Jeffrey D. Ganz and Riemer & Braun-stein LLP, on brief, for appellant., Robert J. Galvin, Christopher J. Marino, and Davis, Malm & DâAgostine, P.C., on brief, for the Abstract Club and the Real Estate Bar Association for Massachusetts, Inc., amici curiae., Sidney Bourne, Claudio M. Delise, and Ralph S. Tyler, on brief, pro se.
Full Opinion (html_with_citations)
In this case we interpret Massachusetts General Laws chapter 183A, section 5, which governs condominium ownersâ rights and powers vis-a-vis the phased development of condominium projects. We reverse the district court, In re Northwood Props., LLC, 356 B.R. 81 (D.Mass.2006), because its statutory interpretation was in error.
Northwood Properties, LLC, (âNorth-woodâ) is the developer of Northwood at Sudbury, a partially completed condominium project. Northwood is currently attempting to reorganize under Chapter 11 of the Bankruptcy Code. At every turn, its reorganization has been opposed by three individuals: Sidney Bourne, Claudio Delise, and Ralph Tyler. Bourne and Delise are residents of Northwood at Sudbury; all three are creditors of Northwood. Bourne and Delise vigorously oppose Northwoodâs attempt to extend its rights to finish developing Northwood at Sud-bury, rights which were set by the original master deed to expire in 2005. Without the extension of these rights, Northwoodâs efforts at reorganization will likely fail.
This discrete dispute turns on a provision in the Massachusetts condominium statute which provides that a condominium owner constructively consents to the addition of further units âif the master deed at the time of the recording of the unit deed ... made possible an accurate determination of the alteration of each unitâs undivided interest that would result therefrom.â Mass. Gen. Laws eh. 183A, § 5(b)(1). This provision has yet to be interpreted by the Supreme Judicial Court or the Massachusetts Appeals Court.
Further, Bourne, Delise, and Tyler all oppose Northwoodâs reorganization plan, offering their own in its place. Under their plan, they would take control of the reorganized development company, Bourne and Delise would be paid for their consent to further development, and Tyler would receive a large settlement for his long-running litigation against Northwood at Sudbury. The three appellees also argue that Northwoodâs final plan denied them a vote in its confirmation by leaving their rights as creditors unimpaired.
The bankruptcy court held that North-wood had successfully extended its development rights; rejected Bourne, Delise, and Tylerâs voting complaint; and confirmed Northwoodâs plan. The district court, sitting as an intermediate appellate court, interpreted section 5 of chapter 183A to hold that Northwood had not successfully extended its development rights. In re Northwood Props., 356 B.R. at 89. Because it remanded the issue of confirmation of Northwoodâs plan for reconsideration in light of this ruling, it did not consider the voting argument. Id.
We hold that we have jurisdiction over both disputes, hold that the district courtâs interpretation of the condominium statute was in error, reverse the district courtâs ruling on the validity of Northwoodâs development rights, find the district courtâs remand moot on the grounds stated, and affirm the bankruptcy courtâs confirmation of the reorganization plan.
I.
Northwood at Sudbury was originally envisioned as a six-building complex *19 that would offer residential care to the residents of its sixty-six condominium units. The master deed for the condominium was recorded on December 9, 1998, following the completion of the first phase of development, which consisted of one twelve-unit building. As the Massachusetts Appeals Court has explained, â[i]n a phased condominium development, groups or stages of units are completed over a period of several years and become part of the condominium by successive amendments to the master deed. âPhasingâ is not a statutory term, but is a usage that has grown out of the general enabling provisionsâ of the condominium statute. Podell v. Lahn, 38 Mass.App.Ct. 688, 651 N.E.2d 859, 860 n. 3 (1995). The deed allowed for four additional phases of construction to complete the project, but it set those development rights to expire on December 9, 2005.
The master deed was amended on May 20, 2002, to account for the completion of the second phase, which consisted of another twelve-unit building and a clubhouse. Bourne and Delise each purchased a unit built in this second phase. No further phases have yet been undertaken.
In advance of the expiration of its development rights, Northwood negotiated an extension of those rights with the condominium unit ownersâ association (âAssociationâ) in exchange for $700,000. Even though Northwood had filed for bankruptcy in the interim, twenty unit owners approved the extension, two abstained, and two â Bourne and Delise â voted against it. This eighty-three percent approval was more than sufficient under the master deed to extend the development rights until December 9, 2010.
When Northwood filed for bankruptcy in September 2005, there were five unsecured claims held by non-insider creditors: (1) $50.00 owed to NStar; (2) $50.00 owed to KeySpan; (3) $305.92 owed to GZA GeoEnvironmental; (4) $622,270 allegedly owed to Ralph Tyler; and (5) approximately $1.5 million owed to the Association. Northwood disputed the debt claimed by Tyler; the legitimacy of that claim is still pending before the bankruptcy court. 1
Bourne and Delise filed a Phasing Rights Motion in Northwoodâs bankruptcy proceedings in February 2006, seeking a determination that the extension of development rights was not valid without their consent. In March 2006, Bourne, Delise, and Tyler each purchased, respectively, the NStar debt, the GZA GeoEnvironmen-tal debt, and the KeySpan debt. By becoming creditors of Northwood, they improved their ability to oppose Northwoodâs Chapter 11 reorganization plan and gained the opportunity to submit their own.
Northwood filed its first proposed reorganization plan in May 2006. Under this plan, the five unsecured, non-insider claims were grouped together and would initially receive approximately five percent of the allowed amount of those claims. Proceeds from either future condominium sales or the sale of Northwoodâs development rights would then be distributed pro rata among the claims. As relevant here, a claim is impaired under a reorganization plan if the plan does not âleave[ ] unaltered the legal, equitable, and contractual rights to which such claim ... entitles the holder of such claim.â 11 U.S.C. § 1124(1). Because their interests were impaired under this plan, Bourne, Delise, and Tyler had a controlling vote over the planâs confirmation, which they opposed.
Northwood then submitted a revised version of its plan in July 2006. This *20 version grouped the NStar, KeySpan, and GZA GeoEnvironmental debts into a convenience class; these claims, including interest, would be paid in full immediately. Tylerâs original claim was placed in its own class and would be paid in full with interest once a final, non-appealable order allowing the claim was entered. This left the Associationâs claim in its own class, to be paid over time by Northwoodâs future earnings as under the first proposed plan. Because the interests of Bourne, Delise, and Tyler were no longer impaired under this plan, their votes were not required for the planâs confirmation. The Association, whose interests remained impaired, voted to accept the plan.
In July 2006, the bankruptcy court denied Bourne and Deliseâs Phasing Rights Motion, rejecting their argument that, despite the vote of the Association, no development rights could be extended without their specific consent. The court then conducted a confirmation hearing on North-woodâs revised plan and approved it. Bourne, Delise, and Tyler objected to the reclassification of claims under the revised plan, arguing that it impermissibly nullified their votes. The court rejected this argument, however, because the revised plan fulfilled all their interests as creditors. Bourne, Delise, and Tyler moved for reconsideration, primarily of the phasing rights issue; the court denied the motion. They then appealed to the district court, which took a different view of the matter than did the bankruptcy court.
Before the district court, Bourne, Delise, and Tyler argued that their Phasing Rights Motion should have been granted and that the revised plan should not have been confirmed. On the confirmation question, they argued in part that the plan was infeasible if Northwood did not have legitimate development rights and in part that Northwoodâs reclassification of their claims was an impermissible âgerrymanderâ meant to deprive them of a say in Northwoodâs reorganization.
The district court held a hearing on November 16, 2006, which focused on the appelleesâ Phasing Rights Motion. The court issued its order three weeks later, essentially granting the Phasing Rights Motion and holding that Northwoodâs development rights had not been legitimately extended. In re Northwood Props., 356 B.R. at 89. It vacated the confirmation of the plan on the grounds that the plan was not feasible without the development rights. Id. In so concluding, the court interpreted the condominium statute as demanding a great degree of precision. That is the first merits issue before us.
Because the court found the revised plan not feasible and thus vacated the planâs confirmation on that ground, the court did not address the reclassification argument. Id. That is the second issue before us.
The district court suggested that North-wood could successfully extend its development rights with less than unanimous consent of the unit owners if the Association first agreed that the percentage interests of the opposed unit owners (Bourne and Delise) in the condominiumâs common areas would remain unchanged. This, of course, would necessitate a greater decrease in the percentage interests of the remaining owners. Id. at 88.
Upon Northwoodâs motion, the district court modified its order, remanding the plan confirmation to the bankruptcy court so that Northwood could pursue this suggestion for curing the problem found by the district court. Northwood has appealed to this court both the district courtâs ruling on the Phasing Rights Motion and its remand of the plan confirmation to the bankruptcy court.
*21 II.
A. Standard of Review
In an appeal from district court review of a bankruptcy court order, this court independently examines the bankruptcy courtâs decision, reviewing findings of fact for clear error and conclusions of law de novo. Official, Unsecured Creditorsâ Comm. v. Stern (In re SPM Mfg. Corp.), 984 F.2d 1305, 1310-11 (1st Cir.1993). The district court decision is given no deference. Id. at 1311.
B. Phasing Rights Motion
1. Appellate Jurisdiction
Appeals in bankruptcy proceedings are governed primarily by 28 U.S.C. § 158, although in Connecticut National Bank v. Germain, 503 U.S. 249, 112 S.Ct. 1146, 117 L.Ed.2d 391 (1992), the Supreme Court clarified that jurisdiction under § 158 was in addition to, not in lieu of, the normal appellate jurisdiction provided by 28 U.S.C. §§ 1291-1292. Id. at 253, 112 S.Ct. 1146. Sitting as an intermediate appellate court, the district court exercised jurisdiction under § 158(a)(1) in reviewing the âfinal judgments, orders, and decreesâ of the bankruptcy court. Both of the bankruptcy courtâs decisions â denying the Phasing Rights Motion and confirming the revised plan â were final as required by § 158(a)(1).
The circuit courts have further appellate jurisdiction over âall final decisions, judgments, orders, and decreesâ issued by the district court sitting in its appellate capacity in bankruptcy proceedings. 28 U.S.C. § 158(d)(1); see also 28 U.S.C. § 1291. This limitation on our appellate jurisdiction recognizes that âthe âfinalityâ of a bankruptcy courtâs decision may be affected by the district courtâs disposition of the appeal.â Bowers v. Conn. Natâl Bank, 847 F.2d 1019, 1022 (2d Cir.1988). Requiring the bankruptcy courtâs decision to be truly final, which requires the district courtâs appellate review to be final, avoids piecemeal appellate review before this court, thereby conserving judicial resources. In re St. Charles Pres. Investors, Ltd., 916 F.2d 727, 729 (D.C.Cir.1990). However, âbecause bankruptcy cases typically involve numerous controversies bearing only a slight relationship to each other, âfinalityâ is given a flexible interpretation in bankruptcy.â In re G.S.F. Corp., 938 F.2d 1467, 1473 (1st Cir.1991), abrogated on different grounds by Conn. Natâl Bank, 503 U.S. 249, 112 S.Ct. 1146, 117 L.Ed.2d 391.
The district courtâs ruling on the Phasing Rights Motion is a final determination under § 158(d). âTo be final, a bankruptcy order need not resolve all of the issues in the proceeding, but it must finally dispose of all the issues pertaining to a discrete dispute within the larger proceeding.â Perry v. First Citizens Fed. Credit Union (In re Perry), 391 F.3d 282, 285 (1st Cir.2004); see also In re G.S.F. Corp., 938 F.2d at 1473; In re Saco Local Dev. Corp., 711 F.2d 441, 444 (1st Cir.1983). The Phasing Rights Motion is essentially a declaratory action, seeking a judicial determination as to whether Northwoodâs development rights have been legitimately extended. Although the motion does not finally resolve all disputes between Northwood and Bourne and Delise, it does resolve a discrete dispute that was instigated before Bourne and Delise became creditors of Northwood. That is, it definitively resolves Bourne and Deliseâs rights as condominium owners, even if not their rights as creditors. 2 We have jurisdiction over this question under § 158(d).
*22 2. The Condominium Statute
Condominiums are governed in Massachusetts by chapter 183A of the Massachusetts General Laws. Chapter 183A âis essentially an enabling statute, setting out a framework for the development of condominiums in the Commonwealth, while providing developers and unit owners with planning flexibility. Such flexibility is particularly important with respect to phased condominium developments where long-term financial and market conditions may be uncertain.â Queler v. Skowron, 438 Mass. 304, 780 N.E.2d 71, 77 (Mass.2002) (citation omitted); see also Tosney v. Chelmsford Vill. Condo. Assân, 397 Mass. 683, 493 N.E.2d 488, 490 (1986); Barclay v. DeVeau, 384 Mass. 676, 429 N.E.2d 323, 326 (1981).
Phasing allows developers to sell units as they are built, which in turn eases construction costs and financing arrangements. The flexibility to revise plans as market and financing conditions change also greatly assists condominium development. The state legislature significantly revised the condominium statute in 1998, adding the key provision in question here and increasing the powers of unit ownersâ associations vis-a-vis individual unit owners. It did so in recognition of âa shortage of affordable housing stock based upon the expiration of the right to add additional condominium units and land in numerous condominiums created pursuant to chapter 183A.â 1998 Mass. Adv. Legis. Serv. 242 (LexisNexis).
We turn to section 5 of chapter 183A with these policy concerns in mind. Because neither the Supreme Judicial Court nor the Massachusetts Appeals Court has interpreted the relevant provisions of section 5 since it was last amended in 1998, we address the question ab initio. As with all statutory interpretation questions, we focus on the language of the statute itself.
Section 5(b)(2) describes the authority and powers of a condominiumâs unit ownersâ association, which includes the power to â[e]xtend, revive or grant rights to develop the condominium, including the right to add additional units or land to the condominium.â Mass. Gen. Laws ch. 183A, § 5(b)(2)(iii). It is not disputable that the Associationâs extension of Northwoodâs development rights met the requirements of section 5(b)(2)(iii). As required by that provision, the master deed authorized additional units, and the eighty-three percent approval rate by the Associationâs members of the extension surpassed the seventy-five percent set by the statute as a default percentage. See id.
The extension of the time to exercise development rights, however, is distinct from the ability to exercise those rights under the statute. The addition of units reduces the percentage interest each unit owner holds in the condominiumâs common areas. State law provides some protection for unit owners in this context. Under section 5(b)(1), a unit ownerâs percentage interest in the common areas can *23 not be âmaterially affectedâ without his or her consent.
Northwood broadly argues that section 5(b)(2)(iii) operates independently from section 5(b)(1) and that unit owners have necessarily waived their rights under section 5(b)(1) through their acceptance of any master deed. We disagree in light of the language in section 5(b) that â[i]n the event of any conflict between the provisions of this subsection and of the master deed, ... this subsection shall control.â
Nonetheless, state law also provides that the requisite consent can be inferred from the unit ownerâs acceptance of the master deed if, at the time the unit deed was recorded, the master deed (1) provided for the additional units and (2) âmade possible an accurate determination of the alteration of each unitâs [percentage] interest that would resultâ from the construction of the additional units. Id. § 5(b)(1). The master deed in this case clearly provided for additional units. The ability of Northwood to exercise its development rights thus hinges on the interpretation of this second clause, particularly the phrase âan accurate determination of the alteration of each unitâs [percentage] interest.â
The district court interpreted this phrase too narrowly. On its reading, an âaccurate determinationâ is the same as âprecise calculations.â In re Northwood Properties, 356 B.R. at 87. Because the master deed did not make it possible for Bourne and Delise âto calculate precisely what their new percentage interests would be following the completion of any additional phases,â the court concluded, North-wood must obtain their express consent before constructing any further units. Id. at 89 (emphasis added).
To impose a requirement of precise calculations of what the new percentage interests would be upon development, however, runs counter to the statuteâs underlying policies of flexibility and pragmatism as well as the language of related provisions. It is also inconsistent with the approach taken by the state courts in interpreting this statute.
As a matter of statutory construction, section 5(a) is closely related to the provision in dispute here, and that section states that a unit ownerâs percentage interest âshall be in the approximate relation that the fair value of the unit ... bears to the ... aggregate fair value of all the unitsâ at the time the unit deed is recorded. Mass. Gen. Laws ch. 183A, § 5(a). Terms like âapproximateâ and âfair valueâ reflect a statutory approach of allowing developers flexibility within a reasonably limited range, not an approach requiring absolute precision. We see no reason why greater requirements for precision would be imposed under section 5(b)(1).
Further, in practice, the district courtâs reading would tie the hands of developers, making it impossible for them to respond to changing market conditions. This would seriously jeopardize developersâ ability to secure financing to complete projects. This in turn could have an adverse impact on present owners of units. And it implicates the legislatureâs concern about removing impediments to developing more housing in the Commonwealth. Thus we read the key phrase, âmade possible an accurate determination,â as not requiring the degree of precision the district court posited.
Our reading is more consistent than that of the district court with the approach taken by state courts in interpreting Chapter 183A. That statute as a whole is an enabling statute. Tosney, 493 N.E.2d at 490. It sets forth minimum requirements but also provides for flexibility. Included in that flexibility, and meant for the benefit of both unit owners and developers, is *24 the ability to adapt the size and scope of a project in response to market conditions by phasing the development over some years. See Queler, 780 N.E.2d at 77; Podell, 651 N.E.2d at 860 n. 3.
We need not determine here the bare minimum a master deed need include to satisfy the constructive consent provision of section 5(b)(1). And it is better for the state courts to themselves articulate the correct standard to apply. What was in the master deed in this case, in our view, was enough.
The master deed stated how the percentage interests would be calculated. It explained that the original schedule of percentage interests had been calculated âin conformance with Chapter 183A, upon the approximate relation which the fair market value of each Unit ... bears to the aggregate fair market value of all the Unitsâ; that is, the deed treats âconformance with Chapter 183Aâ as equivalent to the standard set by section 5(a). In the same paragraph, the master deed states that âsuch percentage interests [shall be] modified in conformance with Chapter 183Aâ following the construction of additional phases. Thus Bourne and Delise knew that their percentage interest would continue to track the approximate ratio of the value of their units to the value of all the units.
The master deed also provided enough information about future phases to allow a reasoned and reasonable approximation of what the aggregate fair value might be. There would be at most sixty-six units, the construction of which would be of equal quality to the existing units. The blueprint of the proposed full development, included with the master deed, showed that two additional buildings would have the same footprint as the two existing buildings and that the remaining building would be slightly larger; this implies that the future units would not be grossly disproportional in size to the existing units. The master deed, by definition, cannot precisely predict the future at the time of its execution. It can, however, set forth reliable and accepted methodologies and provide an accurate description of planned development.
This amount of information is sufficient to allow both the Association and Bourne and Delise to accurately determine how their percentage interests would be affected. They were not caught by surprise or unfairly treated. Bourne and Delise argue that the fact that Northwood and the Association offered two different predictions of their future percentage interests in itself proves that no âaccurate determinationâ was possible, but the very small range between Northwoodâs prediction of 1.52% and the Associationâs prediction of 1.43%â a 0.09% difference â does not mean that no âaccurateâ determination was possible.
The master deed âmade possible an accurate determination of the alteration of each unitâs [percentage] interest that would resultâ from the completion of further phases. As such, Bourne and Delise consented to the future alteration of their percentage interests when they recorded their unit deeds. Northwood may thus exercise the development rights legitimately extended by the Association under section 5(b)(2)(iii).
C. Confirmation of the Reorganization Plan
We have jurisdiction, in these circumstances, to reach the issue of the confirmation of Northwoodâs plan. The district court did not consider two other objections made by Bourne, Delise, and Tyler to that confirmation. As our review of these issues is de novo and on the record from the bankruptcy court, we can and do resolve them ourselves. See Advanced Testing *25 Techs., Inc. v. Desmond (In re Computer Engâg Assocs., Inc.), 337 F.3d 38, 45 (1st Cir.2003) (âOur review of the district courtâs decision amounts to review of the bankruptcy courtâs decision in the first instance.â); In re SPM Mfg. Corp., 984 F.2d at 1310-11 (âIn an appeal from district court review of a bankruptcy court order, the court of appeals independently reviews the bankruptcy courtâs decision (emphasis added). Given the lengthy history of this dispute and the need to avoid piecemeal litigation, we decline to remand to the district court, with the attendant expense and delay, to address issues fully briefed before us that we can resolve. We turn to the two other objections.
We reject the claim that there has been a violation of the Statute of Frauds. No separate written document was needed as this dispute concerns no sale of real property. See Mass. Gen. Laws ch. 259, § 1 (â[n]o action shall be brought ... [u]pon a contract for the sale of lands, tenements ... or of any interest in or concerning themâ unless the contract is in writing and signed by the party to be charged).
The appelleesâ second objection is that they were erroneously grouped into an artificial convenience class in the revised plan in order to orchestrate acceptance of the plan. The bankruptcy court found that âthe reclassification improves the financial position of Bourne, Delise, and Tyler by providing for full payment of their claims and, hence, does not adversely affect them.â There was no error, much less clear error, in this finding. Once their interests as creditors are fully protected, Bourne, Delise, and Tyler have no legitimate grounds for objecting to the reorganization plan.
III.
We reverse the decision of the district court, affirm the bankruptcy courtâs confirmation of the reorganization plan, and remand the case to that court for any further proceedings consistent with this opinion. Costs are awarded to Northwood.
. The alleged debt is related to ongoing legal battles over zoning and permitting stretching back to the initiation of the Northwood at Sudbury development in 1998.
. Although the district court remanded the bankruptcy courtâs ruling on the Phasing *22 Rights Mqtion, that remand pertained to a purely ministerial task, the entry of an order granting the motion. This does not affect the finality of the district court's determination. See In re Gould & Eberhardt Gear Mach. Corp., 852 F.2d 26, 29 (1st Cir.1988) ("When a remand leaves only ministerial proceedings, ... then the remand may be considered final [in terms of § 158(d)]."); see also, e.g., Aegis Specialty Mktg. Inc. v. Ferlita (In re Aegis Specialty Mktg. Inc. of Ala.), 68 F.3d 919, 921 (5th Cir.1995) (considering "the entry of an order by the bankruptcy court in accordance with the district court's decisionâ to be only a ministerial proceeding such that the district courtâs remand was a final order).