Omnipoint Holdings, Inc. v. City of Cranston
Full Opinion (html_with_citations)
In this case a wireless carrier was denied a variance and special use permit by the Cranston Zoning Board of Review to build a wireless communications tower in Cranston, Rhode Island. The carrier had so applied in order to remedy a significant gap it found in coverage.
When the carrier sought federal court review of the denial, the city and zoning board countered that the zoning boardâs decision was not a âfinal actionâ because limited state court review was available. The district court rejected the argument. Omnipoint Holdings, Inc. v. City of Cranston, No. 06-531, 2007 WL 2050316, at *4-5 (D.R.I. July 12, 2007) (order denying motion to dismiss) (City of Cranston I). After a two-day bench trial, the court granted judgment for the plaintiff. Omnipoint Holdings, Inc. v. City of Cranston, No. 06-531, slip op. at 8, (D.R.I. Oct. 23, 2008) (City of Cranston II). It held that the townâs denial of the permits constituted an effective prohibition of service in violation of § 332(c) (7) (B) (i) (II) of the Telecommunications Act of 1996 (âTCAâ), Pub.L. No. 104-104, 110 Stat. 56 (codified as amended in scattered sections of 47 U.S.C.). Id. at 2, 8.
We now affirm. On an issue of first impression in the circuit courts, we hold that the zoning boardâs decision was a âfinal actionâ for purposes of § 332(c)(7)(B)(v) of the TCA. We also reject the defendantsâ claims that the court erred in finding that the zoning boardâs decision âha[d] the effect of prohibiting the provision of personal wireless services.â 47 U.S.C. § 332(c)(7)(B)(i)(II).
I.
We recite the facts in the trial record in the light most favorable to the verdict. Marcano Rivera v. Turabo Medical Center Pâship, 415 F.3d 162, 165 (1st Cir.2005).
T-Mobile USA, Inc. (âT-Mobileâ) has a Federal Communications Commission (âFCCâ) license to operate a digital personal communications service (âPCSâ) wireless network at 1900 megahertz in Rhode Island under which Omnipoint, T-Mobileâs wholly owned subsidiary, operates. Omnipoint provides wireless service to customers through a network of antennae mounted on towers or other structures, often called wireless facilities, that broadcast signals between towers and to customersâ wireless phones and devices. When Omnipoint realizes that an area within its network lacks sufficient coverage for customers to make and maintain calls reliably, it tries to remedy the coverage gap by building a new facility.
The key to coverage is having a strong-enough signal level for customers to maintain contact with the network so they can make and maintain calls. Signal level, the strength of the radio signal customersâ devices receive, is measured in negative decibels per milliwatt (âdBmâ). 1 The nature of Omnipointâs digital PCS network makes keeping signal levels strong more difficult than if it had provided analog-based cellular service. PCS towers broadcast lower signals at a much higher frequency, so those signals cover a smaller area, usually about 1.5 miles. Consequently, PCS providers must build a network of towers relatively near each other, creating an overlapping grid of signals from the towers resembling a honeycomb. For example, Omnipoint has at least sixteen towers within four miles of the proposed tower at issue in this case.
Because its customers value reliable network coverage, Omnipoint has established *42 a national goal of 95 percent reliability for the network, meaning that customers should be able to make and maintain 95 percent of their calls. To meet this goal, Omnipoint has established -84 dBm as its minimum signal strength for in-vehicle coverage nationwide. Federal law does not require any specific signal level; Omnipoint has set high standards to satisfy its customers.
Omnipoint first determined that signal levels around Phenix Avenue in Cranston fell below -84 dBm through a propagation study, a computer program that predicts signal levels. Phenix Avenue is heavily traveled because it is a main road connecting Cranston to the nearby towns of Warwick and Coventry. A consulting engineer for Omnipoint, Elijah Luutu, determined that Omnipoint likely needed a new facility in the area to service this traffic. Later he conducted a drive test, during which he drove a wireless device around the area and mapped the signals it was receiving, which confirmed this conclusion. Based on the propagation study, Luutu designed a âsearch ringâ for Omnipoint staff to find potential locations for the new facility around November 18, 2003. Factoring in topography and the height of the areaâs tree canopy, Luutu calculated that Omnipoint needed to build or find a ninety-foot pole for the new facility.
Omnipoint employees examined the search ring for suitable sites. They looked, in order of preference, for existing towers belonging to other wireless companies, existing structures to mount a facility on, and raw land to construct a facility on. They also considered the ease of building a new facility, the radio frequency needs of the area, and zoning issues when evaluating candidates. An employee searched the area and FCC databases and did not find suitable existing towers, so that option was excluded. He identified four potential sites: the Cranston Fire Department Museum, two different sites at the Cranston Country Club, and the Solid Rock Church. No other structures in the search ring were tall enough to meet Omnipointâs radio frequency requirements. Luutu rejected the museum site because it would provide largely redundant coverage with another tower without covering most of the gap.
With the exclusion of the museum site, Omnipoint came down to three options: an extant utility pole or raw land (to put up a pole) on the country clubâs property, or land on the property of the Solid Rock Church in Cranston. Omnipoint first 'negotiated with the country club. Omnipoint needed an easement to install power lines to the proposed facility on the country clubâs utility pole, so it offered the country club first its standard rate of $1,500 and then its enhanced lease rate of $2,000 per month. The club rejected both offers on the ground that installing power lines could damage its golf courseâs fairways. Omnipoint then offered the country club both the $1,500 and $2,000 lease rates to build a facility on the clubâs raw land. When the clubâs three owners could not agree whether to pay the lease proceeds to themselves or to the club, Omnipoint offered a one-time payment of $25,000 (in addition to the monthly rate) to whichever owner would agree to the other sideâs position. The owners refused to compromise, however, and Omnipoint abandoned negotiations with the country club. 2
Omnipoint then turned to the property of the Solid Rock Church and offered $1,500 per month to lease the raw land to *43 construct a ninety-foot tower disguised as a flagpole. The church accepted. It is this site which is the subject of this controversy. The pole was not in conformance with Cranstonâs zoning ordinances because, given its height, it was too close to the propertyâs southern border. Omnipoint and Solid Rock Church jointly applied for a variance and special use permit on September 21, 2005, almost two years after Omnipoint began searching for a site.
On November 9, 2005, the City of Cranston Planning Commission, which may offer nonbinding recommendations to the zoning board, held a public hearing and issued a written recommendation that the board deny Omnipointâs application because Omnipoint did not âdemonstrate!] that existing nearby facilities c[ould not] accommodate the service need.â The Cranston Zoning Board of Review then conducted two public hearings on April 12, 2006, and September 13, 2006. The board issued a written decision on November 7, 2006, denying Omnipointâs application without then giving a statement of the reasons for its decision.
II.
Omnipoint sued the city, the zoning board, and all five members of the zoning board (collectively âCranstonâ) in federal district court on December 6, 2006, under the TCA. It claimed that Cranston had violated the TCA because it had effectively prohibited the provision of personal wireless services by refusing to grant Omnipointâs application. 3 Omnipoint sought an injunction requiring the board to grant Omnipointâs request for a variance and special use permit and an injunction and order of mandamus ordering the city of Cranston to issue a building permit for constructing the tower.
Cranston moved to dismiss Omnipointâs complaint, arguing that the district court lacked what it referred to as subject matter jurisdiction. Because Rhode Island law permits parties to petition the state superior court for limited review of a zoning boardâs decision, Cranston contended, the zoning boardâs decision was not a âfinal actionâ creating federal jurisdiction under § 332(c)(7)(B)(v). The district court rejected the argument and held the board decision was a âfinal actionâ and that the TCA permitted Omnipoint to bypass Rhode Island state court review. City of Cranston I, 2007 WL 2050316, at *4-5.
The district court held a two-day bench trial on June 27 and July 9, 2008, and heard five witnesses. Gerald Marquis, a real estate manager for Omnipoint, testified that Omnipoint held an FCC license to operate at 1900 megahertz and explained that Omnipoint sets a 95 percent nationwide reliability standard to satisfy customers. Marquis also testified to Omnipointâs process for identifying and remedying gaps in coverage. Two Omnipoint employees described their efforts to find a location for the new facility around Phenix Avenue.
Elijah Luutu, who has designed wireless networks as a radio frequency engineer for twelve years, testified as an expert witness for Omnipoint. Luutu detailed how Omnipoint calculated -84 dBm as its minimum signal level in vehicles. It began with a receiver sensitivity â that is, the minimum decibel levels that mobile devices and base stations need for people to understand *44 someone on the other line â of -102 dBm based on industry standards. Omnipoint added attenuation from obstructions that could block a signal, such as bodies, trees, and buildings, which produced the -84 dBm figure. According to Luutu, the -84 dBm standard ensured Omnipoint met its goal of 95 percent reliability.
Luutu also explained how he created a search ring and evaluated candidates for a facility around Phenix Avenue based on Omnipointâs specifications. He acknowledged he could have studied building multiple, smaller sites to cover the gap, but Luutu only considered building a single tower because Omnipoint instructed him to. Although no proposed site would fully remedy the coverage gap around Phenix Avenue, Luutu, accepting that the country club was unavailable, concluded a tower on the property of the Solid Rock Church was Omnipointâs best alternative.
Cranston presented only one witness, David Maxson, whom it presented as a purported expert. Maxson had never built a wireless network and most of his training and experience was in radio broadcasting. He had, however, worked for a wireless company and had advised municipalities on regulating wireless facilities. Maxsonâs testimony went to two points: he contended there was no gap and, if there were, Omnipoint had alternative solutions. These conclusions were generally consistent with an earlier affidavit he had filed. But he admitted that when he assembled that affidavit, he had never visited the area around Solid Rock Church, had performed no tests there, and had made no computer studies to support his opinions in the affidavit.
Maxson attacked how Omnipoint established its standard for reliable network coverage. He contended that mobile devices receive reliable signals below -84 dBm, but Omnipoint used that overly conservative figure primarily because its calculations were based on an outdated figure for receiver sensitivity and because it double-counted signal loss from a userâs body. Maxson opined that Omnipoint could achieve reliable coverage using a lower signal standard. But he relied only on tests he had performed on Omnipoint networks in other areas. And Maxson never proposed an alternative figure for reliable coverage.
Maxson next said there were several alternatives to building a ninety-foot tower on church property, including placing antennae on other utility poles around Phenix Avenue or another carrierâs tower located in a West Warwick neighborhood Omnipoint employees had never heard of. He primarily opined that Omnipont should have considered building more than one facility to cover the Phenix Avenue gap. Maxson proposed three multisite solutions: building one smaller tower and a series of smaller facilities, called microcells, to supplement coverage; building a series of microcells; and building a distributed antenna system (âDASâ), in which fiberoptic cables connect a series of antennae mounted on utility poles.
Maxson gave vague details on the feasibility of these proposals, however. He did not reconcile his proposals with technology Omnipoint currently uses. On cross examination he acknowledged the DAS mode is not wireless â it requires cables' â and no DAS systems existed in the Phenix Avenue area. He also did not explain how the mierocell solutions would work with Omnipointâs current grid of towers or with the lower PCS signal. And Maxson conceded that he did not investigate whether other sites he suggested were available to Omnipoint or could even support the infrastructure he was envisioning. He identified only general locations to build facilities, such as ânear the golf course,â on âany of a *45 number of those transmission line poles,â and âon the other side of the ridge from Solid Rock Church.â And Maxson performed no testing to show whether these alternative designs actually would cover the gap around Phenix Avenue.
On October 23, 2008, the district court entered judgment for Omnipoint. City of Cranston II, No. 06-531, slip op. at 8. The court explained that Omnipoint had met its burden to show (1) that Cranstonâs zoning decision prevented Omnipoint from closing a âsignificant gapâ in coverage and (2) that further reasonable efforts to find an alternative solution would be fruitless. Id. at 2, 8. The court rejected Maxsonâs testimony: âTaking into account Maxonâs [sic] dearth of experience in designing wireless networks and his failure to conduct any testing before rendering his opinions,â it found that Maxsonâs conclusions were âcompletely unreliable and unpersuasive.â Id. at 7. The court then made two findings of fact:
1. There is a significant gap in Plaintiffs coverage area along Phenix Avenue in Cranston as mapped and tested by Luutu.
2. The only feasible site available to Plaintiff is the site at the Solid Rock Church where the construction of a 90 foot monopole will provide coverage in the gap area.
id Cranston timely appealed to this court, and we affirm.
III.
A. The Zoning Board Decision Was a âFinal Actionâ under the TCA
Cranston makes a novel argument that the zoning boardâs decision is not a âfinal actionâ by a âState or local governmentâ under § 332(c)(7)(B)(v) of the TCA. 4 We review the district courtâs decision de novo because it is an issue of law, Daggett v. Commân on Governmental Ethics and Election Practices, 172 F.3d 104, 109 (1st Cir.1999), and we affirm.
Section 332(c)(7) of the TCA, entitled âPreservation of local zoning authority,â allows state and local governments to apply their zoning regulations to the construction of wireless facilities, subject to five substantive and procedural limitations. 47 U.S.C. § 332(c)(7); see also Natâl Tower, LLC v. Plainville Zoning Bd. of Appeals, 297 F.3d 14, 19-20 & n. 3 (1st Cir.2002) (listing these limitations). It creates a federal cause of action: âAny person adversely affected by any final action or failure to act by a State or local government or any instrumentality thereof that is inconsistent withâ those five limitations may sue in state or federal court within *46 thirty days to enforce the TCAâs provisions. 47 U.S.C. § 332(c)(7)(B)(v).
Cranston implicitly concedes that zoning board decisions often would be final actions under the TCA. But it argues that a Rhode Island law permitting state court review of zoning board decisions creates an exception to that rule precisely because the statute limits the scope of court review and does not provide full court review of zoning board decisions. 5 Cranston argues that such limited review makes state court proceedings part of a âcomprehensive statutory schemeâ for state zoning decisions that is not final until after state court review finishes. Omnipoint rejoins that it did not need to sue in state court because the zoning boardâs decision was a final action by an instrumentality of a local government.
The TCA does not define âfinal action.â The parties do not dispute the Cranston Zoning Board of Review is a âState or local governmentâ or âany instrumentality thereof.â See Blackâs Law Dictionary 764 (9th ed.2009) (defining local government as â[t]he government of a particular locality, such as a cityâ); id. at 870 (defining âinstrumentalityâ as â[a] means or agency through which a function of another entity is accomplished, such as a governing bodyâ).
When interpreting terms within the TCA, we consider its plain text and âdesign, structure, and purpose.â Cablevision of Boston, Inc. v. Pub. Improvement Commân, 184 F.3d 88, 101 (1st Cir.1999) (quoting OâConnell v. Shalala, 79 F.3d 170, 176 (1st Cir.1996)) (internal quotation marks omitted). The Cranston Zoning Board of Reviewâs decision falls within the usual meaning of final action set forth in the language of 47 U.S.C. § 332(c)(7)(B)(v). The terms âfinalâ and âfinal actionâ have special meaning in the law, and we assume Congress knew the âcontent of background lawâ when legislating. In re Rivera Torres, 432 F.3d 20, 25 (1st Cir.2005). Generally a decision is final if it is âconcluded;â that is, if it does not ârequir[e] any further judicial action by the court that rendered the judgment to determine the matter litigatedâ and the decision can be appealed. Blackâs Law Dictionary 705 (9th ed.2009).
The well-settled rule in administrative law is that a âfinal agency actionâ is one that âmark[s] the consummation of the agencyâs decisionmaking process.â Whitman v. Am. Trucking Assâns, 531 U.S. 457, 478, 121 S.Ct. 903, 149 L.Ed.2d 1 (2001) (emphasis added) (quoting Bennett v. Spear, 520 U.S. 154, 177-78, 117 S.Ct. 1154, 137 L.Ed.2d 281 (1997)) (internal quotation marks omitted). It means a âfinal determinationâ in a case by an administrative agency; that is, whether the agency ârendered its last word on the matter.â Harrison v. PPG Indus., Inc., 446 U.S. 578, 586, 100 S.Ct. 1889, 64 L.Ed.2d 525 (1980) (interpreting what is a âfinal actionâ by the Environmental Protection Agency under the Clean Air Act); accord Whitman, 531 U.S. at 478, 121 S.Ct. 903 (same). Only after an agencyâs final action may courts review the agencyâs deci *47 sion. 5 U.S.C. § 704; Natâl Assân of Home Builders v. Defenders of Wildlife, 551 U.S. 644, 659, 127 S.Ct. 2518, 168 L.Ed.2d 467 (2007).
A âfinal action ... by a ... local government or any instrumentality thereofâ must be one that marks the consummation of the instrumentalityâs decision-making process. In this case there is no dispute that the zoning board is a discrete âinstrumentalityâ of Cranston, separate and distinct from the Rhode Island Superi- or Court. The parties agree Cranstonâs zoning board had concluded its decision-making process before that instrumentality and could take no further action. The zoning boardâs decision was final.
Sprint Spectrum L.P. v. City of Carmel, 361 F.3d 998 (7th Cir.2004), on which Cranston relies, undercuts Cranstonâs argument and supports our analysis. The court held a carrierâs claim was not ripe because the carrier sued in federal court when it still had further recourse before the local zoning board. Id. at 1004-05; accord Nextel Commcâns of Mid-Atl., Inc. v. City of Margate, 305 F.3d 188, 193-94 (3d Cir.2002). Indeed the Sprint Spectrum court observed that the carrier would not need to âexhaust[] all state judicial remedies before bringing suit in federal court.â Id. at 1001 n. 2.
Cranstonâs reading would frustrate the TCAâs overall statutory scheme and purpose. The Act stresses the need for speedily deploying telecommunications and seeks to get prompt resolution of disputes under the Act. Congress enacted the TCA âto promote competition and reduce regulation in order to secure lower prices and higher quality services for American telecommunications consumers and encourage the rapid deployment of new telecommunications technologies.â 110 Stat. at 56 (emphasis added). Under § 332(c)(7)(B)(v), parties may sue within thirty days of a final action, and courts must âhear and decide such action[s] on an expedited basis.â To hold Omnipoint nevertheless needed to sue in state court would undermine the TCAâs goals by imposing a new regulatory obstacle to providing consumers with wireless service.
To the extent § 332(c)(7)(B)(v), read in light of its language, context, and purpose, could be thought to be ambiguous, the legislative history confirms that a zoning boardâs decision is a final action and Omnipoint did not need to seek judicial review under state law of that board decision. The House Conference Report defined a final action as a âfinal administrative action at the State or local government level so that a party can commence action ... rather than waiting for the exhaustion of any independent state court remedy otherwise required.â Telecommunications Act of 1996, H.R.Rep. No. 104-458, at 209 (1996) (Conf.Rep.), as reprinted in 1996 U.S.C.C.A.N. 124, 223.
B. The District Court Did Not Err by Granting Judgment to Omnipoint after Trial
The district court found that Cranston had violated the TCAâs provision that local zoning authorities may not âprohibit or have the effect of prohibiting the provision of personal wireless services.â 47 U.S.C. § 332(c)(7)(B)(i)(II). In effective-prohibition cases we review whether the district court applied the proper legal standards de novo. Natâl Tower, 297 F.3d at 22. The district court correctly cited the legal standards in this circuit. But whether, under the circumstances, an effective prohibition has occurred is a factual issue; we review how the district court resolved it for clear error. Id.; accord Omnipoint Commcâns Enters., L.P. v. Zoning Hearing Bd. of Easttown Twp., *48 331 F.3d 386, 392 (3d Cir.2003) (on panel rehearing).
Beyond the statuteâs language, the TCA provides no guidance on what constitutes an effective prohibition, so courts, including this one, have added judicial gloss. E.g., T-Mobile USA v. City of Anacortes, 572 F.3d 987, 995-98 (9th Cir.2009); VoiceStream Minneapolis, Inc. v. St. Croix County, 342 F.3d 818, 833, 834-35 (7th Cir.2003); Second Generation Props., LP v. Town of Pelham, 313 F.3d 620, 631-35 (1st Cir.2002); Sprint Spectrum L.P. v. Willoth, 176 F.3d 630, 643 (2d Cir.1999); APT Pittsburgh Ltd. Pâship v. Penn Twp. Butler County, 196 F.3d 469, 480 (3d Cir.1999); Town of Amherst v. Omnipoint Commâcns Enters., Inc., 173 F.3d 9, 14-15 (1st Cir.1999); see also Willoth, 176 F.3d at 641 (noting, when interpreting this provision, that it âwould be [a] gross understatement to say that the Telecommunications Act of 1996 is not a model of clarity.â (quoting AT & T Corp. v. Iowa Utils. Bd., 525 U.S. 366, 397, 119 S.Ct. 721, 142 L.Ed.2d 835 (1999)) (alteration in original)).
The carrier has the burden to show an effective prohibition has occurred. City of Anacortes, 572 F.3d at 995; US-COC of Greater Iowa, Inc. v. Zoning Bd. of Adjustment, 465 F.3d 817, 825 (8th Cir.2006); St. Croix County, 342 F.3d at 833, 835; USCOC of Va. RSA # 3 v. Montgomery County Bd. of Supervisors, 343 F.3d 262, 268 (4th Cir.2003); Second Generation Props., 313 F.3d at 629; Easttown Twp., 331 F.3d at 397. When a carrier claims an individual denial is an effective prohibition, virtually all circuits require courts to (1) find a âsignificant gapâ in coverage exists in an area and (2) consider whether alternatives to the carrierâs proposed solution to that gap mean that there is no effective prohibition. 6 MetroPCS v. City and County of San Francisco, 400 F.3d 715, 731 (9th Cir.2005); see, e.g., Second Generation Props., 313 F.3d at 631, 635. Circuits disagree, however, in the language they use to measure when a significant gap exists and about the inquiry into alternative solutions.
Courts do agree that both of these determinations are fact-bound. Second Generation Props., 313 F.3d at 631 (âThe question whether an individual denial is an effective prohibition is largely fact-driven.â); accord 360 Degrees Commcâns, 211 F.3d at 87 (describing these cases as requiring âessentially a fact-bound inquiryâ); see also Penn Twp., 196 F.3d at 480 (explaining courts may consider, âe.g., [if] the provider has considered less sensitive sites, alternative system designs, alternative tower designs, placement of antennae on existing structures, etc.â); MetroPCS, 400 F.3d at 733 (calling the significant-gap test an âextremely fact-specificâ inquiry that âdeifies] any bright-line legal ruleâ).
Courts ultimately decide these cases based, not on bright-line legal standards, but on the facts in the record. See, e.g., City of Anacortes, 572 F.3d at 998-99; Second Generation Props., 313 F.3d at 635; USCOC of Va. RSA # 3, 343 F.3d at 268-69; St. Croix County, 342 F.3d at 836; Willoth, 176 F.3d at 643-44; Town of Amherst, 173 F.3d at 14.
1. Existence of a Significant Gap in Coverage
Through the significant-gap analysis courts âdetermine whether a cov *49 erage problem exists at all.â Second Generation Props., 313 F.3d at 631. In this circuit we consider whether a significant gap in coverage exists within the individual carrierâs network. Metheny v. Becker, 352 F.3d 458, 461 & n. 2 (1st Cir.2003); Second Generation Props., 313 F.3d at 632-35. We have rejected the Third Circuitâs rule that considers not the individual carrierâs network but whether any carrier provides service to an area. Cf. Nextel W. Corp. v. Unity Twp., 282 F.3d 257, 265 (3d Cir.2002). In our view, the Third Circuit rule prevents customers in an area from having a choice of reliable carriers and thus undermines the TCAâs goal to improve wireless service for customers through industry competition. Second Generation Props., 313 F.3d at 631, 633. The Ninth Circuit has adopted our approach. MetroPCS, 400 F.3d at 731-33.
When relevant, courts assessing whether a coverage gap is significant should consider, inter alia, the physical size of the gap, the area in which there is a gap, the number of users the gap affects, and whether all of the carrierâs users in that area are similarly affected by the gaps. See, e.g., Second Generation Props., 313 F.3d at 631; see also MetroPCS, 400 F.3d at 733 & n. 10; 360 Degrees Commcâns, 211 F.3d at 87; Cellular Tel. Co. v. Zoning Bd. of Adjustment of the Borough of Ho-Ho-Kus, 197 F.3d 64, 70 n. 2 (3d Cir.1999); Willoth, 176 F.3d at 643-44. Also relevant could be data about percentages of unsuccessful calls or inadequate service during calls in the gap area. Here, Omnipoint had shown its need for coverage around Phenix Avenue is significant. It established Phenix Avenue was a heavily traveled and important route that connects Cranston to its neighbors.
Cranston argues that the district court measured the quality of coverage around Phenix Avenue with an improper â and unfair â yardstick because the court accepted Omnipointâs -84 dBm standard for reliable service, which Omnipoint had set to satisfy customers. Cranston asks us to rule that a trial judge errs in considering the providerâs defined level of acceptable service on the question of the existence of a significant gap. We reject such bright-line rules. See MetroPCS, 400 F.3d at 733. In this case, the district courtâs finding that there was a significant gap in coverage was quite reasonable, and not clear error, on the evidence.
The court did not err by accepting the testimony of Omnipointâs expert, Elijah Luutu, about a coverage gap around Phenix Avenue in Cranston, which we described earlier. At trial and on appeal Cranston has argued that Omnipoint did not meet its burden because Luutuâs testimony was based on the premise that signal levels below -84 dBm constitute a gap in coverage. But the record contains no evidence that undercuts that premise, and the premise was reasonable on its face.
Contrary to Cranstonâs argument, the district court did not adopt -84 dBm as a legal standard for whether a coverage gap exists, and neither do we. The only evidence Cranston presented to contest Luutuâs testimony were Maxsonâs opinions that Omnipointâs methodology for calculating and testing coverage gaps was flawed and its standard for coverage was wrong. But the district court noted that, unlike Luutu, Maxson lacked experience designing wireless systems and his opinions were ânot based on any actual measurements or tests he conducted at the site.â City of Cranston II, No. 06-531, slip op. at 7. It thus found Maxsonâs âconclusions completely unreliable and unpersuasive.â Id.
As the factfinder, it was the district courtâs responsibility to determine how much weight to give each expertâs testimony. Bruce v. Weekly World News, Inc., *50 310 F.3d 25, 30 (1st Cir.2002) (â[T]he district court, qua factfinder, was entitled to make the crucial credibility determination as between the competing expert witnesses.â); cf. Seahorse Marine Supplies, Inc. v. P.R. Sun Oil Co., 295 F.3d 68, 81 (1st Cir.2002) (âThe [expertâs] ultimate credibility determination and the testimonyâs accorded weight are in the juryâs province.â). The district court chose to discount Maxsonâs testimony based on the quality of his experience and supporting evidence, and we will not disturb its assessment. 7 Cf. Ferrara & DiMercurio v. St. Paul Mercury Ins. Co., 240 F.3d 1, 9 (1st Cir.2001) (âWhen the factual underpinning of an expert opinion is weak, it is a matter affecting the weight and credibility of the testimony â a question to be resolved by the jury.â) (quoting Newell P.R., Ltd,, v. Rubbermaid Inc., 20 F.3d 15, 21 (1st Cir.1994) (internal quotation marks omitted)).
2. Alternative Solutions
Once a court has found a coverage gap exists, it must determine whether local authorities have prevented a carrier from closing that gap so as to amount to an effective prohibition. See Second Generation Props., 313 F.3d at 635 (noting even if a gap is found to exist carriers âmust still show that there are no alternative sites which would solve the problemâ). Two articulations have emerged in the circuits for the second prong of effective-prohibition claims. This court and the Seventh Circuit have used the language of the âonly feasible plan.â St. Croix, 342 F.3d at 835; Second Generation Props., 313 F.3d at 630; Town of Amherst, 173 F.3d at 14. The Second, Third, and Ninth Circuits have articulated the question as whether the proposed solution is the least-intrusive means. City of Anacortes, 572 F.3d at 995; Nextel W. Corp., 282 F.3d at 266; Willoth, 176 F.3d at 643. The Fourth Circuit has held courts should simply apply the language of § 332(c)(7)(B)(i)(II) to the facts of a case. 360 Degrees Commcâns, 211 F.3d at 87. Nevertheless, in 360 Degrees Communications, the court quoted our standard from Town of Amherst to reject one carrierâs claim. Id. at 88.
It is unclear how much these different articulations of the tests truly differ. This courtâs opinion in Town of Amherst first used the language of âonly feasible plan.â In that case we held that a carrier could claim a single zoning decision effectively prohibited it from providing wireless service. Town of Amherst, 173 F.3d at 14. But the carrier had the âheavyâ burden âto show from the language and circumstances not just that this application has been rejected but that further reasonable efforts [to find another solution] are so likely to be fruitless that it is a waste of time even to try.â Id. To prevail, the carrier could not insist on one, ideal way to provide service; the TCA required it to consider alternatives more palatable to local zoning authorities. Id. at 14-15. âWere [its] existing proposal the only feasible plan,â we noted, âthen prohibiting its plan might amount to prohibiting personal wireless service.â 8 Id.
*51 The underlying question is whether, under the facts of a case, a zoning decision effectively prohibited providing wireless service. See 47 U.S.C. § 332(c)(7)(B)(i)(II); Second Generation Props., 313 F.3d at 630 (â[T]here can be no general rule classifying whether there is an effective prohibition. It is a case-by-case determination.â); see also 360 Degrees Commcâns, 211 F.3d at 87 (refusing to adopt one analytic approach for such claims because doing so would âunduly limit[ ] what is essentially a fact-bound inquiryâ). When evaluating such claims âwe are in the realm of trade-offsâ between the carrierâs desire to efficiently provide quality service to customers and local governmentsâ primary authority to regulate land use. Town of Amherst, 173 F.3d at 15. A carrier âmay think ... its solution is best,â but, âsubject to an outer limit, such choices are just what Congress reserved to the townâ in § 332(c)(7). Id.
The effective prohibition clause does not stand alone; it is also part of the TCAâs larger goal of encouraging competition to provide consumers with cheaper, higher-quality wireless technology. See id. at 13. As cell phone use increases, carriers need to build more facilities, especially in populated areas, to continue providing reliable coverage, and local regulations can present serious obstacles. 9 See Sw. Bell Mobile Sys., Inc. v. Todd, 244 F.3d 51, 57 (1st Cir.2001) (â[A]s Congress found, âsiting and zoning decisions by non-federal units of government [ ] have created an inconsistent and, at times, conflicting patchwork of requirements which will inhibit the deployment of [wireless technology] ....ââ (quoting Omnipoint Corp. v. Zoning Hearing Bd. of Pine Grove Twp., 181 F.3d 403, 407 (3d Cir.1999) (second alteration in original))); J. Berger, Efficient Wireless Tower Siting: An Alternative to Section 332(c)(7) of the Telecommunications Act of 1996, 23 Temp. EnvtI. L. & Tech. J. 83, 88 (2004). The themes in the TCA of promoting competition in the wireless communications market and of relatively speedily effectuating the purpose of the Act, including the elimination of significant gaps, underlie the determination of feasibility and impose their own constraints. Just as carriers must present evidence of their efforts to locate alternative sites, once they have *52 done so there are limits on town zoning boardsâ ability to insist that carriers keep searching regardless of prior efforts to find locations or costs and resources spent.
Any feasibility analysis balances these competing interests. Natâl Tower, 297 F.3d at 20. A carrier cannot win an effective-prohibition claim merely because local authorities have rejected the carrierâs preferred solution. Second Generation Props., 313 F.3d at 635; Town of Amherst, 173 F.3d at 14-15; accord St. Croix County, 342 F.3d at 834-35. On the other hand, if local authorities reject a proposal that is âthe only feasible plan,â that denial could âamount to prohibiting personal wireless service.â Town of Amherst, 173 F.3d at 14. The burden is on the carrier to prove it âinvestigated thoroughly the possibility of other viable alternativesâ before concluding no other feasible plan was available. St. Croix County, 342 F.3d at 834-35.
When we have held the carrier has not met its burden, the evidence has been essentially undisputed that the carrier had other alternatives. In Town of Amherst, the carrier âdid not present serious alternatives to the townâ other than the most efficient solution, a network of four 190-foot towers, one located in a historic district. 173 F.3d at 11, 15. The town, although willing to allow wireless facilities, opposed the towersâ height and some locations. Id. at 14. We held the carrier did not show it was entitled to summary judgment because it âpractically admitted that somewhat lower towers were technically feasibleâ and it was unclear âthat locating a tower within the historic district was technically essential.â Id. at 15. Similarly, in Second Generation Properties, the carrier presented no explanation why its proposal was the only feasible site. 313 F.3d at 635. Indeed, the carrierâs âown experts acknowledged that its land was not the only location where a tower could provide coverage in the alleged gap.â Id. We noted the TCA gives local authorities an opportunity to consider any feasible alternatives before courts launch âthe heavy artillery of federal preemption.â Id. The Seventh Circuit, in St. Croix, also found a carrier had not met its burden because it presented no evidence it investigated alternative solutions other than conclusory statements. 342 F.3d at 835-36.
Whether the carrier proves an effective prohibition has occurred is a factual question for the trial court to resolve. See Second Generation Props., 313 F.3d at 631 (explaining effective-prohibition claims are âlargely fact-drivenâ). As with most such questions, the district court may consider a number of facts relevant to the conclusion it must reach. What facts are relevant may vary with the case. It is clear that the technical feasibility of the proposed solution or alternative solutions is important. See Town of Amherst, 173 F.3d at 15. Town of Amherst does not say that technical feasibility is the only criterion, nor would we adopt such a rule. The fact that a carrierâs proposed solution to the gap is technologically optimal does not, under Town of Amherst, end the inquiry. Nor does the inquiry end with the solution preferred by town officials other than the zoning board.
Town of Amherst discussed, inter alia, the âoverall costâ to the carrier, whether the solution was technically efficient, whether other technically adequate solutions were in evidence, whether the town could prefer other solutions on aesthetic grounds, and whether local authorities were willing to cooperate with carriers. See id. at 14-17; see also Second Generation Props., 313 F.3d at 635 (âNothing in the Townâs actions thus far shows an unwillingness to acknowledge a problem or permit the crafting of a solution.â). Ultimately the question is a practical inquiry *53 into feasible, available alternatives. See, e.g., City of Anacortes, 572 F.3d at 997-98 (considering the availability of proposed alternatives).
In Town of Amherst the carrierâs rigid insistence on its optimal plan proved fatal. By contrast, in this case, Omnipoint presented evidence its final plan, which was plainly not its optimal plan, was the only feasible one. In light of evidence of Omnipointâs efforts to âinvestigate[ ] thoroughly the possibility of other viable alternatives,â St. Croix County, 342 F.3d at 834-35, the district court did not clearly err in finding that constructing a new tower at the Solid Rock Church site was the only feasible way to close the Phenix Avenue coverage gap.
The evidence described earlier showed that Omnipoint had in fact systematically searched for solutions to the gap problem using technologically reliable criteria and methodologies. Omnipoint considered different types of solutions: adding to existing wireless towers; adding to existing structures of the needed height, including utility poles; and new construction of facilities on unoccupied land. Further, Omnipoint showed it had made financial offers according to its usual rates, increased its rates, and then offered an extraordinary bonus in an effort to reach a contract with the country club but was unsuccessful. After Luutu designed the search ring, it took Omnipoint two years to work through the various options, reach an agreement with the church, and apply for a variance. There was no meaningful contrary evidence.
The trial court could permissibly conclude that Cranstonâs proposed alternatives rebutting this evidence were not feasible. Cranston suggests that Omnipoint was required to go back to the country club a fourth time to try to make a deal by, presumably, sweetening the pot further than it had before when it increased its usual rate and added a bonus payment. That is pure speculation. Cranston offered no evidence that the divided owners of the country club would have agreed, particularly as they had previously rejected any digging up of the fairway, which most of the proposals entailed. Nor did Cranston offer any evidence that Omnipoint had been commercially unreasonable. Omnipoint does not argue, and this case does not turn on, a claim by a carrier that economic infeasibility alone makes an alternative site unavailable.
The court, having found Maxsonâs testimony neither supported by fact nor by experience, was warranted in rejecting his view that Omnipoint should have adopted an alternative technology that the company did not use or, in the case of the fire department museum, that provided largely repetitive coverage with another tower to solve the gap. On this evidence, the district court did not err by finding the Solid Rock Church site was Omnipointâs only feasible option.
Affirmed.
. Because it is measured in negative figures, the larger the dBm number, the weaker the signal. Thus a signal strength of -100 dbm is weaker than a signal of -80 dbm.
. The record suggests Omnipoint negotiated with the country club for about five months in total.
. Omnipoint also claimed the board failed to support its decision with substantial evidence because the board gave no reasons for denying Omnipointâs application. See 47 U.S.C. § 332(c)(7)(B)(iii). During litigation Cranston provided Omnipoint with a comprehensive explanation for the denial that the board kept on file. In response, Omnipoint has dropped its substantial evidence claim.
. Cranston frames this as a question of whether the federal court had âsubject matter jurisdiction,'' which is a questionable articulation. See, e.g., Arbaugh v. Y & H Corp., 546 U.S. 500, 510, 126 S.Ct. 1235, 163 L.Ed.2d 1097 (2006) ("This Court, no less than other courts, has sometimes been profligate in its use of the term [jurisdiction].â); Eberhart v. United States, 546 U.S. 12, 15-16, 126 S.Ct. 403, 163 L.Ed.2d 14 (2005) (per curiam); Scarborough v. Principi, 541 U.S. 401, 413-14, 124 S.Ct. 1856, 158 L.Ed.2d 674 (2004); Kontrick v. Ryan, 540 U.S. 443, 454-55, 124 S.Ct. 906, 157 L.Ed.2d 867 (2004)("Clarity would be facilitated if courts and litigants used the label "jurisdictionalâ not for claim-processing rules, but only for prescriptions delineating the classes of cases (subject-matter jurisdiction) and the persons (personal jurisdiction) falling within a courtâs adjudicatory authority.â); Steel Co. v. Citizens for a Better Envât, 523 U.S. 83, 90-91, 118 S.Ct. 1003, 140 L.Ed.2d 210 (1998).
The relevant section of the TCA, 47 U.S.C. § 332(c)(7)(B)(v), does not clearly state that the final action requirement is jurisdictional. Under Arbaugh, this is a highly relevant consideration. 546 U.S. at 514-16, 126 S.Ct. 1235; accord Chao v. Hotel Oasis, Inc., 493 F.3d 26, 33 (1st Cir.2007). Given our holding, however, we need not decide whether the issue is one of jurisdiction.
. Rhode Island has a separate statute governing state court review of zoning decisions. It provides, "An aggrieved party may appeal a decision of the zoning board of review to the superior court ... within twenty (20) days after the decision has been recorded and posted.â R.I. Gen. Laws § 45-24-69(a). Under Rhode Island law, a state court may reverse the zoning board only on six limited grounds and cannot "substitute its judgment for that of the zoning board of review as to the weight of the evidence on questions of fact.â Id. § 45~24-69(d). Notably, this statute does not even mandate state court review. See id. § 45-24-69(a) (stating that parties âmayâ seek state court review of zoning board decisions).
. The Fourth Circuit has rejected any standard beyond the language in the statute. 360 Degrees Commons Co. of Charlottesville v. Bd. of Supervisors, 211 F.3d 79, 87 (2000). But it has applied a version of this test in at least one case. See id. at 87-88 (assuming a "significant gap[]â existed and holding that the carrier failed to show no alternatives were feasible).
. Contrary to Cranstonâs argument, the district court did not shift the burden of proof to it. The court merely assessed Maxsonâs persuasiveness as an expert based on the quality of support he provided for his opinions.
. Courts since have built on this decision. Citing Town of Amherst, the Second Circuit held that local authorities cannot reject a carrierâs plan that offers âthe least intrusive means for closing a significant gap.â "Willoth, 176 F.3d at 643. The court listed "numerous ways [carriers could] limit the aesthetic impact of a cell siteâ without sacrificing coverage. Id. The Third and Ninth Circuits followed "Willoth, holding carriers must prove *51 their solution is "the least intrusive on the values that the denial sought to serve.â Penn Twp., 196 F.3d at 480; MetroPCS, 400 F.3d at 734-35 (internal quotation marks omitted). The provider must prove it made âa good faith effortâ to "identify and evaluate less intrusive alternatives.â Penn Twp., 196 F.3d at 480. The Seventh Circuit rejected the least-intrusive-means test, opining it undermined local autonomy and strayed from the statutory text, and it instead adopted our feasible-alternative analysis. St. Croix County, 342 F.3d at 834-35 & n. 8 (citing 360 Degrees Commcâns, 211 F.3d at 87). The Seventh Circuit then applied the Town of Amherst test to hold there was no effective prohibition when a carrier produced no evidence it considered alternatives. Id. at 834-36. The Ninth Circuit, however, adopted the least-intrusive-means test because it thought the "only feasible planâ test was "too exacting.â MetroPCS, 400 F.3d at 734.
. Local authorities face what commentators call the "not in my backyardâ ("NIMBYâ) problem: property owners resist new facilities in populated areas because they find wireless facilities unsightly and worry facilities lower property values; yet as cell phone consumers these same people want quality service where they are most. E.g., D. Hughes, When NIMBYs Attack: The Heights to Which Communities Will Climb to Prevent the Siting of Wireless Towers, 23 J. Corp. L. 469, 482-83 (1998); S. Eagle, Wireless Telecommunications, Infrastructure Security, and the NIMBY Problem, 54 Cath. U.L.Rev. 445, 455-57 (2005). Residents often pressure town authorities to tighten and strictly enforce zoning restrictions on wireless facilities, creating numerous pockets of resistance for wireless carriers. Hughes, supra, at 470-71, 482-84.