step-by-step process for building scaffolding. Coleman argues that BP
and Grand Isle established operational control by requiring compliance with
BP safety rules. But safety rules generally do not establish operational control
as a matter of public policy. Coleman argues Grand Isle established
28
Fruge ex rel. Fruge v. Parker Drilling Co., 337 F.3d 558, 561 (5th Cir. 2003).
29
Renwick v. PNK Lake Charles, L.L.C., 901 F.3d 605, 613(5th Cir. 2018) (quoting LeJune,950 F.2d at 270
).
30
Duplantis, 948 F.2d at 193; see also Davenport,569 So. 2d at 28
(declining to hold
that imposing safety procedures can create vicarious liability through the operational-
control exception because it would âencourag[e] owners to ignore and condone safety
violations by independent contractors in order to avoid liabilityâ).
31
Davenport, 569 So. at 28 (âThe fact that [the principalâs] personnel may have
pointed out obvious violations of safety rules and may have sought to have them corrected
does not make [the principal] liable for the consequences of such violations.â).
11
Case: 20-40811 Document: 00516110190 Page: 12 Date Filed: 11/29/2021
No. 20-40811
operational control by having on-site supervisors that determined the
equipment to be issued and used. Even accepting this as true, this actual
exercise of control is less weighty than what the Grand Isle-Brand contract
provided: that Grand Isle would leave to Brand âthe methods and details of
performance, Grand Isle being interested only in the results obtained, and
having no control over the manner and method of performance.â Moreover,
providing tools does not equate to giving step-by-step instructions on how to
build scaffolding. Finally, Coleman argues that Defendants exercised
operational control by directing or âinfluenc[ing]â Brand when to âbegin its
work.â Even assuming they did, that falls squarely within a principalâs
general right to order the work stopped or resumed.
C
Colemanâs third vicarious-liability theory is that even if Brand was an
independent contractor, then there is still a fact dispute over Defendantsâ
vicarious liability under the unsafe-work-practices exception. When a
principal âexpressly or impliedly authorizes an unsafe practice,â then the
principal remains vicariously liable.32 We agree with the district court: No
genuine dispute of material fact exists on this issue.
32
Bartholomew, 832 F.2d at 329(quoting Ewell v. Petro Processors of La., Inc.,364 So. 2d 604
, 606â07 (La. Ct. App. 1978)). Our cases have sometimes referred to the unsafe- work-practices exception collectively with the operational-control exception. See, e.g., Voces v. Energy Res. Tech., G.O.M., L.L.C.,704 F. Appâx 345, 349
(5th Cir. 2017) (per
curiam) (labeling both âthe operational control exceptionâ). We note, however, that both
are distinguishable exceptions to the independent-contractor rule under Louisiana law,
complete with bespoke inquiries.
12
Case: 20-40811 Document: 00516110190 Page: 13 Date Filed: 11/29/2021
No. 20-40811
(1)
We recently explained in Echeverry that the unsafe-work-practices
exception applies only when the principal âexpressly or impliedly authorized
the particular mannerâ which rendered the work unsafe.33 Observing but
failing to object to an unsafe work practice does not create a fact dispute.34
And if the independent contractor âparticipatedâ in deciding to use the
unsafe work practice, that also âweighs heavily againstâ finding a fact
dispute.35 Still, defining the unsafe work practice is no easy task. It first
ârequires determining at what level of generality to view the work
practice.â36 That means âstart[ing] with the underlying actionâ and then
âadd[ing] some specifics of the occasion.â37
The parties disagree about what the unsafe work practice was.
Coleman contends that it was â[p]erforming scaffolding work in inclement
weather.â The inclement weather being the âdangerous wind speedsâ that
day. Grand Isle appears to accept Colemanâs framing, but BP does not. BP
contends that the unsafe work practice was âusing a scaffolding board on an
offshore platformâ and then âcarrying [it] in gusting winds.â
Our decision in Echeverry is instructive in deciding between the
partiesâ competing definitions. In Echeverry, a casino hired a wildlife-removal
company to remove birds from palm trees. The removal company injured a
33
Echeverry, 988 F.3d at 233(quoting Davis v. Dynamic Offshore Res., L.L.C.,865 F.3d 235, 236
(5th Cir. 2017)).
34
See id. (âA company manâs observing and failing to object to the independent
contractorâs unsafe work practices is insufficient evidence of authorization to defeat a
motion for summary judgment.â).
35
Id.
36
Id.
37
Id. at 234.
13
Case: 20-40811 Document: 00516110190 Page: 14 Date Filed: 11/29/2021
No. 20-40811
pedestrian that was standing at a crosswalk by running her over with the
manlift it was using for the work. The âflagmanâ had failed to alert her to its
approach.38 Under those facts, the underlying action was âusing a manlift.â39
After adding occasion specifics, the unsafe work practice became âmoving a
manlift against vehicular traffic at a busy intersection when there was
substantial pedestrian traffic.â40
Using Echeverry as our guide, we agree with BPâs formulation.
Specifically, the underlying action in Echeverry tracked the instrumentality
that caused injury (the manlift) and not the workâs overall purpose (bird
removal). Here the workâs purpose was to build scaffolding. But the
instrumentality that caused Colemanâs injury was the scaffolding board. As
for the occasion specifics, in Echeverry we focused on what specifically made
the underlying action unsafe: using a manlift âagainst vehicular trafficâ; âat
a busy intersectionâ; and while âthere was substantial pedestrian traffic.â41
Here what specifically made using a scaffolding board unsafe was using it on
an offshore platform while winds were gusting. Therefore, we agree with
BPâs unsafe-work-practices articulation: carrying scaffolding boards on an
offshore platform in gusting winds.
(2)
No evidence supports that Defendants expressly or impliedly
authorized Coleman to carry scaffolding boards on an offshore platform in
gusting winds. Coleman points to how BP transferred him to the platform in
an overloaded personnel basket in wind speeds exceeding BPâs safety rules,
38
Id. at 227.
39
Id. at 234.
40
Id.
41
See id.
14
Case: 20-40811 Document: 00516110190 Page: 15 Date Filed: 11/29/2021
No. 20-40811
and that Defendants had a pecuniary motive to resume work after a multi-day
work stoppage. However Coleman got to the platform and whatever
Defendantsâ motives at the time, though, we have already discussed how
Brand retained control over deciding when to work. And the record is clear:
Brand chose to build scaffolding that day despite the wind speeds. Even if
Defendants âinfluencedâ that decision, Brandâs participation in it weighs
heavily against finding a genuine fact dispute. And once the work started, that
BP and Grand Isle supervisors stood by and did nothing to stop Brand cannot
create a fact dispute either.
IV
Coleman contends that even if the independent-contractor rule bars
holding Defendants vicariously liable for his injuries, then each is still directly
liable for its own negligence. Adopting Louisiana law, we have explained
before that a principal owes âno dutyâ to its independent contractors âto
provide a safe work place.â42 But the no-duty rule does not apply when the
principal either affirmatively assumes that duty43 or creates a workplace
hazard.44 Coleman contends that a fact dispute exists for both exceptions.
The district court disagreed. We agree with the district court.
42
Graham, 21 F.3d at 647.
43
Cf. id. (recognizing that a principal can âassume an ex-contract duty to provide
a safe work place,â but rejecting that the principal had in that case).
44
Cf. Zephrin v. Conoco Oil Co., Inc., 884 F.2d 212, 213 (5th Cir. 1989) (âThis court
has consistently held . . . that a principal . . . who hires an independent contractor, over
which it exercises no operational control, has no duty to remedy hazards created by its
independent contractors.â (citations omitted)).
15
Case: 20-40811 Document: 00516110190 Page: 16 Date Filed: 11/29/2021
No. 20-40811
A
For a principal to affirmatively assume a duty to provide its
independent contractors with a safe workplace, it must do more than merely
observe unsafe work habits.45 That more can be met, though, when the
principal âvoluntarily and affirmativelyâ goes beyond the contract to
âreprimand[] the independent contractor for various safety violations.â 46
The key, however, is that the injury must be caused by induced reliance on
the principalâs safety rules. Merely providing general safety rules is not
enough.47 Applying this standard, no evidence supports that either
Defendant assumed a duty to keep Coleman safe.
(1)
Coleman contends that a genuine fact dispute exists over whether BP
assumed a duty towards him. We disagree. Coleman argues that BP assumed
a duty by enforcing safety rules on the platform. But no evidence supports
that these safety rules governed carrying scaffolding boards in gusting winds.
Coleman argues that BP assumed a duty by stationing safety supervisors on
the platform. But merely observing an unsafe work practice is not enough to
assume a duty. Coleman argues that BPâs safety supervisors had the
authority to and actually did determine the âapplicableâ safety equipment
used on the platform. No evidence supports that contention. The deposition
Coleman cites to in support is actually for a Grand Isle employee, not a BP
employee. Further, the BP-Grand Isle contract expressly provided that
45
Graham, 21 F.3d at 648.
46
Id.
47
See LeJune, 950 F.2d at 271 (âNothing in the record before us, however,
indicates that LeJeune was painting the rack on some kind of reliance induced by the
Manual.â).
16
Case: 20-40811 Document: 00516110190 Page: 17 Date Filed: 11/29/2021
No. 20-40811
Grand Isle would âtake full responsibility for the . . . safety of all its
operations and methods necessaryâ to build the scaffolding.
(2)
Coleman also argues that Grand Isle assumed a duty towards him. We
disagree with most of his arguments for many of the same reasons that we
reject that BP assumed a duty. No evidence supports that Grand Isle
enforced safety rules over carrying scaffolding boards in gusting winds. And
Grand Isle did not assume a duty merely based on what its safety supervisors
observed.
Admittedly, though, Grand Isleâs safety supervisors were more
involved than BPâs in one respectâissuing safety equipment. Coleman
points to how Grand Isleâs employee admitted at deposition that its safety
supervisors determined âall applicable equipmentâ to be âusedâ by Brand
on the platform. But that does not matter here. At most it supports a
reasonable inference that Grand Isle undertook a duty to issue Coleman
safety equipment applicable for building scaffolding. But it would be
unreasonable for a jury to conclude from this evidence that Grand Isle
undertook a broader duty to protect Coleman from all hazards on the
platform. In fact, the record directly contradicts such a broad proposition. In
its contract with Grand Isle, Brand expressly warranted that its workers could
perform the work âsafely.â Moreover, nothing in the record supports that
some unspecified piece of non-issued equipment would have or could have
prevented Colemanâs injury. Therefore, Grand Isleâs admission does not
change our analysis.48
48
See Zervas v. Faulkner, 861 F.2d 823, 836â37 (5th Cir. 1988) (equating an âoverly
attenuated chain of inferencesâ with âspeculation and conjectureâ).
17
Case: 20-40811 Document: 00516110190 Page: 18 Date Filed: 11/29/2021
No. 20-40811
B
Coleman finally argues that Defendants were independently negligent
because they created the hazard that injured him. We disagree. As we have
already noted, a principal is not liable for injuries sustained by its independent
contractor when the independent contractor âcreatedâ the hazard.49 A
principal does not create the hazard when it does not âcontrol the operation
of the particular activity during which the plaintiff was allegedly injured.â 50
Simply put, a reasonable jury could not conclude on this evidence that
Defendants controlled the hazard that Coleman alleges injured him: the
decision to start working in high winds. Coleman argues that Defendants
controlled the decision to start work since BP controlled the decision over
when to transport Brand employees to the platform. But deciding when to
transport is not the same thing as deciding when to start building scaffolding.
And on that front, the record not only reflects that Brand independently
decided that ânow [is] the right time to [do] the work,â but also that
everyone on the platform had the authority to stop working if conditions were
unsafe. While Coleman contends he feared for his job if he exercised his stop-
work authority, no evidence supports that Brand harbored similar fears if it
did.
V
As to these Defendants, the district court got it rightâa reasonable
jury could not conclude on this record that either Defendant is vicariously or
directly liable for Colemanâs back injury. Therefore, we AFFIRM the
district court.
49
E.g., Zephrin, 884 F.2d at 213.
50
Id.
18